Back to bathroom remodel contractors
Jeff King And Company Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Sep 2026
- Last 24 months
- 29 permits filed
292 permits since 2000: 208 completed, 18 in progress, 46 never finaled, 20 expired or cancelled.
Of the 46 never-finaled permits, 9 are 3 to 5 years old, 16 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
83 bathroom remodel permits: 68 completed, 4 in progress, 7 never finaled, 4 expired or cancelled. Typically 5 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 2853 Green St | new construction of a 2-story type v-b adu in rear lot to include a gym with crawlspace, studio space with a kitchen, bathroom and sauna.Details
new construction of a 2-story type v-b adu in rear lot to include a gym with crawlspace, studio space with a kitchen, bathroom and sauna. | $145,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 2853 Green St | interior remodel at level 2 & attic. minor window changes, including in kind windows at front facade dormer. level 2 work includes: remodel x 2 bathrooms, relocate x 2 baths, interior partiton changes, new finishes, casework throughout. attic work includes: int partitions to create officeDetails
interior remodel at level 2 & attic. minor window changes, including in kind windows at front facade dormer. level 2 work includes: remodel x 2 bathrooms, relocate x 2 baths, interior partiton changes, new finishes, casework throughout. attic work includes: int partitions to create office | $114,698 |
| May 27, 2026 | In progress issued Jun 2026 | 1950 15th St | 1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1.Details
1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1. | $260,000 |
| Jan 30, 2025 | Completed final sign-off Jan 2026 | 1915 Washington St | inkind remodel of 2 bathrooms and wet bar, one primary bath and closet, one kitchen, removing a wall between kitchen and dining room, and adding a powder bath at 2nd floor. no changes to exterior of home. move skylightDetails
inkind remodel of 2 bathrooms and wet bar, one primary bath and closet, one kitchen, removing a wall between kitchen and dining room, and adding a powder bath at 2nd floor. no changes to exterior of home. move skylight | $600,000 |
| May 14, 2024 | Completed final sign-off Feb 2025 | 263 16th Av | reconfiguration of interior partitions, kitchen remodel, bathroom relocation, new replacement in kind windows at the rear of the house, new hvac and hw.Details
reconfiguration of interior partitions, kitchen remodel, bathroom relocation, new replacement in kind windows at the rear of the house, new hvac and hw. | $100,000 |
| Apr 30, 2024 | In progress issued May 2024 | 2153 Lake St | reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows.Details
reconfiguration of non-structural walls. 2 new skylights. relocation and renovation of bathrooms. infill of 3 windows. | $100,000 |
| Mar 6, 2024 | Expired or cancelled expired Jul 2026 | 525 Hickory St | revision to basement windows, basement bath modifcation, modification to kitchen door & windows.Details
revision to basement windows, basement bath modifcation, modification to kitchen door & windows. | $5,000 |
| Jun 20, 2023 | Completed final sign-off Nov 2023 | 808 Minnesota St | replace in kind 2 bathrooms. fixtures only, no walls affected.Details
replace in kind 2 bathrooms. fixtures only, no walls affected. | $100,000 |
| Dec 2, 2022 | Completed final sign-off Aug 2026 | 525 Hickory St | renovation/.remodel single family remodel kitchen and 2 baths, add 1 bath at basement. replace e brick foundation with concrete. interior only, no new floor areaDetails
renovation/.remodel single family remodel kitchen and 2 baths, add 1 bath at basement. replace e brick foundation with concrete. interior only, no new floor area | $385,000 |
| Sep 19, 2022 | Completed final sign-off Sep 2026 | 529 Hickory St | renovation/remodl of (e) single family residence; remodel kitchen & (2) baths; add (1) bath; replace interior wall finishes; remove (1) bedroom & convert to walk-in closet; voluntary seismic retrofit; replace (e) brick foundation w/(n) concrete; interior only - no (n) floor area.Details
renovation/remodl of (e) single family residence; remodel kitchen & (2) baths; add (1) bath; replace interior wall finishes; remove (1) bedroom & convert to walk-in closet; voluntary seismic retrofit; replace (e) brick foundation w/(n) concrete; interior only - no (n) floor area. | $385,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 3560 Jackson St | remove non load bearing wall in kitchen, remodel extg bathrooms and kitchen in kind, relocate laundry room, replace furnace and water heater.Details
remove non load bearing wall in kitchen, remodel extg bathrooms and kitchen in kind, relocate laundry room, replace furnace and water heater. | $800,000 |
| May 24, 2021 | Completed final sign-off Jun 2022 | 2740 Divisadero St | 3rd fl - (n) bathroom in master bedroom, remove and replace 2 windows in kind (not visible from st), remove wood burning fire place; in media room remove 1 window, relocate (e) gas fireplace, repair (e) flfoor, add sink. add 2 skylights to (n) bathroomDetails
3rd fl - (n) bathroom in master bedroom, remove and replace 2 windows in kind (not visible from st), remove wood burning fire place; in media room remove 1 window, relocate (e) gas fireplace, repair (e) flfoor, add sink. add 2 skylights to (n) bathroom | $32,500 |
| Oct 14, 2020 | Completed final sign-off Dec 2021 | 1900 Pierce St | renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade.Details
renovation of existing basement, replacement of existing strip ftg in basement, kitchen renovation, master bath renovation, interior finish upgrades throughout the home, new window openings & exterior door replacement at north facade. | $600,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2024 | 3801 Jackson St | interior remodel including kitchen & baths, replacemet of (e) windows & doors, in kind. foundation upgrade, energy upgrade, & full seismic upgrade. pv panels & fire sprinklers under separate permit.Details
interior remodel including kitchen & baths, replacemet of (e) windows & doors, in kind. foundation upgrade, energy upgrade, & full seismic upgrade. pv panels & fire sprinklers under separate permit. | $550,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 115 Commonwealth Av | remodel 2 bathrooms in kind. add led lighting in bedroom. replace island counter top in kitchen and change range hood.Details
remodel 2 bathrooms in kind. add led lighting in bedroom. replace island counter top in kitchen and change range hood. | $150,000 |
| May 26, 2020 | Completed final sign-off Oct 2020 | 850 Minnesota St | #557: replace in kind finishes in two full baths and one kitchen; add lighting. no baths in basement. maher naDetails
#557: replace in kind finishes in two full baths and one kitchen; add lighting. no baths in basement. maher na | $200,000 |
| Mar 12, 2020 | Completed final sign-off Apr 2021 | 2503 Broadway | convenience stair at garage to be removed and filled in. selective demo and partial renovation of 1st and 2nd floors. new kitchen and bathroom fixtures.Details
convenience stair at garage to be removed and filled in. selective demo and partial renovation of 1st and 2nd floors. new kitchen and bathroom fixtures. | $200,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2022 | 121 Elsie St | gr fl laundry and bath remodel. add 1 powder rm to e living space. 2nd fl kitchen remodel, remove 1 pwdr room. 3rd fl bath remodel. replace bay window at front.Details
gr fl laundry and bath remodel. add 1 powder rm to e living space. 2nd fl kitchen remodel, remove 1 pwdr room. 3rd fl bath remodel. replace bay window at front. | $200,000 |
| Jun 27, 2019 | Completed final sign-off Oct 2019 | 2711 Scott St | leak remediation at rear deck. main bath remodel, 6'x9', convert bathtub to shower stall, vent and waste to remain. all other plumbing to remain. relocate electrical fixtures, drywall repairs as required. no structural work. new finishesDetails
leak remediation at rear deck. main bath remodel, 6'x9', convert bathtub to shower stall, vent and waste to remain. all other plumbing to remain. relocate electrical fixtures, drywall repairs as required. no structural work. new finishes | $75,000 |
| Jun 14, 2019 | Completed final sign-off Mar 2020 | 112 Liberty St | in-kind remodel of three full bathrooms, replace 5 (e) double hung sashes with new to match (e) profile, function and fit but with dual glazing; paint ext home. walls unchanged or modifield or movied.Details
in-kind remodel of three full bathrooms, replace 5 (e) double hung sashes with new to match (e) profile, function and fit but with dual glazing; paint ext home. walls unchanged or modifield or movied. | $150,000 |
| Mar 13, 2019 | Completed final sign-off May 2021 | 223 Spruce St | revision to pa# 201811196305 to include renovation of bathroom and office on third floor, no work or changes to exterior.Details
revision to pa# 201811196305 to include renovation of bathroom and office on third floor, no work or changes to exterior. | $25,000 |
| Nov 19, 2018 | Completed final sign-off May 2021 | 223 Spruce St | first floor work, minor wall alteration on the second floor, walls are relocated to accommodate renovation of two bedroom and a master bedroom and two bathroom. all work is interior.Details
first floor work, minor wall alteration on the second floor, walls are relocated to accommodate renovation of two bedroom and a master bedroom and two bathroom. all work is interior. | $180,000 |
| Nov 22, 2017 | Never finaled issued Dec 2019, no final | 57 Ashbury Tr | upgrade to fixtures and finishes in kitchen and 2nd floor bath. replacement of select windows. variance for half bath addition to side yard (adjacent to kitchen) and legalize (e) rear yard stucture (writing room)Details
upgrade to fixtures and finishes in kitchen and 2nd floor bath. replacement of select windows. variance for half bath addition to side yard (adjacent to kitchen) and legalize (e) rear yard stucture (writing room) | $100,000 |
| Jul 26, 2017 | Never finaled issued Dec 2017, no final | 2255 Octavia St | revision to pa #201704184231 incl 2 new lightwells & 2 new windows. add't int improvements to basement inc: wine cellar, entertainmt rm,2 bedrm,2 baths,powder,mech, laundry. 1st flr includes removal of wall bet porch & entry, removal of int stair to be replaced by bar @ 1st flr & storage @ 2nd flr.Details
revision to pa #201704184231 incl 2 new lightwells & 2 new windows. add't int improvements to basement inc: wine cellar, entertainmt rm,2 bedrm,2 baths,powder,mech, laundry. 1st flr includes removal of wall bet porch & entry, removal of int stair to be replaced by bar @ 1st flr & storage @ 2nd flr. | $500,000 |
| Jun 14, 2017 | Completed final sign-off Jan 2018 | 2017 Grant Av | remodeling kitchen and bathroom in-kind. all new wood floors and painting throughout.Details
remodeling kitchen and bathroom in-kind. all new wood floors and painting throughout. | $50,000 |
| Mar 20, 2017 | Completed final sign-off May 2017 | 567 Liberty St | bathroom remodel: replace finishes in (e) ground floor bathroom.Details
bathroom remodel: replace finishes in (e) ground floor bathroom. | $12,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2020 | 139 Pfeiffer St | add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows.Details
add upper 3rd floor and roof deck. interior kitchen & bath remodel on the 1st & 2nd floor. new steel frame at garage, new exterior siding & windows. | $350,000 |
| Aug 16, 2016 | Expired or cancelled withdrawn Sep 2016 | 116 Alta St | remodel 1st fl master bedroom, master bath and laundry room. 2nd fl guest room, guest bath and kitchen skin and refrigerator. replace exterior doors and windows in kind. wood windows with true divided light at front facade only.Details
remodel 1st fl master bedroom, master bath and laundry room. 2nd fl guest room, guest bath and kitchen skin and refrigerator. replace exterior doors and windows in kind. wood windows with true divided light at front facade only. | $275,000 |
| Aug 8, 2016 | Never finaled issued Apr 2017, no final | 787 Castro St | reconfigure (e) kitchen, panty and water closet @ first floor. reconfigure (e) bathrooms and closets @ second floor. rebuild & reconfigure (e) stairs throughout. (n) attic access stair.Details
reconfigure (e) kitchen, panty and water closet @ first floor. reconfigure (e) bathrooms and closets @ second floor. rebuild & reconfigure (e) stairs throughout. (n) attic access stair. | $100,000 |
| Aug 5, 2016 | Completed final sign-off Oct 2016 | 882 Geary St | 2/f -remodel kitchen & bathroom in kind.Details
2/f -remodel kitchen & bathroom in kind. | $12,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2018 | 138 16th Av | removal of 2nd & 3rd floor deck/stairs at rear. reconfigure of 1st, 2nd & 3rd floor walls, new mudroom & laundry. new structural work @ 1st, 2nd, 3rd floors. new window & door installation. new fixtures & finishes in the (e) kitchen & baths. new window and door installationDetails
removal of 2nd & 3rd floor deck/stairs at rear. reconfigure of 1st, 2nd & 3rd floor walls, new mudroom & laundry. new structural work @ 1st, 2nd, 3rd floors. new window & door installation. new fixtures & finishes in the (e) kitchen & baths. new window and door installation | $350,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2017 | 2627 Steiner St | interior remodel of (e) gym, powder rm & laundry @ basement; remodel of (e)powder rm & kitchen counter only,remodel master bath,2nd bath,new bath @ level 2; remodel of family room,powder rm & wet bar @level 3.Details
interior remodel of (e) gym, powder rm & laundry @ basement; remodel of (e)powder rm & kitchen counter only,remodel master bath,2nd bath,new bath @ level 2; remodel of family room,powder rm & wet bar @level 3. | $45,000 |
| Dec 3, 2015 | Completed final sign-off Oct 2016 | 1980 Vallejo St | interior renovation of existing apartment, cabinetry, some wall modification at bathrooms, new finishesDetails
interior renovation of existing apartment, cabinetry, some wall modification at bathrooms, new finishes | $600,000 |
| Nov 3, 2015 | Completed final sign-off Aug 2016 | 104 Funston Av | renovate (e) basement-lower (e) slab of non conforming bathroom, office & laundry to provide code compliant headroom. relocate (e) bathroom, new finishes, elec/plmg throughout.3 new windows at basement. main floor-new fireplace surround & case work in (e) living room.Details
renovate (e) basement-lower (e) slab of non conforming bathroom, office & laundry to provide code compliant headroom. relocate (e) bathroom, new finishes, elec/plmg throughout.3 new windows at basement. main floor-new fireplace surround & case work in (e) living room. | $143,000 |
| Jul 20, 2015 | Completed final sign-off Dec 2015 | 635 Steiner St | first floor powder new cabinets and finishes, top floor level. replace plumbing fixtures inkind an new cabinets. 2nd floor bathroomDetails
first floor powder new cabinets and finishes, top floor level. replace plumbing fixtures inkind an new cabinets. 2nd floor bathroom | $20,000 |
| Jun 15, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side.Details
rev.appl.# 2015.0331.2371. correct no. of unit is 2 units & provide plan for kitchen relocation. alteration of interior include wall removed between dining and kitchen. add one bathroom on 3rd floor. enlarge rear exterior wall opening onto deck. add 2 new skylights.replace 2 windows at front & side. | $120,000 |
| Apr 28, 2015 | Completed final sign-off Nov 2015 | 262 30th St | replace garage door and upgrade finishes at garage level bedroom, bath and den. upgrade living room finishes including new gas fireplace insert. replace front entry doorDetails
replace garage door and upgrade finishes at garage level bedroom, bath and den. upgrade living room finishes including new gas fireplace insert. replace front entry door | $75,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2018 | 2651 Baker St | complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel.Details
complete kitchen remodeling, remodeling of two upstairs bathroom. install new electrical panel. | $30,000 |
| Feb 26, 2015 | Completed final sign-off Jun 2015 | 3022 Washington St | the scope of work is the internal remodel of the extg master bath room and replacement of extg kitchen cabinets. a new powder room will also be part of the project.Details
the scope of work is the internal remodel of the extg master bath room and replacement of extg kitchen cabinets. a new powder room will also be part of the project. | $70,000 |
| Feb 3, 2015 | Completed final sign-off Aug 2015 | 601 Van Ness Av | #54- interior remodel to upgrade finishes in kitchen and 2 bathrooms, new flooring. n/a ordinance #155-13Details
#54- interior remodel to upgrade finishes in kitchen and 2 bathrooms, new flooring. n/a ordinance #155-13 | $175,000 |
| Feb 3, 2015 | Completed final sign-off Aug 2015 | 601 Van Ness Av | #53- interior remodel to upgrade finishes in kitchen and 2 bathrooms, new flooring. all work in kind. n/a ordinance #155-13Details
#53- interior remodel to upgrade finishes in kitchen and 2 bathrooms, new flooring. all work in kind. n/a ordinance #155-13 | $175,000 |
| Jan 29, 2015 | Expired or cancelled cancelled Apr 2018 | 283 10th Av | unit# 283. remodel of (e) residence as shown in drawings. horizontal addition to rear of house including new deck off kitchen / family room. new master bedroom & bath. unit# 283a: no net change in floor area.Details
unit# 283. remodel of (e) residence as shown in drawings. horizontal addition to rear of house including new deck off kitchen / family room. new master bedroom & bath. unit# 283a: no net change in floor area. | $650,000 |
| Nov 6, 2014 | Completed final sign-off Mar 2015 | 355 Hermann St | add a master bathroom and a closet. relocate water heater to garage. abandon decorative appliance in study. reframe opening to accept drywall.Details
add a master bathroom and a closet. relocate water heater to garage. abandon decorative appliance in study. reframe opening to accept drywall. | $45,000 |
| May 30, 2014 | Completed final sign-off Nov 2015 | 198 32nd Av | renovate kitchen, laundry room, bathrooms on all floors, renovate master suite. new outlets and lighting t/o, new hvac, install insulation, no change in square footage. no changes to exterior of bldg.Details
renovate kitchen, laundry room, bathrooms on all floors, renovate master suite. new outlets and lighting t/o, new hvac, install insulation, no change in square footage. no changes to exterior of bldg. | $387,000 |
| Mar 4, 2014 | Completed final sign-off Dec 2014 | 107 24th Av | remodel 1 kitchen & 1 bath: modify cabinets & replace all finishes in 1 bathroom on 2/f. include shower pan, lighting change to kitchen will invoke 50% wattage high efficacy requirement; bath lighting will invoke high efficacy or manual-on sensor requirement.Details
remodel 1 kitchen & 1 bath: modify cabinets & replace all finishes in 1 bathroom on 2/f. include shower pan, lighting change to kitchen will invoke 50% wattage high efficacy requirement; bath lighting will invoke high efficacy or manual-on sensor requirement. | $25,000 |
| Sep 23, 2013 | Completed final sign-off Mar 2014 | 2629 Pierce St | new wall at rear of garage and remodel of existing bathroom. interior remodel. no additional square footage. only exterior work is to enlarge on existing window. new window to match existing. window to be altered does not face the street.Details
new wall at rear of garage and remodel of existing bathroom. interior remodel. no additional square footage. only exterior work is to enlarge on existing window. new window to match existing. window to be altered does not face the street. | $55,000 |
| Sep 4, 2013 | Completed final sign-off Jul 2018 | 58 06th Av | kitchen remodel, bathroom remodel, rear / side addition.Details
kitchen remodel, bathroom remodel, rear / side addition. | $175,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2014 | 851 Indiana St | unit #301:remodel extg interior: including kitchen, den, livingroom, stairs to mezzanine bedroom and 2 bathrooms. demolish partition wall, rebuild partition walls. no lighting or mechanical work.Details
unit #301:remodel extg interior: including kitchen, den, livingroom, stairs to mezzanine bedroom and 2 bathrooms. demolish partition wall, rebuild partition walls. no lighting or mechanical work. | $72,000 |
| Jul 12, 2013 | Completed final sign-off May 2014 | 2780 Broadway | replace kitchen can lights w/led can. replace (3) bedroom can lights w/led cans. remove all tiles & fixtures from upstair bath. replace with new. replace master bath vanity, replace powder bath vanity. replace dining room pocket door with new french doors. no change to openings. paint interiorDetails
replace kitchen can lights w/led can. replace (3) bedroom can lights w/led cans. remove all tiles & fixtures from upstair bath. replace with new. replace master bath vanity, replace powder bath vanity. replace dining room pocket door with new french doors. no change to openings. paint interior | $185,000 |
| May 1, 2013 | Never finaled issued May 2013, no final | 85 Yerba Buena Av | change sink fixtures in two baths; upgrade electrical for safety by adding new subpanel and dedicated circuits, add new outlets; add 20-minute fire door at garage entry to home; install insulation; paint throughout.Details
change sink fixtures in two baths; upgrade electrical for safety by adding new subpanel and dedicated circuits, add new outlets; add 20-minute fire door at garage entry to home; install insulation; paint throughout. | $30,000 |
| Apr 26, 2013 | Completed final sign-off Sep 2013 | 1234 Howard St | remove existing bathtub and all tile in bathrooms install new shower & pan with curb. install new shower head hand held shower control & diverter ,install new tile .Details
remove existing bathtub and all tile in bathrooms install new shower & pan with curb. install new shower head hand held shower control & diverter ,install new tile . | $24,000 |
| Apr 19, 2013 | Never finaled issued Oct 2013, no final | 488 Los Palmos Dr | 2 story addition on back renovated kitchen, rev 10.16.13 c.s. (no basement bath).Details
2 story addition on back renovated kitchen, rev 10.16.13 c.s. (no basement bath). | $175,000 |
| Apr 19, 2013 | Completed final sign-off Dec 2013 | 2854 Green St | addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work.Details
addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work. | $19,520 |
| Mar 7, 2013 | Completed final sign-off Jun 2013 | 2812 Laguna St | relocate between bathroom & laundry room. install (n) water heater & hydronic air handler. no work on the first floor.Details
relocate between bathroom & laundry room. install (n) water heater & hydronic air handler. no work on the first floor. | $48,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 4704 Fulton St | unit #4704 - remove & replace all finsihes in existing bathroom. no changes to existing walls, bearing or not. no changes to window or doors, or window & door locations.Details
unit #4704 - remove & replace all finsihes in existing bathroom. no changes to existing walls, bearing or not. no changes to window or doors, or window & door locations. | $25,000 |
| Jan 10, 2013 | Completed final sign-off Nov 2014 | 361 Lombard St | upper unit 2nd & 3rd flrs including remodel kitchen & 2 baths & laundry. provide new appliances & fixtures. remove interior partitions walls. replace living rm doors with larger doors. replace master bedrms windows w/new in (e) openings.replace glass @ solarium, add new solar panels, new fireplace.Details
upper unit 2nd & 3rd flrs including remodel kitchen & 2 baths & laundry. provide new appliances & fixtures. remove interior partitions walls. replace living rm doors with larger doors. replace master bedrms windows w/new in (e) openings.replace glass @ solarium, add new solar panels, new fireplace. | $400,000 |
| Dec 12, 2012 | Completed final sign-off Nov 2014 | 755 Marina Bl | remodel 3rd flr. including master bed, bath, powder +sitting room. (n) deck over (e) 2nd fl + (n) deck over sitting room. (n) windows @ 3rd flr + (n) skylights @ deck.Details
remodel 3rd flr. including master bed, bath, powder +sitting room. (n) deck over (e) 2nd fl + (n) deck over sitting room. (n) windows @ 3rd flr + (n) skylights @ deck. | $200,000 |
| May 17, 2012 | Completed final sign-off Apr 2013 | 2647 Pierce St | minor interior removtion to include: enw mudroom, renovation of kitchen, family & dining room w/new doors & window to rear yard, renovate master bathroom & suite terrace (roof deck)Details
minor interior removtion to include: enw mudroom, renovation of kitchen, family & dining room w/new doors & window to rear yard, renovate master bathroom & suite terrace (roof deck) | $160,000 |
| May 10, 2012 | Completed final sign-off Sep 2012 | 555 04th St | remove & replace stone & tile finishes in master bath, install new stone & tile finishes in living room & kitchen, instal wal paper & paints throughout, install new flooring throughout, no change in existing plan. all existing lighting to remain.Details
remove & replace stone & tile finishes in master bath, install new stone & tile finishes in living room & kitchen, instal wal paper & paints throughout, install new flooring throughout, no change in existing plan. all existing lighting to remain. | $50,000 |
| Apr 13, 2012 | Completed final sign-off Jul 2016 | 190 Edgewood Av | new horizontal addition at each existing floor, new deck areas, relocate garage from lower 1st level to street level, add 1 new bathroom.Details
new horizontal addition at each existing floor, new deck areas, relocate garage from lower 1st level to street level, add 1 new bathroom. | $400,000 |
| Aug 25, 2011 | Completed final sign-off Jan 2012 | 3781 23rd St | add new half bath on ground level including one sink & one toilet, new door.Details
add new half bath on ground level including one sink & one toilet, new door. | $10,000 |
| May 11, 2011 | Completed final sign-off Jan 2012 | 3781 23rd St | (1) bathroom renovation. no change to lighting. replace tub with shower, new fixtures. widen door by 2", same opening.Details
(1) bathroom renovation. no change to lighting. replace tub with shower, new fixtures. widen door by 2", same opening. | $15,000 |
| Mar 24, 2011 | Completed final sign-off Jan 2012 | 1520 Shrader St | interior remodels of kitchen and 2.5 baths, per plans. relocating windows and doors at rear.Details
interior remodels of kitchen and 2.5 baths, per plans. relocating windows and doors at rear. | $125,000 |
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 554 Grove St | kitchen and upper bath room remodel including removal of wall btn kitchen and dining room.Details
kitchen and upper bath room remodel including removal of wall btn kitchen and dining room. | $175,000 |
| Nov 3, 2010 | Completed final sign-off Sep 2011 | 3573 Washington St | kitchen, bathroom, & closet renovation. rework extg stair and some electrical, window replacement at rear of house & skylights.Details
kitchen, bathroom, & closet renovation. rework extg stair and some electrical, window replacement at rear of house & skylights. | $250,000 |
| Sep 7, 2010 | Completed final sign-off Apr 2011 | 79 Skyview Wy | replace exterior windows with new in existing openings. 2 new skylights. remodel kitchen & bathroom. refinish existing hardwood floors. new high efficiency lighting in kitchen & bath. path & paint. new rear deck.Details
replace exterior windows with new in existing openings. 2 new skylights. remodel kitchen & bathroom. refinish existing hardwood floors. new high efficiency lighting in kitchen & bath. path & paint. new rear deck. | $125,000 |
| Jul 9, 2010 | Completed final sign-off Oct 2011 | 3580 Jackson St | kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deckDetails
kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deck | $700,000 |
| Jun 22, 2010 | Completed final sign-off May 2011 | 2025 22nd St | remodel (e) kitchen & bathroom, modify (e) bathroom to add new closet, modify living area finishes. remove portions of nonbearing walls.Details
remodel (e) kitchen & bathroom, modify (e) bathroom to add new closet, modify living area finishes. remove portions of nonbearing walls. | $88,000 |
| Jun 8, 2010 | Completed final sign-off Jan 2011 | 567 Liberty St | remodel 2-baths & 1-kitchen & various interior closets & wall finishes.Details
remodel 2-baths & 1-kitchen & various interior closets & wall finishes. | $185,000 |
| May 13, 2010 | Completed final sign-off Sep 2010 | 344 03rd Av | interior finish work including selective window and door replacement, furnace and water heater replacement, misc exterior repair and replacement, interior and ext painting, roof replacement, exterior deck and stair replacement, complete renovation of 1st floor and 2nd floor baths, 2nd fl kitchenDetails
interior finish work including selective window and door replacement, furnace and water heater replacement, misc exterior repair and replacement, interior and ext painting, roof replacement, exterior deck and stair replacement, complete renovation of 1st floor and 2nd floor baths, 2nd fl kitchen | $125,000 |
| Mar 31, 2010 | Completed final sign-off Dec 2011 | 227 05th Av | addition of new family room at rear of (e) bldg. renovation of (e) kitchen & dining room addition of half bath. renovation of (e) upper level master bedroom & addition of new master bath & renovation of addition bedroom. no change to legal in-law (dwelling unit no. 2)Details
addition of new family room at rear of (e) bldg. renovation of (e) kitchen & dining room addition of half bath. renovation of (e) upper level master bedroom & addition of new master bath & renovation of addition bedroom. no change to legal in-law (dwelling unit no. 2) | $135,000 |
| Mar 19, 2010 | Completed final sign-off Aug 2010 | 611 02nd Av | kitchen & bathroom remodel, new windows at rear, voluntary reinforcement of (e) floor.Details
kitchen & bathroom remodel, new windows at rear, voluntary reinforcement of (e) floor. | $90,000 |
| Oct 15, 2009 | Completed final sign-off Jan 2010 | 2812 Laguna St | renovation of ground floor kitchen incl. new counter tops, cabinetry, new ceiling lights and conversion of ground floor full bath to powder room.Details
renovation of ground floor kitchen incl. new counter tops, cabinetry, new ceiling lights and conversion of ground floor full bath to powder room. | $75,000 |
| Jul 30, 2009 | Completed final sign-off Oct 2009 | 18 Orben Pl | remodel existing bathroom; install new clerestory window at south elevation; increase closet door opening.Details
remodel existing bathroom; install new clerestory window at south elevation; increase closet door opening. | $75,000 |
| Apr 3, 2009 | Never finaled issued Apr 2009, no final | 300 Beale St | non structural interior alterations, new partitions, remove & replace (e) kitchen & bathroom fixtures. unit #301 is located on the 3rd floor. work occurs only on 3rd floorDetails
non structural interior alterations, new partitions, remove & replace (e) kitchen & bathroom fixtures. unit #301 is located on the 3rd floor. work occurs only on 3rd floor | $125,000 |
| Apr 1, 2009 | Completed final sign-off Oct 2009 | 1489 Folsom St | interior remodel of kitchen and replace sink in bath. replace (e) cabinetry, remvoe approx. 16 lf on non-bearing wgypsum board wall, paint all surfaces except floor, replace radiant heating units, replace bathroom sink;complete kitchen remodel.Details
interior remodel of kitchen and replace sink in bath. replace (e) cabinetry, remvoe approx. 16 lf on non-bearing wgypsum board wall, paint all surfaces except floor, replace radiant heating units, replace bathroom sink;complete kitchen remodel. | $20,000 |
| Mar 4, 2009 | Completed final sign-off Sep 2009 | 660 Sanchez St | remodel (e) bathroom, hallway, deck and infill (e) light well for bath room expansion on the 3rd floor. new railing for 2nd floor roof deckDetails
remodel (e) bathroom, hallway, deck and infill (e) light well for bath room expansion on the 3rd floor. new railing for 2nd floor roof deck | $75,000 |
| Oct 17, 2008 | Completed final sign-off Oct 2010 | 5 Sea View Tr | interior remodel-new conditioned space @attic level, new stairs connecting the (e) 2nd fl to new attic space, reconfigured master bath, bedrms on 2nd fl, replace finishes, fixtures in secondary baths on 2nd fl & powder rm @1st fl, exterior remodel-addition of 3 new dormers @roof, repl (e) windowsDetails
interior remodel-new conditioned space @attic level, new stairs connecting the (e) 2nd fl to new attic space, reconfigured master bath, bedrms on 2nd fl, replace finishes, fixtures in secondary baths on 2nd fl & powder rm @1st fl, exterior remodel-addition of 3 new dormers @roof, repl (e) windows | $300,000 |
| Apr 1, 2008 | Expired or cancelled expired Jun 2010 | 419 College Av | upper level (2nd floor): kitchen applicance & bath fixtures remodel new skylight; lower level (1st floor): convert rear portion into bedroom, bath, closet & home office w/new staircase to connect floors. reconfigure add windows at sides & rear of bldg., remove bay window at side.Details
upper level (2nd floor): kitchen applicance & bath fixtures remodel new skylight; lower level (1st floor): convert rear portion into bedroom, bath, closet & home office w/new staircase to connect floors. reconfigure add windows at sides & rear of bldg., remove bay window at side. | $90,000 |
| Apr 20, 2007 | Completed final sign-off Dec 2007 | 3519 Divisadero St | remodel kitchen and bath by removing non bearing walls and installing new finishes, replace existing furnaces with new, replace exising waterheaters with new, new stairway to legalize ground floor living space, bring into code compliance gr flr living spaceDetails
remodel kitchen and bath by removing non bearing walls and installing new finishes, replace existing furnaces with new, replace exising waterheaters with new, new stairway to legalize ground floor living space, bring into code compliance gr flr living space | $146,000 |
| Mar 9, 2007 | Completed final sign-off Dec 2007 | 487 Greenwich St | remodel (1) kitchen and (1) bath, remove bearing wall repalce with engineered beam replace gas heater with direct vent gas heaterDetails
remodel (1) kitchen and (1) bath, remove bearing wall repalce with engineered beam replace gas heater with direct vent gas heater | $110,000 |
| May 28, 2004 | Completed final sign-off Sep 2004 | 902 Rhode Island St | begin demo for work under appl#200308081584 soft demo basement,soft demo bathsDetails
begin demo for work under appl#200308081584 soft demo basement,soft demo baths | $4,000 |
| Nov 25, 2003 | Completed final sign-off Oct 2004 | 23 Mallorca Wy | remodel (e)kitchen/bath/w.c./front closet.non-structural alterations to (e)partitions.Details
remodel (e)kitchen/bath/w.c./front closet.non-structural alterations to (e)partitions. | $58,000 |