# Javier Magana Construction Services

Contractor license 832973. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/javier-magana-construction-services-832973
- JSON: https://www.permitgraph.org/api/contractor?license=832973
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=832973

18 permits since 2000: 10 completed, 2 in progress, 6 never finaled. Typically 0 days from filing to permit and 176 days from permit to final inspection. Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.

- Based in: San Rafael
- On San Francisco permits: Feb 2016 to Jul 2026
- Last 24 months: 4 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2016 | 1 | 0 | 4 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 1 | 0 |
| 2022 | 2 | 0 | 1 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 2 | 0 | 0 | 0 |
| 2026 | 0 | 2 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 9 | 3 | 1 | 5 | 0 | 0 | 148 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 40 | 277 |
| Kitchen remodel | 3 | 3 | 0 | 0 | 0 | 1 | 374 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 314 | 639 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202607245502](https://www.permitgraph.org/p/202607245502) | Jul 24, 2026 | In progress: issued Jul 2026 | [30 Lopez Av](https://www.permitgraph.org/a/2859/004) | revision to 202605271951 for structural framing at door way. |  |
| [202605271951](https://www.permitgraph.org/p/202605271951) | May 27, 2026 | In progress: issued Jun 2026 | [30 Lopez Av](https://www.permitgraph.org/a/2859/004) | convert existing storage to new bed and bath. | $25,000 |
| [202507251634](https://www.permitgraph.org/p/202507251634) | Jul 25, 2025 | Completed: final sign-off Feb 2026 | [1 Northgate Dr](https://www.permitgraph.org/a/3275/002) | revision to pa# 202411275851, exterior entry stairs to remain, (e) beam & posts in garage to remain, update to door schedule, repair dryrot, (n) dishwasher. |  |
| [202411275851](https://www.permitgraph.org/p/202411275851) | Jan 1, 2025 | Completed: final sign-off Feb 2026 | [1 Northgate Dr](https://www.permitgraph.org/a/3275/002) | interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yard | $400,000 |
| [202410032263](https://www.permitgraph.org/p/202410032263) | Oct 3, 2024 | Completed: final sign-off Dec 2024 | [1567 Union St](https://www.permitgraph.org/a/0546/013E) | add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area. | $8,700 |
| [202402296820](https://www.permitgraph.org/p/202402296820) | Feb 29, 2024 | Completed: final sign-off Mar 2025 | [30 Lopez Av](https://www.permitgraph.org/a/2859/004) | residential tenant improvement to include remodel kitchen and master suite, add new powder room, replacement windows, add/remove wall(s) located on 2nd and 3rd floor. sepearte mep permits will need t… | $195,000 |
| [202207118166](https://www.permitgraph.org/p/202207118166) | Jul 11, 2022 | Completed: final sign-off Dec 2022 | [14 San Carlos St](https://www.permitgraph.org/a/3576/027) | one existing bathroom remodel: includes retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| [202207088033](https://www.permitgraph.org/p/202207088033) | Jul 8, 2022 | Never finaled: issued Jul 2022, no final | [1125 Hampshire St](https://www.permitgraph.org/a/4211/021) | one bathroom remodel.hallway bathroom include retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| [202206085919](https://www.permitgraph.org/p/202206085919) | Jun 8, 2022 | Completed: final sign-off Jan 2025 | [101 Liberty St](https://www.permitgraph.org/a/3607/079) | remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level. | $55,000 |
| [201907307372](https://www.permitgraph.org/p/201907307372) | Jul 30, 2019 | Completed: final sign-off Nov 2020 | [1641 Lake St](https://www.permitgraph.org/a/1377/056) | kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry. | $12,000 |
| [201904238690](https://www.permitgraph.org/p/201904238690) | Apr 23, 2019 | Never finaled: issued Apr 2019, no final | [300 03rd St](https://www.permitgraph.org/a/3751/290) | unit 801: retile all bathroom surfaces replace all cabinets, countertops, fixtures to remain in all (e) locations. add gfci were needed. | $45,000 |
| [201808288564](https://www.permitgraph.org/p/201808288564) | Aug 28, 2018 | Completed: final sign-off Oct 2018 | [51 14th Av](https://www.permitgraph.org/a/1344/032) | remove siding, windows. install insulation, structural plywood, water proofing 6 windows and new siding - no work visible from street | $10,000 |
| [201708164990](https://www.permitgraph.org/p/201708164990) | Aug 16, 2017 | Completed: final sign-off Dec 2017 | [3880 22nd St](https://www.permitgraph.org/a/3622/100) | remodel existing bath, reconfigure existing closet to new powder room on second floor. | $45,000 |
| [201612094666](https://www.permitgraph.org/p/201612094666) | Dec 9, 2016 | Never finaled: issued Dec 2016, no final | [1941 Grove St](https://www.permitgraph.org/a/1195/074) | replace plumbing fixtures (toilet, faucet, sinks) in powder room & hall bath; replace receptacles w/gfci | $5,000 |
| [201612094614](https://www.permitgraph.org/p/201612094614) | Dec 9, 2016 | Never finaled: issued Dec 2016, no final | [215 Moulton St](https://www.permitgraph.org/a/0510/050) | bathroom retile, re sheetrock if needed. | $7,000 |
| [201607142416](https://www.permitgraph.org/p/201607142416) | Jul 14, 2016 | Never finaled: issued Jul 2016, no final | [103 Liberty St](https://www.permitgraph.org/a/3607/080) | re-tile master bath, guest bath and powder room. relocate outlets in mirors. relocate electric panel to area outside of closet. relocate rough plumbing in said bathrooms. | $40,000 |
| [201603111840](https://www.permitgraph.org/p/201603111840) | Mar 11, 2016 | Completed: final sign-off Mar 2016 | [631 Cole St](https://www.permitgraph.org/a/1248/003) | replace stringer/risers/treads damaged by dryrot 30% of stairwell, 4 treads, 5 steps, 3 stringers, same location. replace 2x12 with 3x12 pressure treated, add simpson structural hardware on stringer-… | $4,000 |
| [201602169726](https://www.permitgraph.org/p/201602169726) | Feb 16, 2016 | Never finaled: issued Feb 2016, no final | [1941 Grove St](https://www.permitgraph.org/a/1195/074) | add 16 outlets to bedrooms & office | $2,800 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/javier-magana-construction-services-832973.
