Jason Liu Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 1 permit filed
86 permits since 2000: 79 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 9 completed. Typically 0 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Completed final sign-off Dec 2016 | 1 Vega St | replace the tile on deck (about 135 feet), replace wall stucco and dry rot(5 x 16ft)Details
replace the tile on deck (about 135 feet), replace wall stucco and dry rot(5 x 16ft) | $6,500 |
| Feb 10, 2016 | Completed final sign-off Nov 2016 | 87 Clearfield Dr | remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back.Details
remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back. | $45,000 |
| Mar 9, 2015 | Completed final sign-off May 2019 | 749 19th Av | remodel (e) units incl demo&construction. unit 749:convert(e)basement for new living space, rear 2-story addition & new deck. for unit 753:4-story vertical addition w/ roof deck. relocate (e)light well, enlarge(e) garage door. new interior stair. part of interior work under separate permit.Details
remodel (e) units incl demo&construction. unit 749:convert(e)basement for new living space, rear 2-story addition & new deck. for unit 753:4-story vertical addition w/ roof deck. relocate (e)light well, enlarge(e) garage door. new interior stair. part of interior work under separate permit. | $99,999 |
| Oct 17, 2012 | Completed final sign-off Nov 2012 | 1798 15th Av | replace and repair dry rotted 18" high wood deck at backyard. to comply with complaint #201270421.Details
replace and repair dry rotted 18" high wood deck at backyard. to comply with complaint #201270421. | $5,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2014 | 3719 16th St | remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl).Details
remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl). | $135,000 |
| Feb 1, 2010 | Completed final sign-off Dec 2010 | 263 Lakeshore Dr | construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining.Details
construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining. | $60,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2010 | 1455 28th Av | horizontal addition - 2 stories to rear yard approx 342 sq ft per floor. add stairs between floors; add 210 sq ft deck; new media room @ 1st floor; new family room @ 2nd floor.Details
horizontal addition - 2 stories to rear yard approx 342 sq ft per floor. add stairs between floors; add 210 sq ft deck; new media room @ 1st floor; new family room @ 2nd floor. | $88,000 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 16 Agua Wy | remodel of (e) 1st floor space including correction of items on citation #200728417, addition of a deck at rear yard. legalize rooms down & remodel rear play roomDetails
remodel of (e) 1st floor space including correction of items on citation #200728417, addition of a deck at rear yard. legalize rooms down & remodel rear play room | $65,000 |
| Aug 3, 2006 | Completed final sign-off Jul 2007 | 181 De Soto St | add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation.Details
add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation. | $50,000 |