# Integrity Mechanical Systems Corporation

Contractor license 938841. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/integrity-mechanical-systems-corporation-938841
- JSON: https://www.permitgraph.org/api/contractor?license=938841
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=938841

14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 90 days from permit to final inspection. Of the 2 never-finaled permits, 2 are over 10 years old.

- Based in: Hayward
- On San Francisco permits: Feb 2011 to Dec 2013
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2011 | 4 | 0 | 0 | 1 |
| 2012 | 2 | 0 | 1 | 0 |
| 2013 | 5 | 0 | 1 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201312265022](https://www.permitgraph.org/p/201312265022) | Dec 26, 2013 | Completed: final sign-off Feb 2014 | [900 North Point St](https://www.permitgraph.org/a/0452/002) | run new air distribution ducting from existing unit. perform start upa and check of unit to verify proper operation; part of app. 201310290559 | $5,800 |
| [201310189654](https://www.permitgraph.org/p/201310189654) | Oct 18, 2013 | Completed: final sign-off Apr 2014 | [140 New Montgomery St](https://www.permitgraph.org/a/3722/080) | provide & install grease duct & fan for hood provided by others, provide & install make up air duct & fan, provide type 2 duct & fan, provide toilet exhaust system. t.i. #201306199927 | $65,000 |
| [201307111629](https://www.permitgraph.org/p/201307111629) | Jul 11, 2013 | Never finaled: issued Jul 2013, no final | [242 Columbus Av](https://www.permitgraph.org/a/0162/002) | replace extg hood with new type 1 per plan. provide and install hood exhaust duct per plan. provide and install new make up air duct and fan. provide and install dish hood, fan and duct. | $32,940 |
| [201307101479](https://www.permitgraph.org/p/201307101479) | Jul 10, 2013 | Completed: final sign-off Aug 2013 | [244 California St](https://www.permitgraph.org/a/0237/010) | roof level-replace & relocate ef. replace with (type-1 @ rease exit fan) new fan in kind. relocate to safer location on roof, not visible from the street | $6,250 |
| [201303051483](https://www.permitgraph.org/p/201303051483) | Mar 5, 2013 | Completed: final sign-off Apr 2014 | [1177 California St](https://www.permitgraph.org/a/0253A/257) | replace existing pollution control unit and grease exh fan with new in kind. | $27,975 |
| [201303051487](https://www.permitgraph.org/p/201303051487) | Mar 5, 2013 | Completed: final sign-off Oct 2013 | [2660 Harrison St](https://www.permitgraph.org/a/3639/004A) | provide & install 16 ga welded grease duct & rooftop fan, provide & install make up air duct & rooftop fan. ref pa #2012.12.30.7638 & 2012.10.22.2536. hoods & ansul are provided & installed by others… | $26,975 |
| [201211133998](https://www.permitgraph.org/p/201211133998) | Nov 13, 2012 | Completed: final sign-off Jan 2013 | [507 Divisadero St](https://www.permitgraph.org/a/1204/008) | provide & install one type 1 hood & one type 2 dish hood, 2 hood exhaust fans & duct, heated make up air, 1 toilet exhaust fan. ref pa #2012.0404.7537 | $24,200 |
| [201208207738](https://www.permitgraph.org/p/201208207738) | Aug 20, 2012 | Never finaled: issued Aug 2012, no final | [417 Stockton St](https://www.permitgraph.org/a/0285/004) | provide & install one 800 ctm supply & exhaust system for general ventilation of storage areas. | $3,875 |
| [201202073671](https://www.permitgraph.org/p/201202073671) | Feb 7, 2012 | Completed: final sign-off May 2012 | [1224 09th Av](https://www.permitgraph.org/a/1742/033) | ground floor-refer to pa# 2011-1108-8481-provide & install 2 new type 1 hood exhaust systems, provide & install 1 new type 2 hood exhaust system, provide & install new heating system. provide & insta… | $38,750 |
| [201109235347](https://www.permitgraph.org/p/201109235347) | Sep 23, 2011 | Expired or cancelled: expired Aug 2013 | [1529 Fillmore St](https://www.permitgraph.org/a/0707/002) | remove (e) 18' hood (by others, provide/install 16'6 hood (by others), ansul (by others). re-connect new hood to (e) duct. balance (e) supply & mua fans to new spec's on plans. provide/install new to… | $3,750 |
| [201108122378](https://www.permitgraph.org/p/201108122378) | Aug 12, 2011 | Completed: final sign-off Feb 2012 | [721 Market St](https://www.permitgraph.org/a/3706/063) | relocation existing exhaust fan approx 20 feet back from front of building. existing fan is located on the 3rd floor roof. run oulet of existing fan to the top of the 8th floor roof. work is due to c… | $36,800 |
| [201108051925](https://www.permitgraph.org/p/201108051925) | Aug 5, 2011 | Completed: final sign-off Aug 2011 | [2565 03rd St](https://www.permitgraph.org/a/4173/001) | revision to pa# 2011.05.25.6747. install one type 2 hood. install one ef and one make up air fan | $7,895 |
| [201102049647](https://www.permitgraph.org/p/201102049647) | Feb 4, 2011 | Completed: final sign-off Jul 2011 | [1 Yerba Buena Ln](https://www.permitgraph.org/a/3706/096) | mechanical revision to approved plans per app#200812037676. replace specified pcu with with new unit due to specified unit not being avalable |  |
| [201102019423](https://www.permitgraph.org/p/201102019423) | Feb 1, 2011 | Completed: final sign-off May 2011 | [557 Valencia St](https://www.permitgraph.org/a/3569/041) | part of building pa# 2010-0909-0510-install new 6' hood & duct & fan. hood and duct fire suppression on separate permit. | $11,350 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/integrity-mechanical-systems-corporation-938841.
