Ignacio Camarillo Reyes
- Based in
- San Rafael
- On San Francisco permits
- Aug 2010 to Dec 2025
- Last 24 months
- 6 permits filed
59 permits since 2000: 49 completed, 3 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
6 roof deck permits: 6 completed. Typically 8 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2015 | Completed final sign-off Apr 2017 | 135 Alhambra St | revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'dDetails
revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'd | |
| Oct 17, 2013 | Completed final sign-off Apr 2017 | 135 Alhambra St | new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambraDetails
new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambra | $26,300 |
| Apr 3, 2013 | Completed final sign-off Oct 2013 | 3226 Octavia St | remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia onlyDetails
remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia only | $60,000 |
| Dec 3, 2012 | Completed final sign-off May 2013 | 1100 Church St | revision to app#201207306070. to remove sprinkler requirements.sprinkler requirement retained in originla permit for furture roof deck permit. roof deck not to be pursued,sprinklers not reaq for r-2 occupancy,existing egress complies w/r-2 requrements for work performed inpermit @ 201207306070 (e)3Details
revision to app#201207306070. to remove sprinkler requirements.sprinkler requirement retained in originla permit for furture roof deck permit. roof deck not to be pursued,sprinklers not reaq for r-2 occupancy,existing egress complies w/r-2 requrements for work performed inpermit @ 201207306070 (e)3 | |
| Jul 30, 2012 | Completed final sign-off May 2013 | 1100 Church St | interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit.Details
interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit. | $250,000 |
| Mar 23, 2012 | Completed final sign-off Apr 2012 | 601 Clayton St | replace top roof door, 1 3/4" metal door, with self closing system, 1 hr rated, no roof deckDetails
replace top roof door, 1 3/4" metal door, with self closing system, 1 hr rated, no roof deck | $1,200 |