# Hitt Contracting Inc.

Contractor license 811478. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/hitt-contracting-inc-811478
- JSON: https://www.permitgraph.org/api/contractor?license=811478
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=811478

42 permits since 2000: 33 completed, 3 in progress, 5 never finaled, 1 expired or cancelled. Typically 37 days from filing to permit and 189 days from permit to final inspection. Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.

- Based in: San Jose
- On San Francisco permits: Feb 2004 to May 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2004 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 1 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 1 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2021 | 2 | 0 | 0 | 0 |
| 2022 | 7 | 0 | 2 | 0 |
| 2023 | 9 | 0 | 1 | 0 |
| 2024 | 5 | 3 | 0 | 1 |
| 2025 | 2 | 0 | 0 | 0 |
| 2026 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 3 | 2 | 0 | 1 | 0 | 20 | 389 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 20 | 1022 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202605191552](https://www.permitgraph.org/p/202605191552) | May 19, 2026 | Completed: final sign-off May 2026 | [114 Sansome St](https://www.permitgraph.org/a/0267/010) | to obtain final inspection for work approved under pa#202407227025. all work is complete. |  |
| [202506249303](https://www.permitgraph.org/p/202506249303) | Jun 24, 2025 | Completed: final sign-off May 2026 | [114 Sansome St](https://www.permitgraph.org/a/0267/010) | suite 1400; installation of 2 phone booths. | $2,560 |
| [202501178603](https://www.permitgraph.org/p/202501178603) | Jan 17, 2025 | Completed: final sign-off Jul 2026 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | revision to 202311080474. adjust entry vestibule grading. | $6,000 |
| [202408078127](https://www.permitgraph.org/p/202408078127) | Aug 7, 2024 | In progress: issued Aug 2024 | [445 Bush St](https://www.permitgraph.org/a/0287/025) | two new phone booths. life safety system are design build under separate permit. convert exist 2 office to ada access. phone booth ref 2023-0703-1379 r1 | $2,500 |
| [202407227025](https://www.permitgraph.org/p/202407227025) | Jul 22, 2024 | Expired or cancelled: expired May 2026 | [114 Sansome St](https://www.permitgraph.org/a/0267/010) | 14th fl: permitting two (e) furniture phone rooms & anchoring details on the 14th floor. | $2,560 |
| [202404240654](https://www.permitgraph.org/p/202404240654) | Apr 24, 2024 | In progress: issued Jun 2024 | [633 Beach St](https://www.permitgraph.org/a/0024/025) | deferred mep drawings for pa# 2024-0311-7515 ti construction of existing space | $125,000 |
| [202404089581](https://www.permitgraph.org/p/202404089581) | Apr 15, 2024 | Completed: final sign-off Aug 2024 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | fire sprinkler only deferred submittal for fire sprinkler assocaited with pa 202311080474 & 202401184195. underground was on a separate pa 202309207002. | $72,000 |
| [202404109727](https://www.permitgraph.org/p/202404109727) | Apr 10, 2024 | Completed: final sign-off Jun 2024 | [1 California St](https://www.permitgraph.org/a/0264/004) | deferred submittal for pa# 2023-0824-5103 for electrical only. reference ew202404027733 | $20,000 |
| [202403117515](https://www.permitgraph.org/p/202403117515) | Mar 11, 2024 | Completed: final sign-off Feb 2025 | [633 Beach St](https://www.permitgraph.org/a/0024/025) | interior t.i. construction of new load bearning walls, ceiling, millwork, lighting and furniture | $1,125,000 |
| [202402296787](https://www.permitgraph.org/p/202402296787) | Feb 29, 2024 | Completed: final sign-off May 2024 | [1 Market St](https://www.permitgraph.org/a/3713/007) | 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of c… | $50,000 |
| [202402216310](https://www.permitgraph.org/p/202402216310) | Feb 21, 2024 | In progress: issued Oct 2024 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | 25th fl ti. enlargement of existing flex office room to provide a conference room. construction of a reception desk. conversion of an existing storage room into a meeting room. convert existing locke… | $335,000 |
| [202401184195](https://www.permitgraph.org/p/202401184195) | Jan 18, 2024 | Completed: final sign-off Jul 2026 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | deferred electrical work under 202311080474 | $40,000 |
| [202311080474](https://www.permitgraph.org/p/202311080474) | Nov 8, 2023 | Completed: final sign-off Jul 2026 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | renovating (e) building to support 36 ev charging parking stalls and provide pedestrain access | $100,000 |
| [202310058059](https://www.permitgraph.org/p/202310058059) | Oct 5, 2023 | Completed: final sign-off Feb 2024 | [445 Bush St](https://www.permitgraph.org/a/0287/025) | 5th flr. deferred mep for 202307031379 | $100,000 |
| [202309207002](https://www.permitgraph.org/p/202309207002) | Sep 20, 2023 | Completed: final sign-off Aug 2024 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | new sprinkler system to (e) garage under separate permit. new 8" sprinkler underground from poc @ city main to new bfp per plan | $30,000 |
| [202309156737](https://www.permitgraph.org/p/202309156737) | Sep 15, 2023 | Completed: final sign-off Jul 2026 | [1700 Pine St](https://www.permitgraph.org/a/0648/004) | barrier removal, upgrade (e) stair from basement to level 1 and 2 to meet accessibility requirements per 11b-504 | $125,000 |
| [202309055923](https://www.permitgraph.org/p/202309055923) | Sep 5, 2023 | Completed: final sign-off Oct 2023 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | revision to application #202210245023: d.a. checklist update. |  |
| [202308245103](https://www.permitgraph.org/p/202308245103) | Aug 24, 2023 | Completed: final sign-off Jun 2024 | [1 California St](https://www.permitgraph.org/a/0264/004) | 8/f: interior demo of partitions, ceilings, light fixtures, millwork and finishes, new finishes in existing elevator lobby.c | $127,035 |
| [202308013499](https://www.permitgraph.org/p/202308013499) | Aug 1, 2023 | Never finaled: filed Aug 2023, never issued | [360 Spear St](https://www.permitgraph.org/a/3745/009) | revision to 202307263013 to obtain sffd stamp for assemble occupant load info for cafe, prep kitchen, a-3 spaces. administractive permit only. no change to scope of work approved under 202201246538 |  |
| [202307263013](https://www.permitgraph.org/p/202307263013) | Jul 26, 2023 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | 3/f: document assembly occupancy load shown on 202201246538 only. no other changes to previosly approved scope. |  |
| [202307031379](https://www.permitgraph.org/p/202307031379) | Jul 3, 2023 | Completed: final sign-off Feb 2024 | [445 Bush St](https://www.permitgraph.org/a/0287/025) | 5/f: interior commercial ti of existing tenant space, includes non-structural demolition of existing ti and build-out of new including non-structural partitions, doors, and sidelites, suspended ceili… | $330,330 |
| [202304216245](https://www.permitgraph.org/p/202304216245) | Apr 21, 2023 | Completed: final sign-off Dec 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | 5/f: electrical work, replacement of uninterrupted power source (ups) and addition of electrical panels/transformers on lvl 5. | $180,000 |
| [202212148278](https://www.permitgraph.org/p/202212148278) | Dec 14, 2022 | Never finaled: issued Feb 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | 19/f: t.i. limited to the demotion of an (e) hold open doorway at lobby. replace in-kind with a fire rated glass door. no change of square feet or building height. interior only | $10,759 |
| [202210245023](https://www.permitgraph.org/p/202210245023) | Oct 24, 2022 | Completed: final sign-off Oct 2023 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | 19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths. | $15,000 |
| [202209222939](https://www.permitgraph.org/p/202209222939) | Sep 22, 2022 | Completed: final sign-off May 2023 | [4 Embarcadero Center](https://www.permitgraph.org/a/0233/044) | 37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred. | $100,000 |
| [202209132365](https://www.permitgraph.org/p/202209132365) | Sep 13, 2022 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | revise electrical for t.i. under pa# 202208100286. ref pa3 202206096006 & 202201246538 to install 2 800a enclosed breakers for supporting equipment on the 5th fl and install associated feeders frd fr… |  |
| [202208100286](https://www.permitgraph.org/p/202208100286) | Aug 10, 2022 | Completed: final sign-off Aug 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | 3/f: revise island layout @ catering kitchen. ref bpa#202201246538 |  |
| [202206096006](https://www.permitgraph.org/p/202206096006) | Jun 9, 2022 | Completed: final sign-off Aug 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | revision to pa# 202201246538. relocate all gender restroom, 2 water heaters and adjust kitchen layout. update structural detail for operable partitions, remove electical from previously proposed ups… |  |
| [202206075794](https://www.permitgraph.org/p/202206075794) | Jun 7, 2022 | Completed: final sign-off Jun 2023 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | interior ti: (n) non-structural partitions, light fixtures, finishes, millwork, plumbing fixtures. remodel elevator lobby & common corridor. upgrades to restrooms accessability. mep & structural incl… | $5,068,061 |
| [202205275197](https://www.permitgraph.org/p/202205275197) | May 27, 2022 | Never finaled: issued Jun 2022, no final | [436 Bryant St](https://www.permitgraph.org/a/3763/013) | construction of new idf room in existing space. adjustment of branch mechanical and new fan to serve the new room. new branch electrical for a single rack. no change in occupancy, use, or area. | $7,866 |
| [202201246538](https://www.permitgraph.org/p/202201246538) | Jan 24, 2022 | Completed: final sign-off Sep 2023 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumb… | $5,000,000 |
| [202112033675](https://www.permitgraph.org/p/202112033675) | Dec 3, 2021 | Completed: final sign-off Jun 2022 | [33 Falmouth St](https://www.permitgraph.org/a/3753/113) | new private office including non load bearing partitions, branch mech & lighting, accessibility upgrae to an (e) restroom and new finishes. | $350,000 |
| [202105170474](https://www.permitgraph.org/p/202105170474) | May 17, 2021 | Completed: final sign-off Apr 2022 | [33 New Montgomery St](https://www.permitgraph.org/a/3707/062) | floors 15 & 17 t.i.: minor demo, new wall, door, finishes, millwork, lighting, unconcentrated furniture with mnor electric work. | $640,000 |
| [202009194565](https://www.permitgraph.org/p/202009194565) | Sep 19, 2020 | Never finaled: issued Feb 2021, no final | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | 4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f. | $3,000,000 |
| [201909252617](https://www.permitgraph.org/p/201909252617) | Sep 25, 2019 | Completed: final sign-off Feb 2020 | [560 Mission St](https://www.permitgraph.org/a/3708/095) | ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maher | $94,500 |
| [201806141928](https://www.permitgraph.org/p/201806141928) | Jun 14, 2018 | Never finaled: issued Oct 2018, no final | [532 Market St](https://www.permitgraph.org/a/0290/012) | interior tenant improvements including demo, building non-structural partitions & (n) elevator shaft | $250,000 |
| [201802211814](https://www.permitgraph.org/p/201802211814) | Feb 21, 2018 | Completed: final sign-off Jul 2018 | [600 Harrison St](https://www.permitgraph.org/a/3750/073) | modify e ti. revision to pa# 2017-1109-3620 & 2017-1122-4679. add storage rm to server rm. rev to 201711093620 & 201711224679 | $7,500 |
| [201711224679](https://www.permitgraph.org/p/201711224679) | Nov 22, 2017 | Completed: final sign-off Feb 2018 | [600 Harrison St](https://www.permitgraph.org/a/3750/073) | rev to 201711093620: modify (e) ti to include demising a full floor tenant, 2 suites, scope of work include selective demo & const of non load bearing partitions, modify (e) ceiling grid & tiles new… |  |
| [201711093620](https://www.permitgraph.org/p/201711093620) | Nov 9, 2017 | Completed: final sign-off Feb 2018 | [600 Harrison St](https://www.permitgraph.org/a/3750/073) | #600-t.i. to include demising full floor tenant into 2 suites, selective demo & construct non load bearing partitions, modify (e) ceiling grid, tile, new light fixtures, new office doors & frames, sa… | $398,000 |
| [201405145695](https://www.permitgraph.org/p/201405145695) | May 14, 2014 | Completed: final sign-off Apr 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | 21st floor - revision to appl #2013.0626.0561: raise transformer to meet nec clearance, relocate existing switch to clear struct steel. not structural revision; compliance with ordinance #155-13 not… | $2,500 |
| [201306260561](https://www.permitgraph.org/p/201306260561) | Jun 26, 2013 | Completed: final sign-off Jul 2015 | [555 California St](https://www.permitgraph.org/a/0259/026) | replace existing ups unit with new ups. like for like | $30,080 |
| [200402136404](https://www.permitgraph.org/p/200402136404) | Feb 13, 2004 | Completed: final sign-off Jun 2004 | [3222 Geary Bl](https://www.permitgraph.org/a/1065/053) | interior tenant improvement/alteration | $74,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/hitt-contracting-inc-811478.