# High Quality Roofing Co

Contractor license 1045259. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/high-quality-roofing-co-1045259
- JSON: https://www.permitgraph.org/api/contractor?license=1045259
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1045259

251 permits since 2000: 246 completed, 1 in progress, 4 expired or cancelled. Typically 0 days from filing to permit and 16 days from permit to final inspection.

- Based in: San Francisco
- On San Francisco permits: Mar 2020 to Jun 2026
- Last 24 months: 68 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2020 | 17 | 0 | 0 | 1 |
| 2021 | 19 | 0 | 0 | 0 |
| 2022 | 40 | 0 | 0 | 1 |
| 2023 | 55 | 1 | 0 | 1 |
| 2024 | 53 | 0 | 0 | 0 |
| 2025 | 42 | 0 | 0 | 1 |
| 2026 | 20 | 0 | 0 | 0 |

## Most recent permits

The 100 most recent of 251.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202606253963](https://www.permitgraph.org/p/202606253963) | Jun 25, 2026 | Completed: final sign-off Jul 2026 | [153 Galewood Cr](https://www.permitgraph.org/a/2737/077) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $38,000 |
| [202606243881](https://www.permitgraph.org/p/202606243881) | Jun 24, 2026 | Completed: final sign-off Jul 2026 | [800 Quintara St](https://www.permitgraph.org/a/2137/003A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202606082791](https://www.permitgraph.org/p/202606082791) | Jun 8, 2026 | Completed: final sign-off Jul 2026 | [1546 22nd Av](https://www.permitgraph.org/a/1867/031) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| [202606072711](https://www.permitgraph.org/p/202606072711) | Jun 7, 2026 | Completed: final sign-off Jul 2026 | [101 Galewood Cr](https://www.permitgraph.org/a/2737/053) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $56,000 |
| [202606022341](https://www.permitgraph.org/p/202606022341) | Jun 2, 2026 | Completed: final sign-off Jun 2026 | [580 El Camino Del Mar](https://www.permitgraph.org/a/1307/001Z) | reroofing: remove old roof & install new modified bitumen. no hot work. | $16,900 |
| [202605261831](https://www.permitgraph.org/p/202605261831) | May 26, 2026 | Completed: final sign-off Jun 2026 | [2550 31st Av](https://www.permitgraph.org/a/2431/021C) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,800 |
| [202605261922](https://www.permitgraph.org/p/202605261922) | May 26, 2026 | Completed: final sign-off Jul 2026 | [1119 Mason St](https://www.permitgraph.org/a/0213/002A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $43,900 |
| [202605131185](https://www.permitgraph.org/p/202605131185) | May 13, 2026 | Completed: final sign-off May 2026 | [37 Calhoun Tr](https://www.permitgraph.org/a/0113/026) | re-roof, remove old roof, install modified bitumen roof, no hot work | $19,000 |
| [202605010504](https://www.permitgraph.org/p/202605010504) | May 1, 2026 | Completed: final sign-off May 2026 | [1191 Guerrero St](https://www.permitgraph.org/a/3645/014A) | re-roofing, no hot work, remove old roof, install new roof. | $22,000 |
| [202605010554](https://www.permitgraph.org/p/202605010554) | May 1, 2026 | Completed: final sign-off May 2026 | [853 University St](https://www.permitgraph.org/a/6147/034) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| [202604229849](https://www.permitgraph.org/p/202604229849) | Apr 22, 2026 | Completed: final sign-off Apr 2026 | [220 Broderick St](https://www.permitgraph.org/a/1218/021) | re-roofing (no hotworks) | $39,900 |
| [202604179683](https://www.permitgraph.org/p/202604179683) | Apr 17, 2026 | Completed: final sign-off May 2026 | [2201 Mariposa St](https://www.permitgraph.org/a/4012/030) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,900 |
| [202604079068](https://www.permitgraph.org/p/202604079068) | Apr 7, 2026 | Completed: final sign-off Apr 2026 | [240 Alma St](https://www.permitgraph.org/a/1282/012) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202603268355](https://www.permitgraph.org/p/202603268355) | Mar 26, 2026 | Completed: final sign-off Apr 2026 | [2650 Pierce St](https://www.permitgraph.org/a/0562/015) | reroofing no hot works | $18,900 |
| [202603167595](https://www.permitgraph.org/p/202603167595) | Mar 16, 2026 | Completed: final sign-off Mar 2026 | [172 Portola Dr](https://www.permitgraph.org/a/2847/019) | reroofing with no hot works. | $18,500 |
| [202603117406](https://www.permitgraph.org/p/202603117406) | Mar 11, 2026 | Completed: final sign-off Mar 2026 | [2170 46th Av](https://www.permitgraph.org/a/2172/027) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202603087119](https://www.permitgraph.org/p/202603087119) | Mar 8, 2026 | Completed: final sign-off Mar 2026 | [531 26th Av](https://www.permitgraph.org/a/1518/005) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| [202603016729](https://www.permitgraph.org/p/202603016729) | Mar 1, 2026 | Completed: final sign-off Mar 2026 | [345 Granada Av](https://www.permitgraph.org/a/3197/003) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| [202602186132](https://www.permitgraph.org/p/202602186132) | Feb 18, 2026 | Completed: final sign-off Feb 2026 | [171 Randall St](https://www.permitgraph.org/a/6663/028) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,000 |
| [202602125909](https://www.permitgraph.org/p/202602125909) | Feb 12, 2026 | Completed: final sign-off Feb 2026 | [2059 23rd Av](https://www.permitgraph.org/a/2143/015) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202512302955](https://www.permitgraph.org/p/202512302955) | Dec 30, 2025 | Completed: final sign-off Jan 2026 | [520 Magellan Av](https://www.permitgraph.org/a/2927/004) | re roofing no hot works | $18,500 |
| [202512302952](https://www.permitgraph.org/p/202512302952) | Dec 30, 2025 | Completed: final sign-off Mar 2026 | [337 Fulton St](https://www.permitgraph.org/a/0792/007D) | re roofing no hot works | $75,000 |
| [202512071152](https://www.permitgraph.org/p/202512071152) | Dec 7, 2025 | Completed: final sign-off Dec 2025 | [127 Denslowe Dr](https://www.permitgraph.org/a/7239A/027) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,800 |
| [202511028727](https://www.permitgraph.org/p/202511028727) | Nov 2, 2025 | Completed: final sign-off Nov 2025 | [2262 47th Av](https://www.permitgraph.org/a/2303/031) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,900 |
| [202510248073](https://www.permitgraph.org/p/202510248073) | Oct 24, 2025 | Completed: final sign-off Nov 2025 | [116 Pfeiffer St](https://www.permitgraph.org/a/0054/024) | re roofing: no hot works. | $18,000 |
| [202510217783](https://www.permitgraph.org/p/202510217783) | Oct 21, 2025 | Completed: final sign-off Apr 2026 | [530 Junipero Serra Bl](https://www.permitgraph.org/a/7233/001B) | re-roof in kind comp shingles, no hot work. | $45,000 |
| [202510147360](https://www.permitgraph.org/p/202510147360) | Oct 14, 2025 | Completed: final sign-off Oct 2025 | [21 Wabash Tr](https://www.permitgraph.org/a/5067A/001D) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,300 |
| [202510107247](https://www.permitgraph.org/p/202510107247) | Oct 10, 2025 | Completed: final sign-off Oct 2025 | [27 Dawnview Wy](https://www.permitgraph.org/a/2874/001) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,500 |
| [202510086959](https://www.permitgraph.org/p/202510086959) | Oct 8, 2025 | Completed: final sign-off Oct 2025 | [1354 Vermont St](https://www.permitgraph.org/a/4262/028) | re roofing: no hot works. | $39,900 |
| [202510086929](https://www.permitgraph.org/p/202510086929) | Oct 8, 2025 | Completed: final sign-off Feb 2026 | [1668 Fulton St](https://www.permitgraph.org/a/1176/016) | re-roofing, no hot works, no torch down. | $48,000 |
| [202509185600](https://www.permitgraph.org/p/202509185600) | Sep 18, 2025 | Completed: final sign-off Oct 2025 | [115 San Pablo Av](https://www.permitgraph.org/a/3011/023) | reroof. no hot works. | $29,000 |
| [202508274060](https://www.permitgraph.org/p/202508274060) | Aug 27, 2025 | Completed: final sign-off Sep 2025 | [420 Oxford St](https://www.permitgraph.org/a/5996/001A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| [202508273993](https://www.permitgraph.org/p/202508273993) | Aug 27, 2025 | Completed: final sign-off Aug 2025 | [1331 Willard St](https://www.permitgraph.org/a/1275/063) | re-roof: remove old roof, install modified bitumen. no hot work | $16,400 |
| [202508274061](https://www.permitgraph.org/p/202508274061) | Aug 27, 2025 | Completed: final sign-off Sep 2025 | [1558 41st Av](https://www.permitgraph.org/a/1886/025) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| [202508173230](https://www.permitgraph.org/p/202508173230) | Aug 17, 2025 | Completed: final sign-off Aug 2025 | [72 Inverness Dr](https://www.permitgraph.org/a/7210/012) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| [202508102699](https://www.permitgraph.org/p/202508102699) | Aug 10, 2025 | Completed: final sign-off Aug 2025 | [112 Galewood Cr](https://www.permitgraph.org/a/2737/013) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $8,900 |
| [202507241561](https://www.permitgraph.org/p/202507241561) | Jul 24, 2025 | Completed: final sign-off Aug 2025 | [1878 41st Av](https://www.permitgraph.org/a/2077/031) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,900 |
| [202507241539](https://www.permitgraph.org/p/202507241539) | Jul 24, 2025 | Completed: final sign-off Jul 2025 | [1129 Stanyan St](https://www.permitgraph.org/a/2630/049) | reroofing no hot works | $20,000 |
| [202507221371](https://www.permitgraph.org/p/202507221371) | Jul 22, 2025 | Completed: final sign-off Sep 2025 | [29 Bradford St](https://www.permitgraph.org/a/5633/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,500 |
| [202507171026](https://www.permitgraph.org/p/202507171026) | Jul 17, 2025 | Completed: final sign-off Jul 2025 | [1635 Jones St](https://www.permitgraph.org/a/0156/003) | reroof: remove old roof. install new modified bitumen. no hot work. | $39,900 |
| [202507070258](https://www.permitgraph.org/p/202507070258) | Jul 7, 2025 | Completed: final sign-off Jul 2025 | [3580 Pierce St](https://www.permitgraph.org/a/0442A/038) | re-roofing no hot works. | $23,000 |
| [202507070256](https://www.permitgraph.org/p/202507070256) | Jul 7, 2025 | Expired or cancelled: cancelled Jul 2025 | [1630 Jones St](https://www.permitgraph.org/a/0157/048) | re roofing: no hot work. install new modified bitumen. | $39,900 |
| [202507070254](https://www.permitgraph.org/p/202507070254) | Jul 7, 2025 | Completed: final sign-off Jul 2025 | [1865 Union St](https://www.permitgraph.org/a/0543/026A) | re roofing: no hot work. remove old roof and install new comp shingles. | $29,900 |
| [202506249309](https://www.permitgraph.org/p/202506249309) | Jun 24, 2025 | Completed: final sign-off Jul 2025 | [4429 Kirkham St](https://www.permitgraph.org/a/1894/082) | re roofing remove old roof, install comp shingles, (no hot work). | $19,900 |
| [202506249310](https://www.permitgraph.org/p/202506249310) | Jun 24, 2025 | Completed: final sign-off Jun 2025 | [715 Chestnut St](https://www.permitgraph.org/a/0066/026) | re roofing: no hot work | $16,900 |
| [202506108391](https://www.permitgraph.org/p/202506108391) | Jun 10, 2025 | Completed: final sign-off Jun 2025 | [2055 41st Av](https://www.permitgraph.org/a/2161/007A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,300 |
| [202506068148](https://www.permitgraph.org/p/202506068148) | Jun 6, 2025 | Completed: final sign-off Jun 2025 | [3035 Gough St](https://www.permitgraph.org/a/0496/001A) | re-roofing no hot works. | $36,900 |
| [202505086086](https://www.permitgraph.org/p/202505086086) | May 8, 2025 | Completed: final sign-off Jun 2025 | [343 26th Av](https://www.permitgraph.org/a/1407/008) | re-roofing (no hot works) | $20,000 |
| [202505025721](https://www.permitgraph.org/p/202505025721) | May 2, 2025 | Completed: final sign-off May 2025 | [3983 Cesar Chavez St](https://www.permitgraph.org/a/6579/032) | re-roofing - remove existing old roofing and to install modified bitumen. no hot work. flat roof with slope less thah 2:12 pitch. | $25,500 |
| [202505025719](https://www.permitgraph.org/p/202505025719) | May 2, 2025 | Completed: final sign-off May 2025 | [1135 Lake St](https://www.permitgraph.org/a/1372/045) | administrative permit to correct the location of of the reroofing work under pa#202504174662 from "rear bldg" to "front bldg". no work will be done for rear bldg roof. |  |
| [202504174659](https://www.permitgraph.org/p/202504174659) | Apr 17, 2025 | Completed: final sign-off May 2025 | [1164 Powell St](https://www.permitgraph.org/a/0192/043) | reroof, no hot work | $49,000 |
| [202504174662](https://www.permitgraph.org/p/202504174662) | Apr 17, 2025 | Completed: final sign-off May 2025 | [1135 Lake St](https://www.permitgraph.org/a/1372/045) | rear building - reroof, no hot work | $23,000 |
| [202504033697](https://www.permitgraph.org/p/202504033697) | Apr 3, 2025 | Completed: final sign-off Apr 2025 | [106 Glenview Dr](https://www.permitgraph.org/a/2874/005) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,500 |
| [202503192584](https://www.permitgraph.org/p/202503192584) | Mar 19, 2025 | Completed: final sign-off Mar 2025 | [3955 Mission St](https://www.permitgraph.org/a/5802/030) | re-roof no hot works | $19,800 |
| [202503182513](https://www.permitgraph.org/p/202503182513) | Mar 18, 2025 | Completed: final sign-off Mar 2025 | [301 Maynard St](https://www.permitgraph.org/a/5889/020) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| [202503122073](https://www.permitgraph.org/p/202503122073) | Mar 12, 2025 | Completed: final sign-off Mar 2025 | [289 Frederick St](https://www.permitgraph.org/a/1269/086) | reroofing. no hot work. | $26,950 |
| [202503122072](https://www.permitgraph.org/p/202503122072) | Mar 12, 2025 | Completed: final sign-off Mar 2025 | [135 Pinehurst Wy](https://www.permitgraph.org/a/3271/007) | reroofing. no hot work. install modified bitumen | $18,900 |
| [202503112062](https://www.permitgraph.org/p/202503112062) | Mar 11, 2025 | Completed: final sign-off Mar 2025 | [1674 40th Av](https://www.permitgraph.org/a/1904/034) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,000 |
| [202502100022](https://www.permitgraph.org/p/202502100022) | Feb 10, 2025 | Completed: final sign-off Mar 2025 | [136 Parnassus Av](https://www.permitgraph.org/a/1272/010) | re-roofing no hot works | $28,300 |
| [202502079975](https://www.permitgraph.org/p/202502079975) | Feb 7, 2025 | Completed: final sign-off Mar 2025 | [1939 Jackson St](https://www.permitgraph.org/a/0601/006E) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,700 |
| [202502079974](https://www.permitgraph.org/p/202502079974) | Feb 7, 2025 | Completed: final sign-off Jun 2025 | [524 46th Av](https://www.permitgraph.org/a/1499/028) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $36,600 |
| [202501259083](https://www.permitgraph.org/p/202501259083) | Jan 25, 2025 | Completed: final sign-off Feb 2025 | [795 33rd Av](https://www.permitgraph.org/a/1611/018D) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,400 |
| [202501138238](https://www.permitgraph.org/p/202501138238) | Jan 13, 2025 | Completed: final sign-off Jan 2025 | [5214 Anza St](https://www.permitgraph.org/a/1501/020) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,900 |
| [202412317556](https://www.permitgraph.org/p/202412317556) | Dec 31, 2024 | Completed: final sign-off Jan 2025 | [1431 Judah St](https://www.permitgraph.org/a/1834/035) | re-roofing, no hot works. | $22,500 |
| [202412187036](https://www.permitgraph.org/p/202412187036) | Dec 18, 2024 | Completed: final sign-off Dec 2024 | [195 26th Av](https://www.permitgraph.org/a/1332/018) | re-roofing. no hot works | $36,000 |
| [202412187038](https://www.permitgraph.org/p/202412187038) | Dec 18, 2024 | Completed: final sign-off Dec 2024 | [157 Beaver St](https://www.permitgraph.org/a/2614/091) | re-roofing. no hot works | $15,000 |
| [202412066360](https://www.permitgraph.org/p/202412066360) | Dec 6, 2024 | Completed: final sign-off Dec 2024 | [655 11th Av](https://www.permitgraph.org/a/1633/014) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $26,000 |
| [202411265807](https://www.permitgraph.org/p/202411265807) | Nov 26, 2024 | Completed: final sign-off Dec 2024 | [1858 26th Av](https://www.permitgraph.org/a/2062/011) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| [202411225622](https://www.permitgraph.org/p/202411225622) | Nov 22, 2024 | Completed: final sign-off Dec 2024 | [2762 42nd Av](https://www.permitgraph.org/a/2510/032) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202411185244](https://www.permitgraph.org/p/202411185244) | Nov 18, 2024 | Completed: final sign-off Nov 2024 | [360 Hazelwood Av](https://www.permitgraph.org/a/3053/025) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,800 |
| [202411104740](https://www.permitgraph.org/p/202411104740) | Nov 10, 2024 | Completed: final sign-off Nov 2024 | [676 Silver Av](https://www.permitgraph.org/a/5904/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,300 |
| [202411064542](https://www.permitgraph.org/p/202411064542) | Nov 6, 2024 | Completed: final sign-off Nov 2024 | [155 Galewood Cr](https://www.permitgraph.org/a/2737/078) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $54,300 |
| [202411054459](https://www.permitgraph.org/p/202411054459) | Nov 5, 2024 | Completed: final sign-off Nov 2024 | [1410 Ingalls St](https://www.permitgraph.org/a/4732/001A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,900 |
| [202410283920](https://www.permitgraph.org/p/202410283920) | Oct 28, 2024 | Completed: final sign-off Nov 2024 | [101 Wilde Av](https://www.permitgraph.org/a/6197/001) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,900 |
| [202410173172](https://www.permitgraph.org/p/202410173172) | Oct 17, 2024 | Completed: final sign-off Nov 2024 | [2539 Post St](https://www.permitgraph.org/a/1081/033) | reroof. remove old roof and install (n) modified bitumen | $21,000 |
| [202410173170](https://www.permitgraph.org/p/202410173170) | Oct 17, 2024 | Completed: final sign-off Nov 2024 | [2543 Post St](https://www.permitgraph.org/a/1081/032) | reroof. remove old roof and install (n) modified bitumen | $21,000 |
| [202410142886](https://www.permitgraph.org/p/202410142886) | Oct 14, 2024 | Completed: final sign-off Oct 2024 | [1806 28th Av](https://www.permitgraph.org/a/2064/023A) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| [202410082594](https://www.permitgraph.org/p/202410082594) | Oct 8, 2024 | Completed: final sign-off Jan 2025 | [111 Galewood Cr](https://www.permitgraph.org/a/2737/051) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $50,000 |
| [202409291917](https://www.permitgraph.org/p/202409291917) | Sep 29, 2024 | Completed: final sign-off Oct 2024 | [1208 Powhattan Av](https://www.permitgraph.org/a/5657/034) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,500 |
| [202409261655](https://www.permitgraph.org/p/202409261655) | Sep 26, 2024 | Completed: final sign-off Nov 2024 | [33 Marcela Av](https://www.permitgraph.org/a/2856/015) | reroofing | $45,000 |
| [202409160844](https://www.permitgraph.org/p/202409160844) | Sep 16, 2024 | Completed: final sign-off Oct 2024 | [370 Santa Ana Av](https://www.permitgraph.org/a/3258/015) | reroofing | $17,700 |
| [202409160843](https://www.permitgraph.org/p/202409160843) | Sep 16, 2024 | Completed: final sign-off Oct 2024 | [1525 09th Av](https://www.permitgraph.org/a/1855/003) | reroofing | $30,300 |
| [202409100441](https://www.permitgraph.org/p/202409100441) | Sep 10, 2024 | Completed: final sign-off Sep 2024 | [4142 26th St](https://www.permitgraph.org/a/6554/010) | reroofing. no work to (e) roof structural sheathing. | $24,700 |
| [202409100436](https://www.permitgraph.org/p/202409100436) | Sep 10, 2024 | Completed: final sign-off Oct 2024 | [1537 Church St](https://www.permitgraph.org/a/6593/019) | reroofing. no work to (e) roof structural sheathing. | $19,900 |
| [202408299763](https://www.permitgraph.org/p/202408299763) | Aug 29, 2024 | Completed: final sign-off Dec 2024 | [5170 Mission St](https://www.permitgraph.org/a/7030/006B) | re-roofing | $23,900 |
| [202408299762](https://www.permitgraph.org/p/202408299762) | Aug 29, 2024 | Completed: final sign-off Sep 2024 | [260 Clinton Pk](https://www.permitgraph.org/a/3534/056) | reroofing | $30,600 |
| [202408239397](https://www.permitgraph.org/p/202408239397) | Aug 23, 2024 | Completed: final sign-off Sep 2024 | [505 Gennessee St](https://www.permitgraph.org/a/3086/007) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,900 |
| [202408229311](https://www.permitgraph.org/p/202408229311) | Aug 22, 2024 | Completed: final sign-off Aug 2024 | [571 11th Av](https://www.permitgraph.org/a/1554/007I) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,700 |
| [202408188910](https://www.permitgraph.org/p/202408188910) | Aug 18, 2024 | Completed: final sign-off Aug 2024 | [150 Cresta Vista Dr](https://www.permitgraph.org/a/3005C/023) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| [202408138592](https://www.permitgraph.org/p/202408138592) | Aug 13, 2024 | Completed: final sign-off Aug 2024 | [40 17th Av](https://www.permitgraph.org/a/1342/013) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $30,700 |
| [202407297501](https://www.permitgraph.org/p/202407297501) | Jul 29, 2024 | Completed: final sign-off Aug 2024 | [69 Grand View Av](https://www.permitgraph.org/a/2748/016) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| [202407166575](https://www.permitgraph.org/p/202407166575) | Jul 16, 2024 | Completed: final sign-off Aug 2024 | [1674 23rd Av](https://www.permitgraph.org/a/1921/033) | reroof | $16,900 |
| [202407166572](https://www.permitgraph.org/p/202407166572) | Jul 16, 2024 | Completed: final sign-off Jul 2024 | [544 27th St](https://www.permitgraph.org/a/6581/054) | reroof | $23,300 |
| [202406255162](https://www.permitgraph.org/p/202406255162) | Jun 25, 2024 | Completed: final sign-off Jun 2024 | [1263 Broadway](https://www.permitgraph.org/a/0155/041) | reroof | $18,400 |
| [202405313507](https://www.permitgraph.org/p/202405313507) | May 31, 2024 | Completed: final sign-off Jun 2024 | [1426 22nd Av](https://www.permitgraph.org/a/1832/038) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,900 |
| [202405202439](https://www.permitgraph.org/p/202405202439) | May 20, 2024 | Completed: final sign-off May 2024 | [465 Magellan Av](https://www.permitgraph.org/a/2925/011) | reroofing | $16,900 |
| [202405202438](https://www.permitgraph.org/p/202405202438) | May 20, 2024 | Completed: final sign-off May 2024 | [1395 33rd Av](https://www.permitgraph.org/a/1788/014C) | reroofing | $13,900 |
| [202405202532](https://www.permitgraph.org/p/202405202532) | May 20, 2024 | Completed: final sign-off Jun 2024 | [400 Melrose Av](https://www.permitgraph.org/a/3003/012) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| [202405091850](https://www.permitgraph.org/p/202405091850) | May 9, 2024 | Completed: final sign-off May 2024 | [1088 Le Conte Av](https://www.permitgraph.org/a/5475/015) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,000 |
| [202405091848](https://www.permitgraph.org/p/202405091848) | May 9, 2024 | Completed: final sign-off May 2024 | [1822 18th Av](https://www.permitgraph.org/a/2054/026) | re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/high-quality-roofing-co-1045259.