# High Level Construction Co

Contractor license 815112. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/high-level-construction-co-815112
- JSON: https://www.permitgraph.org/api/contractor?license=815112
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=815112

44 permits since 2000: 40 completed, 4 never finaled. Typically 9 days from filing to permit and 120 days from permit to final inspection. Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Dec 2003 to Jan 2026
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 1 | 0 | 0 | 0 |
| 2004 | 1 | 0 | 0 | 0 |
| 2005 | 2 | 0 | 0 | 0 |
| 2006 | 1 | 0 | 0 | 0 |
| 2007 | 2 | 0 | 0 | 0 |
| 2009 | 7 | 0 | 1 | 0 |
| 2010 | 4 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 2 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 3 | 0 | 0 | 0 |
| 2015 | 6 | 0 | 0 | 0 |
| 2016 | 0 | 0 | 1 | 0 |
| 2017 | 2 | 0 | 2 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 2 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |
| 2026 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 3 | 3 | 0 | 0 | 0 | 0 | 128 |
| Deck | 2 | 2 | 0 | 0 | 0 | 36 | 90 |
| Bathroom remodel | 8 | 8 | 0 | 0 | 0 | 10 | 88 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202601164072](https://www.permitgraph.org/p/202601164072) | Jan 16, 2026 | Completed: final sign-off Apr 2026 | [173 Harold Av](https://www.permitgraph.org/a/6979/003) | 1st fl: add wetbar at (e) playroom and remodel part of (e) garage to new media room with new bathroom | $65,000 |
| [202412106520](https://www.permitgraph.org/p/202412106520) | Dec 10, 2024 | Completed: final sign-off Jul 2025 | [234 Madrid St](https://www.permitgraph.org/a/6010/010) | new 1-level deck @ rear yard. at 1st floor remodel (e) space to (n) family w/wet bar, (n) laundry, (n) bath and (n) bedroom. adding 807 sqft. | $182,000 |
| [202209212822](https://www.permitgraph.org/p/202209212822) | Sep 21, 2022 | Completed: final sign-off Mar 2023 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele,… | $405,570 |
| [202012019893](https://www.permitgraph.org/p/202012019893) | Dec 1, 2020 | Completed: final sign-off Mar 2022 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr acce… | $310,155 |
| [202012019892](https://www.permitgraph.org/p/202012019892) | Dec 1, 2020 | Completed: final sign-off Mar 2022 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated m… | $289,203 |
| [201908209241](https://www.permitgraph.org/p/201908209241) | Aug 20, 2019 | Completed: final sign-off Jul 2022 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | suite 675: commercial t.i. 6th flr which includes demo of non-structural partitions, doors, casework, lighting, finishes, construction includes non-structural partitions, glazing, doors, lighting, fi… | $320,497 |
| [201705116335](https://www.permitgraph.org/p/201705116335) | May 11, 2017 | Completed: final sign-off Apr 2019 | [500 Sutter St](https://www.permitgraph.org/a/0284/004) | 2nd floor, spec suite 204 - demolition of non-structural partitions and medical equipments. tenant improvement include construction of non-structural partiions, ceilings, lights & finishes includes a… | $182,000 |
| [201705116330](https://www.permitgraph.org/p/201705116330) | May 11, 2017 | Completed: final sign-off Sep 2017 | [500 Sutter St](https://www.permitgraph.org/a/0284/004) | 2nd floor, spec suite 201 - demolition ofnon-structural partitoins, millwork & medical equipments. tenant improvement include construction of new non-structural partiions, ceilings, lights & finishes… | $71,000 |
| [201704285167](https://www.permitgraph.org/p/201704285167) | Apr 28, 2017 | Never finaled: issued Jun 2017, no final | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 7th floor, common areas : commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, me… | $150,000 |
| [201704285169](https://www.permitgraph.org/p/201704285169) | Apr 28, 2017 | Never finaled: issued Jun 2017, no final | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 7th floor unit 750 srs: commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mech… | $300,000 |
| [201610140299](https://www.permitgraph.org/p/201610140299) | Oct 14, 2016 | Never finaled: issued Nov 2016, no final | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep. | $375,600 |
| [201511193075](https://www.permitgraph.org/p/201511193075) | Nov 19, 2015 | Completed: final sign-off Apr 2016 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | suite # 1830: commercial t.i. which includes new non-structural partitions, lighting, plumbin, mechnical, electrical, millwork and finishes. n/a for maher. | $214,420 |
| [201510230622](https://www.permitgraph.org/p/201510230622) | Oct 23, 2015 | Completed: final sign-off Sep 2016 | [2638 17th Av](https://www.permitgraph.org/a/2480/003E) | construct two bedrooms, one full bathroom, hallway. all work at ground floor. | $46,000 |
| [201510058814](https://www.permitgraph.org/p/201510058814) | Oct 5, 2015 | Completed: final sign-off Nov 2015 | [423 31st Av](https://www.permitgraph.org/a/1463/004) | replace existed dry rotted siding at the front of the building with stucoo and reveal lines where siding existing. | $7,500 |
| [201503231646](https://www.permitgraph.org/p/201503231646) | Mar 23, 2015 | Completed: final sign-off Aug 2015 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 18th floor; suite 1825 - partial interior only demo demising of (e) suite 1825. partition construction, new lights & finishes throughout. restrooms; reconfiguration of (e) 18th flr rr to provide acce… | $250,000 |
| [201503161000](https://www.permitgraph.org/p/201503161000) | Mar 16, 2015 | Completed: final sign-off Sep 2015 | [500 Sutter St](https://www.permitgraph.org/a/0284/004) | suite 300 - demolitoin of non-structural partitions. tenannt improvement include construciton of new interior partitions, new ceiling & lights, & new finishes. at restroom - relocation of grab bars,… | $75,000 |
| [201502269384](https://www.permitgraph.org/p/201502269384) | Feb 26, 2015 | Completed: final sign-off Aug 2015 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | #700- partial interior only, non-structural ti includes demo of walls betweens 3 (e) private offices to provide for a new conference room. demo of (e) ceiling grid and lights, install (n) grid & ligh… | $298,000 |
| [201411212184](https://www.permitgraph.org/p/201411212184) | Nov 21, 2014 | Completed: final sign-off Apr 2015 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | suite 1000: partial interior only demolition to (e) suite 1000, proposed interior only, new finishes, cabinetry and electrical as noted. maher n/a | $269,765 |
| [201410279915](https://www.permitgraph.org/p/201410279915) | Oct 27, 2014 | Completed: final sign-off Mar 2015 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | #1110- partial interior only demolition to (e) suite. new construction includes new sidelights at private offices. new lights and new ceiling grid throughout. install new suite entry doors. new lower… | $225,000 |
| [201404082677](https://www.permitgraph.org/p/201404082677) | Apr 8, 2014 | Completed: final sign-off May 2014 | [7227 Geary Bl](https://www.permitgraph.org/a/1508/040) | unit 1: deck repair (less than 50%)for unit #1; (common area)partial rear exterior wall repair under the deck siding only. no structural work | $19,950 |
| [201311051113](https://www.permitgraph.org/p/201311051113) | Nov 5, 2013 | Completed: final sign-off Feb 2014 | [2223 39th Av](https://www.permitgraph.org/a/2310/003) | construct one bedroom, family room and one bathroom, all work at ground floor. | $32,000 |
| [201309045894](https://www.permitgraph.org/p/201309045894) | Sep 4, 2013 | Completed: final sign-off Mar 2014 | [68 Brentwood Av](https://www.permitgraph.org/a/3054/020) | replace existing stucco with new stucco (in-kind). | $25,000 |
| [201207235455](https://www.permitgraph.org/p/201207235455) | Jul 23, 2012 | Completed: final sign-off Oct 2012 | [122 Paris St](https://www.permitgraph.org/a/6012/011A) | legalize two bedrooms, one full bath & storage/laundry room. all work at ground floor. | $32,000 |
| [201203297159](https://www.permitgraph.org/p/201203297159) | Mar 29, 2012 | Completed: final sign-off Sep 2012 | [2144 Filbert St](https://www.permitgraph.org/a/0516/014) | remodel of kitchen and pantry, laundry area, new cabinets, countertops, tile floor and electrical, plumbing. | $19,000 |
| [201108081967](https://www.permitgraph.org/p/201108081967) | Aug 8, 2011 | Completed: final sign-off Jan 2012 | [1214 02nd Av](https://www.permitgraph.org/a/1749/021) | upper unit - remodel of existing ktichen, demo & install new drywall, flooring, electrical & plumbing & cabinetry. prep, prime & paint. | $15,000 |
| [201011175169](https://www.permitgraph.org/p/201011175169) | Nov 17, 2010 | Completed: final sign-off Jan 2011 | [1070 Pacheco St](https://www.permitgraph.org/a/2120A/012) | repair exterior siding on left side and front garage side of house approx. 250 sq. ft. | $5,500 |
| [201009241621](https://www.permitgraph.org/p/201009241621) | Sep 24, 2010 | Completed: final sign-off Jun 2013 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | revision to 200909217301. error on original application. scope of work: build out 10 offices, phone room, 1 copy room, 1 coffee room at suites 1925 and 1950 per approved plans |  |
| [201009030245](https://www.permitgraph.org/p/201009030245) | Sep 3, 2010 | Completed: final sign-off Nov 2010 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms. | $147,400 |
| [201006023661](https://www.permitgraph.org/p/201006023661) | Jun 2, 2010 | Completed: final sign-off Jul 2010 | [225 10th Av](https://www.permitgraph.org/a/1423/007) | remodel (e) bathroom on 2nd floor | $2,800 |
| [200912032573](https://www.permitgraph.org/p/200912032573) | Dec 3, 2009 | Completed: final sign-off Feb 2010 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | office tenant improvement; demise existing suite, add new door to corridor, remove one existing room(store rm.). | $46,126 |
| [200910239693](https://www.permitgraph.org/p/200910239693) | Oct 23, 2009 | Completed: final sign-off Feb 2010 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area. | $15,500 |
| [200909307952](https://www.permitgraph.org/p/200909307952) | Sep 30, 2009 | Never finaled: issued Oct 2009, no final | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 19th floor - mep submittal for tenant improvement of 2 offices spaces. ref. appl.200909217301. | $74,100 |
| [200906160527](https://www.permitgraph.org/p/200906160527) | Jun 16, 2009 | Completed: final sign-off Jul 2009 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permits | $12,000 |
| [200904216739](https://www.permitgraph.org/p/200904216739) | Apr 21, 2009 | Completed: final sign-off Sep 2009 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electrical | $88,000 |
| [200904216741](https://www.permitgraph.org/p/200904216741) | Apr 21, 2009 | Completed: final sign-off Sep 2009 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit....... | $88,000 |
| [200904216742](https://www.permitgraph.org/p/200904216742) | Apr 21, 2009 | Completed: final sign-off Sep 2009 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | 11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included.... | $88,000 |
| [200902132135](https://www.permitgraph.org/p/200902132135) | Feb 13, 2009 | Completed: final sign-off Mar 2009 | [601 Montgomery St](https://www.permitgraph.org/a/0208/026) | voluntary barrier removal: provide diagonal access to toilets (men's & women's) | $22,500 |
| [200703237124](https://www.permitgraph.org/p/200703237124) | Mar 23, 2007 | Completed: final sign-off Apr 2007 | [173 Harold Av](https://www.permitgraph.org/a/6979/003) | renew pa#200607207138 & #200508019062 for final inspection. |  |
| [200703237059](https://www.permitgraph.org/p/200703237059) | Mar 23, 2007 | Completed: final sign-off Jul 2007 | [1371 32nd Av](https://www.permitgraph.org/a/1787/009D) | adding b, exercise room, bathroom, bedroom added on ground floor and relocate laundry room. | $30,000 |
| [200603307861](https://www.permitgraph.org/p/200603307861) | Mar 30, 2006 | Completed: final sign-off May 2006 | [2142 45th Av](https://www.permitgraph.org/a/2173/041) | remodel (e) 1 kitchen with new cabinets. counter top. sink appliances and new tiles floor. no structural work. remodel (e) 1 bathroom with new sink & bathtub. | $16,000 |
| [200508029171](https://www.permitgraph.org/p/200508029171) | Aug 2, 2005 | Completed: final sign-off Nov 2005 | [1998 15th Av](https://www.permitgraph.org/a/2120B/012) | repair stucco @ right side of the building. | $6,000 |
| [200508019062](https://www.permitgraph.org/p/200508019062) | Aug 1, 2005 | Completed: final sign-off Apr 2007 | [173 Harold Av](https://www.permitgraph.org/a/6979/003) | horizontal addition (approx. 40' x 25') | $150,000 |
| [200407027997](https://www.permitgraph.org/p/200407027997) | Jul 2, 2004 | Completed: final sign-off Sep 2004 | [74 Arnold Av](https://www.permitgraph.org/a/5805/014) | repair stucco at front | $7,000 |
| [200312101958](https://www.permitgraph.org/p/200312101958) | Dec 10, 2003 | Completed: final sign-off Apr 2004 | [1974 36th Av](https://www.permitgraph.org/a/2099/058) | remodel kitchen - change cabinet, sink, stove, walls. | $10,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/high-level-construction-co-815112.
