Back to kitchen remodel contractors
He & Kuang Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Jul 2026
- Last 24 months
- 12 permits filed
90 permits since 2000: 80 completed, 4 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 39 completed, 4 in progress. Typically 0 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 2 Fernwood Dr | remodel kitchen fixture and applicance, upgrade mep. no structrual or layout change. upgrade electrical in living and dining room.Details
remodel kitchen fixture and applicance, upgrade mep. no structrual or layout change. upgrade electrical in living and dining room. | $35,000 |
| Apr 30, 2026 | In progress issued May 2026 | 922 Lawton St | remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical &Details
remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical & | $200,000 |
| Feb 24, 2026 | In progress issued Mar 2026 | 1614 35th Av | 1/f: add 2 (n) bedrooms, (n) bathroom, & (n) mudroom. 2/f: in-fill courtyard & lightwell. remodel (e) kitchen w/ open design. add (n) walk-in pantry. convert (e) bedroom into (n) master bedroom. electrical upgrade throughout house.Details
1/f: add 2 (n) bedrooms, (n) bathroom, & (n) mudroom. 2/f: in-fill courtyard & lightwell. remodel (e) kitchen w/ open design. add (n) walk-in pantry. convert (e) bedroom into (n) master bedroom. electrical upgrade throughout house. | $100,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1722 Ortega St | remodel kitchen & bath, add a new full bath, remove walls, replace 3 skylights and a window on 2nd floor; remodel bath, add kitchenette (2 burner) no oven & laundry on 1st floor; add lights & outletsDetails
remodel kitchen & bath, add a new full bath, remove walls, replace 3 skylights and a window on 2nd floor; remodel bath, add kitchenette (2 burner) no oven & laundry on 1st floor; add lights & outlets | $150,000 |
| Sep 9, 2025 | Completed final sign-off Mar 2026 | 1554 25th Av | kitchen renovation: in kind, no layout changed, 1. replace cabinets, appliances and flooring, 2. upgrade electrical, 3. upgrade plumbing, 4. replace a window between kitchen and central patio (non street visble)Details
kitchen renovation: in kind, no layout changed, 1. replace cabinets, appliances and flooring, 2. upgrade electrical, 3. upgrade plumbing, 4. replace a window between kitchen and central patio (non street visble) | $35,000 |
| May 22, 2025 | Completed final sign-off Sep 2025 | 2162 40th Av | 1)remodel kitchen, remove existing cabinets, install new counter tops, plumbing appliances, hood and tile. 2)remodel existing bathroom. remove & replace existing covering, plumbing fixtures, install new plumbing fixture tile. 3)upgrade 2nd fl. elec outlets & lighting, add one sub electrical panel.Details
1)remodel kitchen, remove existing cabinets, install new counter tops, plumbing appliances, hood and tile. 2)remodel existing bathroom. remove & replace existing covering, plumbing fixtures, install new plumbing fixture tile. 3)upgrade 2nd fl. elec outlets & lighting, add one sub electrical panel. | $48,000 |
| May 17, 2024 | Completed final sign-off Oct 2025 | 2455 22nd Av | remodel existing kitchen. upgrade electricity on 2nd fl include ceiling lights and outlets 200 amp new panelDetails
remodel existing kitchen. upgrade electricity on 2nd fl include ceiling lights and outlets 200 amp new panel | $30,000 |
| Mar 29, 2024 | Completed final sign-off Oct 2024 | 1344 20th Av | 2x kitchen remodel: 1. replace cabinets, appliances and floorings; 2. update eelctrical; 3. update plumbing; upper unit (1344) & lower unit (1346).Details
2x kitchen remodel: 1. replace cabinets, appliances and floorings; 2. update eelctrical; 3. update plumbing; upper unit (1344) & lower unit (1346). | $33,000 |
| Mar 28, 2024 | Completed final sign-off Feb 2025 | 115 Upland Dr | interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind.Details
interior remodel. 1/f: remodel bathroom. add an office, a media room, a bathroom. 2/f: remodel (e) kitchen and bathroom. add a bathroom. replace (3) termite damage front windows in-kind. | $180,000 |
| Jan 5, 2024 | Completed final sign-off Mar 2024 | 2765 39th Av | kitchen remodeling in kind: 1: upgrade kitchen electrical and plumbing. 2) replace counter tops, cabinets, and appliance. no change to wall layout. no change to floor layout. no structural work.Details
kitchen remodeling in kind: 1: upgrade kitchen electrical and plumbing. 2) replace counter tops, cabinets, and appliance. no change to wall layout. no change to floor layout. no structural work. | $25,000 |
| Nov 21, 2023 | Completed final sign-off Jul 2025 | 326 10th Av | comply novv 202287556. remodel rearrange livinig, dining, kitchen,bedroo, bath, stairs,full bath, office. remove walls, infill lightwells, remove sundroom,add deck, stairs 2nd fl. remodel 2 bedroom, bath, playrm.add kitchenette w2 burner stove,no oven,hood,sink. add full bath 1st fl. replace windowsDetails
comply novv 202287556. remodel rearrange livinig, dining, kitchen,bedroo, bath, stairs,full bath, office. remove walls, infill lightwells, remove sundroom,add deck, stairs 2nd fl. remodel 2 bedroom, bath, playrm.add kitchenette w2 burner stove,no oven,hood,sink. add full bath 1st fl. replace windows | $120,000 |
| Oct 13, 2023 | Completed final sign-off Jan 2024 | 2019 31st Av | kitchen remodeling - upgrade kitchen electrical. replace countertops, cabinets, and hood.Details
kitchen remodeling - upgrade kitchen electrical. replace countertops, cabinets, and hood. | $15,000 |
| Aug 23, 2023 | Completed final sign-off Dec 2023 | 270 Upland Dr | upgrade electrical work include one new 200 amp service. new wiring lights outlets through out house. except kitchen and bathroom area. install new sheetrock over existing plaster covering. taping and painting finish. install new kitchen faucet and bath faucet. no structural changeDetails
upgrade electrical work include one new 200 amp service. new wiring lights outlets through out house. except kitchen and bathroom area. install new sheetrock over existing plaster covering. taping and painting finish. install new kitchen faucet and bath faucet. no structural change | $26,000 |
| Dec 22, 2022 | Completed final sign-off May 2023 | 175 10th Av | apt 1: renovate one kitchen and one and a half bath. non structural work.Details
apt 1: renovate one kitchen and one and a half bath. non structural work. | $18,000 |
| Dec 5, 2022 | Completed final sign-off Apr 2023 | 1105 Quintara St | reply to compliant # 202299257 insatll 356 sf fl & wall tiles for 2 children's restroom in preschool, install 3700 sf tiles for 2 classrooms, 2 teachers restroom, 2 storage, kitchen, janitor closet and office. remodel 1 e teachers restroom into ada restroomDetails
reply to compliant # 202299257 insatll 356 sf fl & wall tiles for 2 children's restroom in preschool, install 3700 sf tiles for 2 classrooms, 2 teachers restroom, 2 storage, kitchen, janitor closet and office. remodel 1 e teachers restroom into ada restroom | $40,000 |
| Apr 27, 2022 | Completed final sign-off Aug 2023 | 2101 30th Av | 1st fl - add mechanical room; 2nd fl - remodel kitchen bathroom; add 1 full bath, 1 new skylight; replace all windows with in-kindDetails
1st fl - add mechanical room; 2nd fl - remodel kitchen bathroom; add 1 full bath, 1 new skylight; replace all windows with in-kind | $55,000 |
| Apr 13, 2022 | Completed final sign-off Jul 2023 | 2058 36th Av | 1/f: add 1 den, family and 1.5 bath. 2/f: remodel kitchen, bathroom and add den. add new deck.Details
1/f: add 1 den, family and 1.5 bath. 2/f: remodel kitchen, bathroom and add den. add new deck. | $85,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2023 | 92 Curtis St | relocate (e) bedrm and kitchen and add one full bath at 2nd floor.Details
relocate (e) bedrm and kitchen and add one full bath at 2nd floor. | $40,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2022 | 788 Junipero Serra Bl | remodel kitchen. open walls. add beams and columns. verify footings in crawl space. add masterbath and remodel (e) bath. add closets. change 3 windows not visible from street. general mep upgrades.Details
remodel kitchen. open walls. add beams and columns. verify footings in crawl space. add masterbath and remodel (e) bath. add closets. change 3 windows not visible from street. general mep upgrades. | $50,000 |
| Mar 25, 2021 | Completed final sign-off Sep 2023 | 651 41st Av | revision to no-plan pa# 202101213009. 1st fl add 2 bedrooms, 2 full baths, family, & laundry. 2nd fl remodel kitchen and bathroom. add 1 bedroom & 1 full bath. infill lightwell & add roof deck at rear & patio at rear.Details
revision to no-plan pa# 202101213009. 1st fl add 2 bedrooms, 2 full baths, family, & laundry. 2nd fl remodel kitchen and bathroom. add 1 bedroom & 1 full bath. infill lightwell & add roof deck at rear & patio at rear. | $108,000 |
| Feb 9, 2021 | Completed final sign-off Jun 2021 | 3145 Noriega St | remodel kitchen(127 sf) and 1 bath (52 sf) in kind. no change on walls and layout. maintain 1-hour separation units at area of work.Details
remodel kitchen(127 sf) and 1 bath (52 sf) in kind. no change on walls and layout. maintain 1-hour separation units at area of work. | $30,000 |
| Jan 21, 2021 | Completed final sign-off Sep 2023 | 651 41st Av | remodel kitchen (127 sf) and bath (52 sf) in kind. no change on walls and layouts.Details
remodel kitchen (127 sf) and bath (52 sf) in kind. no change on walls and layouts. | $16,000 |
| Nov 10, 2020 | Completed final sign-off Apr 2022 | 163 Naples St | revision to pa# 202011068365(no plan). 1st fl add 2 bedrooms, 1 full bath, home office & family room. 2nd fl remodel kitchen, bedrooms & bathroom, add 1 full bath, add interior staircase & deck at rear. infill lightwell at northeast side.Details
revision to pa# 202011068365(no plan). 1st fl add 2 bedrooms, 1 full bath, home office & family room. 2nd fl remodel kitchen, bedrooms & bathroom, add 1 full bath, add interior staircase & deck at rear. infill lightwell at northeast side. | $95,000 |
| Nov 6, 2020 | Completed final sign-off Apr 2022 | 163 Naples St | remodel kitchen(78 sf) amd 1 bath (43 sf)no change to layout of walls and openings.Details
remodel kitchen(78 sf) amd 1 bath (43 sf)no change to layout of walls and openings. | $35,000 |
| Oct 23, 2020 | Completed final sign-off Jun 2022 | 323 16th Av | remodel (e) bathrooms & add a full bathroom on 3/f. on 2/f: remodel kitchen, add a 1/2 bath, remove wall, replace stairs to 1/f. remove non-permitted structural and stairs & convert back to original at rear. add storage on1/f. replace windows/door at rear. door at front. relcate water heater/furnaceDetails
remodel (e) bathrooms & add a full bathroom on 3/f. on 2/f: remodel kitchen, add a 1/2 bath, remove wall, replace stairs to 1/f. remove non-permitted structural and stairs & convert back to original at rear. add storage on1/f. replace windows/door at rear. door at front. relcate water heater/furnace | $95,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2020 | 2454 44th Av | kitchen and bathroom remodel. no structural changes. upgrade plumbing and electrical. no change on wallDetails
kitchen and bathroom remodel. no structural changes. upgrade plumbing and electrical. no change on wall | $20,000 |
| May 24, 2019 | Completed final sign-off Dec 2019 | 1546 32nd Av | remodel kitchen and bathroom in-kind. replace sheetrock in living and dining rooms. replace wiring, add lights.Details
remodel kitchen and bathroom in-kind. replace sheetrock in living and dining rooms. replace wiring, add lights. | $30,000 |
| Mar 13, 2019 | Completed final sign-off Jan 2020 | 180 Parker Av | remodel/relocate kitchen, add a full bath, re-arrange rooms on 2nd fl; add rooms & a full bath on 1st fl. relocate water heater and furnaceDetails
remodel/relocate kitchen, add a full bath, re-arrange rooms on 2nd fl; add rooms & a full bath on 1st fl. relocate water heater and furnace | $5,800 |
| Mar 6, 2017 | Completed final sign-off Dec 2017 | 1363 25th Av | remodel kitchen & bath, add a full bath & laundry, close lightwell, remove walls @ 3rd flr. remodel kitchen & bath, add laundry on 2nd flr. relocate/replace water heaters & furnaces, remove laundry & bath on 1st floor. replace w/alum clad wood windows @ front & vinyl windows @ rear.upgrade ele,plbgDetails
remodel kitchen & bath, add a full bath & laundry, close lightwell, remove walls @ 3rd flr. remodel kitchen & bath, add laundry on 2nd flr. relocate/replace water heaters & furnaces, remove laundry & bath on 1st floor. replace w/alum clad wood windows @ front & vinyl windows @ rear.upgrade ele,plbg | $75,000 |
| Nov 16, 2016 | Completed final sign-off Jan 2018 | 685 26th Av | convert family to living and kitchen, remodel bath, rearrange bedrm, legalize as 2nd unit on 1st flr. infill lt well, remodel kitchen & bath. add bathrooms, combine living and dining, replace interior stairs, add skylts and ext stairs on 2nd flr. replace windows in kind at front.replace part fdnDetails
convert family to living and kitchen, remodel bath, rearrange bedrm, legalize as 2nd unit on 1st flr. infill lt well, remodel kitchen & bath. add bathrooms, combine living and dining, replace interior stairs, add skylts and ext stairs on 2nd flr. replace windows in kind at front.replace part fdn | $90,000 |
| Feb 23, 2016 | Completed final sign-off Jun 2016 | 679 26th Av | lower unit-kitchen remodeling,1) upgrade electrical at kichen, 2) replace kitchen cabinets, 3) install appliancesDetails
lower unit-kitchen remodeling,1) upgrade electrical at kichen, 2) replace kitchen cabinets, 3) install appliances | $10,000 |
| Dec 21, 2015 | Completed final sign-off Oct 2016 | 691 29th Av | comply w/complaint #201585081 & revision to #201512165218. relocate entry 2nd flr to 1st flr, remodel (e) skylight & stair, relocate kitchen, remove bearing wall, demolish bedroom to add bathrm, add powder rm. 1st flr: add 2 bedrooms, 2 bathrooms, family room & wet bar.Details
comply w/complaint #201585081 & revision to #201512165218. relocate entry 2nd flr to 1st flr, remodel (e) skylight & stair, relocate kitchen, remove bearing wall, demolish bedroom to add bathrm, add powder rm. 1st flr: add 2 bedrooms, 2 bathrooms, family room & wet bar. | $150,000 |
| Dec 16, 2015 | Completed final sign-off Oct 2016 | 691 29th Av | remodel kitchen and bathroom on upper floor and 1/2 bathroom on lower floor. re-sheetrock living room.Details
remodel kitchen and bathroom on upper floor and 1/2 bathroom on lower floor. re-sheetrock living room. | $30,000 |
| Aug 21, 2015 | Completed final sign-off Jan 2016 | 2981 25th Av | kitchen remodel - remove non-bearing wall between kitchen & breakfat; remodel kitchen windows - combine 2 into single windowDetails
kitchen remodel - remove non-bearing wall between kitchen & breakfat; remodel kitchen windows - combine 2 into single window | $30,000 |
| May 8, 2015 | Completed final sign-off Oct 2015 | 687 23rd Av | remodel kitchen & 2 bathrooms on 2/f & 3/fDetails
remodel kitchen & 2 bathrooms on 2/f & 3/f | $30,000 |
| Jan 12, 2015 | Completed final sign-off Jun 2015 | 1908 23rd Av | replace kitchen counter & cabinets, remodel existing bath, add a full bath, add lights on 2nd flr, legalize storage room on ground floor per plan.Details
replace kitchen counter & cabinets, remodel existing bath, add a full bath, add lights on 2nd flr, legalize storage room on ground floor per plan. | $30,000 |
| Dec 16, 2013 | Completed final sign-off Mar 2014 | 122 Stillings Av | kitchen remodel; to comply with cec150(k)8; new cabinets moving plumbing and electricalDetails
kitchen remodel; to comply with cec150(k)8; new cabinets moving plumbing and electrical | $6,000 |
| Aug 6, 2012 | Completed final sign-off Jan 2013 | 33 San Anselmo Av | kitchen remodel. no structural changed. replace (e) kitchen cabinets, counter tops, floor tiles, sink & faucet. upgrade electrical sub-panel & electrical at kitchen. lighting comply w/ title 24.Details
kitchen remodel. no structural changed. replace (e) kitchen cabinets, counter tops, floor tiles, sink & faucet. upgrade electrical sub-panel & electrical at kitchen. lighting comply w/ title 24. | $12,000 |
| Sep 7, 2011 | Completed final sign-off May 2012 | 658 12th Av | kitchen remodel. replace and remove existing kitchen cabinets. upgrade electrical work and install 6 recessed flourescent lights. replace faucet and sink. remove existing flooring and tiles.Details
kitchen remodel. replace and remove existing kitchen cabinets. upgrade electrical work and install 6 recessed flourescent lights. replace faucet and sink. remove existing flooring and tiles. | $5,000 |
| Sep 15, 2010 | Completed final sign-off Nov 2010 | 3801 Ulloa St | remove partition wall btn dining and kitchen. remodel kitchen on 2nd floorDetails
remove partition wall btn dining and kitchen. remodel kitchen on 2nd floor | $10,000 |
| Jul 14, 2009 | Completed final sign-off Oct 2009 | 201 Harrison St | kitchen remodel- repl cabinets, new lights, appliances, painting at unit #1127, sprinklers under separate permit if removal of walls requires alteration to sprinkler systemDetails
kitchen remodel- repl cabinets, new lights, appliances, painting at unit #1127, sprinklers under separate permit if removal of walls requires alteration to sprinkler system | $10,000 |
| Jan 7, 2008 | Completed final sign-off Mar 2008 | 1991 29th Av | remodel 1 kitchen. new cabinet, counter top / plumbing fixtures. new paint inside / outside. 1 bath: replace toilet & sink.Details
remodel 1 kitchen. new cabinet, counter top / plumbing fixtures. new paint inside / outside. 1 bath: replace toilet & sink. | $14,000 |
| Nov 26, 2007 | Completed final sign-off May 2008 | 1879 20th Av | add bathroom, remodel upper bath, remodel kitchen, convert laundry room to den, convert family room to mstr bedroom, add sliding doors at rear, replace (e) deck, (n) sectional garage door, (n) furnace & wtr heater.Details
add bathroom, remodel upper bath, remodel kitchen, convert laundry room to den, convert family room to mstr bedroom, add sliding doors at rear, replace (e) deck, (n) sectional garage door, (n) furnace & wtr heater. | $35,000 |