2,995 permits since 2000: 2,260 completed, 55 in progress, 300 never finaled, 380 expired or cancelled. Typically 13 days from filing to permit and 185 days from permit to final inspection. Of the 300 never-finaled permits, 15 are 3 to 5 years old, 73 are 5 to 10 years old, 212 are over 10 years old. 19 were filed but never issued.

- Based in: San Francisco
- On San Francisco permits: Jan 2000 to Nov 2026
- Last 24 months: 110 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 118 | 0 | 1 | 104 |
| 2001 | 93 | 0 | 10 | 47 |
| 2002 | 65 | 0 | 4 | 17 |
| 2003 | 120 | 0 | 8 | 33 |
| 2004 | 129 | 0 | 5 | 20 |
| 2005 | 83 | 0 | 14 | 36 |
| 2006 | 72 | 0 | 5 | 15 |
| 2007 | 106 | 0 | 7 | 18 |
| 2008 | 85 | 0 | 7 | 12 |
| 2009 | 57 | 0 | 3 | 3 |
| 2010 | 122 | 0 | 24 | 8 |
| 2011 | 78 | 0 | 16 | 8 |
| 2012 | 95 | 0 | 25 | 9 |
| 2013 | 139 | 0 | 23 | 10 |
| 2014 | 96 | 0 | 20 | 7 |
| 2015 | 124 | 0 | 28 | 5 |
| 2016 | 102 | 0 | 19 | 3 |
| 2017 | 89 | 0 | 18 | 2 |
| 2018 | 117 | 0 | 25 | 0 |
| 2019 | 75 | 0 | 18 | 4 |
| 2020 | 52 | 0 | 4 | 2 |
| 2021 | 37 | 0 | 6 | 5 |
| 2022 | 48 | 0 | 7 | 8 |
| 2023 | 44 | 1 | 3 | 1 |
| 2024 | 57 | 6 | 0 | 3 |
| 2025 | 45 | 12 | 0 | 0 |
| 2026 | 12 | 36 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 24 | 18 | 0 | 3 | 3 | 20 | 252 |
| Stairs | 132 | 103 | 10 | 13 | 6 | 27 | 377 |
| Deck | 13 | 9 | 1 | 2 | 1 | 10 | 195 |
| Pergola or trellis | 3 | 2 | 1 | 0 | 0 | 71 | 191 |
| Kitchen remodel | 37 | 19 | 2 | 11 | 5 | 26 | 190 |

## Most recent permits

The 100 most recent of 2,995.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611190967](https://www.permitgraph.org/p/202611190967) | Nov 19, 2026 | In progress: issued Nov 2026 | [535 Washington St](https://www.permitgraph.org/a/0207/033) | to obtain final inspection for work approved under pa# 202507080363. all work is complete |  |
| [202610279933](https://www.permitgraph.org/p/202610279933) | Oct 27, 2026 | In progress: issued Nov 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 3rd floor: internal demo only, ab017 future t.i. to follow(bldg is fully sprinklered) |  |
| [202610269885](https://www.permitgraph.org/p/202610269885) | Oct 26, 2026 | In progress: issued Nov 2026 | [1 California St](https://www.permitgraph.org/a/0264/004) | interior tenant improvement to renovate level 31 for office use. the project comprises an open office layout with several private offices, a pantry, small meeting rooms, and a large conference room.… | $3,000,000 |
| [202610199591](https://www.permitgraph.org/p/202610199591) | Oct 19, 2026 | In progress: issued Oct 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | suite#: 1200. mep permit pa#: 202609188353 for approved architectural. work includes new duct work and diffusers, heat pumps, lighting, electrical and plumbing. |  |
| [202609188353](https://www.permitgraph.org/p/202609188353) | Sep 18, 2026 | In progress: issued Sep 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | revision to open permit#202602125816, design changes, revised evcs stall location. |  |
| [202609188312](https://www.permitgraph.org/p/202609188312) | Sep 18, 2026 | In progress: issued Sep 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout. | $1,500 |
| [202609117956](https://www.permitgraph.org/p/202609117956) | Sep 11, 2026 | In progress: filed Sep 2026, not yet issued | [2801 Geary Bl](https://www.permitgraph.org/a/1091/001) | construct ext wall at kitchen storage room property line. upgrade accessible restroom demo rear deck stair. | $15,000 |
| [202609037627](https://www.permitgraph.org/p/202609037627) | Sep 3, 2026 | In progress: issued Oct 2026 | [1 Market St](https://www.permitgraph.org/a/3713/007) | 6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17 | $512,352 |
| [202609027622](https://www.permitgraph.org/p/202609027622) | Sep 2, 2026 | In progress: issued Sep 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | roof-revision 202406255203 to mount roof top equipment |  |
| [202608106316](https://www.permitgraph.org/p/202608106316) | Aug 10, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, pantry 08-212p and pantry 08-411p |  |
| [202608066150](https://www.permitgraph.org/p/202608066150) | Aug 6, 2026 | In progress: issued Aug 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includes demo and construction of non-structural partitions, doors, glazing, ceilings and finishes. mep deferred. | $256,025 |
| [202608046053](https://www.permitgraph.org/p/202608046053) | Aug 4, 2026 | In progress: issued Aug 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing modification. associated connection and reinforcement details to convenience stairs. no change to architectual… | $3,000 |
| [202607285676](https://www.permitgraph.org/p/202607285676) | Jul 28, 2026 | In progress: issued Jul 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | install evacuation maps. (level 6,7, & 8) | $2,000 |
| [202607225392](https://www.permitgraph.org/p/202607225392) | Jul 22, 2026 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod addition. |  |
| [202607165148](https://www.permitgraph.org/p/202607165148) | Jul 16, 2026 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | revision phone booths under 202505287420 floors 16. area of work fl 16, add focus pods |  |
| [202607165143](https://www.permitgraph.org/p/202607165143) | Jul 16, 2026 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | 8th floor: phone booth revision per pa #202509125222. |  |
| [202607104843](https://www.permitgraph.org/p/202607104843) | Jul 10, 2026 | In progress: issued Jul 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. | $5,000 |
| [202606264015](https://www.permitgraph.org/p/202606264015) | Jun 26, 2026 | In progress: issued Jul 2026 | [1 California St](https://www.permitgraph.org/a/0264/004) | 22/fl- ref 202604229900- mep work | $750,000 |
| [202606223632](https://www.permitgraph.org/p/202606223632) | Jun 22, 2026 | In progress: issued Jul 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | revisions from 202602266569 - permit set are clouded, tagged and include updates to restroom scope updates per architectural ceiling and wall changes, constructibility coordination. |  |
| [202606092838](https://www.permitgraph.org/p/202606092838) | Jun 9, 2026 | In progress: issued Jun 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | provide mechanincal and electrical for pa#2025-1208-1164 | $90,000 |
| [202606092839](https://www.permitgraph.org/p/202606092839) | Jun 9, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | mech revisions for 8th floor ti permit # 202510207678. |  |
| [202606032410](https://www.permitgraph.org/p/202606032410) | Jun 3, 2026 | Completed: final sign-off Oct 2026 | [491 Post St](https://www.permitgraph.org/a/0307/009) | to obtain final inspection for work approved under pa# 201205049824. all work is complete. |  |
| [202605221781](https://www.permitgraph.org/p/202605221781) | May 22, 2026 | In progress: issued Jun 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 12/f: revision to 202512030869. this revision includes updates to structural drawings to reflect landlord-reviewed changes for field inspection coordination. work includes revisions to grand stair fr… | $15,000 |
| [202605211749](https://www.permitgraph.org/p/202605211749) | May 21, 2026 | In progress: issued Oct 2026 | [425 Market St](https://www.permitgraph.org/a/3709/014) | interior ti for a financial bank - charles schwab- mep ugprade, asscoiated with the remodel. | $550,000 |
| [202605010540](https://www.permitgraph.org/p/202605010540) | May 1, 2026 | In progress: issued Jun 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) floor, opening, structural supports, associated revisions to partition, ceiling and lighting and finishes. 2-… | $399,334 |
| [202605010517](https://www.permitgraph.org/p/202605010517) | May 1, 2026 | In progress: issued Jun 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work includes new floor opening, structural supports, associated revisions, ceiling & lighting & finishes | $399,334 |
| [202604239939](https://www.permitgraph.org/p/202604239939) | Apr 23, 2026 | In progress: issued May 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | suite 1200: deffered m.e.p for pa #202602125816 | $25,000 |
| [202604239945](https://www.permitgraph.org/p/202604239945) | Apr 23, 2026 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | def. health dept submittal for bpa: 202510207678 - l8 catering pantry. |  |
| [202604239959](https://www.permitgraph.org/p/202604239959) | Apr 23, 2026 | In progress: issued May 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | ste 2400 deferred submittal for mep ref pa 202602135952 | $25,000 |
| [202604239943](https://www.permitgraph.org/p/202604239943) | Apr 23, 2026 | Completed: final sign-off Jul 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping | $20,000 |
| [202604229900](https://www.permitgraph.org/p/202604229900) | Apr 22, 2026 | In progress: issued May 2026 | [1 California St](https://www.permitgraph.org/a/0264/004) | 22/fl-ref 202603318610- ti to (e) office space including non structual demo. (n) interior partitions, ceilings, doors, finishes, millwork, lighting, power/data, adn associated mep modifications for o… | $1,500,000 |
| [202604179645](https://www.permitgraph.org/p/202604179645) | Apr 17, 2026 | In progress: issued Apr 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revision to pa# 202406255203 + 202602276646 to remove shaft bottom @ fsd |  |
| [202604079037](https://www.permitgraph.org/p/202604079037) | Apr 7, 2026 | In progress: issued Apr 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into 2 phone rooms on 11/f, 13/f, 14/f. includes non-structural partitions, ceilings, doors, finishes, & associat… | $68,000 |
| [202604079019](https://www.permitgraph.org/p/202604079019) | Apr 7, 2026 | In progress: issued May 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & revised smoke narrative for an addition of 2 new convenience stairs on 11th to 12th & 13th & 14th | $143,772 |
| [202603318610](https://www.permitgraph.org/p/202603318610) | Mar 31, 2026 | In progress: issued Mar 2026 | [1 California St](https://www.permitgraph.org/a/0264/004) | 22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and light fixtures only. ti will be on separate permit | $40,000 |
| [202603278438](https://www.permitgraph.org/p/202603278438) | Mar 27, 2026 | In progress: issued Mar 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stair & new integrated planters. no work effect public row | $125,000 |
| [202603248163](https://www.permitgraph.org/p/202603248163) | Mar 24, 2026 | Completed: final sign-off Jul 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | deferred mep for office ti permit 202603036821. spec suites 250 and 270. | $200,000 |
| [202602276647](https://www.permitgraph.org/p/202602276647) | Mar 11, 2026 | In progress: issued Jun 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also… | $2,350,400 |
| [202603036821](https://www.permitgraph.org/p/202603036821) | Mar 3, 2026 | Completed: final sign-off Jul 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & f… | $750,000 |
| [202602276646](https://www.permitgraph.org/p/202602276646) | Feb 27, 2026 | In progress: issued Mar 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnoval of sector 2 shaft and roof top equipment scope |  |
| [202602276723](https://www.permitgraph.org/p/202602276723) | Feb 27, 2026 | In progress: issued Apr 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf. | $8,000,000 |
| [202602266569](https://www.permitgraph.org/p/202602266569) | Feb 26, 2026 | In progress: issued Apr 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft | $15,855,932 |
| [202602135952](https://www.permitgraph.org/p/202602135952) | Feb 13, 2026 | In progress: issued Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 2/f suite 2400: tenant improvement. interior construction of non structural elements including but not necessary limited interior partitions, doors, finishes, ceiling and lighting. relocation of rest… | $1,400,000 |
| [202602135969](https://www.permitgraph.org/p/202602135969) | Feb 13, 2026 | In progress: issued Mar 2026 | [535 Washington St](https://www.permitgraph.org/a/0207/033) | revise pa #202204111970 and 202507080363 to document approved code equivalency for panic hardware at exit gates of redwood park. |  |
| [202602125816](https://www.permitgraph.org/p/202602125816) | Feb 12, 2026 | In progress: issued Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceiling and lighting. mep deferred. non structural. | $1,100,000 |
| [202602095509](https://www.permitgraph.org/p/202602095509) | Feb 9, 2026 | In progress: issued Mar 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans. | $13,383,368 |
| [202601204090](https://www.permitgraph.org/p/202601204090) | Jan 20, 2026 | Completed: final sign-off Oct 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | non structural demo on floors 1,4,5, & 6 | $830,000 |
| [202601143839](https://www.permitgraph.org/p/202601143839) | Jan 14, 2026 | Completed: final sign-off Jun 2026 | [1140 07th St](https://www.permitgraph.org/a/3820/004) | to obtain final inspection for work approved under 202010315479 and 202002144560 |  |
| [202512081180](https://www.permitgraph.org/p/202512081180) | Dec 8, 2025 | In progress: issued Mar 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations. | $1,000,000 |
| [202512081164](https://www.permitgraph.org/p/202512081164) | Dec 8, 2025 | In progress: issued Mar 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | provide new exit passageway at ground floor | $250,000 |
| [202512030863](https://www.permitgraph.org/p/202512030863) | Dec 3, 2025 | In progress: issued Mar 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,500,000 |
| [202512030869](https://www.permitgraph.org/p/202512030869) | Dec 3, 2025 | In progress: issued Mar 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, anchar… | $9,700,000 |
| [202512020736](https://www.permitgraph.org/p/202512020736) | Dec 2, 2025 | Completed: final sign-off Dec 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | revision to bpa: 202506309783 - scope includes partial removal of approved light fixtures that will impact electrical and energy sheets. |  |
| [202512010611](https://www.permitgraph.org/p/202512010611) | Dec 1, 2025 | In progress: issued Mar 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep | $6,600,000 |
| [202511260514](https://www.permitgraph.org/p/202511260514) | Nov 26, 2025 | In progress: issued Mar 2026 | [101 California St](https://www.permitgraph.org/a/0263/011) | 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep. | $8,800,000 |
| [202511210171](https://www.permitgraph.org/p/202511210171) | Nov 21, 2025 | Completed: final sign-off Apr 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) pane… |  |
| [202510248150](https://www.permitgraph.org/p/202510248150) | Nov 17, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | 7th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,123,250 |
| [202510207678](https://www.permitgraph.org/p/202510207678) | Nov 17, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | 8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry. | $3,083,100 |
| [202511139547](https://www.permitgraph.org/p/202511139547) | Nov 13, 2025 | Completed: final sign-off Jun 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150. | $15,000 |
| [202511109277](https://www.permitgraph.org/p/202511109277) | Nov 10, 2025 | Completed: final sign-off Sep 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following building applications: l6-202510288253, l7-202510248150, l8 202510207678 | $275,000 |
| [202509165412](https://www.permitgraph.org/p/202509165412) | Nov 6, 2025 | In progress: issued Mar 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trell… | $250,000 |
| [202510288253](https://www.permitgraph.org/p/202510288253) | Oct 28, 2025 | Completed: final sign-off Oct 2026 | [505 Howard St](https://www.permitgraph.org/a/3736/183) | 6th flr - tenant improvement including build out of new open work space, enclosed offices, meeting rooms, and restrooms. | $4,163,600 |
| [202510076847](https://www.permitgraph.org/p/202510076847) | Oct 7, 2025 | Completed: final sign-off Jan 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 17th & 18th fl: deferred mep for pa # 202508062394 | $101,415 |
| [202509246061](https://www.permitgraph.org/p/202509246061) | Sep 24, 2025 | Completed: final sign-off Jul 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existin… | $25,000 |
| [202509195677](https://www.permitgraph.org/p/202509195677) | Sep 19, 2025 | Completed: final sign-off Dec 2025 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | deferred mep for building permit 202507030103 |  |
| [202509165351](https://www.permitgraph.org/p/202509165351) | Sep 16, 2025 | Completed: final sign-off Dec 2025 | [300 Clay St](https://www.permitgraph.org/a/0204/021) | revision to pa# 202502261091: removing the work on the east entrance from the scope of work. |  |
| [202509125218](https://www.permitgraph.org/p/202509125218) | Sep 12, 2025 | Completed: final sign-off Feb 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 22nd fl - revision to pa202504114245 for relocation of fire smoke dampers |  |
| [202509054634](https://www.permitgraph.org/p/202509054634) | Sep 12, 2025 | In progress: issued Jan 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | deferred submittal to pa# 202406255203 for frp structural only. |  |
| [202509125222](https://www.permitgraph.org/p/202509125222) | Sep 12, 2025 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | revision to 202506096173. remove 1 focus pod on floor 8,9,10, and 11. |  |
| [202509105026](https://www.permitgraph.org/p/202509105026) | Sep 10, 2025 | Completed: final sign-off Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | #3000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507231432, new lighting in open office 108 and 111 only. | $15,000 |
| [202509105024](https://www.permitgraph.org/p/202509105024) | Sep 10, 2025 | Completed: final sign-off Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | #4000 mechanical demo & revise existing ductwork furnish & install 1 new duct & diffusers, rebalance existing terminal units ref pa 202507221346 | $15,000 |
| [202509054642](https://www.permitgraph.org/p/202509054642) | Sep 5, 2025 | Completed: final sign-off Apr 2026 | [201 Spear St](https://www.permitgraph.org/a/3741/032) | 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. a… | $800,000 |
| [202508273987](https://www.permitgraph.org/p/202508273987) | Aug 27, 2025 | Completed: final sign-off Dec 2025 | [300 Clay St](https://www.permitgraph.org/a/0204/021) | ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms. |  |
| [202508203517](https://www.permitgraph.org/p/202508203517) | Aug 20, 2025 | Completed: final sign-off Aug 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | interior tenant fitout of office space on l20 of a 50 story building. non structural partitions and ceilings, finishes and millwork. | $2,520,000 |
| [202508203523](https://www.permitgraph.org/p/202508203523) | Aug 20, 2025 | Completed: final sign-off Aug 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 21st fl- interior demolition subject to and interior tenant fit out of office space including non-structural partitions, ceilings, finishes and millwork. | $2,190,000 |
| [202508132898](https://www.permitgraph.org/p/202508132898) | Aug 13, 2025 | Completed: final sign-off Sep 2025 | [425 Market St](https://www.permitgraph.org/a/3709/014) | 2nd fl ref pa # 2024-1021-3389. evacuation signage | $5,000 |
| [202508062394](https://www.permitgraph.org/p/202508062394) | Aug 6, 2025 | Completed: final sign-off Jan 2026 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 17th and 18th/fl: tenant improvement to include construction of new inner-connecting stairs between floors 17th and 18th. demolition and installation of new power outlets and tel/data. rework ceiling… | $378,295 |
| [202507231432](https://www.permitgraph.org/p/202507231432) | Jul 23, 2025 | Completed: final sign-off Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | #3000: 3rd floor, consists of interior construction. mechanical, electrical, fls, and fire sprinkler work is limited to what is required based on new lighting layout. scope does not affect plumbing f… | $131,148 |
| [202507221320](https://www.permitgraph.org/p/202507221320) | Jul 22, 2025 | Completed: final sign-off Nov 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | suite 1600 - ref ti 202506279624- mech demo revise (e) ductwork and diffusers furnish and install new duct, rebalance (e) terminal. electrical track lighting fixtures, and circuiting controls | $25,000 |
| [202507221346](https://www.permitgraph.org/p/202507221346) | Jul 22, 2025 | Completed: final sign-off Feb 2026 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | #4000 -patch and repair finishes impacted by interior demo and adddition of new lighting. | $90,000 |
| [202507080363](https://www.permitgraph.org/p/202507080363) | Jul 8, 2025 | In progress: issued Aug 2025 | [535 Washington St](https://www.permitgraph.org/a/0207/033) | revision to pa #202204111970 to document approved occupant load for a-2 space; change exit gates to swing in the direction of egress; location of fire extinguishers and exit signs. |  |
| [202507030103](https://www.permitgraph.org/p/202507030103) | Jul 3, 2025 | Completed: final sign-off Dec 2025 | [301 Howard St](https://www.permitgraph.org/a/3738/011) | 5th fl, ste 500 existing office remodel that includes selected demo and new construction of walls, floors, electrical, ceilings and light fixture removal/replacement, new phone booths. mep deferred | $887,826 |
| [202506309783](https://www.permitgraph.org/p/202506309783) | Jun 30, 2025 | Completed: final sign-off Dec 2025 | [350 Mission St](https://www.permitgraph.org/a/3710/017) | 2/f - ti (e)restaurant & bar located. add accessory use for 2(n) golf simulators with metal trellis; modification & removal of (e) wood trellis; existing building is fully sprinkler. fire sprinklers… | $297,800 |
| [202506279624](https://www.permitgraph.org/p/202506279624) | Jun 27, 2025 | Completed: final sign-off Nov 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | 1/f suite 1600 interior demolition of non structural elements including but not limited to partition, doors, finishes, ceilings, lighting, mechanical and electrical outlets and switches w/patch repai… | $92,432 |
| [202506259469](https://www.permitgraph.org/p/202506259469) | Jun 25, 2025 | Completed: final sign-off Aug 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | ste 4807: l4-furnish & install new duct and diffuser to accomodate new floor plan. demo & revise existing ductwork. office tenant retrofit: lighting fixtures and associated circuting/control, power a… | $17,532 |
| [202506178888](https://www.permitgraph.org/p/202506178888) | Jun 17, 2025 | Completed: final sign-off Aug 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | interior demolition of levels 20 and 21. demolition subject to ab-017 | $250,000 |
| [202506047929](https://www.permitgraph.org/p/202506047929) | Jun 4, 2025 | Completed: final sign-off Aug 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | tenant improvement: partial demo at e wall, add door, add new wall, relocate e lighting and elec | $36,750 |
| [202505287420](https://www.permitgraph.org/p/202505287420) | May 28, 2025 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | floors 12-19: install focus pods. | $25,000 |
| [202505287418](https://www.permitgraph.org/p/202505287418) | May 28, 2025 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | floors 21-25, 27-30: install focus pods. | $25,000 |
| [202505096173](https://www.permitgraph.org/p/202505096173) | May 9, 2025 | Completed: final sign-off Aug 2026 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | install focus pods on floors 8,9.10, & 11 | $60,000 |
| [202505055833](https://www.permitgraph.org/p/202505055833) | May 5, 2025 | Completed: final sign-off Nov 2025 | [615 Battery St](https://www.permitgraph.org/a/0174/004) | 6/f: deferred mep submittal for building permit 202503212723 includes mechanical, electrical, and plumbing. | $384,260 |
| [202505025724](https://www.permitgraph.org/p/202505025724) | May 2, 2025 | Completed: final sign-off Oct 2025 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | 11/f: ref 202504174648: structure - new elevated concrete slab. | $20,000 |
| [202504305490](https://www.permitgraph.org/p/202504305490) | Apr 30, 2025 | Completed: final sign-off Nov 2025 | [615 Battery St](https://www.permitgraph.org/a/0174/004) | revision to pa 202503212723 change to restroom layout no fixture changes |  |
| [202504245156](https://www.permitgraph.org/p/202504245156) | Apr 24, 2025 | Completed: final sign-off Jul 2025 | [120 Kearny St](https://www.permitgraph.org/a/0292/008) | 37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open office |  |
| [202504174648](https://www.permitgraph.org/p/202504174648) | Apr 17, 2025 | Completed: final sign-off Jun 2025 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | 11th fl: new multi-faith room. new finishes, mechanical & electrical | $243,000 |
| [202503263103](https://www.permitgraph.org/p/202503263103) | Apr 15, 2025 | In progress: issued Aug 2025 | [185 Berry St](https://www.permitgraph.org/a/3803/005) | converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements t… | $15,000,000 |
| [202504114245](https://www.permitgraph.org/p/202504114245) | Apr 11, 2025 | Completed: final sign-off Feb 2026 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 22nd floor: interior tenant fit out of office space. | $2,350,000 |
| [202504023585](https://www.permitgraph.org/p/202504023585) | Apr 2, 2025 | Completed: final sign-off Nov 2025 | [600 Montgomery St](https://www.permitgraph.org/a/0207/032) | 35/f: electrical work for pa #202502120191 |  |
| [202503263060](https://www.permitgraph.org/p/202503263060) | Mar 26, 2025 | Completed: final sign-off Aug 2025 | [2 Embarcadero Center](https://www.permitgraph.org/a/0231/023) | 19/flr- demo of non load bearing partitions, finishes, ceilings construction of (n) full height partitions, doors, glazing, assoocated electrical power lighting, associates mechanical system distribu… | $400,000 |
| [202503212723](https://www.permitgraph.org/p/202503212723) | Mar 21, 2025 | Completed: final sign-off Nov 2025 | [615 Battery St](https://www.permitgraph.org/a/0174/004) | 6th fl: interior alteration of (e) office suite. new non structural partitions, millwork, ceilings, finishes. remodel of (e) restrooms, (n) accessible platform lift & alterations to portions of the 5… | $484,753 |

---