44 permits since 2000: 29 completed, 1 in progress, 10 never finaled, 4 expired or cancelled. Typically 3 days from filing to permit and 185 days from permit to final inspection. Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.

- Based in: San Rafael
- On San Francisco permits: Dec 2003 to Feb 2025
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 2 | 0 | 0 | 0 |
| 2004 | 3 | 0 | 0 | 1 |
| 2006 | 1 | 0 | 0 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2008 | 2 | 0 | 0 | 0 |
| 2009 | 6 | 0 | 0 | 0 |
| 2011 | 3 | 0 | 0 | 0 |
| 2012 | 2 | 0 | 1 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 0 | 0 | 3 | 0 |
| 2015 | 1 | 0 | 3 | 0 |
| 2016 | 2 | 0 | 1 | 1 |
| 2017 | 0 | 0 | 1 | 1 |
| 2018 | 1 | 0 | 0 | 0 |
| 2019 | 1 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 0 | 0 |
| 2021 | 0 | 0 | 1 | 0 |
| 2022 | 0 | 0 | 0 | 1 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 1 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 6 | 4 | 0 | 1 | 1 | 156 | 431 |
| Pergola or trellis | 1 | 1 | 0 | 0 | 0 | 191 | 65 |
| Kitchen remodel | 9 | 7 | 0 | 1 | 1 | 6 | 203 |
| Bathroom remodel | 11 | 8 | 0 | 2 | 1 | 11 | 248 |
| Stairs | 6 | 3 | 0 | 2 | 1 | 74 | 385 |
| Deck | 7 | 5 | 0 | 2 | 0 | 62 | 236 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202502240958](https://www.permitgraph.org/p/202502240958) | Feb 24, 2025 | In progress: issued Feb 2025 | [851 Alvarado St](https://www.permitgraph.org/a/2802/040) | to perform exploratory demolition, removing sheet rock and non structural materials. contractor will replace materials in kind. this work is for the new adu. | $4,000 |
| [202501218692](https://www.permitgraph.org/p/202501218692) | Feb 17, 2025 | Completed: final sign-off Oct 2026 | [851 Alvarado St](https://www.permitgraph.org/a/2802/040) | ab1114:adu converted @ basement(no addition)including:(n) windows & doors,(n)1hr fire rated interior corridor to access adu.remodel of(e)kitchen & bath,exterior stairs replaced & roof deck repair wat… | $220,000 |
| [202412116581](https://www.permitgraph.org/p/202412116581) | Dec 11, 2024 | Completed: final sign-off Dec 2024 | [2390 Hyde St](https://www.permitgraph.org/a/0068/040) | to obtain final inspection for work approved under pa # 2021-0709-4106 & 2022-0708-8106. all work is complete |  |
| [202207088106](https://www.permitgraph.org/p/202207088106) | Jul 8, 2022 | Expired or cancelled: expired Dec 2024 | [2390 Hyde St](https://www.permitgraph.org/a/0068/040) | unit 3 - renovation of (e) 2-level condo: kitchen, 3 baths main fl, 1 bath lower level, interior stair upgrade, bedroom upgrades. ref 202201196232. | $39,221 |
| [202104088199](https://www.permitgraph.org/p/202104088199) | Apr 8, 2021 | Never finaled: issued Jun 2021, no final | [569 Duboce Av](https://www.permitgraph.org/a/3538/055) | widening the (e)7'-6" garage door to 9'-0". replace in-kind (e) exterior door, 2(e) exterior windows at the rearside of the house. replace 2(e) exterior doors at rear. repair & replace portion of (e)… | $300,000 |
| [202003066362](https://www.permitgraph.org/p/202003066362) | Mar 6, 2020 | Completed: final sign-off Jan 2021 | [755 14th Av](https://www.permitgraph.org/a/1657/008A) | bathroom remodel. new plumbing fixtures and tile. convert bathtub to shower. reconfigure closet next to bathroom. | $16,000 |
| [201908209373](https://www.permitgraph.org/p/201908209373) | Aug 20, 2019 | Completed: final sign-off Nov 2019 | [529 Commercial St](https://www.permitgraph.org/a/0228/018) | mep submittal for 201807194945 |  |
| [201807194945](https://www.permitgraph.org/p/201807194945) | Jul 19, 2018 | Completed: final sign-off Nov 2019 | [529 Commercial St](https://www.permitgraph.org/a/0228/018) | new partition, new finishes for tenant improvement. all work on second floor.. | $100,000 |
| [201709056810](https://www.permitgraph.org/p/201709056810) | Sep 5, 2017 | Never finaled: issued May 2019, no final | [101 Lansdale Av](https://www.permitgraph.org/a/2974/015) | level one: no work. level two: add bedroom on (e) deck at the back of the house. | $65,000 |
| [201702078798](https://www.permitgraph.org/p/201702078798) | Feb 7, 2017 | Expired or cancelled: expired Jul 2024 | [670 12th Av](https://www.permitgraph.org/a/1633/033) | new roof deck at front roof. no expansion of bld envelope. no added sq footage.additional scope to bpa #2016/1014/0322 | $5,000 |
| [201610140322](https://www.permitgraph.org/p/201610140322) | Oct 14, 2016 | Completed: final sign-off Dec 2018 | [670 12th Av](https://www.permitgraph.org/a/1633/033) | interior remodel on all existing floors, replace exterior windows, new skylights, new roof deck over e roof at rear, replace rear deck, removeal of bay window at rear, partial lightwell infill | $600,000 |
| [201608195554](https://www.permitgraph.org/p/201608195554) | Aug 19, 2016 | Never finaled: issued Aug 2016, no final | [670 12th Av](https://www.permitgraph.org/a/1633/033) | exploratory demo for architect and engineer. removal of non structural finishes. patch and repair, in kind. | $1,000 |
| [201605258304](https://www.permitgraph.org/p/201605258304) | May 25, 2016 | Expired or cancelled: cancelled Jan 2026 | [425 Bush St](https://www.permitgraph.org/a/0287/023) | suite#200 - new pair of 90 min. fire-rated entry doors at existing elevator lobby and new floor and wall finishes at elevator lobby. | $10,000 |
| [201604144815](https://www.permitgraph.org/p/201604144815) | Apr 14, 2016 | Completed: final sign-off Jun 2017 | [569 Duboce Av](https://www.permitgraph.org/a/3538/055) | new deck in rear with new stair to replace (e) landing and stair. | $9,000 |
| [201511102198](https://www.permitgraph.org/p/201511102198) | Nov 10, 2015 | Completed: final sign-off Nov 2016 | [516 21st Av](https://www.permitgraph.org/a/1563/039) | interior remodel @ 2nd floor kitchen. remove wall between kitchen & dining | $35,000 |
| [201503100355](https://www.permitgraph.org/p/201503100355) | Mar 10, 2015 | Never finaled: issued Mar 2015, no final | [44 Jersey St](https://www.permitgraph.org/a/6510/007) | scope includes stair access and roof deck for the use of unit 44 only | $45,000 |
| [201502188642](https://www.permitgraph.org/p/201502188642) | Feb 18, 2015 | Never finaled: issued Feb 2015, no final | [373 Arguello Bl](https://www.permitgraph.org/a/1432/048) | replace 3rd floor window at the rear of the building to match existing. replace front wood window new window to match existing. front windows that are existing are wood casement with divided lights.… | $8,000 |
| [201502128177](https://www.permitgraph.org/p/201502128177) | Feb 12, 2015 | Never finaled: issued Feb 2015, no final | [40 Jersey St](https://www.permitgraph.org/a/6510/007) | scope includes renovation of e bathrooms, kitchens at unit 40, 42, 46. new french door and deck at unit 40. | $50,000 |
| [201406279885](https://www.permitgraph.org/p/201406279885) | Jun 27, 2014 | Never finaled: issued Aug 2014, no final | [40 Jersey St](https://www.permitgraph.org/a/6510/007) | revision to 201406269544: scope of work changed to window replacement of all 60 existing windows at same openings, interior renovation of a unit 44 only. voluntary seismic upgrade to open garage fron… | $200,000 |
| [201406269544](https://www.permitgraph.org/p/201406269544) | Jun 26, 2014 | Never finaled: issued Jun 2014, no final | [40 Jersey St](https://www.permitgraph.org/a/6510/007) | interior demolition to an existing four unit building in preparation of tenant improvement. | $15,000 |
| [201404082761](https://www.permitgraph.org/p/201404082761) | Apr 8, 2014 | Never finaled: issued May 2014, no final | [373 Arguello Bl](https://www.permitgraph.org/a/1432/048) | ground floor: re-build existing interior stair, remodel existing habitable space to new master bedroom & bth, new 1/2 bath. second floor: remodel ktichen & stair to ground floor. compliance with ordi… | $150,000 |
| [201307232550](https://www.permitgraph.org/p/201307232550) | Jul 23, 2013 | Completed: final sign-off Feb 2014 | [34 Porter St](https://www.permitgraph.org/a/5807/004) | kitchen and bathroom renovation. replace (e) window in both two total. no structural work new electrical and new plumbing work. | $45,000 |
| [201212246820](https://www.permitgraph.org/p/201212246820) | Dec 24, 2012 | Never finaled: issued Jan 2013, no final | [425 Bush St](https://www.permitgraph.org/a/0287/023) | barrier removal work - 4th floor restroom. work includes new partitions, doors & frame, new fixtures, finishes, lighting, minor plumbing & electrical. | $53,000 |
| [201212216724](https://www.permitgraph.org/p/201212216724) | Dec 21, 2012 | Completed: final sign-off Apr 2013 | [351 California St](https://www.permitgraph.org/a/0261/010A) | demo of (e) non-load bearing interior partitions, doors & finishes. new construction of ceiling heights. partitions, doors & finishes. mep under separate permit. | $208,000 |
| [201204108045](https://www.permitgraph.org/p/201204108045) | Apr 10, 2012 | Completed: final sign-off Jul 2012 | [1483 Mcallister St](https://www.permitgraph.org/a/0777/037) | repair existing deck s story. replace 6 posts, new railing, less than 50% | $2,000 |
| [201110146782](https://www.permitgraph.org/p/201110146782) | Oct 14, 2011 | Completed: final sign-off May 2012 | [201 Vicente St](https://www.permitgraph.org/a/2932/001) | 1st floor: kitchen remodel with removal of 1 non-structural wall, partial powder rm remodel, minor dry rot repair. adding structural support for floor joists above. 2nd floor: master bath and guest b… | $70,000 |
| [201108051829](https://www.permitgraph.org/p/201108051829) | Aug 5, 2011 | Completed: final sign-off Oct 2012 | [447 Battery St](https://www.permitgraph.org/a/0206/002) | interior demolition of 3rd floor, construction of new offices & conference room. restroom and breakroom upgrades. | $110,000 |
| [201107281251](https://www.permitgraph.org/p/201107281251) | Jul 28, 2011 | Completed: final sign-off May 2012 | [209 Noe St](https://www.permitgraph.org/a/3560/036) | remodel of kitchen & 2 bathrooms to include addition of 2 new skylights and parapets | $75,000 |
| [200911040582](https://www.permitgraph.org/p/200911040582) | Nov 4, 2009 | Completed: final sign-off Jan 2010 | [1405 Douglass St](https://www.permitgraph.org/a/6605/019) | to obtain final inspection for work approved under pa 200809192062; all work is complete |  |
| [200911040581](https://www.permitgraph.org/p/200911040581) | Nov 4, 2009 | Completed: final sign-off Jan 2010 | [1405 Douglass St](https://www.permitgraph.org/a/6605/019) | to obtain final inspection for work approved under pa 200805202482; all work is complete |  |
| [200911040580](https://www.permitgraph.org/p/200911040580) | Nov 4, 2009 | Completed: final sign-off Jan 2010 | [1405 Douglass St](https://www.permitgraph.org/a/6605/019) | to obtain final inspection for work approved under pa 200806235096; all work is complete |  |
| [200908124662](https://www.permitgraph.org/p/200908124662) | Aug 12, 2009 | Completed: final sign-off Jan 2010 | [1 Lupine Av](https://www.permitgraph.org/a/1069/036) | remodel of existing bathroom - change out plumbing fixtures tile & electrical, provide high efficancy lights ore "manual on" occupancy sensor in bathroom. | $10,000 |
| [200906039608](https://www.permitgraph.org/p/200906039608) | Jun 3, 2009 | Completed: final sign-off Jan 2010 | [1405 Douglass St](https://www.permitgraph.org/a/6605/019) | to complete work and obtain final inspection for work approved under previous application pa#200610104534s | $80,000 |
| [200904277098](https://www.permitgraph.org/p/200904277098) | Apr 27, 2009 | Completed: final sign-off Jan 2010 | [1405 Douglass St](https://www.permitgraph.org/a/6605/019) | revision to appl #200803217683 to add a sink cabient, refrigerator cabient, built-in barbeque w/2' tall splash bedhind it & warming , storage drawers beneath it at the north roof deck under the propo… | $3,000 |
| [200812108212](https://www.permitgraph.org/p/200812108212) | Dec 10, 2008 | Completed: final sign-off Jul 2012 | [824 Green St](https://www.permitgraph.org/a/0119/012) | new 250 sf roof deck, new exterior spiral stair to 3rd floor deck, new door to new stair | $50,000 |
| [200801222985](https://www.permitgraph.org/p/200801222985) | Jan 22, 2008 | Completed: final sign-off May 2009 | [2312 Greenwich St](https://www.permitgraph.org/a/0511/007) | comply with physical inspection report 3r-5008 | $1,500 |
| [200706154105](https://www.permitgraph.org/p/200706154105) | Jun 15, 2007 | Completed: final sign-off Dec 2007 | [2367 Bush St](https://www.permitgraph.org/a/0679/045) | kitchen remodel. replace existing appliances and cabinets with new. add high efficacy under cabinet lighting and 2 pendants in e downlight location. replace e old windows 2 w/new replacement windows | $39,000 |
| [200603106397](https://www.permitgraph.org/p/200603106397) | Mar 10, 2006 | Completed: final sign-off Mar 2006 | [1859 Scott St](https://www.permitgraph.org/a/1050/033) | replacing original proposed new stl. beam with 7 x 11 7/8 wood power beams at same location & eliminate special inspection for welding. see page s2, structural engineering drawings dated 03/01/06. th… |  |
| [200412060795](https://www.permitgraph.org/p/200412060795) | Dec 6, 2004 | Completed: final sign-off Dec 2004 | [36 Santa Ynez Av](https://www.permitgraph.org/a/3209/007) | rev. in scope of work due to cost restrains.deletion of elevated raised deck @ back yard location |  |
| [200412060782](https://www.permitgraph.org/p/200412060782) | Dec 6, 2004 | Completed: final sign-off Dec 2004 | [36 Santa Ynez Av](https://www.permitgraph.org/a/3209/007) | to renew app #200311049347 |  |
| [200406166623](https://www.permitgraph.org/p/200406166623) | Jun 16, 2004 | Completed: final sign-off Apr 2005 | [2312 Greenwich St](https://www.permitgraph.org/a/0511/007) | residential remodel. remodel kitchen, remodel 2 baths, 1 structural wall-see structural eng calcs & | $80,000 |
| [200402106039](https://www.permitgraph.org/p/200402106039) | Feb 10, 2004 | Expired or cancelled: expired Feb 2006 | [190 25th Av](https://www.permitgraph.org/a/1334/015A) | remove exist plaster and lath, remove exist stucco from front, upgrade electrical as needed, seismic | $30,000 |
| [200312152319](https://www.permitgraph.org/p/200312152319) | Dec 15, 2003 | Completed: final sign-off Dec 2003 | [55 Capra Wy](https://www.permitgraph.org/a/0463A/038) | rev. appl#200301296162 include 1 skylight, bench, stucco finish on parapet walls |  |
| [200312091904](https://www.permitgraph.org/p/200312091904) | Dec 9, 2003 | Completed: final sign-off Dec 2004 | [36 Santa Ynez Av](https://www.permitgraph.org/a/3209/007) | renovation of (e) bsmt, upstairs bathroom, add 1 bath @ lower level,add paved patio in back yard, | $80,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.