# H 2 Construction

Contractor license 928776. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/h-2-construction-928776
- JSON: https://www.permitgraph.org/api/contractor?license=928776
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=928776

21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 233 days from permit to final inspection. Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old. 1 was filed but never issued.

- Based in: Millbrae
- On San Francisco permits: Mar 2012 to Sep 2026
- Last 24 months: 4 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 2 | 0 | 0 | 0 |
| 2015 | 1 | 0 | 1 | 0 |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |
| 2019 | 0 | 0 | 0 | 1 |
| 2021 | 2 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 1 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 3 | 0 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 2 | 2 | 0 | 0 | 0 | 314 | 706 |
| Stairs | 5 | 5 | 0 | 0 | 0 | 25 | 233 |
| Bathroom remodel | 8 | 7 | 0 | 1 | 0 | 101 | 358 |
| Kitchen remodel | 3 | 2 | 1 | 0 | 0 | 73 | 554 |
| Deck | 2 | 2 | 0 | 0 | 0 | 89 | 174 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609097857](https://www.permitgraph.org/p/202609097857) | Sep 9, 2026 | In progress: issued Sep 2026 | [3172 Sacramento St](https://www.permitgraph.org/a/1006/030) | kitchen remodel. repair in kind, no change in layout, new cabinets, new countertop and appliances. | $12,700 |
| [202511200141](https://www.permitgraph.org/p/202511200141) | Nov 20, 2025 | Completed: final sign-off Dec 2025 | [270 Claremont Bl](https://www.permitgraph.org/a/2979/007) | tile (e) stairs at front of house, less than 50% repair, no changes, street visible. | $1,100 |
| [202509256121](https://www.permitgraph.org/p/202509256121) | Sep 25, 2025 | Completed: final sign-off Nov 2025 | [579 46th Av](https://www.permitgraph.org/a/1498/020) | dry rot repair on front of building remove dry rot water proof then stucco like and match existing stucco no structural work | $7,600 |
| [202505277298](https://www.permitgraph.org/p/202505277298) | May 27, 2025 | Completed: final sign-off Nov 2025 | [270 Claremont Bl](https://www.permitgraph.org/a/2979/007) | revision to pa 202410202766 engineering structural change design from 2x14 to 2x10 to match existing framing. revise structural joist & beam. same layout no change. |  |
| [202410102766](https://www.permitgraph.org/p/202410102766) | Oct 28, 2024 | Completed: final sign-off Dec 2025 | [270 Claremont Bl](https://www.permitgraph.org/a/2979/007) | rear yard excavation of 18.4cy.relocate stair.1/f:add 1 bed & 1 bath,interior layout reconfig & remodeling 2/f:add 1 bed & 1 bath; layout reconfig. new windows on ne, new w/h, hvac, floor heating, up… | $142,000 |
| [202404119826](https://www.permitgraph.org/p/202404119826) | Apr 11, 2024 | Completed: final sign-off Sep 2024 | [119 Girard St](https://www.permitgraph.org/a/5925/027) | voluntary work to remove unpermitted non-structural partitions and cap off plumbing at lower floor and back of garage. interior work only | $5,000 |
| [202204132165](https://www.permitgraph.org/p/202204132165) | Apr 13, 2022 | Never finaled: filed Apr 2022, never issued | [119 Girard St](https://www.permitgraph.org/a/5925/027) | to comply with his nov's 202289105 & 202289274. add heating system, repair bathroom floor tile, clear hallway, add smoke detectors, repair toilet, clean floor | $6,000 |
| [202111172591](https://www.permitgraph.org/p/202111172591) | Nov 17, 2021 | Completed: final sign-off Mar 2022 | [3712 Ulloa St](https://www.permitgraph.org/a/2387/055) | reference pa #202110070046. dry rot repair like to like one beam and one post | $4,000 |
| [202110070046](https://www.permitgraph.org/p/202110070046) | Oct 7, 2021 | Completed: final sign-off Mar 2022 | [3712 Ulloa St](https://www.permitgraph.org/a/2387/055) | replace leaking windows like for like. same size. front 6 windows, back 2 windows with aluminum clad wood windows. | $15,000 |
| [201909121513](https://www.permitgraph.org/p/201909121513) | Sep 12, 2019 | Expired or cancelled: expired Jul 2023 | [1942 Sutter St](https://www.permitgraph.org/a/0677/013) | exploratory demolition i.e. remove some sheetrock | $4,000 |
| [201809271605](https://www.permitgraph.org/p/201809271605) | Sep 27, 2018 | Completed: final sign-off Jan 2019 | [780 Duncan St](https://www.permitgraph.org/a/6588/008B) | revision to permit #201711214559. additional changes, extended deck in backyard less than 3'above finish floor (n) shower in powder room to clarify bpa #2018/0524/0003(suspended by planning) |  |
| [201711214559](https://www.permitgraph.org/p/201711214559) | Nov 21, 2017 | Completed: final sign-off Jan 2019 | [780 Duncan St](https://www.permitgraph.org/a/6588/008B) | to comply withnov 200343508: remodel (e) 2 story sfr w/2 car garage. conversion of 441.9 sq ft of (e) garage enclosure of 61.1 sq ft of covered entryway. add of 1/2 bath. legalize of (e) roof deck an… | $200,000 |
| [201707101408](https://www.permitgraph.org/p/201707101408) | Jul 10, 2017 | Completed: final sign-off Oct 2018 | [215 Bradford St](https://www.permitgraph.org/a/5690/039) | remodel (e) kitchen, add skylight, remove load bearing wall on 2/f, add post & beam. remodel (e) upstairs bath, add bath on g/f. update electrical with nema 5-15. | $34,000 |
| [201610281436](https://www.permitgraph.org/p/201610281436) | Oct 28, 2016 | Completed: final sign-off Feb 2019 | [4400 Anza St](https://www.permitgraph.org/a/1509/021) | seismic retrofit of soft story to comply with sfbc ch 34b mandating seismic retrofit per 2012 iebc app a4 | $70,000 |
| [201602038729](https://www.permitgraph.org/p/201602038729) | Feb 3, 2016 | Completed: final sign-off Jul 2020 | [267 Clipper St](https://www.permitgraph.org/a/6553/030) | vertical addition with front & rear roof deck. horizontal 2 story bump out into rear yard. conditioning of 1st floor storage area. add 2 bedrooms, 3 baths, upgrading elect, plumb, mech, addition one… | $400,000 |
| [201510190063](https://www.permitgraph.org/p/201510190063) | Oct 19, 2015 | Never finaled: issued Oct 2015, no final | [80 Terrace Dr](https://www.permitgraph.org/a/3072A/025) | enlarge (e) opening in (e) bearing wall. remove selected cabintry & non load bearing partition. | $1,500 |
| [201507101176](https://www.permitgraph.org/p/201507101176) | Jul 10, 2015 | Completed: final sign-off Sep 2016 | [18 Jade Pl](https://www.permitgraph.org/a/7522/014) | remodel & alteration 3 br; additon of interior partitions, floors,finishes. upgrade mep; remodel kit & bath. add 2 bedrooms, 1 office, 2 baths. replace e decking. railing, roofing. remove b/f rear de… | $175,000 |
| [201408063202](https://www.permitgraph.org/p/201408063202) | Aug 6, 2014 | Completed: final sign-off Dec 2015 | [110 Santa Clara Av](https://www.permitgraph.org/a/3072A/001) | repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacement | $1,000 |
| [201407232006](https://www.permitgraph.org/p/201407232006) | Jul 23, 2014 | Completed: final sign-off Apr 2016 | [110 Santa Clara Av](https://www.permitgraph.org/a/3072A/001) | revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level. |  |
| [201312305275](https://www.permitgraph.org/p/201312305275) | Dec 30, 2013 | Completed: final sign-off Apr 2016 | [110 Santa Clara Av](https://www.permitgraph.org/a/3072A/001) | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood… | $70,000 |
| [201203095757](https://www.permitgraph.org/p/201203095757) | Mar 9, 2012 | Completed: final sign-off Aug 2012 | [60 Ocean Av](https://www.permitgraph.org/a/3207/013) | tenantimprovement; change of use from retail to exercise gym, (n) ada compliant restrooms, new concrete floor, structural column relocation, miscellaneous interior renovations, remove exterior stairs… | $47,354 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/h-2-construction-928776.