# Green Sequoia Construction Group Inc

Contractor license 1025852. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/green-sequoia-construction-group-inc-1025852
- JSON: https://www.permitgraph.org/api/contractor?license=1025852
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1025852

14 permits since 2000: 11 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 78 days from permit to final inspection. Of the 2 never-finaled permits, 2 are 5 to 10 years old.

- Based in: Alameda
- On San Francisco permits: Nov 2017 to Oct 2019
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2017 | 0 | 0 | 2 | 0 |
| 2018 | 5 | 0 | 0 | 0 |
| 2019 | 6 | 0 | 0 | 1 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 3 | 3 | 0 | 0 | 0 | 2 | 657 |
| Bathroom remodel | 6 | 5 | 0 | 0 | 1 | 7 | 108 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 6 | 224 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201910164663](https://www.permitgraph.org/p/201910164663) | Oct 16, 2019 | Completed: final sign-off Jan 2020 | [237 08th Av](https://www.permitgraph.org/a/1425/007) | replace (e) stair in-kind (like for like) | $25,000 |
| [201908279962](https://www.permitgraph.org/p/201908279962) | Aug 27, 2019 | Completed: final sign-off Dec 2019 | [130 Funston Av](https://www.permitgraph.org/a/1372/037) | remodeling 3 bathrms - hallway master and powder rm. hallway bathrm & powder rm will have like for like replacement of fixtures (inc lights) & finishes. hallway doorway will be enlarged. masterbedrm… | $30,000 |
| [201905019383](https://www.permitgraph.org/p/201905019383) | May 1, 2019 | Expired or cancelled: expired Apr 2024 | [855 Lincoln Wy](https://www.permitgraph.org/a/1741/057) | interior remodel of 2 bathrooms. master bath -tub shower converted to walk-in shower. hallway bath, walk-in shower converted to tub shower. no structural work. no framing modification. | $15,000 |
| [201904037041](https://www.permitgraph.org/p/201904037041) | Apr 3, 2019 | Completed: final sign-off Aug 2019 | [855 Lincoln Wy](https://www.permitgraph.org/a/1741/058) | unit 4. remodel kitchen & 2 baths, replace flooring in entire home, add recessed lighting. no plans. like for like replacement of fixtures and finishes. | $100,000 |
| [201903215901](https://www.permitgraph.org/p/201903215901) | Mar 21, 2019 | Completed: final sign-off Jan 2021 | [516 Dwight St](https://www.permitgraph.org/a/6116/035) | sagging support beam replacement in kitchen. ref to #201902132855 for interior work. | $10,000 |
| [201902132855](https://www.permitgraph.org/p/201902132855) | Feb 13, 2019 | Completed: final sign-off Jan 2021 | [516 Dwight St](https://www.permitgraph.org/a/6116/035) | 2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter. | $100,000 |
| [201901180811](https://www.permitgraph.org/p/201901180811) | Jan 18, 2019 | Completed: final sign-off Mar 2019 | [909 Guerrero St](https://www.permitgraph.org/a/3617/064) | remove non load bearing column; cap gas line, add one outlet, paint & drywall | $10,000 |
| [201811085405](https://www.permitgraph.org/p/201811085405) | Nov 8, 2018 | Completed: final sign-off Nov 2019 | [175 Bluxome St](https://www.permitgraph.org/a/3785/052) | #123: convert 1/2 to full bath. replace (e) stair with spiral stair. | $10,000 |
| [201809211058](https://www.permitgraph.org/p/201809211058) | Sep 21, 2018 | Completed: final sign-off Dec 2018 | [1465 Hayes St](https://www.permitgraph.org/a/1205/049) | converting closet to (n) full bath. & install new window replacing existing window. not visible from the street. | $10,000 |
| [201806010819](https://www.permitgraph.org/p/201806010819) | Jun 1, 2018 | Completed: final sign-off Jul 2018 | [10 Inca Ln](https://www.permitgraph.org/a/0723C/031) | #1 -bathroom remodel | $12,000 |
| [201801118422](https://www.permitgraph.org/p/201801118422) | Jan 11, 2018 | Completed: final sign-off Feb 2018 | [2770 Taylor St](https://www.permitgraph.org/a/0013/006) | removing rusted metal sutds in service corridor. all concrete bldg wall is non- support 29' long 8' tall. replacing top and bottom plate, new studs and 2 layers 5/8" rock on one side. n/a for maher | $6,000 |
| [201801098220](https://www.permitgraph.org/p/201801098220) | Jan 9, 2018 | Completed: final sign-off Mar 2018 | [591 46th Av](https://www.permitgraph.org/a/1498/023) | rear: replace four wood windows at rear with wood windows. max u-factor 0.32 or better. | $9,500 |
| [201711284948](https://www.permitgraph.org/p/201711284948) | Nov 28, 2017 | Never finaled: issued Nov 2017, no final | [10 Inca Ln](https://www.permitgraph.org/a/0723C/031) | make a sub panel (up to 75 amps) inside apt # 1 | $500 |
| [201711154098](https://www.permitgraph.org/p/201711154098) | Nov 15, 2017 | Never finaled: issued Nov 2017, no final | [10 Inca Ln](https://www.permitgraph.org/a/0723C/031) | unit 1: tear out (e) kichen cabinets and prepare for installation by others. add and move electrical to match new cabinets. | $9,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/green-sequoia-construction-group-inc-1025852.
