# Got Power Inc Dba C D & Power

Contractor license 757162. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/got-power-inc-dba-c-d-power-757162
- JSON: https://www.permitgraph.org/api/contractor?license=757162
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=757162

8 permits since 2000: 7 completed, 1 expired or cancelled. Typically 20 days from filing to permit and 273 days from permit to final inspection.

- Based in: Martinez
- On San Francisco permits: Aug 2009 to May 2017
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2009 | 3 | 0 | 0 | 0 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2016 | 0 | 0 | 0 | 1 |
| 2017 | 1 | 0 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201705186955](https://www.permitgraph.org/p/201705186955) | May 18, 2017 | Completed: final sign-off May 2021 | [333 Baker St](https://www.permitgraph.org/a/1206/003) | generator & concrete pad replacement. no new electrical loads. | $60,000 |
| [201608175199](https://www.permitgraph.org/p/201608175199) | Aug 17, 2016 | Expired or cancelled: cancelled Feb 2020 | [832 Folsom St](https://www.permitgraph.org/a/3733/017) | generator (100kw) set & anchored to concrete pad. elec, auto transfer switch, exhaust. ref pa 201603212603. maher n/a. | $50,000 |
| [201209240452](https://www.permitgraph.org/p/201209240452) | Sep 24, 2012 | Completed: final sign-off Feb 2013 | [888 Brannan St](https://www.permitgraph.org/a/3780/006) | lift generator with 325 gallon integral double-walled tank into place and anchor within existing outdoor room, run generator exhaust and vents up above roof line 12 feet above grade. | $100,000 |
| [201111229429](https://www.permitgraph.org/p/201111229429) | Nov 22, 2011 | Completed: final sign-off Nov 2012 | [750 02nd St](https://www.permitgraph.org/a/3794/002A) | 1st & 8th floors-refer to pa# 2008-0731-8072-install fill port material, dual piping, transfer switch, remote annunicator, 2 day tanks, 30kw generator estop & everything necessary for generator insta… | $150,000 |
| [201004301414](https://www.permitgraph.org/p/201004301414) | Apr 30, 2010 | Completed: final sign-off Nov 2010 | [100 Pine St](https://www.permitgraph.org/a/0262/020) | work @ 8th floor. removing old 250 kw generator & replaceing with new 250 kw generator that meets mission standards setting on existing panel. running 8 ft of double wall fuel line to new 200 gallon… | $100,000 |
| [200910300240](https://www.permitgraph.org/p/200910300240) | Oct 30, 2009 | Completed: final sign-off Jul 2010 | [1099 Fillmore St](https://www.permitgraph.org/a/0774/020) | revision pa# 2009-0806-4260-will be replacing a concrete pad under approved generator | $4,000 |
| [200910239691](https://www.permitgraph.org/p/200910239691) | Oct 23, 2009 | Completed: final sign-off Jul 2010 | [1099 Fillmore St](https://www.permitgraph.org/a/0774/020) | revision to appl #200908064260 - pipe size reduced from 3" to 1-1/4". |  |
| [200908064260](https://www.permitgraph.org/p/200908064260) | Aug 6, 2009 | Completed: final sign-off Jul 2010 | [1099 Fillmore St](https://www.permitgraph.org/a/0774/020) | install generator upon (e) concrete pad.bolt down using read head type wedge anchors.new 2" conduit four 3/0 and one #1 wire to feed from generator to new 400 amp ats, from main service to new too am… | $175,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/got-power-inc-dba-c-d-power-757162.
