# Gaitan Construction

Contractor license 808399. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/gaitan-construction-808399
- JSON: https://www.permitgraph.org/api/contractor?license=808399
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=808399

48 permits since 2000: 40 completed, 5 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection. Of the 5 never-finaled permits, 5 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Apr 2005 to Jun 2018
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2005 | 1 | 0 | 0 | 1 |
| 2006 | 2 | 0 | 0 | 1 |
| 2007 | 5 | 0 | 0 | 0 |
| 2008 | 3 | 0 | 0 | 0 |
| 2010 | 3 | 0 | 2 | 0 |
| 2011 | 3 | 0 | 0 | 0 |
| 2012 | 7 | 0 | 0 | 1 |
| 2013 | 8 | 0 | 1 | 0 |
| 2014 | 2 | 0 | 2 | 0 |
| 2015 | 2 | 0 | 0 | 0 |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 27 | 24 | 0 | 1 | 2 | 0 | 114 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 296 | 1063 |
| Bathroom remodel | 27 | 21 | 0 | 3 | 3 | 0 | 112 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 296 | 1063 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201806192302](https://www.permitgraph.org/p/201806192302) | Jun 19, 2018 | Completed: final sign-off Jun 2018 | [215 San Carlos St](https://www.permitgraph.org/a/3596/035) | to comply with physical inspection report cc-8273 | $5,200 |
| [201702240083](https://www.permitgraph.org/p/201702240083) | Feb 24, 2017 | Completed: final sign-off Jun 2018 | [2041 Hyde St](https://www.permitgraph.org/a/0096/001A) | revision to permit 201410108632 remove all scope of work unit 2043 |  |
| [201607081907](https://www.permitgraph.org/p/201607081907) | Jul 8, 2016 | Completed: final sign-off Aug 2018 | [1912 Golden Gate Av](https://www.permitgraph.org/a/1151/010) | excavate for full height 1st flr. 2nd flr renovation. in-fill (e) interior court | $50,000 |
| [201601126919](https://www.permitgraph.org/p/201601126919) | Jan 12, 2016 | Completed: final sign-off Jun 2018 | [2047 Hyde St](https://www.permitgraph.org/a/0096/001A) | interior remodel of unit 2041 - 2nd floor unit. remodel (e) bathroom, kitchen & add (1) bathroom. | $37,000 |
| [201510210371](https://www.permitgraph.org/p/201510210371) | Oct 21, 2015 | Completed: final sign-off Dec 2016 | [2440 24th St](https://www.permitgraph.org/a/4214/034) | remodel of upper cond includding new mstr bath, remodel (e) bathroom, general upgrade of moulding, new kitchen island, some replacement windows- not visible from street, minor elec work - new lights… | $75,000 |
| [201504305073](https://www.permitgraph.org/p/201504305073) | Apr 30, 2015 | Completed: final sign-off May 2016 | [663 21st Av](https://www.permitgraph.org/a/1623/013) | work at upper level: convert sewing room into bathroom | $15,000 |
| [201411131464](https://www.permitgraph.org/p/201411131464) | Nov 13, 2014 | Never finaled: issued Nov 2014, no final | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | remodel (8) shower stalls: replace w/pre-fab shower pan & tile walls, paint. all work to be done in the men's (4) and women's (4) gym. | $28,000 |
| [201410108632](https://www.permitgraph.org/p/201410108632) | Oct 10, 2014 | Completed: final sign-off Jun 2018 | [2041 Hyde St](https://www.permitgraph.org/a/0096/001A) | interior remodel of unit 2045 and 2043. remodel e bath and kitchens. 2 new baths. new windows throughout. at front, windows to be aluminum-clad | $60,000 |
| [201409297562](https://www.permitgraph.org/p/201409297562) | Sep 29, 2014 | Completed: final sign-off Jun 2018 | [2041 Hyde St](https://www.permitgraph.org/a/0096/001A) | new roof deck, new stair to roof from top floor unit. lateral upgrade under the new roof deck and voluntary lateral strengthening at 2 levels. | $15,000 |
| [201402037604](https://www.permitgraph.org/p/201402037604) | Feb 3, 2014 | Never finaled: issued Feb 2014, no final | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | patch work after electrical work at elevator lobby area, reinforce under new counter tops located at elevator lobbies; compliance with ord 155-13 not required | $10,000 |
| [201309207393](https://www.permitgraph.org/p/201309207393) | Sep 20, 2013 | Never finaled: issued Sep 2013, no final | [1441 Montgomery St](https://www.permitgraph.org/a/0086/001C) | unit #1-remodel including new kitchen, bathroom & general upgrades of finishes inside including painting & re finishing floors & new lighting | $45,000 |
| [201309187131](https://www.permitgraph.org/p/201309187131) | Sep 18, 2013 | Completed: final sign-off Oct 2013 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | basic like for like bathroom & kitchen remodel, paint, floor refinish | $18,000 |
| [201309066196](https://www.permitgraph.org/p/201309066196) | Sep 6, 2013 | Completed: final sign-off May 2014 | [957 Hayes St](https://www.permitgraph.org/a/0822/031) | unit #4-reconfigure interior of (e) apartment. new kitchen, 2 new baths, new wallboard, new elec, new plmg, new doors. replace (e) footings, posts & beams. no windows | $50,000 |
| [201307172085](https://www.permitgraph.org/p/201307172085) | Jul 17, 2013 | Completed: final sign-off Jan 2014 | [957 Hayes St](https://www.permitgraph.org/a/0822/031) | unit#9:revised scope to app#201303263023. show kitchen moved location. removed optional braced wall. detail (now no braced walls added). all new drywall moved location of 1 bedroom. (no other revisio… |  |
| [201307172084](https://www.permitgraph.org/p/201307172084) | Jul 17, 2013 | Completed: final sign-off May 2014 | [957 Hayes St](https://www.permitgraph.org/a/0822/031) | unit #2: revise scope of work per app#201304164704 to show moved kitchen to different area. delete w/d hookup in hall. delete optional braced wall |  |
| [201304114335](https://www.permitgraph.org/p/201304114335) | Apr 11, 2013 | Completed: final sign-off Sep 2014 | [2430 Lake St](https://www.permitgraph.org/a/1333/057) | remodel kitchen & 2 bathrooms. refinish floors & paint. not adding or moving walls | $25,000 |
| [201303263023](https://www.permitgraph.org/p/201303263023) | Mar 26, 2013 | Completed: final sign-off Jan 2014 | [957 Hayes St](https://www.permitgraph.org/a/0822/031) | unit #9: 1) remodel 2 bathrooms,2)remodel kitchen, 3)all new electrical,4 new plmg fixtures, 5) install insulation to opened walls, 6) repair/replace hardwood floors, 7)new tile in bathrooms, 8)add s… | $50,000 |
| [201303202585](https://www.permitgraph.org/p/201303202585) | Mar 20, 2013 | Completed: final sign-off May 2013 | [1888 Golden Gate Av](https://www.permitgraph.org/a/1152/019) | complete bathroom & kitchen remodel: replace all wall coverings, plumbing, electrical, cabinets, tile, fixtures etc. upgrade electrical panel, painting & refinish hardwood floors | $18,000 |
| [201301107683](https://www.permitgraph.org/p/201301107683) | Jan 10, 2013 | Completed: final sign-off May 2013 | [2430 Lake St](https://www.permitgraph.org/a/1333/057) | work in unit #7 only - renovate kitchen & (2) bathrooms, refinish hardwood floors, paint, on wall/partition change. | $25,000 |
| [201211284996](https://www.permitgraph.org/p/201211284996) | Nov 28, 2012 | Completed: final sign-off Aug 2013 | [571 Minna St](https://www.permitgraph.org/a/3726/087) | demo to comply with viloation # 201228521. two units, on ground floor. | $26,500 |
| [201211144223](https://www.permitgraph.org/p/201211144223) | Nov 14, 2012 | Completed: final sign-off Jan 2013 | [115 Haight St](https://www.permitgraph.org/a/0856/023) | unit #11-complete 1 bathroom & kitchen remodel-replace all wall coverings, electrical & plumbing, fixtures, etc. upgrade electrical panel. no window, door, ceiling, floor or wall work on this permit… | $20,000 |
| [201211063597](https://www.permitgraph.org/p/201211063597) | Nov 6, 2012 | Completed: final sign-off May 2014 | [957 Hayes St](https://www.permitgraph.org/a/0822/031) | complete bathroom & kitchen remodel. relace all wall coverings electtical, plumbing cabinets, fixtures etc. upgrade electrical panel, install harwood flooring throughout the unit & painting unit #2 | $18,000 |
| [201209109340](https://www.permitgraph.org/p/201209109340) | Sep 10, 2012 | Completed: final sign-off Nov 2012 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | installtion of fan in mens bathroom, replacement of fan in womens bathroom install dedicated circuit for both fans,& install motion sensors for fans. replace under sink plumbing (graps) repair work t… | $2,000 |
| [201206142626](https://www.permitgraph.org/p/201206142626) | Jun 14, 2012 | Expired or cancelled: expired Dec 2014 | [1932 Jefferson St](https://www.permitgraph.org/a/0911/030) | bathroom remodel:replace of shower valve, wall tiles, install gfci and switch, vanity and top, toilet, light, and floor tile. light shall be high efficacy unless conrolled by manual on occupancy sens… | $10,000 |
| [201204097943](https://www.permitgraph.org/p/201204097943) | Apr 9, 2012 | Completed: final sign-off Apr 2012 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/162) | to obtain final inspection for work approved under pa#2010-04-02-9561. all work is complete. | $600 |
| [201202154254](https://www.permitgraph.org/p/201202154254) | Feb 15, 2012 | Completed: final sign-off Apr 2012 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/311) | remodel 1 kitchen, like for like cabinetry, install appliances and counters. lighting to comply with cec150(k). | $9,000 |
| [201201182432](https://www.permitgraph.org/p/201201182432) | Jan 18, 2012 | Completed: final sign-off Apr 2012 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/161) | kitchen remodel: like for like replacement, cabinets, appliances, counters, lights and switch/receptacles. bathroom remodel: replace tub, tile shower valve, fan & fixtures. no window, door, wall on c… | $16,000 |
| [201111299661](https://www.permitgraph.org/p/201111299661) | Nov 29, 2011 | Completed: final sign-off Feb 2012 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/128) | bathroom - replace shower & tile, replace fan with all like items. toilet & tub & sink. kitchen - replace cabinets & appliances with like items & sink. bring electrical up to code. no change on walls. | $18,000 |
| [201109023842](https://www.permitgraph.org/p/201109023842) | Sep 2, 2011 | Completed: final sign-off Nov 2011 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/042) | kitchen remodel at unit #222: remove & replace cabinets, counter tops, appliancies like for like. no wall removal or relocation. a minimum of 50% of the total rated wattage of permanently installed l… | $9,000 |
| [201103242763](https://www.permitgraph.org/p/201103242763) | Mar 24, 2011 | Completed: final sign-off Sep 2011 | [720 York St](https://www.permitgraph.org/a/4080/049) | replacement of tub and tiles (walls), heater/fan, gfci & switch. (n) lighting comply with cec 150(k), no moving or adding walls. | $8,000 |
| [201010153110](https://www.permitgraph.org/p/201010153110) | Oct 15, 2010 | Completed: final sign-off Feb 2011 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/078) | unit #78 on 4/f - like/like kitchen remodel: replacement of cabinets, counter and flooring, add receptacles and recessed lighting. | $9,000 |
| [201009211315](https://www.permitgraph.org/p/201009211315) | Sep 21, 2010 | Completed: final sign-off Sep 2011 | [1628 Vallejo St](https://www.permitgraph.org/a/0551/027) | bathroom remodel - replacement of shower tile and pan, exhaust and gfci lighting comply cec 150 (k) high efficacy lighting or occupancy sensor. no change to exhaust system. | $13,000 |
| [201006084037](https://www.permitgraph.org/p/201006084037) | Jun 8, 2010 | Never finaled: issued Jun 2010, no final | [601 Van Ness Av](https://www.permitgraph.org/a/0762/464) | unit #1109: bathoom remodel: replacing tub with free form shower, tile entire bathroom, replace all fixtures; toilet sink, light fixtures, med. cab., etc. | $13,000 |
| [201004029561](https://www.permitgraph.org/p/201004029561) | Apr 2, 2010 | Never finaled: issued Apr 2010, no final | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/162) | unit #724 - removal of existing tub & tile, & fixtures. install new tub, tile in entire bahtroom & installation of all new fixtures. bathroom remodel, no wall removal. area:5'-6"x9' no windows and no… | $9,000 |
| [201002035865](https://www.permitgraph.org/p/201002035865) | Feb 3, 2010 | Completed: final sign-off Apr 2010 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/019) | unit #102- remodel kitchen: cabinet replacement, outlets/gfci under sink plbg, like for like; remodel bathroom: repalcement of tub, tile wall & floor, vanity & sink, toilet, like for like. | $20,000 |
| [200806305659](https://www.permitgraph.org/p/200806305659) | Jun 30, 2008 | Completed: final sign-off Sep 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/230) | work @ unit# 230 only. kitchen remodel. cabinet & counter top replacement, keepsame layout. replace light & appliances. min 50% of kitchen watt in fluorescent. bathroom remodel. replace shower / tub… | $25,000 |
| [200806023421](https://www.permitgraph.org/p/200806023421) | Jun 2, 2008 | Completed: final sign-off Sep 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/330) | work @ unit# 330 only. removal of tub & fixtures. replace tub, fixtures & tile installation. bathroom remodel. replace light fixtures & light switches & gfci. | $8,000 |
| [200802265628](https://www.permitgraph.org/p/200802265628) | Feb 26, 2008 | Completed: final sign-off Jun 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/311) | remove of shower tub unit, replace toilet, shower value, and vanity install cast iron tub. tile and new fixtures. at bathroom @ #311 | $9,500 |
| [200712100064](https://www.permitgraph.org/p/200712100064) | Dec 10, 2007 | Completed: final sign-off Feb 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/336) | renew pa#200705211819 for final inspection. |  |
| [200712100060](https://www.permitgraph.org/p/200712100060) | Dec 10, 2007 | Completed: final sign-off Jun 2008 | [1749 Polk St](https://www.permitgraph.org/a/0619/001) | work on unit#4,#5,#8. kitchen cabinet replacement & bathroom tile replacement only on all three units, painting & floor refinished. light fixture replacement and under sink plumbing. | $36,000 |
| [200708220542](https://www.permitgraph.org/p/200708220542) | Aug 22, 2007 | Completed: final sign-off Feb 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/278) | removal of tub/sshower unit and replace with concrete construction shower, tile walls, floor & shower base. replace outlets (gfci) and dlight fixture. fluorescent or manual on auto off switch. | $8,500 |
| [200705211819](https://www.permitgraph.org/p/200705211819) | May 21, 2007 | Completed: final sign-off Feb 2008 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/336) | removal of tub/shower unit and replaced/ w concrete construction shower tile walls and shower base. | $8,500 |
| [200702093868](https://www.permitgraph.org/p/200702093868) | Feb 9, 2007 | Completed: final sign-off Apr 2007 | [54 Pearl St](https://www.permitgraph.org/a/3502/050) | relation to physical inspection: 3r-4683, to comply with 3r report #3r-4683. | $1,200 |
| [200611278473](https://www.permitgraph.org/p/200611278473) | Nov 27, 2006 | Completed: final sign-off Jan 2007 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/270) | kitchen cabinets and countertop replacement to granite, floor replacement from linoleum to hardwood floor lainate flooring. new lighting to be flourescent | $8,500 |
| [200610245899](https://www.permitgraph.org/p/200610245899) | Oct 24, 2006 | Completed: final sign-off Nov 2006 | [1539 10th Av](https://www.permitgraph.org/a/1856/007) | countertop replacment in kitchen with granite. to existing capbints and under sink plumbing. repairs to walls from tile back splash removal | $2,300 |
| [200602023658](https://www.permitgraph.org/p/200602023658) | Feb 2, 2006 | Expired or cancelled: expired May 2007 | [4540 California St](https://www.permitgraph.org/a/1367/025) | complete kitchen remodel: new cabs, ceramic tile flooring new lighting. complete bathroom remodel: new fixtures, lighting, tile comply with his nov#200561591 & 3200562075 date 7-6-05 & 8-15-05. | $36,000 |
| [200510064963](https://www.permitgraph.org/p/200510064963) | Oct 6, 2005 | Expired or cancelled: expired May 2007 | [4540 California St](https://www.permitgraph.org/a/1367/025) | removal of (e)kitchen cabinets & linoleum flooring.replace w/new cabs,ceramic tile flooring,new lighting - kitchen.removal of (e)tile,fixtures,sink,toilet,shower valves & replace with new tile & fixt… | $48,000 |
| [200504180204](https://www.permitgraph.org/p/200504180204) | Apr 18, 2005 | Completed: final sign-off Sep 2005 | [56 Pearl St](https://www.permitgraph.org/a/3502/049) | removal of old kitchen cabinets & replaced; installation of ceramic flr tiles; installation of grani | $7,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/gaitan-construction-808399.
