Back to bathroom remodel contractors
Freemodel Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2021 to Sep 2026
- Last 24 months
- 8 permits filed
43 permits since 2000: 40 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 23 completed, 2 in progress. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1805 Fillmore St | unit# 301: kitchen remodel in kind. new cabinets and plumbing fixtures. two full bathroom remodel in kind with bathtub.Details
unit# 301: kitchen remodel in kind. new cabinets and plumbing fixtures. two full bathroom remodel in kind with bathtub. | $60,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 1333 Jones St | 11/f unit:#1105 full interior remodel of existing primary bathroom and partial remodel of existing guest bathroom within an existing residential condominium unitDetails
11/f unit:#1105 full interior remodel of existing primary bathroom and partial remodel of existing guest bathroom within an existing residential condominium unit | $78,000 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 291 Capistrano Av | ground floor remodel to include new full bath, laundry, and storage room, 450 sq ftDetails
ground floor remodel to include new full bath, laundry, and storage room, 450 sq ft | $60,000 |
| Oct 3, 2025 | Completed final sign-off Jan 2026 | 69 Lisbon St | full bathroom remodel in kind with bathtub. full kitchen remodel with layout changes. addition of half bath in new location on 2nd floor.Details
full bathroom remodel in kind with bathtub. full kitchen remodel with layout changes. addition of half bath in new location on 2nd floor. | $60,000 |
| Mar 13, 2025 | Completed final sign-off Jun 2025 | 50 Walter St | unit a: remodel kitchen in kind. replace vanity in bath onlyDetails
unit a: remodel kitchen in kind. replace vanity in bath only | $40,000 |
| Oct 10, 2024 | Completed final sign-off Nov 2024 | 1907 Leavenworth St | unit 9: bath remodel limited to replacing bathtub/showr to stand walk in shower.add 1 electrical outlet at toiletDetails
unit 9: bath remodel limited to replacing bathtub/showr to stand walk in shower.add 1 electrical outlet at toilet | $2,000 |
| Jul 11, 2024 | Completed final sign-off Sep 2024 | 2350 27th Av | remodel kitchen and (2) baths. replace toilet and naity only (no tile/tub/shower) no structuralDetails
remodel kitchen and (2) baths. replace toilet and naity only (no tile/tub/shower) no structural | $44,000 |
| Jun 10, 2024 | Completed final sign-off Sep 2024 | 290 Cambridge St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $18,000 |
| May 13, 2024 | Completed final sign-off Oct 2024 | 60 Hiliritas Av | 1st fl full bath remodel, lower portion of existing framing to match same level as rest of the floor, add wet bar. (ref:2nd fl remodel layout, bath remodel under 202403117552). (ref:3rd fl remodel layout, kitchen and bath remodel under 202403117552), 4th fl relocate washerDetails
1st fl full bath remodel, lower portion of existing framing to match same level as rest of the floor, add wet bar. (ref:2nd fl remodel layout, bath remodel under 202403117552). (ref:3rd fl remodel layout, kitchen and bath remodel under 202403117552), 4th fl relocate washer | $50,000 |
| Apr 26, 2024 | Completed final sign-off Jul 2024 | 159 Faith St | kitchen and bathroom remodel in kind, plumbing fixtures to be installed in (e) location. kit= replace 3 cabs + (n) countertops only. bath = new vanity, toilet + tile floor only. roof repair of dryrot substrate only (reroofing permit to be pulled by roofing contractor).Details
kitchen and bathroom remodel in kind, plumbing fixtures to be installed in (e) location. kit= replace 3 cabs + (n) countertops only. bath = new vanity, toilet + tile floor only. roof repair of dryrot substrate only (reroofing permit to be pulled by roofing contractor). | $8,000 |
| Mar 26, 2024 | Completed final sign-off Jan 2025 | 256 Collingwood St | one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit.Details
one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit. | $55,000 |
| Mar 11, 2024 | Completed final sign-off Oct 2024 | 60 Hiliritas Av | remodel kitchen and 4 bathrooms. no structural, 2 of the bathrooms are fixtures and floor tile 0nly.Details
remodel kitchen and 4 bathrooms. no structural, 2 of the bathrooms are fixtures and floor tile 0nly. | $65,000 |
| Jan 31, 2024 | Completed final sign-off Jun 2024 | 2990 25th St | replaceing (e) kitchen cabinets, no layout changes, like for like replace vanity, same size, same location, upgrade faucets hallway bathroom primary bathroom: replace vainty same size, upgrade faucets, tile the batahtub, keeping original bathtub, no plumbing or elec changes. no wall alteration.Details
replaceing (e) kitchen cabinets, no layout changes, like for like replace vanity, same size, same location, upgrade faucets hallway bathroom primary bathroom: replace vainty same size, upgrade faucets, tile the batahtub, keeping original bathtub, no plumbing or elec changes. no wall alteration. | $12,000 |
| Oct 27, 2023 | Completed final sign-off Feb 2024 | 7 Nebraska St | (2) in kind bathroom remodels - in kind replacement of valve, toilet, shower head and sink. change outlets, switches, and light fixtures. recessed lighting installation (2) rooms. primary bathroom and 1st floor room. total (2) bathrooms.Details
(2) in kind bathroom remodels - in kind replacement of valve, toilet, shower head and sink. change outlets, switches, and light fixtures. recessed lighting installation (2) rooms. primary bathroom and 1st floor room. total (2) bathrooms. | $15,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2024 | 146 Peralta Av | remodel kitchen & bath, same layout, no structural, no removal of wallsDetails
remodel kitchen & bath, same layout, no structural, no removal of walls | $35,000 |
| Jul 6, 2023 | Completed final sign-off Sep 2024 | 673 Andover St | kitchen remodel, down stairs bathroom remodel adding interior stairs, relocate bathroom and convert recreation room to master bedroom on 1st fl. new interior stairs, remodel kitchen and two bath rooms, repair rear decks-less than 50%Details
kitchen remodel, down stairs bathroom remodel adding interior stairs, relocate bathroom and convert recreation room to master bedroom on 1st fl. new interior stairs, remodel kitchen and two bath rooms, repair rear decks-less than 50% | $50,000 |
| Jun 25, 2023 | Completed final sign-off Oct 2023 | 407 Sawyer St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $24,750 |
| Feb 2, 2023 | Completed final sign-off Sep 2023 | 263 16th Av | revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel.Details
revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel. | |
| Jan 31, 2023 | Completed final sign-off May 2023 | 2485 Union St | 1st fl, unit 1 -bathroom remodel & closet conversion to laundry space; sf of project 140. not moving (e) walls; all fixtures ins (e) bathroom are staying in smae location except removing (e) bathtub & replacing shower w/curbed shower pan; relocating shower plumbing to adjacent wall; in-kind sink/Details
1st fl, unit 1 -bathroom remodel & closet conversion to laundry space; sf of project 140. not moving (e) walls; all fixtures ins (e) bathroom are staying in smae location except removing (e) bathtub & replacing shower w/curbed shower pan; relocating shower plumbing to adjacent wall; in-kind sink/ | $30,000 |
| Jan 17, 2023 | Completed final sign-off Apr 2023 | 849 Noe St | unit #2: kitchen and bathroom remodel, replace electrical subpanel with circuits for new appliances replace electrical outlets, add recessed ligths ledDetails
unit #2: kitchen and bathroom remodel, replace electrical subpanel with circuits for new appliances replace electrical outlets, add recessed ligths led | $70,000 |
| Sep 16, 2022 | Completed final sign-off Sep 2023 | 263 16th Av | demo of 2/f level kitchen in full, and demo (3) bathrooms in full, no change in wall locations. repace kitchen and 3 bathrooms in kind no change in floor plans or wallsDetails
demo of 2/f level kitchen in full, and demo (3) bathrooms in full, no change in wall locations. repace kitchen and 3 bathrooms in kind no change in floor plans or walls | $15,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 849 Noe St | unit #6 : in place kitchen and bathroom remodel- replace electrical subpanel with circuits for new appliances, replace elecrical outlets, add led recessed lights, repair in wall heater.Details
unit #6 : in place kitchen and bathroom remodel- replace electrical subpanel with circuits for new appliances, replace elecrical outlets, add led recessed lights, repair in wall heater. | $70,000 |
| Apr 26, 2022 | Completed final sign-off Oct 2022 | 3988 20th St | remodel existing primary bathroom (1) with new fixtures, tile, lighting, cabinetry - no structural work. dry rot repair wood siding at rear and sides to match existing. replace in kind (3) windows at rear - not visible from street. dual glazed fiberglass/wood. u 0.3 max.Details
remodel existing primary bathroom (1) with new fixtures, tile, lighting, cabinetry - no structural work. dry rot repair wood siding at rear and sides to match existing. replace in kind (3) windows at rear - not visible from street. dual glazed fiberglass/wood. u 0.3 max. | $42,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 849 Noe St | unit #1,3,4,5: in place kitchen and bathroom remodel-exhaust fan, replace electricl subpanel with circuts for new appliance replace elecrical outlets, replace buildng intercom, add recessed lights- all led with sensors.Details
unit #1,3,4,5: in place kitchen and bathroom remodel-exhaust fan, replace electricl subpanel with circuts for new appliance replace elecrical outlets, replace buildng intercom, add recessed lights- all led with sensors. | $325,000 |
| Jul 1, 2021 | Completed final sign-off Dec 2021 | 224 Lexington St | bathroom: replace exh fan with humidstat & switch; replace vanity, led lights; replace faucet forshower; install new tub; intsall new sink and vanity; upgrade toilet; remove tile. install new tile, but pony wall (like for like).Details
bathroom: replace exh fan with humidstat & switch; replace vanity, led lights; replace faucet forshower; install new tub; intsall new sink and vanity; upgrade toilet; remove tile. install new tile, but pony wall (like for like). | $10,000 |