Back to kitchen remodel contractors
Fox Brothers Construction Inc
- Based in
- Monte Rio
- On San Francisco permits
- Jan 2000 to Jul 2026
- Last 24 months
- 4 permits filed
169 permits since 2000: 147 completed, 1 in progress, 6 never finaled, 15 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 19 completed, 1 in progress. Typically 11 days from filing to permit and 368 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Aug 2026 | 574 30th Av | revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight.Details
revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight. | $15,000 |
| Sep 18, 2023 | Completed final sign-off Apr 2024 | 654 Waller St | cosmetic remodel of e kitchen and bath. replace 3 existing windows. not visible from street. replace fixtures, flooring, lightingDetails
cosmetic remodel of e kitchen and bath. replace 3 existing windows. not visible from street. replace fixtures, flooring, lighting | $95,000 |
| Jun 26, 2023 | Completed final sign-off Dec 2023 | 4006 22nd St | revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from streetDetails
revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from street | |
| Dec 14, 2022 | Completed final sign-off May 2024 | 147 Melrose Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. | $9,500 |
| Dec 28, 2021 | Completed final sign-off Nov 2022 | 647 Teresita Bl | remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard.Details
remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard. | $375,000 |
| Jan 29, 2021 | Completed final sign-off Dec 2023 | 4006 22nd St | infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street.Details
infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street. | $42,397 |
| Nov 27, 2019 | Completed final sign-off Nov 2020 | 731 Judah St | install kitchen in lower level unitDetails
install kitchen in lower level unit | $40,000 |
| Oct 7, 2019 | Completed final sign-off Nov 2020 | 130 Oak Park Dr | voiluntary retrofit 1st fl. increase habitable area conditioning rear side of 1st fl to create rumpus room with full bath. 2nd fl kitchen, 2 bath remodels, skylights. new windows new stair 42" wide to improve transition. no change to existing volumeDetails
voiluntary retrofit 1st fl. increase habitable area conditioning rear side of 1st fl to create rumpus room with full bath. 2nd fl kitchen, 2 bath remodels, skylights. new windows new stair 42" wide to improve transition. no change to existing volume | $250,000 |
| Apr 1, 2019 | Completed final sign-off Feb 2021 | 725 44th Av | horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading.Details
horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading. | $300,000 |
| Dec 14, 2018 | Completed final sign-off May 2020 | 331 Day St | 1st floor: add master suite with bath, add bedroom, bath. 2nd floor: relocate laundry & bath, remove walls, renovate kitchen, add stair, replace wiring, replace windows, demo shed in backyard.Details
1st floor: add master suite with bath, add bedroom, bath. 2nd floor: relocate laundry & bath, remove walls, renovate kitchen, add stair, replace wiring, replace windows, demo shed in backyard. | $250,000 |
| Dec 22, 2017 | Completed final sign-off May 2024 | 246 Faxon Av | replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden levelDetails
replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden level | $120,000 |
| Mar 19, 2015 | Completed final sign-off Sep 2018 | 550 07th Av | horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace.Details
horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace. | $178,000 |
| Oct 14, 2014 | Completed final sign-off May 2016 | 731 Judah St | new staircase to garage,2nd fl: remodel kitchen converting 47 sq ft of deck (lightwell) to kitchen, new double sink in bathroom, remove bath, install new shower. legalize gr fl storage room and bath.Details
new staircase to garage,2nd fl: remodel kitchen converting 47 sq ft of deck (lightwell) to kitchen, new double sink in bathroom, remove bath, install new shower. legalize gr fl storage room and bath. | $150,000 |
| Jan 2, 2013 | Completed final sign-off Nov 2014 | 16 Powers Av | no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles.Details
no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles. | $135,000 |
| Jul 23, 2012 | Completed final sign-off Sep 2012 | 1311 43rd Av | replace existing kitchen cabinets in lower unit in-kindDetails
replace existing kitchen cabinets in lower unit in-kind | $6,200 |
| Aug 12, 2010 | Completed final sign-off Dec 2010 | 737 Anderson St | interior remodeling; ground flr. termite repair 2nd. flr. remodel kitchen & bathroom, replace water damaged in living rm. 3rd. flr. remodel bathroom, relocate closet in bedroom. replace fence footing @ rear yard.Details
interior remodeling; ground flr. termite repair 2nd. flr. remodel kitchen & bathroom, replace water damaged in living rm. 3rd. flr. remodel bathroom, relocate closet in bedroom. replace fence footing @ rear yard. | $30,000 |
| May 6, 2009 | Completed final sign-off Jul 2009 | 250 Fell St | unit # 25: rewire the entire apt/remodel kichen and bathroom; make minor plumbng changes in kitchen & bath. remodel kitchen: new cabinets, granite,flrng & lgtng. remodel bath: retile tub area, new sink, add lighting & outlet.main lvng area: put electrical wall, new fxtures & recessed lighting.Details
unit # 25: rewire the entire apt/remodel kichen and bathroom; make minor plumbng changes in kitchen & bath. remodel kitchen: new cabinets, granite,flrng & lgtng. remodel bath: retile tub area, new sink, add lighting & outlet.main lvng area: put electrical wall, new fxtures & recessed lighting. | $25,000 |
| Jun 25, 2008 | Completed final sign-off Mar 2009 | 1990 Funston Av | remodle kitchen & bathrm upstair, rebuild internal stair, add 1 bedrm, 1 bathrm, & 1 family rm on ground floor, rebuild rear deck & add patio @ side, repace all doors & windows, remove vinyl siding, repace fences @ front, side & rear. decks no more than 3' above grade. elect/plmbg seprate permit.Details
remodle kitchen & bathrm upstair, rebuild internal stair, add 1 bedrm, 1 bathrm, & 1 family rm on ground floor, rebuild rear deck & add patio @ side, repace all doors & windows, remove vinyl siding, repace fences @ front, side & rear. decks no more than 3' above grade. elect/plmbg seprate permit. | $54,000 |
| Jun 7, 2004 | Completed final sign-off Jul 2005 | 400 Crestlake Dr | kitchen remodel replace cabinets and appliances bath 1 remodel replace bath tub sink toilet and tileDetails
kitchen remodel replace cabinets and appliances bath 1 remodel replace bath tub sink toilet and tile | $60,000 |
| Jul 22, 2002 | Completed final sign-off Mar 2004 | 1517 06th Av | add 1 bedrm & 1 bathrm to lower unti @ basemtn level remodel (e) kitchen.bathrm/porch in lower unitDetails
add 1 bedrm & 1 bathrm to lower unti @ basemtn level remodel (e) kitchen.bathrm/porch in lower unit | $68,000 |