Back to bathroom remodel contractors
Fox Brothers Construction Inc
- Based in
- Monte Rio
- On San Francisco permits
- Jan 2000 to Jul 2026
- Last 24 months
- 4 permits filed
169 permits since 2000: 147 completed, 1 in progress, 6 never finaled, 15 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 25 completed, 1 expired or cancelled. Typically 15 days from filing to permit and 348 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2026 | Completed final sign-off Aug 2026 | 723 44th Av | new interior stair, new laundry room and bathroom remodel on lower level. new breakfast nook. removing existing exterior rear door.Details
new interior stair, new laundry room and bathroom remodel on lower level. new breakfast nook. removing existing exterior rear door. | $190,000 |
| Sep 18, 2023 | Completed final sign-off Apr 2024 | 654 Waller St | cosmetic remodel of e kitchen and bath. replace 3 existing windows. not visible from street. replace fixtures, flooring, lightingDetails
cosmetic remodel of e kitchen and bath. replace 3 existing windows. not visible from street. replace fixtures, flooring, lighting | $95,000 |
| Dec 14, 2022 | Completed final sign-off May 2024 | 147 Melrose Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). alteration of service equipment. | $9,500 |
| Dec 28, 2021 | Completed final sign-off Nov 2022 | 647 Teresita Bl | remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard.Details
remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard. | $375,000 |
| Jan 29, 2021 | Completed final sign-off Dec 2023 | 4006 22nd St | infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street.Details
infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street. | $42,397 |
| Oct 22, 2019 | Completed final sign-off Nov 2022 | 893 Ashbury St | conditioning of attic spce: 4 new dormers, 1 skylight, new tair, new electrical, new plumbing for bathroom, structural as neccessary.Details
conditioning of attic spce: 4 new dormers, 1 skylight, new tair, new electrical, new plumbing for bathroom, structural as neccessary. | $125,000 |
| Oct 7, 2019 | Completed final sign-off Nov 2020 | 130 Oak Park Dr | voiluntary retrofit 1st fl. increase habitable area conditioning rear side of 1st fl to create rumpus room with full bath. 2nd fl kitchen, 2 bath remodels, skylights. new windows new stair 42" wide to improve transition. no change to existing volumeDetails
voiluntary retrofit 1st fl. increase habitable area conditioning rear side of 1st fl to create rumpus room with full bath. 2nd fl kitchen, 2 bath remodels, skylights. new windows new stair 42" wide to improve transition. no change to existing volume | $250,000 |
| Apr 1, 2019 | Completed final sign-off Feb 2021 | 725 44th Av | horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading.Details
horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading. | $300,000 |
| Dec 14, 2018 | Completed final sign-off May 2020 | 331 Day St | 1st floor: add master suite with bath, add bedroom, bath. 2nd floor: relocate laundry & bath, remove walls, renovate kitchen, add stair, replace wiring, replace windows, demo shed in backyard.Details
1st floor: add master suite with bath, add bedroom, bath. 2nd floor: relocate laundry & bath, remove walls, renovate kitchen, add stair, replace wiring, replace windows, demo shed in backyard. | $250,000 |
| Dec 22, 2017 | Completed final sign-off May 2024 | 246 Faxon Av | replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden levelDetails
replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden level | $120,000 |
| Mar 19, 2015 | Completed final sign-off Sep 2018 | 550 07th Av | horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace.Details
horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace. | $178,000 |
| Nov 19, 2014 | Completed final sign-off May 2016 | 731 Judah St | revision to 201410148844 prform seismic bolting and bracing. revise lower floor plan to add legal bedroom and bathDetails
revision to 201410148844 prform seismic bolting and bracing. revise lower floor plan to add legal bedroom and bath | $20,000 |
| Nov 19, 2014 | Expired or cancelled cancelled Jan 2026 | 731 Judah St | revision to 201410148844. perform seismic bolting and bracing, revised lower floor plan to add legal bedroom and bathDetails
revision to 201410148844. perform seismic bolting and bracing, revised lower floor plan to add legal bedroom and bath | $20,000 |
| Oct 14, 2014 | Completed final sign-off May 2016 | 731 Judah St | new staircase to garage,2nd fl: remodel kitchen converting 47 sq ft of deck (lightwell) to kitchen, new double sink in bathroom, remove bath, install new shower. legalize gr fl storage room and bath.Details
new staircase to garage,2nd fl: remodel kitchen converting 47 sq ft of deck (lightwell) to kitchen, new double sink in bathroom, remove bath, install new shower. legalize gr fl storage room and bath. | $150,000 |
| Jan 2, 2013 | Completed final sign-off Nov 2014 | 16 Powers Av | no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles.Details
no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles. | $135,000 |
| Jul 19, 2012 | Completed final sign-off Jan 2013 | 3784 20th St | add dormer at rear facade, add bathroom at 4th floor.Details
add dormer at rear facade, add bathroom at 4th floor. | $30,000 |
| Jun 13, 2012 | Completed final sign-off May 2015 | 4066 26th St | convert 2 to 1 unit,seismic retrofit,insulate wall,replace windows remodel kitcn,add bath, reloc internal stair & remove internal wall lower unit,extend s. wall of lower unit 16" to south to meet exterior of upper unit. extend ceiling height 32" for northern most (rear)portion of lower,add roof deckDetails
convert 2 to 1 unit,seismic retrofit,insulate wall,replace windows remodel kitcn,add bath, reloc internal stair & remove internal wall lower unit,extend s. wall of lower unit 16" to south to meet exterior of upper unit. extend ceiling height 32" for northern most (rear)portion of lower,add roof deck | $305,000 |
| Feb 16, 2012 | Completed final sign-off May 2012 | 1457 Willard St | revision to app#201109134439 under construction. add stair. 1st floor to 2nd floor. convert 1/2 bath to full bath on 1st floor.Details
revision to app#201109134439 under construction. add stair. 1st floor to 2nd floor. convert 1/2 bath to full bath on 1st floor. | $10,000 |
| Sep 13, 2011 | Completed final sign-off May 2012 | 1457 Willard St | construct new garage with new curbcut below (e) residence. convert (e) 1st floor (garage) storage to occupied level with bedroom & 1/2 bathroomDetails
construct new garage with new curbcut below (e) residence. convert (e) 1st floor (garage) storage to occupied level with bedroom & 1/2 bathroom | $125,000 |
| Aug 12, 2010 | Completed final sign-off Dec 2010 | 737 Anderson St | interior remodeling; ground flr. termite repair 2nd. flr. remodel kitchen & bathroom, replace water damaged in living rm. 3rd. flr. remodel bathroom, relocate closet in bedroom. replace fence footing @ rear yard.Details
interior remodeling; ground flr. termite repair 2nd. flr. remodel kitchen & bathroom, replace water damaged in living rm. 3rd. flr. remodel bathroom, relocate closet in bedroom. replace fence footing @ rear yard. | $30,000 |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 870 Chestnut St | remodel existing lower bathroom unit #1. replace all tile, fixtures, some plumbing, new outlets. size of bathrm 8' x 10'. install 2 new lights. no wall removal. high efficacy lighting or occupancy sensor. no change to exhaust system.Details
remodel existing lower bathroom unit #1. replace all tile, fixtures, some plumbing, new outlets. size of bathrm 8' x 10'. install 2 new lights. no wall removal. high efficacy lighting or occupancy sensor. no change to exhaust system. | $10,000 |
| Jun 30, 2010 | Completed final sign-off Nov 2010 | 130 San Aleso Av | remodel extg bathroom on 2nd floor. replace all tile, fixtures, new outlets and some new plmg. size for bathroom loft 10 ft by 8 ft.install 3 new light fixtures. provide h.e. lights or manual on occupancy sensor.Details
remodel extg bathroom on 2nd floor. replace all tile, fixtures, new outlets and some new plmg. size for bathroom loft 10 ft by 8 ft.install 3 new light fixtures. provide h.e. lights or manual on occupancy sensor. | $16,317 |
| May 6, 2009 | Completed final sign-off Jul 2009 | 250 Fell St | unit # 25: rewire the entire apt/remodel kichen and bathroom; make minor plumbng changes in kitchen & bath. remodel kitchen: new cabinets, granite,flrng & lgtng. remodel bath: retile tub area, new sink, add lighting & outlet.main lvng area: put electrical wall, new fxtures & recessed lighting.Details
unit # 25: rewire the entire apt/remodel kichen and bathroom; make minor plumbng changes in kitchen & bath. remodel kitchen: new cabinets, granite,flrng & lgtng. remodel bath: retile tub area, new sink, add lighting & outlet.main lvng area: put electrical wall, new fxtures & recessed lighting. | $25,000 |
| Jun 7, 2004 | Completed final sign-off Jul 2005 | 400 Crestlake Dr | kitchen remodel replace cabinets and appliances bath 1 remodel replace bath tub sink toilet and tileDetails
kitchen remodel replace cabinets and appliances bath 1 remodel replace bath tub sink toilet and tile | $60,000 |
| Jan 12, 2004 | Completed final sign-off Apr 2004 | 30 Entrada Ct | add master bath including toilet, shower, tub & sinks to (e) closet. add two closets in (e) bedrromDetails
add master bath including toilet, shower, tub & sinks to (e) closet. add two closets in (e) bedrrom | $30,000 |
| May 29, 2003 | Completed final sign-off Apr 2004 | 55 Merced Av | remodel two bathrooms, cabinets, flooring. vanites. replace sheetrocks & plumbingDetails
remodel two bathrooms, cabinets, flooring. vanites. replace sheetrocks & plumbing | $11,000 |