# Flores General Building

Contractor license 976557. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/flores-general-building-976557
- JSON: https://www.permitgraph.org/api/contractor?license=976557
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=976557

100 permits since 2000: 89 completed, 3 in progress, 7 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 97 days from permit to final inspection. Of the 7 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.

- Based in: Oakland
- On San Francisco permits: Aug 2013 to Aug 2026
- Last 24 months: 12 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 12 | 0 | 1 | 0 |
| 2016 | 10 | 0 | 1 | 0 |
| 2017 | 4 | 0 | 2 | 0 |
| 2018 | 8 | 0 | 0 | 0 |
| 2019 | 9 | 0 | 1 | 0 |
| 2020 | 5 | 0 | 0 | 0 |
| 2021 | 5 | 0 | 1 | 0 |
| 2022 | 6 | 0 | 1 | 1 |
| 2023 | 9 | 0 | 0 | 0 |
| 2024 | 6 | 0 | 0 | 0 |
| 2025 | 5 | 1 | 0 | 0 |
| 2026 | 4 | 2 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 76 | 70 | 2 | 4 | 0 | 0 | 108 |
| Bathroom remodel | 82 | 76 | 2 | 4 | 0 | 0 | 100 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 0 | 41 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202608035956](https://www.permitgraph.org/p/202608035956) | Aug 3, 2026 | Completed: final sign-off Nov 2026 | [920 Broderick St](https://www.permitgraph.org/a/1153/015) | unit 920 1/2 - remodel kitchen and bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in ki… | $65,000 |
| [202608035955](https://www.permitgraph.org/p/202608035955) | Aug 3, 2026 | Completed: final sign-off Nov 2026 | [3358 16th St](https://www.permitgraph.org/a/3557/029) | unit 3358a- remodel kitchen and 2x bathroom fully, trench the rest of home for full electrical and plumbing upgrades. replace sheetrock, paint and flooring as needed. no wall or layout changes. in ki… | $75,000 |
| [202607275621](https://www.permitgraph.org/p/202607275621) | Jul 27, 2026 | In progress: issued Sep 2026 | [3210 Gough St](https://www.permitgraph.org/a/0473/013D) | renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area. | $40,000 |
| [202604239948](https://www.permitgraph.org/p/202604239948) | Apr 23, 2026 | In progress: issued Apr 2026 | [1957 Hayes St](https://www.permitgraph.org/a/1210/033) | remodel existing kitchen and 2 bathrooms, rewire entire unit. paint entire unit. refinish floors. replace existing electric wall heater in kind. no removal of any walls. | $55,000 |
| [202602095521](https://www.permitgraph.org/p/202602095521) | Feb 9, 2026 | Completed: final sign-off Jun 2026 | [3210 Gough St](https://www.permitgraph.org/a/0473/013D) | unit 102: renovations - new kitchen and bathroom locations. new bedroom. new bedroom egress window facing gough st. associated structural, mechanical, electrical, and plumbing. no changes to habitabl… | $40,000 |
| [202601083487](https://www.permitgraph.org/p/202601083487) | Jan 8, 2026 | Completed: final sign-off Apr 2026 | [1436 Waller St](https://www.permitgraph.org/a/1245/010) | complete remodel of kitchen & 2 bathrooms, 1 w/ shower pan, 1 w/ tub. complete electrical rewire, replace (e) wall heaters w/ new ones in kind. full repaint and floor installation and walls to be mov… | $75,000 |
| [202510318717](https://www.permitgraph.org/p/202510318717) | Oct 31, 2025 | In progress: issued Dec 2025 | [523 Chestnut St](https://www.permitgraph.org/a/0064/001) | ref to 202503192581 & 202503192580. fireplace removal & infill chimney openings | $5,000 |
| [202507211241](https://www.permitgraph.org/p/202507211241) | Jul 21, 2025 | Completed: final sign-off Sep 2025 | [1831 Larkin St](https://www.permitgraph.org/a/0596/005) | unit #1: remodel (e) kitchen & bathroom as is, no changes. trench unit for electrical/ upgrade entire unit elelctrical. replace (e) wall heaters in-kind. paint unit. no removal of walls | $49,000 |
| [202505206880](https://www.permitgraph.org/p/202505206880) | May 20, 2025 | Completed: final sign-off Jul 2025 | [1255 Page St](https://www.permitgraph.org/a/1235/024) | unit 5: complete remodel for 1 kitchen. rewire unit, 5/8" type x sheetrock, where treches are done for electrical, and paint swap electrical (e) heaters for new same kind. only paint to be done in ba… | $35,000 |
| [202504305517](https://www.permitgraph.org/p/202504305517) | Apr 30, 2025 | Completed: final sign-off Jul 2025 | [3354 16th St](https://www.permitgraph.org/a/3557/028) | unit 3354 a - revision to pa# 202504214896 for removal of lath and plaster and replace with 5/8" sheetrock thoughout. all work on 3rd flr w/i unit 3354a | $5,500 |
| [202504305529](https://www.permitgraph.org/p/202504305529) | Apr 30, 2025 | Completed: final sign-off Jan 2026 | [333 Frederick St](https://www.permitgraph.org/a/1268/047) | remodel 3 bed/1bath at 2nd flr into 3 bed/3 bath unit. remove 4 (e) windows, install (2) fiberglass windows. | $69,937 |
| [202504214896](https://www.permitgraph.org/p/202504214896) | Apr 21, 2025 | Completed: final sign-off Jul 2025 | [3354 16th St](https://www.permitgraph.org/a/3557/028) | unit 3354 a- remodel kitchen and bathroom . rewire and replace flooring, drywall, paint and replace wall heaters like for like . no wall removal or layout change. | $56,000 |
| [202407116275](https://www.permitgraph.org/p/202407116275) | Jul 11, 2024 | Completed: final sign-off Sep 2024 | [277 Hickory St](https://www.permitgraph.org/a/0832/070) | repair rear stairs to be code compliant per inspector request on permit # 202401043438 - less than 50% in kind repairs. | $6,700 |
| [202401184223](https://www.permitgraph.org/p/202401184223) | Jan 18, 2024 | Completed: final sign-off Jan 2025 | [331 Frederick St](https://www.permitgraph.org/a/1268/047) | remodel kitchen and bathroom (e) require electrical and upgrade plumbing for kitchen and bath no walls to be moved | $39,000 |
| [202401174122](https://www.permitgraph.org/p/202401174122) | Jan 17, 2024 | Completed: final sign-off May 2025 | [274 Oak St](https://www.permitgraph.org/a/0832/071) | full unit remodel. full kitchen and bathroom remodel as is. full electrical upgrade units. no walls to be moved. no structural to be done. comply with nov#: 202311531 repair fire damage siding per en… | $87,000 |
| [202401174123](https://www.permitgraph.org/p/202401174123) | Jan 17, 2024 | Completed: final sign-off May 2025 | [276 Oak St](https://www.permitgraph.org/a/0832/071) | remodel kitchen and bathroom in kind, full electrical upgrade full unit remodel. no walls to be moved, no structural to be done. all work in kind. no framing. | $87,000 |
| [202401043436](https://www.permitgraph.org/p/202401043436) | Jan 4, 2024 | Completed: final sign-off Jul 2024 | [277 Hickory St](https://www.permitgraph.org/a/0832/012) | to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be done | $67,000 |
| [202401043438](https://www.permitgraph.org/p/202401043438) | Jan 4, 2024 | Completed: final sign-off Sep 2024 | [279 Hickory St](https://www.permitgraph.org/a/0832/012) | to comply with nov# 202311463: full unit remodel full kitchen and bathroom remodel in kind full electrical upgrade, no walls to be moved, no structural to be done | $67,000 |
| [202309287602](https://www.permitgraph.org/p/202309287602) | Sep 28, 2023 | Completed: final sign-off Jan 2024 | [501 Jersey St](https://www.permitgraph.org/a/6540/001) | unit #4: remodel 1 kitchen and 1 bathroom. no walls to be moved electrical upgrade to the entire unit. | $42,000 |
| [202307212684](https://www.permitgraph.org/p/202307212684) | Jul 21, 2023 | Completed: final sign-off Jan 2024 | [260 Dolores St](https://www.permitgraph.org/a/3557/008A) | remodel 3 bathrooms, 1 kitchen, rewire entire unit. plumbing upgrades to bathroom and kitchen. paint and floor refinish. no walls to be moved. no structural work to be done. inkind | $59,000 |
| [202306059235](https://www.permitgraph.org/p/202306059235) | Jun 5, 2023 | Completed: final sign-off Sep 2023 | [940 Leavenworth St](https://www.permitgraph.org/a/0276/021) | unit # 5: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade… | $49,000 |
| [202306059237](https://www.permitgraph.org/p/202306059237) | Jun 5, 2023 | Completed: final sign-off Sep 2023 | [936 Leavenworth St](https://www.permitgraph.org/a/0276/020) | unit # 6: remodel kitchen in kind - replace cabinets, countertop, and floor tiles in kind. remodel bathroom in kind - replace floor tiles & toilet in kind. paint & refinish floors. electrical upgrade… | $49,000 |
| [202306029109](https://www.permitgraph.org/p/202306029109) | Jun 2, 2023 | Completed: final sign-off Aug 2023 | [2299 Green St](https://www.permitgraph.org/a/0558/023) | complete kitchnen remodel, change peestal for vanity in bathroom. electrical upgrade for the entire apartment, paint, refinish floors. both in kind remodel of bath and kitchen. | $45,000 |
| [202302101798](https://www.permitgraph.org/p/202302101798) | Feb 10, 2023 | Completed: final sign-off Aug 2024 | [1329 Bay St](https://www.permitgraph.org/a/0472/038) | remodel (2) bathrooms and kitchen moving no walls. | $30,000 |
| [202301250703](https://www.permitgraph.org/p/202301250703) | Jan 25, 2023 | Completed: final sign-off Apr 2023 | [650 Masonic Av](https://www.permitgraph.org/a/1186/012) | unit #12: remodel kitchen and bathroom as is, no layout change. no walls to be removed. kitchen gypboard removal, bathroom gyp and floor tile removal, no floor plywood. | $32,000 |
| [202301250704](https://www.permitgraph.org/p/202301250704) | Jan 25, 2023 | Completed: final sign-off Apr 2023 | [650 Masonic Av](https://www.permitgraph.org/a/1186/012) | unit #2: remodel kitchen and bathroom as is, no layout change no walls to be removed. kitch gypboard removal, bathroom gypboard and floor tile, no floor plywood removal. | $32,000 |
| [202301170225](https://www.permitgraph.org/p/202301170225) | Jan 17, 2023 | Completed: final sign-off Aug 2024 | [1331 Bay St](https://www.permitgraph.org/a/0472/038) | remodel 2 baths and kitchen. no layout change. moving no walls. | $27,000 |
| [202212158468](https://www.permitgraph.org/p/202212158468) | Dec 15, 2022 | Completed: final sign-off Jan 2023 | [1983 Mcallister St](https://www.permitgraph.org/a/1176/025) | replace cabinets and countrtops tile bathrooms, refinish all floors. paint entire unit. no walls to be opened no electrical no plumbing beginh walls. comply with compliany # 202299990 | $20,000 |
| [202208080073](https://www.permitgraph.org/p/202208080073) | Aug 8, 2022 | Completed: final sign-off Dec 2022 | [1144 Clay St](https://www.permitgraph.org/a/0213/011) | unit #3: remodel kitchen and bathroom keeping same layout, all new plumbing and electrical upgrade for the unit. paint and refinish floors, not moving any walls. | $29,500 |
| [202208049932](https://www.permitgraph.org/p/202208049932) | Aug 4, 2022 | Completed: final sign-off Oct 2022 | [29 Lapidge St](https://www.permitgraph.org/a/3588/029) | unit 3: complete remodel of kitchen and bathroom keeping the same lay out. no removal of walls . upgrade electrical paint refinish floors | $29,000 |
| [202206297384](https://www.permitgraph.org/p/202206297384) | Jun 29, 2022 | Expired or cancelled: cancelled Jan 2026 | [1801 Hayes St](https://www.permitgraph.org/a/1209/001) | unit 3: respond to complaint for washer and dryer hook ups: electrical and plumbing | $1,500 |
| [202203301221](https://www.permitgraph.org/p/202203301221) | Mar 30, 2022 | Never finaled: filed Mar 2022, never issued | [2090 Broadway](https://www.permitgraph.org/a/0566/014A) | for nov #202180822 and #202180990 (for item #2 only): repair concrete spalling at roof parapet | $10,000 |
| [202203301220](https://www.permitgraph.org/p/202203301220) | Mar 30, 2022 | Completed: final sign-off May 2022 | [1329 Bay St](https://www.permitgraph.org/a/0472/038) | make corrections on nov#202288184: make repairs on garage plaster ceiling less than 50% | $2,500 |
| [202202077508](https://www.permitgraph.org/p/202202077508) | Feb 7, 2022 | Completed: final sign-off Oct 2022 | [23 Belvedere St](https://www.permitgraph.org/a/1247/003) | (1) kitchen & (1.5) bathroom remodel. electrical upgrade, plumbing upgrade in kitchen & bathroom. no structural work to be done. | $29,000 |
| [202201075555](https://www.permitgraph.org/p/202201075555) | Jan 7, 2022 | Completed: final sign-off Sep 2022 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | 3rd fl: (unit 303) reconfigure interior layout w/ 1 bedroom, one bathroom, nook kitchen, dining living rooms. | $20,000 |
| [202111293184](https://www.permitgraph.org/p/202111293184) | Nov 29, 2021 | Completed: final sign-off May 2022 | [537 Baker St](https://www.permitgraph.org/a/1184/005) | complete kitchen remodel. complete bath remodel. upgrade electrical. refinish floors and paint. no structural work to be done. no moving walls. | $32,000 |
| [202107275161](https://www.permitgraph.org/p/202107275161) | Jul 27, 2021 | Completed: final sign-off Oct 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | #506. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| [202107275162](https://www.permitgraph.org/p/202107275162) | Jul 27, 2021 | Completed: final sign-off Oct 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | #604. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| [202104088152](https://www.permitgraph.org/p/202104088152) | Apr 8, 2021 | Completed: final sign-off Jul 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | #204 full kitchen and bathroom remodel, same layouts, replace tub for shower in the bathroom. complete electrical rewire. no wllas to be moved. | $29,500 |
| [202103035746](https://www.permitgraph.org/p/202103035746) | Mar 3, 2021 | Never finaled: issued Nov 2021, no final | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | unit 201: add one bedroom. remodel kitchen. | $20,000 |
| [202102094297](https://www.permitgraph.org/p/202102094297) | Feb 9, 2021 | Completed: final sign-off Jun 2021 | [1733 Mcallister St](https://www.permitgraph.org/a/1178/026) | full kitchen remodel with same floor plan. full electrical upgrade. replace toilet, vanity, and floor in bath. refinish floor sand paint unit. no framing work, no structural work. | $28,000 |
| [202012181319](https://www.permitgraph.org/p/202012181319) | Dec 18, 2020 | Completed: final sign-off Mar 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | unit 404. remodel kitchen and bathroom in studio apartment. same layout. change tub for shower. rewire unit and upgrade subpanel. no walls to be removed. | $30,000 |
| [202010055925](https://www.permitgraph.org/p/202010055925) | Oct 5, 2020 | Completed: final sign-off Jun 2021 | [1787 Haight St](https://www.permitgraph.org/a/1248/020) | renovate (e) split bath. (n) bathroom additional interior work only. in-kind kitchen remodel. mep under separate permit. | $85,000 |
| [202006108360](https://www.permitgraph.org/p/202006108360) | Jun 10, 2020 | Completed: final sign-off Sep 2020 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | #602: remodel kitchen and bathroom in-kind. complete re-wire. swapping tub for shower. all walls to remain, no movement. | $29,000 |
| [202005298016](https://www.permitgraph.org/p/202005298016) | May 29, 2020 | Completed: final sign-off Dec 2020 | [945 Scott St](https://www.permitgraph.org/a/1155/001) | renovation of existing apartment. new finishes at bedrooms and living room. new kitchen cabinets. renovate bathroom and add one bathroom. | $22,000 |
| [202001313237](https://www.permitgraph.org/p/202001313237) | Jan 31, 2020 | Completed: final sign-off Jun 2020 | [650 Masonic Av](https://www.permitgraph.org/a/1186/012) | unit #4: interior remodel of apartment. removal of interior partition walls(non bearing); remodel of kitchen and bathroom. | $40,900 |
| [201912169672](https://www.permitgraph.org/p/201912169672) | Dec 16, 2019 | Completed: final sign-off Aug 2020 | [1144 Clay St](https://www.permitgraph.org/a/0213/011) | remodel kitchen and bathroom, rewire entire unit. change tub for shower. no structural work to be done. kitchen 10x12, bathroom 8x5 | $29,000 |
| [201912169630](https://www.permitgraph.org/p/201912169630) | Dec 16, 2019 | Never finaled: issued Dec 2019, no final | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | unit #305: interior remodel to reconfigure extg unit to a 2 bedrooms and 1 bath apartment. no change to unit sq ft. | $45,000 |
| [201909131605](https://www.permitgraph.org/p/201909131605) | Sep 13, 2019 | Completed: final sign-off Jan 2020 | [1144 Clay St](https://www.permitgraph.org/a/0213/011) | unit 5: kitchen and bathroom remodel. rewire unit. change tub for shower. no structural work to be done. kitchen 10" 12", bathroom 8" x 5" | $25,000 |
| [201908269790](https://www.permitgraph.org/p/201908269790) | Aug 26, 2019 | Completed: final sign-off Oct 2019 | [645 Natoma St](https://www.permitgraph.org/a/3727/033) | build a wall dwith a new pair of pocket doors in the living rm to create a home office space | $10,000 |
| [201908128512](https://www.permitgraph.org/p/201908128512) | Aug 12, 2019 | Completed: final sign-off Sep 2019 | [776 41st Av](https://www.permitgraph.org/a/1604/009) | apt 1: remodel ofkitchen & bathroom, rewire entire unit, replace (e) electrical heater for same, remove tub in bathroom and convert to shower. paint and refinish floor for the studio unit. | $25,000 |
| [201907085265](https://www.permitgraph.org/p/201907085265) | Jul 8, 2019 | Completed: final sign-off Aug 2019 | [180 Duboce Av](https://www.permitgraph.org/a/3502/028) | complete bathroom remodel in kind same layout, upgrade electrical, add a sub panel, patch, paint and refinish floors. | $22,500 |
| [201905312203](https://www.permitgraph.org/p/201905312203) | May 31, 2019 | Completed: final sign-off Jul 2019 | [650 Masonic Av](https://www.permitgraph.org/a/1186/012) | unit 6 - interior remodel, removal of interior partition walls. relocation of kitchen per plans. bathroom remodel. no structural changes proposed. create a bedroom | $25,000 |
| [201904168074](https://www.permitgraph.org/p/201904168074) | Apr 16, 2019 | Completed: final sign-off Apr 2019 | [1107 Ocean Av](https://www.permitgraph.org/a/6944/043) | to comply with his complaint #201929736 dated 2/21/2019, install rail on back stairs, reduce riser opening, replace broken window, clean up common area. | $2,500 |
| [201902062245](https://www.permitgraph.org/p/201902062245) | Feb 6, 2019 | Completed: final sign-off May 2019 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | unit 505. interior remodel. reconfigure (e) unit to 2 bedroom, 1 bathroom unit. no change in unit sq ft. | $45,000 |
| [201901311701](https://www.permitgraph.org/p/201901311701) | Jan 31, 2019 | Completed: final sign-off Apr 2019 | [75 Langton St](https://www.permitgraph.org/a/3730/108) | kitchen & bathroom remodel, upgrade electrical, install new plumbing fixtures, replace (e) wall electric heaters in-kind, no structural work to be done. | $37,500 |
| [201811135634](https://www.permitgraph.org/p/201811135634) | Nov 13, 2018 | Completed: final sign-off Mar 2019 | [1115 Polk St](https://www.permitgraph.org/a/0691/002) | unit #21 & #32: remodel (2) kitchen & (2) bathrooms, upgrade electrical for the unit. change fixtures in bathroom. no structural. | $55,000 |
| [201810092594](https://www.permitgraph.org/p/201810092594) | Oct 9, 2018 | Completed: final sign-off Oct 2018 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | to obtain final inspection for work approved under pa# 201505227018 & 201603141880. all work is complete. |  |
| [201805149030](https://www.permitgraph.org/p/201805149030) | May 14, 2018 | Completed: final sign-off Aug 2018 | [1720 Golden Gate Av](https://www.permitgraph.org/a/1153/007A) | unit #1 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| [201805149033](https://www.permitgraph.org/p/201805149033) | May 14, 2018 | Completed: final sign-off Aug 2018 | [1720 Golden Gate Av](https://www.permitgraph.org/a/1153/007A) | unit #23 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| [201805149032](https://www.permitgraph.org/p/201805149032) | May 14, 2018 | Completed: final sign-off Aug 2018 | [1720 Golden Gate Av](https://www.permitgraph.org/a/1153/007A) | unit #31 - kitchen and bathroom remodel. rewire unit, upgrade plumbing, change tub for shower. paint and new floors | $27,000 |
| [201804025278](https://www.permitgraph.org/p/201804025278) | Apr 2, 2018 | Completed: final sign-off Nov 2018 | [42 Sumner St](https://www.permitgraph.org/a/3730/044) | addition of new bathroom. extg kitchen remodel and extg bathroom remodel. | $35,000 |
| [201802272301](https://www.permitgraph.org/p/201802272301) | Feb 27, 2018 | Completed: final sign-off Mar 2019 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $29,000 |
| [201802080812](https://www.permitgraph.org/p/201802080812) | Feb 8, 2018 | Completed: final sign-off Aug 2018 | [46 Sumner St](https://www.permitgraph.org/a/3730/045) | addition of new bathroom. remodel of (e) kitchen and (e) bathroom | $45,000 |
| [201711204384](https://www.permitgraph.org/p/201711204384) | Nov 20, 2017 | Completed: final sign-off Feb 2018 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors. | $25,000 |
| [201708255938](https://www.permitgraph.org/p/201708255938) | Aug 25, 2017 | Never finaled: issued Feb 2018, no final | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appl… | $40,000 |
| [201708074057](https://www.permitgraph.org/p/201708074057) | Aug 7, 2017 | Completed: final sign-off Oct 2017 | [2022 Larkin St](https://www.permitgraph.org/a/0153/023) | front bldg - complete demo of ktichen & bath. addition of 1 bathroom, move/ relocate ktichen, remodel existing bathroom, removal of non-bearing walls, framing of new partition walls, add laundry. | $30,000 |
| [201708074052](https://www.permitgraph.org/p/201708074052) | Aug 7, 2017 | Never finaled: issued Aug 2017, no final | [175 Alhambra St](https://www.permitgraph.org/a/0466A/033) | #201 - removal of structural & non-structural walls, construction of new walls, construction/relocation of new kitchen, renovation of existing bath, construction of new bath & bedroom, new electrical… | $35,000 |
| [201705186979](https://www.permitgraph.org/p/201705186979) | May 18, 2017 | Completed: final sign-off Oct 2017 | [753 44th Av](https://www.permitgraph.org/a/1600/008) | remodel kitchen and bathroom and upgrade electrical. enlrage bathroom by bumping it into bedroom closet area. | $27,000 |
| [201703141388](https://www.permitgraph.org/p/201703141388) | Mar 14, 2017 | Completed: final sign-off May 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish. | $23,000 |
| [201610240995](https://www.permitgraph.org/p/201610240995) | Oct 24, 2016 | Completed: final sign-off Dec 2016 | [902 Divisadero St](https://www.permitgraph.org/a/1155/016) | unit #102: remodel kitchen and bathroom, upgrade electrical, no changes on walls. | $25,000 |
| [201610240993](https://www.permitgraph.org/p/201610240993) | Oct 24, 2016 | Completed: final sign-off Feb 2017 | [902 Divisadero St](https://www.permitgraph.org/a/1155/016) | unit #203: remodel kitchen and bath, upgrade electrical, no wall changes. | $28,000 |
| [201610240969](https://www.permitgraph.org/p/201610240969) | Oct 24, 2016 | Completed: final sign-off Feb 2017 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | unit 105, complete kitchen and bath remodel, convert to 2 bedrooms, 1 bath, electrical upgrade. no change to unit size | $35,000 |
| [201608225679](https://www.permitgraph.org/p/201608225679) | Aug 22, 2016 | Completed: final sign-off Nov 2016 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | convert unit 101 from studio to 1 bedroom configuration. no change to structural work relocate kitchen add new appliances, remodel kitchen, remodel bathroom. | $35,000 |
| [201608225707](https://www.permitgraph.org/p/201608225707) | Aug 22, 2016 | Completed: final sign-off Nov 2016 | [902 Divisadero St](https://www.permitgraph.org/a/1155/016) | #202: remodeling kitchen and bathroom, electrical upgrade. no changes on walls. | $25,000 |
| [201608195526](https://www.permitgraph.org/p/201608195526) | Aug 19, 2016 | Never finaled: issued Aug 2016, no final | [175 Alhambra St](https://www.permitgraph.org/a/0466A/033) | unit #301 & #304. revision to ref pa 201606099479 & 201606099477 structural framing for remodel unit #301 & #304 due to longitudinal direction of floor joists. maher na |  |
| [201606099477](https://www.permitgraph.org/p/201606099477) | Jun 9, 2016 | Completed: final sign-off Mar 2017 | [175 Alhambra St](https://www.permitgraph.org/a/0466A/033) | #301 - relocate kitchen per plan to add 2nd bedroom, add a bathroom, removal of non-bearing walls. n/a maher ordinance | $30,000 |
| [201606099479](https://www.permitgraph.org/p/201606099479) | Jun 9, 2016 | Completed: final sign-off Mar 2017 | [175 Alhambra St](https://www.permitgraph.org/a/0466A/033) | #304 - relocate kitchen per plan to add 2nd bedrooms, add a bathroom, removal of non-bearing walls. no exterior changes. n/a maher ordinance | $30,000 |
| [201605238100](https://www.permitgraph.org/p/201605238100) | May 23, 2016 | Completed: final sign-off Sep 2016 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | apt #602: move ktichen location . add 1 bedroom, move non bearing wall per plan. sheetrock, paint and refinish floors. no work on bathroom | $35,000 |
| [201604134682](https://www.permitgraph.org/p/201604134682) | Apr 13, 2016 | Completed: final sign-off Aug 2016 | [902 Divisadero St](https://www.permitgraph.org/a/1155/016) | apt 103: replacement of kitchen appliances and cabinets. replacement of plmbg fixtures. new kitchen and 2 bathroom finishes and painting. partial removal of non-load bearing walls in kitchen & living… | $25,000 |
| [201603041198](https://www.permitgraph.org/p/201603041198) | Mar 4, 2016 | Completed: final sign-off Aug 2016 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | #102 - relocate kitchen to add a bedroom, rewire electrical, upgrade plumbing, sheetrock, paint, new cabinets & counters, refinish floors. | $29,000 |
| [201512225725](https://www.permitgraph.org/p/201512225725) | Dec 22, 2015 | Completed: final sign-off Jul 2016 | [3586 Pierce St](https://www.permitgraph.org/a/0442A/034) | interior renovation to kitchen, new cabinets, replace 1 window in place & enlarge 2 others, relocate & replace door to secondary exit, interior renovation of (e) bathroom. add new bath to second bedr… | $100,000 |
| [201511233403](https://www.permitgraph.org/p/201511233403) | Nov 23, 2015 | Never finaled: issued Nov 2015, no final | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | unit #201: convert (e) closet to bathroom, relocate kitchen, move non bearing walls, drywall, paint and refinish hardwood floors, convert (e) kitchen to office. maher na | $45,000 |
| [201511233406](https://www.permitgraph.org/p/201511233406) | Nov 23, 2015 | Completed: final sign-off Apr 2016 | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | unit 303, add 1 bathroom, relocate kitchen, move non bearing walls, remodel (e) bathroom, drywall, paint & refinish floors. add bedroom where kitchen | $45,000 |
| [201509157055](https://www.permitgraph.org/p/201509157055) | Sep 15, 2015 | Completed: final sign-off Jan 2016 | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | remodel (e) kitchen & bathroom in unit 104. move non-bearing walls, electrical, plumbing, drywall, paint and floor refinish. add bathroom | $30,000 |
| [201509157051](https://www.permitgraph.org/p/201509157051) | Sep 15, 2015 | Completed: final sign-off Nov 2015 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | remodel unit 606 per plans. move wall (non bearing) electrical, plumbing, drywall, paint and refinish floors. convert to 1 bedroom layout no change to unit size | $27,000 |
| [201505227018](https://www.permitgraph.org/p/201505227018) | May 22, 2015 | Completed: final sign-off Oct 2018 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | legalize (e) ground floor unit previously installed prior to 1960. (n) studio apartment per ord no. 43-14. studio with 1 bathroom. | $35,000 |
| [201505227036](https://www.permitgraph.org/p/201505227036) | May 22, 2015 | Completed: final sign-off Aug 2015 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | unit #302: renovate & reconfigure for 2 bedrooms, 1 bathroom layout. no change to unit size. | $25,000 |
| [201504204017](https://www.permitgraph.org/p/201504204017) | Apr 20, 2015 | Completed: final sign-off Sep 2015 | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | unit 302: update electrical and plumbing, relocate kitchen, add a bath, add laundry hook ups, paint, refinish floors. remove non load bearing walls to abate complaint 201480181 | $31,000 |
| [201504173937](https://www.permitgraph.org/p/201504173937) | Apr 17, 2015 | Completed: final sign-off Jun 2015 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | unit #402: remodel to 2 bedrooms from 1 bedroom. convert existing kitchen and dining room to bedroom,remove closet and relocate kitchen to closet area per plan. complaint #201529691 under separate pe… | $25,000 |
| [201503302254](https://www.permitgraph.org/p/201503302254) | Mar 30, 2015 | Completed: final sign-off Apr 2015 | [4248 23rd St](https://www.permitgraph.org/a/2772/026) | remove dryrot on garage wall and install new 2x4 and siding, replace about (7) wall studs in - kind on left side of garage. | $4,500 |
| [201503302251](https://www.permitgraph.org/p/201503302251) | Mar 30, 2015 | Completed: final sign-off Jul 2015 | [1850 Sacramento St](https://www.permitgraph.org/a/0623/004) | demolition of wood storage sheds in back of bldg. to comply with complaint #201529691, shed about 15 ft wide by 9 ft deep. | $5,500 |
| [201503160911](https://www.permitgraph.org/p/201503160911) | Mar 16, 2015 | Completed: final sign-off Sep 2015 | [3535 Fillmore St](https://www.permitgraph.org/a/0467A/011) | update electrical & plumbing, relocate kitchen add a bathrom, add laundry hook up, paint, refinish floors, remove non-load bearing walls. turn existing kitchen and dining room into bedroom | $32,000 |
| [201501135579](https://www.permitgraph.org/p/201501135579) | Jan 13, 2015 | Completed: final sign-off Apr 2015 | [3571 16th St](https://www.permitgraph.org/a/3564/093) | unit 7: kitchen & bath remodel: electrical & plumbing upgrade, new subpanel, add a washer/dryer in (e) closet, cabinets, granite, drywall, paint, & new floors. | $24,000 |
| [201411101151](https://www.permitgraph.org/p/201411101151) | Nov 10, 2014 | Completed: final sign-off Mar 2015 | [3029 Franklin St](https://www.permitgraph.org/a/0480/002) | kitchen and bath remodel electrical upgrade, paint & floor refnish. adding plumbing hook ups for washer and dryer in kitchen, frame new wall. | $20,000 |
| [201403281995](https://www.permitgraph.org/p/201403281995) | Mar 28, 2014 | Completed: final sign-off Nov 2014 | [55 Red Rock Wy](https://www.permitgraph.org/a/7517/442) | unit 210 - kitchen & bath remodel, paint, install new flooring. | $19,500 |
| [201403281991](https://www.permitgraph.org/p/201403281991) | Mar 28, 2014 | Completed: final sign-off May 2014 | [1878 Market St](https://www.permitgraph.org/a/0871/005) | shower to be redone, new shower pan, new mixing valve & re-tile on ground floor. | $3,500 |
| [201402118258](https://www.permitgraph.org/p/201402118258) | Feb 11, 2014 | Completed: final sign-off Apr 2014 | [943 Clay St](https://www.permitgraph.org/a/0224/032) | unit #250: revision to 201312265032 for relocation of bathroom room and adding non bearing walls |  |
| [201311081479](https://www.permitgraph.org/p/201311081479) | Nov 8, 2013 | Completed: final sign-off Dec 2013 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windows | $17,500 |
| [201308295604](https://www.permitgraph.org/p/201308295604) | Aug 29, 2013 | Completed: final sign-off Sep 2013 | [1888 Golden Gate Av](https://www.permitgraph.org/a/1152/019) | kitchen and bathroom remodel: add circuits for kitchen new cabinets & tile; addd gfi for bathroom, new vainity & toilet; paint entire unit. | $17,500 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/flores-general-building-976557.
