# Dpr Construction Inc

Contractor license 599846. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/dpr-construction-inc-599846
- JSON: https://www.permitgraph.org/api/contractor?license=599846
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=599846

450 permits since 2000: 332 completed, 21 never finaled, 97 expired or cancelled. Typically 12 days from filing to permit and 126 days from permit to final inspection. Of the 21 never-finaled permits, 3 are 5 to 10 years old, 18 are over 10 years old.

- Based in: Redwood City
- On San Francisco permits: Jan 2000 to Dec 2019
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 16 | 0 | 0 | 14 |
| 2001 | 54 | 0 | 0 | 29 |
| 2002 | 25 | 0 | 1 | 6 |
| 2003 | 51 | 0 | 5 | 15 |
| 2004 | 28 | 0 | 0 | 7 |
| 2005 | 17 | 0 | 2 | 12 |
| 2006 | 32 | 0 | 1 | 3 |
| 2007 | 26 | 0 | 0 | 5 |
| 2008 | 29 | 0 | 3 | 2 |
| 2009 | 19 | 0 | 4 | 1 |
| 2010 | 7 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 0 |
| 2014 | 3 | 0 | 1 | 0 |
| 2015 | 4 | 0 | 0 | 0 |
| 2016 | 11 | 0 | 1 | 1 |
| 2017 | 2 | 0 | 1 | 0 |
| 2018 | 2 | 0 | 0 | 0 |
| 2019 | 5 | 0 | 2 | 2 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 0 | 0 | 0 | 1 | 0 |  |
| Stairs | 11 | 9 | 0 | 0 | 2 | 44 | 327 |
| Bathroom remodel | 3 | 2 | 0 | 0 | 1 | 0 | 66 |
| Deck | 1 | 1 | 0 | 0 | 0 | 3 | 903 |

## Most recent permits

The 100 most recent of 450.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201912190003](https://www.permitgraph.org/p/201912190003) | Dec 19, 2019 | Completed: final sign-off Aug 2020 | [1 Market St](https://www.permitgraph.org/a/3713/007) | steaurt tower: partial t.i. to 7th floor: office suite, 10,379 sq. ft. includes, open office, breakroom (for employee use only) and conference rooms. | $1,750,000 |
| [201912179718](https://www.permitgraph.org/p/201912179718) | Dec 17, 2019 | Completed: final sign-off Nov 2020 | [455 Market St](https://www.permitgraph.org/a/3709/012) | 23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & f… | $1,034,959 |
| [201912109075](https://www.permitgraph.org/p/201912109075) | Dec 10, 2019 | Completed: final sign-off Aug 2020 | [1 Market St](https://www.permitgraph.org/a/3713/007) | partial floor demo to 7th floor steurt for upcoming tenant improvement | $100,000 |
| [201910245438](https://www.permitgraph.org/p/201910245438) | Oct 24, 2019 | Expired or cancelled: cancelled Jan 2026 | [135 Townsend St](https://www.permitgraph.org/a/3794/022) | provide supply ducts and registers for the fitness space on level 4. provide 2 exhaust fans for the shower rooms on level 4 and 5. ref app#201909171806. n/a for maher | $75,000 |
| [201910184980](https://www.permitgraph.org/p/201910184980) | Oct 18, 2019 | Never finaled: issued Dec 2019, no final | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm. | $500,000 |
| [201910154430](https://www.permitgraph.org/p/201910154430) | Oct 15, 2019 | Completed: final sign-off Dec 2020 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | #f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher | $500,000 |
| [201909091095](https://www.permitgraph.org/p/201909091095) | Sep 9, 2019 | Never finaled: issued Sep 2019, no final | [1250 Tennessee St](https://www.permitgraph.org/a/4171/020) | interior non-structural demotion including partitions mep. are to remain vacant until all accessibility feature | $200,000 |
| [201908078160](https://www.permitgraph.org/p/201908078160) | Aug 7, 2019 | Completed: final sign-off Dec 2020 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | 2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transfo… | $22,750,000 |
| [201902223626](https://www.permitgraph.org/p/201902223626) | Feb 22, 2019 | Expired or cancelled: cancelled Jan 2026 | [156 02nd St](https://www.permitgraph.org/a/3722/005) | 1st-6th fl. 1st fl - demo & construction of nonstructural partitions, light fixtures, doors and millwork. new restrooms & ada upgrades, new lighting fixtures, new drinking fountains; 2nd - 6th fl - n… | $1,437,541 |
| [201803163839](https://www.permitgraph.org/p/201803163839) | Mar 16, 2018 | Completed: final sign-off Jun 2020 | [100 Hooper St](https://www.permitgraph.org/a/3808/015) | revision to 201410209377 s3. update fuel port fill location add detail of fuel kill post wall construction, correct egress schedule door width typo, and correct keynotes for ele. show upgraded panel… |  |
| [201803093304](https://www.permitgraph.org/p/201803093304) | Mar 9, 2018 | Completed: final sign-off May 2019 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 6th fl - change elevator lobby doors, minor ti | $30,000 |
| [201711063233](https://www.permitgraph.org/p/201711063233) | Nov 6, 2017 | Completed: final sign-off Oct 2018 | [150 Hooper St](https://www.permitgraph.org/a/3808/016) | all floors: evacuation signage for 150 hooper fire permit only. n/a for maher | $2,000 |
| [201711063238](https://www.permitgraph.org/p/201711063238) | Nov 6, 2017 | Completed: final sign-off Mar 2020 | [100 Hooper St](https://www.permitgraph.org/a/3808/015) | evacuation signage for 100 hooper fire permit only. n/a for maher | $2,000 |
| [M789007](https://www.permitgraph.org/p/M789007) | May 23, 2017 | Never finaled: issued May 2017, no final | [100 Hooper St](https://www.permitgraph.org/a/3808/015) | street space |  |
| [201608094569](https://www.permitgraph.org/p/201608094569) | Aug 9, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to ref pa 201604013708 clearification about technical infeasibility of ada van accessible parking at garage maher na |  |
| [201608094567](https://www.permitgraph.org/p/201608094567) | Aug 9, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to ref pa 201502037319 clearification about technical infeasibility of ada van accessible parking at garage maher na |  |
| [201608054318](https://www.permitgraph.org/p/201608054318) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to (e) pa 201509116686: clarification about technical infeasiblity of ada van accessible parking at garage maher na |  |
| [201608054312](https://www.permitgraph.org/p/201608054312) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to ref pa 201606028968: clarification about technical infeasibility of ada van accessible parking at garage. maher na |  |
| [201608054317](https://www.permitgraph.org/p/201608054317) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to (e) pa 201510210369: clarification about technical infeasiblity of ada van accessible parking at garage maher na |  |
| [201608054315](https://www.permitgraph.org/p/201608054315) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to (e) pa 201505126148: clarification about technical infeasiblity of ada van accessible parking at garage, maher na |  |
| [201608054320](https://www.permitgraph.org/p/201608054320) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to (e) pa 201504204091 clarification about technical infeasiblity of ada van accessible parking at garage maher na |  |
| [201608054319](https://www.permitgraph.org/p/201608054319) | Aug 5, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | revision to (e) pa 201504204092: clarification about technical infeasiblity of ada van accessible parking at garage maher na |  |
| [201608034069](https://www.permitgraph.org/p/201608034069) | Aug 3, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 8/f- revision to existing pa#201506048095 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 |  |
| [201608034066](https://www.permitgraph.org/p/201608034066) | Aug 3, 2016 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 4/f- revision to existing pa#201506038003 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 |  |
| [201608034068](https://www.permitgraph.org/p/201608034068) | Aug 3, 2016 | Never finaled: issued Aug 2016, no final | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | 6/f- revision to existing pa#201511031646 to clarify technical infeasibility of ada van accessible parking at garage. n/a ordinance #155-13 |  |
| [201606028968](https://www.permitgraph.org/p/201606028968) | Jun 2, 2016 | Completed: final sign-off Mar 2017 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | work at basement, floor 1, and roof. basement: modify partition walls. install new generator and fuel oil system. ref app#201505126148. roof structural modification to extg equipment. floor 1: add me… | $3,400,000 |
| [201603293329](https://www.permitgraph.org/p/201603293329) | Mar 29, 2016 | Expired or cancelled: expired Aug 2023 | [400 Paul Av](https://www.permitgraph.org/a/5431A/051) | remodel (e) building with new offices, new ceilings, new interior walls. |  |
| [201511031646](https://www.permitgraph.org/p/201511031646) | Nov 3, 2015 | Completed: final sign-off Aug 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | interior alterations to floor 6. renovations include dining, food prep and meeting areas that are an accessory use. maher not req. life safety/type 1 hood deferred submittals. | $2,000,000 |
| [201505126148](https://www.permitgraph.org/p/201505126148) | May 12, 2015 | Completed: final sign-off Feb 2017 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | alterations to (e) 8 story bldg. work includes new mep upgrades,roof screen & mech platform.2nd flr: work includes computer lab, idf & elec rm & bathrm upgrades.lower level work to remove 8 parking s… | $3,356,000 |
| [201504204091](https://www.permitgraph.org/p/201504204091) | Apr 20, 2015 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | interior renovations to 3rd fl including arch, mep. demo completed under 201502037319. fire sprinklers & alarm under separate permit. compliance with maher ordinance no 155-13 not required. | $1,500,000 |
| [201501236584](https://www.permitgraph.org/p/201501236584) | Jan 23, 2015 | Completed: final sign-off Sep 2016 | [188 The Embarcadero](https://www.permitgraph.org/a/3715/013) | flrs: 2,6 and 8: non-structural demo of partitions, doors, frames, millwork, ceiling tile & grid, lighting, finishes. there is no new construction; maher n/a | $210,000 |
| [201411171680](https://www.permitgraph.org/p/201411171680) | Nov 17, 2014 | Completed: final sign-off Aug 2016 | [400 Paul Av](https://www.permitgraph.org/a/5431A/014) | demolish one story manafacturing center. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $20,000 |
| [201411171675](https://www.permitgraph.org/p/201411171675) | Nov 17, 2014 | Never finaled: issued Oct 2015, no final | [400 Paul Av](https://www.permitgraph.org/a/5431A/014) | to erect 2 stories, no basement, data center building. ** maher: compliance with ordinance no# 155-13 not required | $300,000 |
| [201405155895](https://www.permitgraph.org/p/201405155895) | May 15, 2014 | Completed: final sign-off Sep 2016 | [50 Trenton St](https://www.permitgraph.org/a/0192/035) | temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111907 | $57,000 |
| [201405155897](https://www.permitgraph.org/p/201405155897) | May 15, 2014 | Completed: final sign-off Sep 2016 | [1019 Stockton St](https://www.permitgraph.org/a/0192/002) | temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111914 | $57,000 |
| [201310108949](https://www.permitgraph.org/p/201310108949) | Oct 10, 2013 | Completed: final sign-off Sep 2016 | [835 Jackson St](https://www.permitgraph.org/a/0192/041) | the tower crane will be used for the construction of the new chinese hospital. the cranes use will be for loading and unloading of material and equipment. | $450,000 |
| [201005212947](https://www.permitgraph.org/p/201005212947) | May 21, 2010 | Completed: final sign-off Sep 2010 | [1500 Owens St](https://www.permitgraph.org/a/8709/006) | new walk & canopy along side of building with up lighting | $136,784 |
| [201005182714](https://www.permitgraph.org/p/201005182714) | May 18, 2010 | Completed: final sign-off Dec 2010 | [2250 Hayes St](https://www.permitgraph.org/a/1191/039) | exterior window replacement at ground flr. | $50,000 |
| [201004301402](https://www.permitgraph.org/p/201004301402) | Apr 30, 2010 | Completed: final sign-off Aug 2010 | [1 Market St](https://www.permitgraph.org/a/3713/007) | owner's preparation of an (e) restaurant space for demo and some exterior/interior work full t.i. under future permit. interior demolition, exterior storefront relocation/replacement, new mechanical… | $95,238 |
| [201002237020](https://www.permitgraph.org/p/201002237020) | Feb 23, 2010 | Completed: final sign-off Sep 2010 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | rev. to pa# 2009.07.23.3307. revise structural steel lay out for roof top equipment |  |
| [201002116399](https://www.permitgraph.org/p/201002116399) | Feb 11, 2010 | Completed: final sign-off Mar 2010 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 2nd floor-room alteration with minimal electrical & plumbing, mechanical work within an (e) room requiring no new construction such as partitions, doors, flooring covering, ceiling system or wall fin… | $30,395 |
| [201002086130](https://www.permitgraph.org/p/201002086130) | Feb 8, 2010 | Completed: final sign-off Sep 2010 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | revision to pa# 2009-0723-3307-per field conditions, revise 2 hour rated construction to match (e) 1 hour rated construction | $17,500 |
| [201002015643](https://www.permitgraph.org/p/201002015643) | Feb 1, 2010 | Completed: final sign-off Feb 2010 | [685 Market St](https://www.permitgraph.org/a/3707/051) | basement level-revision to pa# 2009-1222-3644-change rating of doors at rated wlal to 20 min., clarify max occupancy per fire marshall & signage | $100 |
| [200912223641](https://www.permitgraph.org/p/200912223641) | Dec 22, 2009 | Completed: final sign-off Feb 2010 | [685 Market St](https://www.permitgraph.org/a/3707/051) | interior t.i. in (e) tenant suite: basement area reduce size of (e) classroom, add seminar classroom and increase size of stationary storage room and reception will involve drywall work, painting, ca… | $300,000 |
| [200910199227](https://www.permitgraph.org/p/200910199227) | Oct 19, 2009 | Never finaled: issued Oct 2009, no final | [710 Market St](https://www.permitgraph.org/a/0312/003) | ref. pa# 2006.07.13.6416s3. omit 3 hr rated roll down shutters with fusible link and smoke detectors as shown in pa# 2006.07.13.6416s3 on sheets a2.12,a3.03, a8.21 and a8.22. including all references… |  |
| [200908064215](https://www.permitgraph.org/p/200908064215) | Aug 6, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 29th & 30th floor - revision to appl #200903103719 to remove smoke curtain at inter-connecting stair. | $5,000 |
| [200908064220](https://www.permitgraph.org/p/200908064220) | Aug 6, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 28th, 29th & 30th floors revision to appl #200904277091 for added structural work. other minor revisions include relocation of mep, finishes & partition locations. replacing existing fire smoke dampe… | $300,000 |
| [200907313888](https://www.permitgraph.org/p/200907313888) | Jul 31, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/059) | 28th, 29th & 30th floors - fire & life safety system for t.i. permit appl. #2009/0427/7091. | $50,000 |
| [200907233307](https://www.permitgraph.org/p/200907233307) | Jul 23, 2009 | Completed: final sign-off Sep 2010 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | alteration of data and electric rooms on 4th fl of bldg "f". replace partial roof/top mechanical/electrical equipment with new structural supports, replace (1) generator in existing generator yard. f… | $10,000,000 |
| [200907011765](https://www.permitgraph.org/p/200907011765) | Jul 1, 2009 | Expired or cancelled: expired Oct 2024 | [1500 Owens St](https://www.permitgraph.org/a/8709/006) | new non combustible shed roof with open sides at roof level | $21,000 |
| [200906059867](https://www.permitgraph.org/p/200906059867) | Jun 5, 2009 | Completed: final sign-off Feb 2011 | [710 Market St](https://www.permitgraph.org/a/0312/003) | to obtain final inspection for work approved under pa #200710296720. all work is complete. |  |
| [200906059852](https://www.permitgraph.org/p/200906059852) | Jun 5, 2009 | Completed: final sign-off Nov 2011 | [450 Sansome St](https://www.permitgraph.org/a/0229/018) | convert existing side entrance to be a service entrance with delivery lift to complete work and obtain final inspection for work under pa 200710034450 | $50,000 |
| [200904277091](https://www.permitgraph.org/p/200904277091) | Apr 27, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/043) | t.i at 28th, 29th 30th floor: mechanical, electrical, plumbing, structural & life safety, upgrade existing toilet rooms and add additional toilet rooms on 30th fl. | $5,000,000 |
| [200904277112](https://www.permitgraph.org/p/200904277112) | Apr 27, 2009 | Never finaled: issued Apr 2011, no final | [1 Market St](https://www.permitgraph.org/a/3713/006) | remodel of 2 office tower lobbies, (e) atrium & concourse, demo exterior decorative metal grilles, new exterior doors to match e storefront, remodel of existing and addition of new retail spaces, new… | $13,125,000 |
| [200904085817](https://www.permitgraph.org/p/200904085817) | Apr 8, 2009 | Completed: final sign-off May 2009 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 2nd floor - revision to 200803036055, change in occupancy classification from b to a3 for gallery in existing office space. add door hardware & occupancy load signage @ a-3 gallery. |  |
| [200903244708](https://www.permitgraph.org/p/200903244708) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [1500 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200807086156. all work has been completed. |  |
| [200903244707](https://www.permitgraph.org/p/200903244707) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [1500 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200712100084. all work has been completed. |  |
| [200903244703](https://www.permitgraph.org/p/200903244703) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [1550 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200712180728. all work has been completed. |  |
| [200903244705](https://www.permitgraph.org/p/200903244705) | Mar 24, 2009 | Never finaled: issued Mar 2009, no final | [1550 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200710014150. all work has been completed. |  |
| [200903244706](https://www.permitgraph.org/p/200903244706) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [1500 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200807176969. all work has been completed. |  |
| [200903244704](https://www.permitgraph.org/p/200903244704) | Mar 24, 2009 | Never finaled: issued Mar 2009, no final | [1550 Owens St](https://www.permitgraph.org/a/8709/006) | to obtain final inspection for work approved under pa#200804210226. all work has been completed. |  |
| [200903184345](https://www.permitgraph.org/p/200903184345) | Mar 18, 2009 | Completed: final sign-off Mar 2010 | [1 Stockton St](https://www.permitgraph.org/a/0327/025) | barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor. | $20,000 |
| [200903174256](https://www.permitgraph.org/p/200903174256) | Mar 17, 2009 | Completed: final sign-off Jul 2009 | [405 Howard St](https://www.permitgraph.org/a/3737/001) | minor non-structural modifications to existing 2nd. floor tenant space. new partitions and reception desk. | $1,600,000 |
| [200903113915](https://www.permitgraph.org/p/200903113915) | Mar 11, 2009 | Completed: final sign-off Feb 2011 | [710 Market St](https://www.permitgraph.org/a/0312/003) | revision to pa# 2006-0713-6416/s6-relocation of sprinkler valves assembly from vestibule to stairs in star #3. | $15,000 |
| [200903103719](https://www.permitgraph.org/p/200903103719) | Mar 10, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 29th & 30th floors-new interconnecting stairs to be added between floors 29th & 30th including structural work | $338,562 |
| [200903103714](https://www.permitgraph.org/p/200903103714) | Mar 10, 2009 | Completed: final sign-off Oct 2009 | [595 Market St](https://www.permitgraph.org/a/3708/043) | ab17 soft demo- non structural walls & ceiling, floors 28,29 and 30. | $50,000 |
| [200901069582](https://www.permitgraph.org/p/200901069582) | Jan 6, 2009 | Completed: final sign-off May 2009 | [10 United Nations Pz](https://www.permitgraph.org/a/0351/050) | 5th floor tenant improvement of an (e) low-rise office bldg of about 10,500 usable sq.ft. the tenant is an adult educational school w/classrooms & office space for facility. additional accessible toi… | $450,000 |
| [200812309329](https://www.permitgraph.org/p/200812309329) | Dec 30, 2008 | Completed: final sign-off Feb 2011 | [710 Market St](https://www.permitgraph.org/a/0312/003) | installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3 | $75,000 |
| [200812299249](https://www.permitgraph.org/p/200812299249) | Dec 29, 2008 | Completed: final sign-off May 2009 | [10 United Nations Pz](https://www.permitgraph.org/a/0351/050) | demolition of (e) interior partitions, ceilings and plumbing in a vacant tenant space on the 1st floor. work will be done under ab-017 | $50,000 |
| [200812299252](https://www.permitgraph.org/p/200812299252) | Dec 29, 2008 | Expired or cancelled: expired Apr 2021 | [10 United Nations Pz](https://www.permitgraph.org/a/0351/050) | 1st floor-modification of (e) dumpster room. moving door to (e) sprinkler riser. no exterior work | $5,000 |
| [200812168549](https://www.permitgraph.org/p/200812168549) | Dec 16, 2008 | Completed: final sign-off Dec 2010 | [2250 Hayes St](https://www.permitgraph.org/a/1191/039) | structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patc… | $600,000 |
| [200812087993](https://www.permitgraph.org/p/200812087993) | Dec 8, 2008 | Expired or cancelled: expired Jun 2014 | [1 Market St](https://www.permitgraph.org/a/3713/007) | lobby- demolition of interior finishes, partitions, mechanical and electrical equipment in preparation for remodel to be issued under separate permit. per provision ab.017 accessibilty compliance wil… | $500,000 |
| [200812057905](https://www.permitgraph.org/p/200812057905) | Dec 5, 2008 | Completed: final sign-off Dec 2008 | [405 Howard St](https://www.permitgraph.org/a/3737/001) | renew pa# 2006/08/15/9562 to obtain final inspection which renew pa# 2003/02/10/7027, pa# 2003/02/10/7028 & pa# 2002/12/20/3995. |  |
| [200812057904](https://www.permitgraph.org/p/200812057904) | Dec 5, 2008 | Completed: final sign-off Dec 2008 | [405 Howard St](https://www.permitgraph.org/a/3737/001) | renew pa# 2006/08/15/9559 to obtain final inspection which renew pa# 2003/01/09/4903, pa# 2002/12/20/3991 & pa# 2003/04/25/3116. |  |
| [200812057906](https://www.permitgraph.org/p/200812057906) | Dec 5, 2008 | Completed: final sign-off Dec 2008 | [405 Howard St](https://www.permitgraph.org/a/3737/001) | renew pa# 2006/08/15/9563 to obtain final inspection which renew pa# 2002/12/30/4298, pa# 2003/02/14/7500 & pa# 2003/01/20/6293. |  |
| [M143064](https://www.permitgraph.org/p/M143064) | Nov 19, 2008 | Never finaled: issued Nov 2008, no final | [601 16th St](https://www.permitgraph.org/a/8723/008) | request to add address for a temporary construction trailer which will be removed by year 2013 (no foundation - movable) |  |
| [200811126338](https://www.permitgraph.org/p/200811126338) | Nov 12, 2008 | Completed: final sign-off Dec 2010 | [2250 Hayes St](https://www.permitgraph.org/a/1191/039) | renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the… | $7,500,000 |
| [200809302977](https://www.permitgraph.org/p/200809302977) | Sep 30, 2008 | Completed: final sign-off May 2009 | [10 United Nations Pz](https://www.permitgraph.org/a/0351/050) | tenant improvment 6th floor of e low rise office building. tenant is an adult educational school (b occupancy) with classrooms and instructional food facilities. project will provide acessible toilet… | $1,200,000 |
| [200809040822](https://www.permitgraph.org/p/200809040822) | Sep 4, 2008 | Completed: final sign-off Sep 2008 | [50 Osgood Pl](https://www.permitgraph.org/a/0164/031) | 3rd floor-tenant improvement-patching walls, demo doorway and infill, add window, add telephone lines, data lines and light swithces | $24,864 |
| [200808290430](https://www.permitgraph.org/p/200808290430) | Aug 29, 2008 | Completed: final sign-off Oct 2008 | [235 Montgomery St](https://www.permitgraph.org/a/0269/001) | drywall and glazing to create deicated office in existing office building 5th floor | $28,000 |
| [200808250013](https://www.permitgraph.org/p/200808250013) | Aug 25, 2008 | Completed: final sign-off Nov 2009 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/012) | renew pa# 2007/01/09/1303 for final inspection only. |  |
| [200806245243](https://www.permitgraph.org/p/200806245243) | Jun 24, 2008 | Completed: final sign-off Sep 2008 | [720 Market St](https://www.permitgraph.org/a/0312/004) | 5th floor: tenant improvement. demo interior partitions, construct new interior partitions. remodel bathrooms for ada accessibility requirements. add new lighting and repair ceiling. | $90,000 |
| [200806063847](https://www.permitgraph.org/p/200806063847) | Jun 6, 2008 | Completed: final sign-off Dec 2008 | [501 02nd St](https://www.permitgraph.org/a/3774/067) | 7th floor-removal of temporary dry wall partitions. relocate 4 electrical outlets, paint and carpet | $35,000 |
| [200805222707](https://www.permitgraph.org/p/200805222707) | May 22, 2008 | Completed: final sign-off May 2008 | [450 Sansome St](https://www.permitgraph.org/a/0229/018) | renew appl#200710054671, 200705171532, 200708099296 for final inspection. |  |
| [200805222705](https://www.permitgraph.org/p/200805222705) | May 22, 2008 | Completed: final sign-off May 2008 | [450 Sansome St](https://www.permitgraph.org/a/0229/018) | renew appl#200707136709 for final inspection. |  |
| [200804240557](https://www.permitgraph.org/p/200804240557) | Apr 24, 2008 | Completed: final sign-off Jun 2008 | [120 Howard St](https://www.permitgraph.org/a/3717/019) | add and relocate ductwork for existing hvac on 6th floor | $9,000 |
| [200804240543](https://www.permitgraph.org/p/200804240543) | Apr 24, 2008 | Completed: final sign-off Dec 2008 | [1275 Market St](https://www.permitgraph.org/a/3701/064) | renovation of plaza to include landscape, waterproofing, minor electric for lighting, irrigation. | $1,000,000 |
| [200804220375](https://www.permitgraph.org/p/200804220375) | Apr 22, 2008 | Completed: final sign-off Jun 2008 | [120 Howard St](https://www.permitgraph.org/a/3717/019) | demo some ex. non bearing partition wall and reconstruct new ones to creat a new storage room. (1st flr) | $40,550 |
| [200804028632](https://www.permitgraph.org/p/200804028632) | Apr 2, 2008 | Completed: final sign-off Oct 2008 | [1 Market St](https://www.permitgraph.org/a/3713/006) | new structural steel support for operable wall (skyfold door). ref arch #200803036055 | $8,000 |
| [200804028596](https://www.permitgraph.org/p/200804028596) | Apr 2, 2008 | Completed: final sign-off Oct 2008 | [1 Market St](https://www.permitgraph.org/a/3713/006) | new elec distribution for lighting, mech equip,convenience power, copiers, printers, av equipment. mech, new hvac sistribution, new vav boxes, fsds and heate pumps. new structural steel support for o… | $1,043 |
| [200804018443](https://www.permitgraph.org/p/200804018443) | Apr 1, 2008 | Completed: final sign-off Jun 2008 | [10 United Nations Pz](https://www.permitgraph.org/a/0351/050) | 2nd floor-convert (e) fixed seat classroom into a video studio classroom. divide another classroom to create a video control room and storage room. electrical lights & hvac if any, under separate bui… | $35,000 |
| [200803318376](https://www.permitgraph.org/p/200803318376) | Mar 31, 2008 | Never finaled: issued Apr 2008, no final | [120 Howard St](https://www.permitgraph.org/a/3717/019) | demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used. | $12,000 |
| [200803268068](https://www.permitgraph.org/p/200803268068) | Mar 26, 2008 | Completed: final sign-off Jun 2008 | [120 Howard St](https://www.permitgraph.org/a/3717/019) | t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate p… | $250,000 |
| [200803106736](https://www.permitgraph.org/p/200803106736) | Mar 10, 2008 | Completed: final sign-off Feb 2011 | [710 Market St](https://www.permitgraph.org/a/0312/003) | tower crane drawings to site permit application 200607136416. |  |
| [200803056323](https://www.permitgraph.org/p/200803056323) | Mar 5, 2008 | Completed: final sign-off Apr 2008 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | 29th floor-remove 2 strobes and 1 speaker, add 2 speaker/strobes, 3 smoke detectors, 2 duct smoke detectors, 1 control module and 6 monitor modules | $2,500 |
| [200803036055](https://www.permitgraph.org/p/200803036055) | Mar 3, 2008 | Completed: final sign-off Oct 2008 | [1 Market St](https://www.permitgraph.org/a/3713/006) | 2nd floor-interior office construction & gallery space. new finishes, electrical, fire sprinkler, hvac & plumbing to be under seperate permit submission, project is seeking leed platinum certificatio… | $2,200,000 |
| [200801253219](https://www.permitgraph.org/p/200801253219) | Jan 25, 2008 | Completed: final sign-off Apr 2008 | [300 Clay St](https://www.permitgraph.org/a/0204/021) | alteration to mechanical ststem to accomondate ti office layout on the 13th floor. ref. pa# 2007/11/27/8940. demo some duct lines and relocate them to fit new office layout. install 4 new exhaust fan… | $25,000 |
| [200801253242](https://www.permitgraph.org/p/200801253242) | Jan 25, 2008 | Completed: final sign-off May 2008 | [450 Sansome St](https://www.permitgraph.org/a/0229/018) | revision to pa# 2005/08/03/9280 to relocate handrails adjacent to handicap lift. revise ada drinking fountain | $2,000 |
| [200801243125](https://www.permitgraph.org/p/200801243125) | Jan 24, 2008 | Never finaled: issued Jan 2008, no final | [405 Howard St](https://www.permitgraph.org/a/3737/001) | renew pa#200212203991 for final inspection. |  |
| [200801112344](https://www.permitgraph.org/p/200801112344) | Jan 11, 2008 | Completed: final sign-off Apr 2008 | [300 Clay St](https://www.permitgraph.org/a/0204/021) | 13th floor: revision to appl #200711278940 to reduce scope of work. tenant to remove (2) doors and consider previous work as part of overall tenant space. revision is clouded and indicated by delta 1. |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.