17 permits since 2000: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 5 days from filing to permit and 170 days from permit to final inspection. Of the 1 never-finaled permit, 1 is over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Sep 2001 to Jul 2017
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2001 | 1 | 0 | 0 | 0 |
| 2003 | 2 | 0 | 0 | 0 |
| 2004 | 1 | 0 | 0 | 1 |
| 2005 | 0 | 0 | 0 | 1 |
| 2006 | 2 | 0 | 0 | 0 |
| 2007 | 1 | 0 | 0 | 0 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 1 | 0 | 0 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2014 | 1 | 0 | 1 | 0 |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 0 | 0 | 0 | 1 |
| 2017 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 1 | 1 | 0 | 0 | 0 | 175 | 870 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [201707131812](https://www.permitgraph.org/p/201707131812) | Jul 13, 2017 | Completed: final sign-off Oct 2018 | [116 New Montgomery St](https://www.permitgraph.org/a/3722/071) | sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maher | $10,000 |
| [201607051575](https://www.permitgraph.org/p/201607051575) | Jul 5, 2016 | Expired or cancelled: cancelled Jan 2026 | [701 Cesar Chavez St](https://www.permitgraph.org/a/4358/026) | demo approc 3500 sf of (e) concrete slab on grade and replace with new 8" thick concrete slab on grade maher na | $69,890 |
| [201508214926](https://www.permitgraph.org/p/201508214926) | Aug 21, 2015 | Completed: final sign-off May 2016 | [400 Alabama St](https://www.permitgraph.org/a/3968/001) | demo portion of (e) exterior wall, interior floor and side walk & construct pg&e concrete. alcove open to exterior to house gas meter. maher na | $3,500 |
| [201406279790](https://www.permitgraph.org/p/201406279790) | Jun 27, 2014 | Completed: final sign-off Jun 2015 | [230 Gough St](https://www.permitgraph.org/a/0833/014) | sub-basement sidewalk replacement. structural steel, structural concrete, & concrete sidewalk wear surface. no exterior or interior work to building. | $31,000 |
| [201401277147](https://www.permitgraph.org/p/201401277147) | Jan 27, 2014 | Never finaled: issued Jan 2014, no final | [44 Page St](https://www.permitgraph.org/a/0837/006) | repair/replace portions of (e)sidewalk over unoccupied vault space outside of building property. (sf dpw permit 131e-0336, 13mse-0214, 13sw-0093, 13v-0043). | $82,000 |
| [201204248937](https://www.permitgraph.org/p/201204248937) | Apr 24, 2012 | Completed: final sign-off Mar 2015 | [180 Sutter St](https://www.permitgraph.org/a/0288/010) | demolish exist sidewalk , water proof membrane & partial structural frame, install new steel structure metal deck, concrete waterproof membrane topping, slab, curb & gutter, restore finishes, mep in… | $317,000 |
| [201106228708](https://www.permitgraph.org/p/201106228708) | Jun 22, 2011 | Completed: final sign-off Nov 2011 | [300 Montgomery St](https://www.permitgraph.org/a/0260/010) | reconstruct a portion of structural slab over subsidewalk basement to allow construction of accessible curb ramps as permitted by bsm permit 11ie-0302 | $12,000 |
| [201003107874](https://www.permitgraph.org/p/201003107874) | Mar 10, 2010 | Completed: final sign-off Sep 2010 | [701 Sansome St](https://www.permitgraph.org/a/0175/004) | work in response to nov 201031522 dated 1-20-10. infill 2 access holes to sub sidewalk basement area to allow filling of subsidewalk area abandonment. reconstruct 55 sq ft of structural slab over sub… | $12,000 |
| [200703166416](https://www.permitgraph.org/p/200703166416) | Mar 16, 2007 | Completed: final sign-off May 2007 | [1105 Battery St](https://www.permitgraph.org/a/0107/008) | demolition of interior partitions & concrete floor. replace portion of concrete slab to match existing. | $10,000 |
| [200611087200](https://www.permitgraph.org/p/200611087200) | Nov 8, 2006 | Completed: final sign-off Nov 2006 | [1000 Sutter St](https://www.permitgraph.org/a/0279/005) | renew pa# 200508291431 for final inspection. |  |
| [200606123755](https://www.permitgraph.org/p/200606123755) | Jun 12, 2006 | Completed: final sign-off Aug 2006 | [3649 Market St](https://www.permitgraph.org/a/2754/046) | trim and patch ten damaged concrete treads with non shrink grout-under 50% repair only in kind. to comply with nov3200669113. treat work at front exterior. | $2,290 |
| [200508291431](https://www.permitgraph.org/p/200508291431) | Aug 29, 2005 | Expired or cancelled: expired Mar 2007 | [1000 Sutter St](https://www.permitgraph.org/a/0279/005) | remove & replace +/-120 s.f. of structural sidewalk over basement. | $7,200 |
| [200412060697](https://www.permitgraph.org/p/200412060697) | Dec 6, 2004 | Completed: final sign-off Jul 2005 | [1813 Polk St](https://www.permitgraph.org/a/0598/002) | remove & replace deteriorating single slab sidewalk slab above sub-sidewalk basement | $16,000 |
| [200406307646](https://www.permitgraph.org/p/200406307646) | Jun 30, 2004 | Expired or cancelled: expired Nov 2005 | [50 Beale St](https://www.permitgraph.org/a/3710/018) | revise of existing sidewalk permit #200306036109 and #031e-408 reducing scope of work |  |
| [200307290590](https://www.permitgraph.org/p/200307290590) | Jul 29, 2003 | Completed: final sign-off Oct 2003 | [1000 Sutter St](https://www.permitgraph.org/a/0279/005) | remove & replace concrete structural slab & portion of topping slab over sub sidewalk bsmt | $15,000 |
| [200305164856](https://www.permitgraph.org/p/200305164856) | May 16, 2003 | Completed: final sign-off Jan 2004 | [160 Pine St](https://www.permitgraph.org/a/0262/018) | modify existing structural slab to accommodate new compliant curb ramp @pine/battery corner | $10,000 |
| [200109289530](https://www.permitgraph.org/p/200109289530) | Sep 28, 2001 | Completed: final sign-off Apr 2004 | [256 Grant Av](https://www.permitgraph.org/a/0293/009) | repair damage glass sidewalk panel with concrete infill . | $15,000 |

---