# Dome Construction Corp

Contractor license 464986. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/dome-construction-corp-464986
- JSON: https://www.permitgraph.org/api/contractor?license=464986
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=464986

838 permits since 2000: 663 completed, 10 in progress, 95 never finaled, 70 expired or cancelled. Typically 13 days from filing to permit and 158 days from permit to final inspection. Of the 95 never-finaled permits, 2 are 3 to 5 years old, 42 are 5 to 10 years old, 51 are over 10 years old.

- Based in: So. San Francisco
- On San Francisco permits: Aug 2003 to Oct 2026
- Last 24 months: 19 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 1 | 0 | 0 | 0 |
| 2004 | 57 | 0 | 2 | 5 |
| 2005 | 54 | 0 | 4 | 8 |
| 2006 | 42 | 0 | 3 | 12 |
| 2007 | 43 | 0 | 0 | 2 |
| 2008 | 19 | 0 | 1 | 1 |
| 2009 | 10 | 0 | 1 | 0 |
| 2010 | 10 | 0 | 1 | 0 |
| 2011 | 10 | 0 | 1 | 0 |
| 2012 | 15 | 0 | 4 | 1 |
| 2013 | 25 | 0 | 3 | 1 |
| 2014 | 22 | 0 | 7 | 1 |
| 2015 | 41 | 0 | 11 | 4 |
| 2016 | 44 | 0 | 14 | 3 |
| 2017 | 70 | 0 | 8 | 4 |
| 2018 | 63 | 0 | 14 | 15 |
| 2019 | 37 | 0 | 12 | 7 |
| 2020 | 26 | 0 | 1 | 3 |
| 2021 | 28 | 0 | 6 | 1 |
| 2022 | 16 | 0 | 2 | 2 |
| 2023 | 12 | 0 | 0 | 0 |
| 2024 | 7 | 2 | 0 | 0 |
| 2025 | 4 | 3 | 0 | 0 |
| 2026 | 7 | 5 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 6 | 5 | 0 | 1 | 0 | 6 | 307 |
| Kitchen remodel | 15 | 10 | 0 | 3 | 2 | 55 | 363 |
| Stairs | 43 | 37 | 0 | 3 | 3 | 30 | 251 |
| Roof deck | 3 | 2 | 0 | 1 | 0 | 42 | 601 |

## Most recent permits

The 100 most recent of 838.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610300155](https://www.permitgraph.org/p/202610300155) | Oct 30, 2026 | In progress: filed Oct 2026, not yet issued | [28 Fremont St](https://www.permitgraph.org/a/3709/014) | g/f: limited scope of work includes extending (e) gas & electrical lines through (e) concrete slab to fuel/power. (2) new fire pits & (7) new free-standing patio heaters. no structural nor major work… | $110,000 |
| [202609168218](https://www.permitgraph.org/p/202609168218) | Sep 16, 2026 | In progress: issued Oct 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revision to 202603167623 for altered door swing and extension of sewer line. | $3,000 |
| [202604239966](https://www.permitgraph.org/p/202604239966) | Apr 23, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850 |  |
| [202604239969](https://www.permitgraph.org/p/202604239969) | Apr 23, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844 |  |
| [202604139342](https://www.permitgraph.org/p/202604139342) | Apr 13, 2026 | In progress: issued Jun 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | floor 4 to 7: upgrading the finishes to existing elevator lobbies. 1st floor: replacing floor finished and installing new shower glass doors in existing restrooms. for general building accessible upg… | $300,000 |
| [202604038844](https://www.permitgraph.org/p/202604038844) | Apr 3, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings |  |
| [202604038850](https://www.permitgraph.org/p/202604038850) | Apr 3, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931 |  |
| [202604018691](https://www.permitgraph.org/p/202604018691) | Apr 1, 2026 | Completed: final sign-off Jun 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy… | $200,000 |
| [202603167623](https://www.permitgraph.org/p/202603167623) | Mar 16, 2026 | In progress: issued Jul 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | sector 1, level 1; t.i. to develop a pilates studio. work out area with (12) reformers machines, reception area with merchandise. propose new exterior entrance. approx 100 sqft. of the slab in new en… | $255,000 |
| [202602266597](https://www.permitgraph.org/p/202602266597) | Feb 26, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy l… | $1,168,299 |
| [202602266610](https://www.permitgraph.org/p/202602266610) | Feb 26, 2026 | Completed: final sign-off Jul 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of… | $1,097,019 |
| [202601284723](https://www.permitgraph.org/p/202601284723) | Jan 28, 2026 | In progress: issued Feb 2026 | [1 Warriors Wy](https://www.permitgraph.org/a/8722/021) | revision to pa#: 202506058032; blue office library modifications enclosed desk areas to make them into phone rooms, updated egress, construction, lighting locations, power locations, finishes. |  |
| [202512171960](https://www.permitgraph.org/p/202512171960) | Dec 17, 2025 | Completed: final sign-off Mar 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fix… | $700,000 |
| [202512172039](https://www.permitgraph.org/p/202512172039) | Dec 17, 2025 | Completed: final sign-off Mar 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting,… | $350,000 |
| [202512171962](https://www.permitgraph.org/p/202512171962) | Dec 17, 2025 | Completed: final sign-off Mar 2026 | [595 Market St](https://www.permitgraph.org/a/3708/043) | 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exteri… | $630,000 |
| [202510036662](https://www.permitgraph.org/p/202510036662) | Oct 3, 2025 | In progress: issued May 2026 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | 1st fl lobby renovations in sectors 2 and 4. | $1,612,328 |
| [202506108382](https://www.permitgraph.org/p/202506108382) | Jul 9, 2025 | In progress: issued Sep 2025 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | new pg&e electrical service upgrade to the (e) senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipment | $500,000 |
| [202506058032](https://www.permitgraph.org/p/202506058032) | Jun 5, 2025 | In progress: issued Nov 2025 | [1 Warriors Wy](https://www.permitgraph.org/a/8722/021) | level 100 (blue) workplace ti: demo of non structural walls, ceilings & lights. construction of non structural walls, ceilings & lights, millwork, finishes & furniture. no increase or change in occup… | $1,070,000 |
| [202502190601](https://www.permitgraph.org/p/202502190601) | Feb 19, 2025 | Completed: final sign-off Nov 2025 | [2 Bryant St](https://www.permitgraph.org/a/3768/016) | 1st/f interior t.i. with demo of non bearing partition, new ceiling, lighting, new finishes. upgrade with meps. | $1,100,000 |
| [202411064468](https://www.permitgraph.org/p/202411064468) | Nov 6, 2024 | Completed: final sign-off Feb 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | evacuation map signage for the 6th and 7th fl |  |
| [202410253731](https://www.permitgraph.org/p/202410253731) | Oct 25, 2024 | Completed: final sign-off Feb 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | rev 202212128137- clarify lab sink counter height |  |
| [202410163044](https://www.permitgraph.org/p/202410163044) | Oct 16, 2024 | In progress: issued Mar 2025 | [600 California St](https://www.permitgraph.org/a/0241/003) | 2/f & 3/f: relocate (e) pre-fabricated telephone booths. install seismic strapping. | $40,000 |
| [202407106189](https://www.permitgraph.org/p/202407106189) | Jul 10, 2024 | Completed: final sign-off Jul 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | rev 202212128137- layout in sec 1 changes from 1 to 2 tenants. no change in use or occupancy |  |
| [202404039216](https://www.permitgraph.org/p/202404039216) | Apr 3, 2024 | In progress: issued Jun 2024 | [333 Bush St](https://www.permitgraph.org/a/0288/032) | 4/f: construction of (3) new phone rooms in existing office. mechanical, electrical, life safety, and sprinkler will be separate permit. no change to (e) occupancy or egress. path of travel approved… | $35,000 |
| [202403298927](https://www.permitgraph.org/p/202403298927) | Mar 29, 2024 | Completed: final sign-off Jan 2025 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | rev to pa# 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair p… | $50,000 |
| [202403288843](https://www.permitgraph.org/p/202403288843) | Mar 28, 2024 | Completed: final sign-off Jan 2025 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | rev to pa# 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b… |  |
| [202403188046](https://www.permitgraph.org/p/202403188046) | Mar 18, 2024 | Completed: final sign-off Feb 2025 | [2525 03rd St](https://www.permitgraph.org/a/4173/001) | construction of a wall on top of an (e) lab to mitigate noise from (e) mechanical equipment. no change of use or external work | $75,000 |
| [202403067219](https://www.permitgraph.org/p/202403067219) | Mar 6, 2024 | Completed: final sign-off Apr 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | evacuation maps for 202207188717 |  |
| [202309297702](https://www.permitgraph.org/p/202309297702) | Sep 29, 2023 | Completed: final sign-off Jun 2024 | [1801 Vicente St](https://www.permitgraph.org/a/2468A/003) | safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panels | $44,000 |
| [202309297697](https://www.permitgraph.org/p/202309297697) | Sep 29, 2023 | Completed: final sign-off Jun 2024 | [1801 Vicente St](https://www.permitgraph.org/a/2468A/003) | safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| [202309297703](https://www.permitgraph.org/p/202309297703) | Sep 29, 2023 | Completed: final sign-off Jun 2024 | [1801 Vicente St](https://www.permitgraph.org/a/2468A/003) | safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| [202309146604](https://www.permitgraph.org/p/202309146604) | Sep 14, 2023 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | revision to pa 202208019663 for 5th fl tenant work includes revisions to level 5 only, including non structural partition & associated mep sector 1, floor 5 |  |
| [202306160283](https://www.permitgraph.org/p/202306160283) | Jun 16, 2023 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | shop drawings and details for interior metal platform and stairway for pa# 202306099728 & 20220523388 |  |
| [202306099728](https://www.permitgraph.org/p/202306099728) | Jun 9, 2023 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | revision to pa# 202205023388. interior only. installation of pre-fabricated metal platform structure approximately 170 s.f. for equipment within (e) with building envelope. deferred mep. | $150,000 |
| [202306069362](https://www.permitgraph.org/p/202306069362) | Jun 6, 2023 | Completed: final sign-off Aug 2023 | [3625 24th St](https://www.permitgraph.org/a/6512/027) | voluntary structural upgrades. patching affected finishes and ada upgrades at main entry. | $65,000 |
| [202305057234](https://www.permitgraph.org/p/202305057234) | May 5, 2023 | Completed: final sign-off Oct 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | revison to permit# 2022-1116-6678. remove non-bearing wall, reduction of scope |  |
| [202304115492](https://www.permitgraph.org/p/202304115492) | Apr 11, 2023 | Completed: final sign-off Aug 2024 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | mep work for 202212087889. rooftop mechanical equipment added with ductwork to floors below. | $756,000 |
| [202303214080](https://www.permitgraph.org/p/202303214080) | Mar 21, 2023 | Completed: final sign-off Jun 2023 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | structural only, beam shear strengthening using fiber polymer reinforcement fir (e) 2nd level concrete beams to support e & n structural loads per 202204061682. deferred sprinklers & alarms | $25,000 |
| [202303022945](https://www.permitgraph.org/p/202303022945) | Mar 2, 2023 | Completed: final sign-off Oct 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | mechanical work (mep) for 3rd fl. ref pa# 2022-1205-7671 | $360,000 |
| [202303022943](https://www.permitgraph.org/p/202303022943) | Mar 2, 2023 | Completed: final sign-off Oct 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | mechanical work (mep) for 4th fl. ref pa# 2022-1116-6678 | $360,000 |
| [202212128137](https://www.permitgraph.org/p/202212128137) | Dec 12, 2022 | Completed: final sign-off Jul 2025 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | sector 1: tenant improvement on the 6th and 7th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plu… | $5,750,000 |
| [202212087889](https://www.permitgraph.org/p/202212087889) | Dec 8, 2022 | Completed: final sign-off Aug 2024 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | building infrastructure work only. rooftop mechanical equipment and duct runs to floors below via both fire-rated stairwells top to bottom for voluntary stair pressurization. not visible not historic… | $165,000 |
| [202212057671](https://www.permitgraph.org/p/202212057671) | Dec 5, 2022 | Completed: final sign-off Nov 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | revision to bpa#202202117832 3/f, new interior, nonbearing partitions, new kitchenette, new restrooms | $85,800 |
| [202211307381](https://www.permitgraph.org/p/202211307381) | Nov 30, 2022 | Completed: final sign-off Dec 2022 | [555 Buckingham Wy](https://www.permitgraph.org/a/7295/036) | revision to permit 202107063809. restroom conversion to storage room #112, decreasing in cost. |  |
| [202211166678](https://www.permitgraph.org/p/202211166678) | Nov 16, 2022 | Completed: final sign-off Dec 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | interior work only: 4th floor demolition of non-bearing partition walls, adding new non-bearing walls and new kitchenette and restrooms. | $135,125 |
| [202208019663](https://www.permitgraph.org/p/202208019663) | Aug 1, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | tenant improvement on the 4th and 5th floors of an existing 12-story building. scope of work includes office and labratories (changing occupancy from b to l) with associated mechancial, plumbing, and… | $6,000,000 |
| [202207259239](https://www.permitgraph.org/p/202207259239) | Jul 25, 2022 | Completed: final sign-off Mar 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | selective demo in preparation for t.i of the 4-7th floor in sector 1 of an (e) 12-story bldg. no structural demo. to comply with ab-017. | $125,000 |
| [202207188717](https://www.permitgraph.org/p/202207188717) | Jul 18, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | level 6-7: addition of shafts and duct riser only in sector 1 of building. | $250,000 |
| [202207188714](https://www.permitgraph.org/p/202207188714) | Jul 18, 2022 | Completed: final sign-off Aug 2024 | [1800 Owens St](https://www.permitgraph.org/a/8727/008) | level 4-5: addition of shafts and duct riser only in sector 1 of building. | $240,000 |
| [202207017662](https://www.permitgraph.org/p/202207017662) | Jul 1, 2022 | Completed: final sign-off May 2023 | [2525 03rd St](https://www.permitgraph.org/a/4173/001) | mechanical, electrical, and plumbing work for approved pa# 202205063728. | $750,000 |
| [202206075743](https://www.permitgraph.org/p/202206075743) | Jun 30, 2022 | Completed: final sign-off Jan 2025 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferr… | $4,800,000 |
| [202205063728](https://www.permitgraph.org/p/202205063728) | May 6, 2022 | Completed: final sign-off May 2023 | [2525 03rd St](https://www.permitgraph.org/a/4173/001) | renovation of extg brewery space to cultured seafood production space. no change of use, nor exterior work. deferred mep work. | $3,242,000 |
| [202205023388](https://www.permitgraph.org/p/202205023388) | May 2, 2022 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | tenant improvement, (n) installation of equipment including mechanical, electrical, plumbing work. revision to previously approved pa #202112073858 & 202111303330 | $3,315,697 |
| [202204273108](https://www.permitgraph.org/p/202204273108) | Apr 27, 2022 | Expired or cancelled: cancelled Jan 2026 | [2505 03rd St](https://www.permitgraph.org/a/4173/001) | interior renovation of (e) brewery (food production) to seafood production space, including interior walls, ceilings, no change of use, no exterior work. deferred mep work | $3,242 |
| [202204061682](https://www.permitgraph.org/p/202204061682) | Apr 6, 2022 | Completed: final sign-off Jan 2025 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | interior only sow:core and shell seismic/strl improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred:m… | $600,000 |
| [202203281021](https://www.permitgraph.org/p/202203281021) | Mar 28, 2022 | Completed: final sign-off Mar 2023 | [750 Florida St](https://www.permitgraph.org/a/4082/005) | exploratory investigation and selective demo of (e) finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling work | $50,000 |
| [202202117832](https://www.permitgraph.org/p/202202117832) | Feb 11, 2022 | Expired or cancelled: expired Nov 2023 | [350 Parnassus Av](https://www.permitgraph.org/a/1275/059) | 3rd fl - interior work only non-bearing partition; demo w/n kitchenette and meeting room. accessibility per ab-017. | $49,000 |
| [202201317016](https://www.permitgraph.org/p/202201317016) | Jan 31, 2022 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | mechanical & electrical work for approved permit 202112073858 |  |
| [202201266689](https://www.permitgraph.org/p/202201266689) | Jan 26, 2022 | Never finaled: issued Jan 2022, no final | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | administrative permit. obtaining a fire assemble permit. no work to be done on this permit |  |
| [202201256574](https://www.permitgraph.org/p/202201256574) | Jan 25, 2022 | Never finaled: issued Mar 2022, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/029) | revision to pa# 202008252611. tissue culture room & post pcr room layout elec outlets + remove window. reduce security cameras, door schedule, 10th fl alcove, elec for sign, elec panel + outlets. rev… |  |
| [202112073858](https://www.permitgraph.org/p/202112073858) | Dec 7, 2021 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | add a new equipment in existing room. mep deferred under separate permit. add new exterior exist door @ existing opening. | $422,726 |
| [202112023494](https://www.permitgraph.org/p/202112023494) | Dec 2, 2021 | Completed: final sign-off Jun 2022 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | (floors 5,9,13): revision for dph review only for reference permit 202110190713 |  |
| [202112023498](https://www.permitgraph.org/p/202112023498) | Dec 2, 2021 | Completed: final sign-off Jun 2022 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | (floors: 7,15): revision for dph review only for reference permit 20210806539 |  |
| [202112023497](https://www.permitgraph.org/p/202112023497) | Dec 2, 2021 | Completed: final sign-off Jun 2022 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | 11/f: revision for dph review only for reference permit 202108176544 |  |
| [202111303330](https://www.permitgraph.org/p/202111303330) | Nov 30, 2021 | Completed: final sign-off Jan 2025 | [1069 Pennsylvania Av](https://www.permitgraph.org/a/4226/021) | change of use from commercial kitchen "catering" to "food development laboratory" to support research into food texture and flavor. no work to be done under this permit. ref t.i permit 201508043322. |  |
| [202110190713](https://www.permitgraph.org/p/202110190713) | Oct 19, 2021 | Never finaled: issued Oct 2021, no final | [222 02nd St](https://www.permitgraph.org/a/3735/063) | flrs 5,9,13: revision to permit 202106182800. modifiy floor plans in mother's rooms to accomidate deisgn conflict |  |
| [202110180658](https://www.permitgraph.org/p/202110180658) | Oct 18, 2021 | Completed: final sign-off Jun 2022 | [1155 Bryant St](https://www.permitgraph.org/a/3526/019B) | revision to app#202110140490 structural review only for sump pump and ac unit with mechanical curb detail added to roof. | $45,000 |
| [202110140490](https://www.permitgraph.org/p/202110140490) | Oct 14, 2021 | Completed: final sign-off Jun 2022 | [1155 Bryant St](https://www.permitgraph.org/a/3526/019B) | interior work only: renovation @ 1st and 3rd fl. adding a few non bearing walls, mep under separate permit. fire alarm/sprinklers under sep permits, if applic. | $225,000 |
| [202109168579](https://www.permitgraph.org/p/202109168579) | Sep 16, 2021 | Completed: final sign-off Nov 2023 | [685 Market St](https://www.permitgraph.org/a/3707/051) | t.i. of the extg space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, mil… | $2,300,000 |
| [202109017607](https://www.permitgraph.org/p/202109017607) | Sep 1, 2021 | Completed: final sign-off Dec 2021 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | restroom upgrades, alter 1 toilet facility. mep deferred. | $172,418 |
| [202108267164](https://www.permitgraph.org/p/202108267164) | Aug 26, 2021 | Expired or cancelled: withdrawn Oct 2021 | [1155 Bryant St](https://www.permitgraph.org/a/3526/019B) | renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f (e) to remain. special equip installation interface details are required for this project.… | $2,669,004 |
| [202108176544](https://www.permitgraph.org/p/202108176544) | Aug 17, 2021 | Never finaled: issued Sep 2021, no final | [222 02nd St](https://www.permitgraph.org/a/3735/063) | 11th floor break room and conference room improvement, finishes, non rated partitions ceiling assembly and light fixtures,mep under sep permit. | $250,000 |
| [202108096048](https://www.permitgraph.org/p/202108096048) | Aug 9, 2021 | Completed: final sign-off Sep 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | mep for pa 2021 0112 2527 |  |
| [202108065939](https://www.permitgraph.org/p/202108065939) | Aug 6, 2021 | Never finaled: issued Sep 2021, no final | [222 02nd St](https://www.permitgraph.org/a/3735/063) | floor 7th and 15th only. refresh work to wellness and break room. improvements to non-rated partitions, finishes, ceiling assembly, and lighting fixtures mep under seperate permit. | $500,000 |
| [202107073866](https://www.permitgraph.org/p/202107073866) | Jul 7, 2021 | Completed: final sign-off Sep 2021 | [555 Buckingham Wy](https://www.permitgraph.org/a/7295/036) | soft demo of partitions ceiling for ti work under pa# 202107063809. per ab-017. | $48,000 |
| [202107063809](https://www.permitgraph.org/p/202107063809) | Jul 6, 2021 | Completed: final sign-off Dec 2022 | [555 Buckingham Wy](https://www.permitgraph.org/a/7295/036) | full floor ti - new partitions, ceiling, lighting, mep new finishes and break room | $935,287 |
| [202106182800](https://www.permitgraph.org/p/202106182800) | Jun 18, 2021 | Never finaled: issued Jul 2021, no final | [222 02nd St](https://www.permitgraph.org/a/3735/063) | 5th, 9th, 13th fl: refresh work for mothers rm/micro kitchen/breakroom mostly finishes. new non-rated partitions. mep under separate permit. ref to pa 201806010758 (9th fl) & 201804176543 (13th fl).… | $650,000 |
| [202106081940](https://www.permitgraph.org/p/202106081940) | Jun 8, 2021 | Never finaled: issued Jun 2021, no final | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | suite r3112: revision to bpa#202012161174. remove casework & coffee shtutles on sales floor. add new casework, bean to cup & ice machine at sales floor. revise espresso machine to be relocated to new… |  |
| [202106021483](https://www.permitgraph.org/p/202106021483) | Jun 2, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | floors 36/37/38: rev to pa201806121688 & 202002184644 - (n) door release at doors with card readers. new ada compliant sliding door levers. maher n/a | $1,000 |
| [202105261138](https://www.permitgraph.org/p/202105261138) | May 26, 2021 | Never finaled: issued Jun 2021, no final | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | record set-sffd: only for review of previously approved drawings which were incorrectly n/a'd by sffd. this is a record set to document sffd review & approval of the t.i. submittal drawings. ref. t.i… |  |
| [202105110164](https://www.permitgraph.org/p/202105110164) | May 11, 2021 | Completed: final sign-off Sep 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. | $15,000 |
| [202105100091](https://www.permitgraph.org/p/202105100091) | May 10, 2021 | Completed: final sign-off Sep 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | adding initiating & notification appliances in the partial floor space to conform to the new floor plan layout. existing smoke control system will not be altered. |  |
| [202104279439](https://www.permitgraph.org/p/202104279439) | Apr 27, 2021 | Completed: final sign-off Nov 2021 | [2101 Mission St](https://www.permitgraph.org/a/3575/091) | ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes. | $636,000 |
| [202104148537](https://www.permitgraph.org/p/202104148537) | Apr 14, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application(s): 201805088541; 201811014759; 201811014753. | $15,600 |
| [202104148554](https://www.permitgraph.org/p/202104148554) | Apr 14, 2021 | Completed: final sign-off Apr 2022 | [2101 Mission St](https://www.permitgraph.org/a/3575/091) | suite #304: non-structural interior only demolition per ab-017, area to remain vacant until all accessibility features have been restored. | $15,000 |
| [202104057871](https://www.permitgraph.org/p/202104057871) | Apr 5, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application# 201910215030: 201909272893. |  |
| [202104057865](https://www.permitgraph.org/p/202104057865) | Apr 5, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application# 201801199077. | $30,000 |
| [202104057886](https://www.permitgraph.org/p/202104057886) | Apr 5, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application(s): 201808288555: 201801088085: 201712277415. | $1,000 |
| [202104057885](https://www.permitgraph.org/p/202104057885) | Apr 5, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application(s): 201811014758: 201802090939: 201804247247. |  |
| [202104057876](https://www.permitgraph.org/p/202104057876) | Apr 5, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit application # 201808288554: 201712277416. | $1,000 |
| [202104027831](https://www.permitgraph.org/p/202104027831) | Apr 2, 2021 | Completed: final sign-off Jul 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | to obtain final inspection for work approved under permit no(s): 201808288551: 201805088538: 201802090935: all work is completed. | $1,000 |
| [202103257331](https://www.permitgraph.org/p/202103257331) | Mar 25, 2021 | Completed: final sign-off Sep 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | 37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a. |  |
| [202103116420](https://www.permitgraph.org/p/202103116420) | Mar 11, 2021 | Completed: final sign-off Oct 2022 | [650 California St](https://www.permitgraph.org/a/0241/025) | demo of existing interconnecting stairway.infill of slab at previous stair opening. light finish | $200,000 |
| [202101132546](https://www.permitgraph.org/p/202101132546) | Jan 13, 2021 | Completed: final sign-off Apr 2021 | [222 02nd St](https://www.permitgraph.org/a/3735/063) | replace 3 wshps, like for like. | $100,000 |
| [202101122527](https://www.permitgraph.org/p/202101122527) | Jan 12, 2021 | Completed: final sign-off Sep 2022 | [360 Spear St](https://www.permitgraph.org/a/3745/009) | priority processing per ab-004. t.i. non-structural demo, new interior non-loading bearing partitions, new doors, and new ceilings. new elect,plumbing, mech work to be tie into existing building util… | $3,131,492 |
| [202012181350](https://www.permitgraph.org/p/202012181350) | Dec 18, 2020 | Completed: final sign-off Sep 2021 | [415 Mission St](https://www.permitgraph.org/a/3720/009) | revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation. |  |
| [202012161174](https://www.permitgraph.org/p/202012161174) | Dec 16, 2020 | Completed: final sign-off Feb 2025 | [3 Embarcadero Center](https://www.permitgraph.org/a/0232/016) | suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area. | $150,000 |
| [202011239537](https://www.permitgraph.org/p/202011239537) | Nov 23, 2020 | Expired or cancelled: cancelled Jul 2023 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | determine occ load for assembly space. fire review only, administrative permit only for occupant load. revision to: 2020-0110-1681. |  |
| [202011209343](https://www.permitgraph.org/p/202011209343) | Nov 20, 2020 | Completed: final sign-off Mar 2021 | [333 Bush St](https://www.permitgraph.org/a/0288/032) | 4th fl: demolition of non-structural elements including 1 exterior glazing panel & addition of new swing door & sidelight for acccess to terrace. | $35,000 |
| [202011068432](https://www.permitgraph.org/p/202011068432) | Nov 6, 2020 | Completed: final sign-off Mar 2021 | [333 Bush St](https://www.permitgraph.org/a/0288/032) | 4/f: deffered mep for 202002144567. maher n/a. |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.