# Devcon Construction

Contractor license 399163. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/devcon-construction-399163
- JSON: https://www.permitgraph.org/api/contractor?license=399163
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=399163

147 permits since 2000: 93 completed, 30 in progress, 18 never finaled, 6 expired or cancelled. Typically 14 days from filing to permit and 175 days from permit to final inspection. Of the 18 never-finaled permits, 2 are 5 to 10 years old, 16 are over 10 years old.

- Based in: Milpitas
- On San Francisco permits: Nov 2001 to Nov 2026
- Last 24 months: 34 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2001 | 2 | 0 | 0 | 0 |
| 2002 | 0 | 0 | 1 | 0 |
| 2004 | 9 | 0 | 2 | 1 |
| 2005 | 0 | 0 | 0 | 1 |
| 2006 | 4 | 0 | 2 | 1 |
| 2007 | 4 | 0 | 1 | 1 |
| 2008 | 7 | 0 | 0 | 0 |
| 2009 | 2 | 0 | 7 | 0 |
| 2010 | 8 | 0 | 0 | 1 |
| 2011 | 3 | 0 | 0 | 1 |
| 2012 | 3 | 0 | 1 | 0 |
| 2013 | 5 | 0 | 1 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 5 | 0 | 1 | 0 |
| 2016 | 7 | 0 | 0 | 0 |
| 2017 | 9 | 0 | 1 | 0 |
| 2018 | 4 | 0 | 0 | 0 |
| 2019 | 5 | 0 | 0 | 0 |
| 2020 | 1 | 0 | 1 | 0 |
| 2021 | 1 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 1 | 1 | 0 | 0 |
| 2024 | 3 | 0 | 0 | 0 |
| 2025 | 2 | 11 | 0 | 0 |
| 2026 | 3 | 18 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 12 | 7 | 2 | 3 | 0 | 38 | 155 |
| Pergola or trellis | 2 | 2 | 0 | 0 | 0 | 112 | 137 |
| Kitchen remodel | 2 | 0 | 2 | 0 | 0 | 174 |  |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 6 | 84 |
| Bathroom remodel | 2 | 2 | 0 | 0 | 0 | 33 | 984 |

## Most recent permits

The 100 most recent of 147.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611100595](https://www.permitgraph.org/p/202611100595) | Nov 10, 2026 | In progress: filed Nov 2026, not yet issued | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | revision to pa#202307252968 s6. proposes modifications to exterior doors adjacent to roof terrace a and roof terrace b at level 3. add maglocks to some doors for additional security after hours when… | $25,000 |
| [202610290073](https://www.permitgraph.org/p/202610290073) | Oct 29, 2026 | In progress: issued Nov 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | deferred seismic bracing of suspended mechanical and electrical systems. ref bpa: 2025.0903.4495, 2026.0310.7301 and 2026.0506.0741 |  |
| [202610290066](https://www.permitgraph.org/p/202610290066) | Oct 29, 2026 | In progress: issued Nov 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | deffered submital anchorage for mechanical equipment ref pa# 2025-0903-4495, 2026-0310-7301, 2026-0506-0741. |  |
| [202609037656](https://www.permitgraph.org/p/202609037656) | Sep 3, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | revision to 202512211612. revision to lighting controols and t24 forms. update to remove daylighting contls and demand response due to installed lighting power being less than 80% of allowed lighting… |  |
| [202608056109](https://www.permitgraph.org/p/202608056109) | Aug 5, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5th fl - replacement of (4) pairs of doors at two 5th floor elevator lobby vestibules. mep and 2 way comms system under separate permit | $70,000 |
| [202607305849](https://www.permitgraph.org/p/202607305849) | Jul 30, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with… | $160,000 |
| [202607235489](https://www.permitgraph.org/p/202607235489) | Jul 23, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | ground floor: separate mep pemit for small t.i. converting an existing restaurant to event space. ref pa #202606022357 | $300,000 |
| [202607215359](https://www.permitgraph.org/p/202607215359) | Jul 21, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced | $350,000 |
| [202607215337](https://www.permitgraph.org/p/202607215337) | Jul 21, 2026 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | mep permit for tenant improvement converting an existing restaurant and office space to event space. ref 202512111591 | $350,000 |
| [202607014438](https://www.permitgraph.org/p/202607014438) | Jul 1, 2026 | In progress: issued Jul 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | deferred mep seismic bracing. ref permit 202509034495. |  |
| [202606263991](https://www.permitgraph.org/p/202606263991) | Jun 26, 2026 | In progress: issued Jul 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting. |  |
| [202606022357](https://www.permitgraph.org/p/202606022357) | Jun 2, 2026 | In progress: issued Jul 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit. | $300,000 |
| [202605261911](https://www.permitgraph.org/p/202605261911) | May 26, 2026 | Completed: final sign-off Sep 2026 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | this restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fixtures, accessories, toilet and unrinal partitions, counter… | $209,208 |
| [202605060741](https://www.permitgraph.org/p/202605060741) | May 22, 2026 | In progress: issued Oct 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | revision to pa # 202509034495 for added exterior pool, shifted pathway, added bldg pad at nw corner, mech, & plaumbing, lighting & electrical revisions, reference delta 12 for revisions. reference fo… | $100,000 |
| [202603268313](https://www.permitgraph.org/p/202603268313) | Apr 8, 2026 | In progress: issued May 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | deferred glulam beam connections permit and superstructure revision. reference pa# 2025.0903.4495 |  |
| [202603278457](https://www.permitgraph.org/p/202603278457) | Mar 27, 2026 | In progress: issued Apr 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5/f- revision to pa# 202512111612: division of existing reading room to individual small conference and phone rooms. |  |
| [202512111611](https://www.permitgraph.org/p/202512111611) | Mar 24, 2026 | In progress: issued May 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 4-5/fl- ti includes the installation of (n) comunicationg stair | $250,000 |
| [202603107301](https://www.permitgraph.org/p/202603107301) | Mar 10, 2026 | In progress: issued Apr 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | revision 202509034495 for in ground spas. reference 202602045167 for foundation and pump room revisions. electrical deferred for separate submittal. no change in use or size. no exterior changes. rev… | $10,000 |
| [202602055339](https://www.permitgraph.org/p/202602055339) | Feb 5, 2026 | Completed: final sign-off Apr 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | revision to ground improvement. ref pa #202510167538 |  |
| [202602045167](https://www.permitgraph.org/p/202602045167) | Feb 4, 2026 | In progress: issued Feb 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | revision to foundation for future spa ref pa # 2025-0903-4495. architectural & mep elements of spa will be submitted separately. add change of groundskeeping covered area to pump room. | $10,000 |
| [202601143793](https://www.permitgraph.org/p/202601143793) | Jan 14, 2026 | Completed: final sign-off Jun 2026 | [100 Hooper St](https://www.permitgraph.org/a/3808/015) | t.i. to establish a separate tenant space on the 4th floor of 100 hooper st. work includes new non-structural partition, new doors, exit signage, ceiling adjustments, & floor refinishing. no exterior… | $175,000 |
| [202512111591](https://www.permitgraph.org/p/202512111591) | Dec 11, 2025 | In progress: issued Jul 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. | $367,000 |
| [202512111612](https://www.permitgraph.org/p/202512111612) | Dec 11, 2025 | In progress: issued Mar 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) sy… | $300,000 |
| [202512111551](https://www.permitgraph.org/p/202512111551) | Dec 11, 2025 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware | $240,000 |
| [202512111594](https://www.permitgraph.org/p/202512111594) | Dec 11, 2025 | In progress: issued Sep 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware | $350,000 |
| [202512111608](https://www.permitgraph.org/p/202512111608) | Dec 11, 2025 | In progress: issued Feb 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, light… | $200,000 |
| [202512111586](https://www.permitgraph.org/p/202512111586) | Dec 11, 2025 | In progress: issued Jan 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework | $100,000 |
| [202512111610](https://www.permitgraph.org/p/202512111610) | Dec 11, 2025 | In progress: issued Jan 2026 | [345 Spear St](https://www.permitgraph.org/a/3744/002) | 5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework | $75,000 |
| [202510308518](https://www.permitgraph.org/p/202510308518) | Oct 30, 2025 | In progress: issued Aug 2026 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | removal of a section of carpet & interior glass storefront, patching, & installation of new bike racks serivng 70 total bikes, within the existing cats tutoring center at saint ignatious college prep… | $10,000 |
| [202510167538](https://www.permitgraph.org/p/202510167538) | Oct 16, 2025 | Completed: final sign-off Apr 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | soil improvement. design build const of vibro displacement column (vdc) & 1 vibro compaction ground improvement. ground improvement only & exclude design & construction of foundation shoring. tempora… | $534,000 |
| [202510066801](https://www.permitgraph.org/p/202510066801) | Oct 6, 2025 | Completed: final sign-off Apr 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | treasure island. rough grading to excavate approx 20,000 cubic yard of soil & transport material to dumpsite @ 4th st/avenue h locate 1/4 mile se. depth of excavation varies from 0.1 to 5.7'. additio… | $560,000 |
| [202509034495](https://www.permitgraph.org/p/202509034495) | Sep 18, 2025 | In progress: issued Jan 2026 | [449 Avenue H](https://www.permitgraph.org/a/8925/001) | **premium plan review**new construction of type ii-b (sprinklered), 1-story steel and mass timber structure to include training facility (locker room, weight training, athletic training, hydotherapy… | $31,100,000 |
| [202506209158](https://www.permitgraph.org/p/202506209158) | Jun 20, 2025 | In progress: issued Jul 2025 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | plumbing review & stormwater control pid review for 3 story alteration permit ref pa # 2023-0725-2968 |  |
| [202506178846](https://www.permitgraph.org/p/202506178846) | Jun 17, 2025 | In progress: issued Aug 2025 | [2225 Jerrold Av](https://www.permitgraph.org/a/5286A/020) | new manufacturing restrooms. new door hardware on (e) doors. re-stripe (e) parking lot for 37 parking space off mckinnon ave. new accessible ramp to main entry. replacement of 3 overhead loading door… | $700,000 |
| [202411155101](https://www.permitgraph.org/p/202411155101) | Nov 15, 2024 | Completed: final sign-off Mar 2025 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | installation of fountain & steel gates. all work within property lines. | $50,000 |
| [202405011161](https://www.permitgraph.org/p/202405011161) | May 1, 2024 | Completed: final sign-off Jan 2025 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | partial interior non structural demo only per ab017 | $45,000 |
| [202403057136](https://www.permitgraph.org/p/202403057136) | Mar 5, 2024 | Completed: final sign-off Jul 2024 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | install 12 temporary modular classroom buildings (as approved by state) on (e) field. construction included ramps, stairs, & electrical hookups.lighting not included. | $120,000 |
| [202309126403](https://www.permitgraph.org/p/202309126403) | Sep 12, 2023 | Completed: final sign-off Mar 2025 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | interior ti to the (e) snack shack including new walls, metal wall panels, rubber flooring, epoxy flooring, w/self coving base & operable corrugated metal doors, snack-shack includes grab & go area &… | $550,000 |
| [202307252968](https://www.permitgraph.org/p/202307252968) | Jul 25, 2023 | In progress: issued Aug 2024 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | the project consist of a proposed 142500 gsf addition of educational and accessory spaces to an existing education building. the existing building is 3 stories and the addition proposed is three stor… | $75,000,000 |
| [202203049271](https://www.permitgraph.org/p/202203049271) | Mar 4, 2022 | Completed: final sign-off Jun 2022 | [749 Toland St](https://www.permitgraph.org/a/5284A/008) | r.30 insulation to underside of roof deck; r.19 insulation to exterior walls @ warehouse only. mep under seperate permit. | $325,000 |
| [202104067967](https://www.permitgraph.org/p/202104067967) | Apr 6, 2021 | Completed: final sign-off May 2021 | [1598 Bay St](https://www.permitgraph.org/a/0459/034) | demo exterior wall 5-6" none bearing wall. replace 5-6" of metal studs, re plaster (e) wall, install brick veneer. comply w/ bid nov# 202174751. no plans per bid/ces site visit. | $9,000 |
| [202008131706](https://www.permitgraph.org/p/202008131706) | Aug 13, 2020 | Completed: final sign-off Apr 2026 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | (east building): revision to pa# 201611303815-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. |  |
| [202008131707](https://www.permitgraph.org/p/202008131707) | Aug 13, 2020 | Never finaled: issued Sep 2020, no final | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | (west building): revision to pa# 201611303820-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. |  |
| [201909030436](https://www.permitgraph.org/p/201909030436) | Sep 3, 2019 | Completed: final sign-off Oct 2019 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | revision to permit #201905221392. rename storage room 102b to electrical room. move entry room to new electrical room. |  |
| [201908148782](https://www.permitgraph.org/p/201908148782) | Aug 14, 2019 | Completed: final sign-off Nov 2021 | [2335 Golden Gate Av](https://www.permitgraph.org/a/1145/003) | revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it d… |  |
| [201908138632](https://www.permitgraph.org/p/201908138632) | Aug 13, 2019 | Completed: final sign-off Apr 2021 | [2800 Turk Bl](https://www.permitgraph.org/a/1107/008) | rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wal… | $75,000 |
| [201907267026](https://www.permitgraph.org/p/201907267026) | Jul 26, 2019 | Completed: final sign-off Sep 2020 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | in-kind window replacement at classroom building | $87,000 |
| [201905221392](https://www.permitgraph.org/p/201905221392) | May 22, 2019 | Completed: final sign-off Oct 2019 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | reclassify ground fl music storage for classroom. reclassify batting cage/exercise room to 2 classrooms. add 2 exterior windows and 3 doors. | $42,000 |
| [201811156026](https://www.permitgraph.org/p/201811156026) | Nov 15, 2018 | Completed: final sign-off Nov 2021 | [2335 Golden Gate Av](https://www.permitgraph.org/a/1145/003) | addition of approx 4,900 sq ft. reconfigure west side upper level to create (n) west entry lobby, southwest corner & club/event space. will reduce total seating capacity by approx 650. minor alterati… | $6,800,000 |
| [201806222663](https://www.permitgraph.org/p/201806222663) | Jun 22, 2018 | Completed: final sign-off Mar 2024 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldie… | $909,000 |
| [201806222661](https://www.permitgraph.org/p/201806222661) | Jun 22, 2018 | Completed: final sign-off Mar 2024 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldie… | $1,980,000 |
| [201804095853](https://www.permitgraph.org/p/201804095853) | Apr 9, 2018 | Completed: final sign-off Jun 2024 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | demolition of a type 4, 1-story maintenance building for usf campus. | $20,000 |
| [201708296273](https://www.permitgraph.org/p/201708296273) | Aug 29, 2017 | Completed: final sign-off May 2018 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher na |  |
| [201708296264](https://www.permitgraph.org/p/201708296264) | Aug 29, 2017 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to app: #201312234917 s8. as built plans for distributed antenna system (das). maher na |  |
| [201708144677](https://www.permitgraph.org/p/201708144677) | Aug 14, 2017 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13 |  |
| [201706300803](https://www.permitgraph.org/p/201706300803) | Jun 30, 2017 | Never finaled: issued Dec 2017, no final | [1598 Bay St](https://www.permitgraph.org/a/0459/007) | deferred submittal- metal stairs. shop drawings #2015-1223-5830 |  |
| [201706169644](https://www.permitgraph.org/p/201706169644) | Jun 16, 2017 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | for recording purpose to clarify number of dwelling units as 263 as approved in pa#201312234917 addemdum #5 |  |
| [201704073466](https://www.permitgraph.org/p/201704073466) | Apr 7, 2017 | Completed: final sign-off Jul 2017 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | music building - convert existing office on 2nd fl to 2 gender neutral single occupant bathrooms. convert existing garment storage room on 2nd fl to student loundge and office | $18,000 |
| [201701318334](https://www.permitgraph.org/p/201701318334) | Jan 31, 2017 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision pa #201312234917 to show shop drawings structural details & calculations per awnigns & sun shades. n/a maher ordinance |  |
| [201701318333](https://www.permitgraph.org/p/201701318333) | Jan 31, 2017 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision pa #201312234917 for balcony guardrail shop drawings & structural calculations & details. n/a maher ordinance |  |
| [201701318329](https://www.permitgraph.org/p/201701318329) | Jan 31, 2017 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision pa #201312234917 for stairs & railings sturctural detail & calculations & shop drawings. n/a maher ordinance |  |
| [201701207529](https://www.permitgraph.org/p/201701207529) | Jan 20, 2017 | Completed: final sign-off Feb 2017 | [2130 Fulton St](https://www.permitgraph.org/a/1145/003) | to obtain final inspection for work approved under pa # 200507127459. all work is complete. n/a maher |  |
| [201612195320](https://www.permitgraph.org/p/201612195320) | Dec 19, 2016 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision pa#201312234917 by adding details of roof ventilation as approved attached ab-005. n/a ordinance #155-13 |  |
| [201612064302](https://www.permitgraph.org/p/201612064302) | Dec 6, 2016 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revise previously approved electrical plans under app#201312234917 to resolve discrepancies with fire/smoke detectors between prevously approved mechanical plans requester by fire department. revise… |  |
| [201611303820](https://www.permitgraph.org/p/201611303820) | Nov 30, 2016 | Completed: final sign-off Jul 2024 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | (west building) to erect 5 stories, no basement with 1 level type i-a over 4 levels type 5-a, 71 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $34,000,000 |
| [201611303815](https://www.permitgraph.org/p/201611303815) | Nov 30, 2016 | Completed: final sign-off Jul 2024 | [2500 Turk Bl](https://www.permitgraph.org/a/1107/008) | (east building) to erect 4 stories with 1 basement, type va building, 84 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $38,000,000 |
| [201610170431](https://www.permitgraph.org/p/201610170431) | Oct 17, 2016 | Completed: final sign-off Oct 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to 201312234917-s5 to revise by adding details at ventilation at ridge |  |
| [201608054314](https://www.permitgraph.org/p/201608054314) | Aug 5, 2016 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to app#201312234917 to extend 8' wall to an extg retaining wall which was approved at the planning commission. n/a for maher |  |
| [201605278592](https://www.permitgraph.org/p/201605278592) | May 27, 2016 | Completed: final sign-off Aug 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to ref pa2016 1223 4817 add #5 note on sheet ms.02 sff a b 2.05 #1 only requested by sffd fire protection engineer. maher na |  |
| [201512235830](https://www.permitgraph.org/p/201512235830) | Dec 23, 2015 | Completed: final sign-off Nov 2018 | [1598 Bay St](https://www.permitgraph.org/a/0459/007) | to erect 4 stories, 1 basement, 28 units residential & commercial building. ** maher: n/a ** | $10,500,000 |
| [201507222181](https://www.permitgraph.org/p/201507222181) | Jul 22, 2015 | Never finaled: issued Jul 2015, no final | [444 De Haro St](https://www.permitgraph.org/a/3979/001) | revision to approved pa 201503029724, scope is to revise duct smoke detector (dsd)to smoke detector (sd) and add fire alarm matrix per fir inspector's request,no new work, maher n/a |  |
| [201506108596](https://www.permitgraph.org/p/201506108596) | Jun 10, 2015 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | revision to app#201312234917-s. change to pad elevation of dwelling units. n/a for maher |  |
| [201503100371](https://www.permitgraph.org/p/201503100371) | Mar 10, 2015 | Completed: final sign-off May 2015 | [555 19th St](https://www.permitgraph.org/a/4058/009) | non-rated, non structural, aluminum framed, tempered, glass partitions and doors. | $31,465 |
| [201503029724](https://www.permitgraph.org/p/201503029724) | Mar 2, 2015 | Completed: final sign-off Oct 2015 | [444 De Haro St](https://www.permitgraph.org/a/3979/001) | revisions to approved pa# 2014 0626 9566 as noted on plans. work includes new 2nd floor entry area. new demising wall to create subteway space, av room reconfiguration. maher - not req'd |  |
| [201502279590](https://www.permitgraph.org/p/201502279590) | Feb 27, 2015 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | pile load test program per plan to test soil condition. maher - not req'd | $10,000 |
| [201410300279](https://www.permitgraph.org/p/201410300279) | Oct 30, 2014 | Completed: final sign-off Feb 2020 | [638 19th St](https://www.permitgraph.org/a/4044/032) | unit #0c2: commercial tenant improvement to existing commercial space. existing permitted ada compliant bathroom, existing permitted entrance, ada compliant ramp, elec, lighting, new interior partito… | $43,000 |
| [201408083371](https://www.permitgraph.org/p/201408083371) | Aug 8, 2014 | Completed: final sign-off May 2015 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | demolish 2 stories storage. maher n/a | $200,000 |
| [201406269566](https://www.permitgraph.org/p/201406269566) | Jun 26, 2014 | Completed: final sign-off Oct 2015 | [444 De Haro St](https://www.permitgraph.org/a/3979/001) | 2nd fl - tenant improvements to (e) office suite on 2nd fl. construction of (n) mezzanine w/ stairs & ramp. open offices & support spaces. (n) lighting & electrical power/data. (n) mechanical systems… | $3,384,842 |
| [201403271843](https://www.permitgraph.org/p/201403271843) | Mar 27, 2014 | Completed: final sign-off Sep 2014 | [27 South Park](https://www.permitgraph.org/a/3775/042) | work @ unit# 201 only. interior tenant improvement to (e) office space on the 2nd floor. work to include new partitions, move glazed paritions, new underlayment & carpet. mep under separate permit. *… | $175,000 |
| [201312234917](https://www.permitgraph.org/p/201312234917) | Dec 23, 2013 | Completed: final sign-off Sep 2017 | [1201 Tennessee St](https://www.permitgraph.org/a/4172/022) | erect a 6 story residential and commercial building. | $55,000,000 |
| [201311071312](https://www.permitgraph.org/p/201311071312) | Nov 7, 2013 | Never finaled: issued Nov 2013, no final | [1600 15th St](https://www.permitgraph.org/a/3547/003) | revision to appl #2013.1015.9212 - add one relay module for stair #2 garage door release & connect to existing fire alarm system of the bldg. revision to fire alarm 2007-1001-4208 s7 | $500 |
| [201310159212](https://www.permitgraph.org/p/201310159212) | Oct 15, 2013 | Completed: final sign-off Dec 2013 | [1600 15th St](https://www.permitgraph.org/a/3547/003) | revsion of submitted approved egress plan to enhance resident security. pa #2007-1001-4208, ground floor. |  |
| [201305177260](https://www.permitgraph.org/p/201305177260) | May 17, 2013 | Completed: final sign-off Sep 2013 | [1880 Mission St](https://www.permitgraph.org/a/3547/002A) | revision to pa# 2007-1001-4208/s4-passenger elevator |  |
| [201305167152](https://www.permitgraph.org/p/201305167152) | May 16, 2013 | Completed: final sign-off Sep 2013 | [1880 Mission St](https://www.permitgraph.org/a/3547/002A) | revision to app#200710014208 s3 shifting shearwall and detailing along per structural detail revised. |  |
| [201303011274](https://www.permitgraph.org/p/201303011274) | Mar 1, 2013 | Completed: final sign-off Jun 2013 | [500 Terry A. Francois Bl](https://www.permitgraph.org/a/8721/001) | provide carpet and paint at 2 extg unfinished stair walls. | $200,000 |
| [201208016312](https://www.permitgraph.org/p/201208016312) | Aug 1, 2012 | Never finaled: issued Sep 2012, no final | [1880 Mission St](https://www.permitgraph.org/a/3547/002A) | steel stairs. revision to pa# 2007/10/01/4208 s-3. comments in red on am steel shops are from architect of record. 2010 code. |  |
| [201205100225](https://www.permitgraph.org/p/201205100225) | May 10, 2012 | Completed: final sign-off May 2012 | [625 Townsend St](https://www.permitgraph.org/a/3799/008) | 1st floor-revision of 2 existing evacuation map signage | $600 |
| [201204208753](https://www.permitgraph.org/p/201204208753) | Apr 20, 2012 | Completed: final sign-off Sep 2013 | [1880 Mission St](https://www.permitgraph.org/a/3547/002A) | revision to pa#200710014208-s3. submittal of structural hold down system, shop dwgs, calculations and project data. |  |
| [201201252839](https://www.permitgraph.org/p/201201252839) | Jan 25, 2012 | Completed: final sign-off Jun 2012 | [625 Townsend St](https://www.permitgraph.org/a/3799/008) | 1st floor only - (4) new offices, (3) new phone rooms. flooring, av upgrades, related elect, hvac. fire sprinkler under separate permit. | $212,000 |
| [201111158887](https://www.permitgraph.org/p/201111158887) | Nov 15, 2011 | Completed: final sign-off Oct 2013 | [1850 Mission St](https://www.permitgraph.org/a/3547/002) | shoring & tiebacks per plan. revision to pa #200710014208. for 1880 mission street construction. |  |
| [201106299193](https://www.permitgraph.org/p/201106299193) | Jun 29, 2011 | Completed: final sign-off Jan 2012 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | revision to pa# 2011.04.27.4890 to include foundation only. |  |
| [201105196381](https://www.permitgraph.org/p/201105196381) | May 19, 2011 | Expired or cancelled: expired Nov 2015 | [490 Jamestown Av](https://www.permitgraph.org/a/5000/001) | remove (e) gates per plan, install new fence and gates, new stage, new outdoor concession stand. all work outdoors, no new enclosed spaces | $527,000 |
| [201104274890](https://www.permitgraph.org/p/201104274890) | Apr 27, 2011 | Completed: final sign-off Jan 2012 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | replacement of existing exterior aluminum bleachers & provide accessible seating. | $550,000 |
| [201012237333](https://www.permitgraph.org/p/201012237333) | Dec 23, 2010 | Expired or cancelled: withdrawn Mar 2011 | [601 Townsend St](https://www.permitgraph.org/a/3799/001) | adobe systems plans to install fuel cell power generating equip in s. exterior veranda at sf facility genreate elec on site.encroach onto public right of way along king st,will be a major encorachmen… | $425,000 |
| [201012237334](https://www.permitgraph.org/p/201012237334) | Dec 23, 2010 | Completed: final sign-off Oct 2011 | [650 King St](https://www.permitgraph.org/a/3799/002) | this permit is for install of the fuel cell for generating electricity for adobe systems at the adjacent building at 601 townsend street. | $5,000 |
| [201011044305](https://www.permitgraph.org/p/201011044305) | Nov 4, 2010 | Completed: final sign-off Jan 2011 | [601 Townsend St](https://www.permitgraph.org/a/3799/001) | remodel to existing shower areas & adding 3 new shower stalls each on 1st and 2nd floors. | $192,299 |
| [201008178925](https://www.permitgraph.org/p/201008178925) | Aug 17, 2010 | Completed: final sign-off Aug 2011 | [1155 Battery St](https://www.permitgraph.org/a/0107/007) | levi strauss. interior non struc.ti on ground fl only. work includes selective demo and renovation, drywall clgs, finishes, mech, and elec. approx sqft; 32,174 with retail shell enclosure. new shower… | $1,423,000 |
| [201004281209](https://www.permitgraph.org/p/201004281209) | Apr 28, 2010 | Completed: final sign-off Aug 2010 | [490 Jamestown Av](https://www.permitgraph.org/a/5000/001) | replacement seats at field level and new field level seats | $148,000 |
| [201004281211](https://www.permitgraph.org/p/201004281211) | Apr 28, 2010 | Completed: final sign-off Aug 2010 | [490 Jamestown Av](https://www.permitgraph.org/a/5000/001) | new field level suite | $118,000 |
| [201004200630](https://www.permitgraph.org/p/201004200630) | Apr 20, 2010 | Completed: final sign-off Aug 2011 | [1155 Battery St](https://www.permitgraph.org/a/0107/007) | rvision to pa# 2009.1124.1989. revised restroom fixtures. new lighting. | $10,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/devcon-construction-399163.
