# Dba Golden Gate Termite, Diodati  Inc

Contractor license 449501. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/dba-golden-gate-termite-diodati-inc-449501
- JSON: https://www.permitgraph.org/api/contractor?license=449501
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=449501

179 permits since 2000: 143 completed, 20 never finaled, 16 expired or cancelled. Typically 0 days from filing to permit and 74 days from permit to final inspection. Of the 20 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old, 9 are over 10 years old.

- Based in: Burlingame
- On San Francisco permits: Jan 2000 to Apr 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 5 | 0 | 0 | 8 |
| 2001 | 4 | 0 | 0 | 5 |
| 2008 | 12 | 0 | 3 | 0 |
| 2009 | 13 | 0 | 0 | 1 |
| 2010 | 14 | 0 | 0 | 0 |
| 2011 | 14 | 0 | 0 | 0 |
| 2012 | 18 | 0 | 1 | 1 |
| 2013 | 15 | 0 | 1 | 0 |
| 2014 | 8 | 0 | 1 | 0 |
| 2015 | 1 | 0 | 1 | 0 |
| 2016 | 3 | 0 | 3 | 0 |
| 2017 | 8 | 0 | 1 | 0 |
| 2018 | 5 | 0 | 4 | 0 |
| 2019 | 4 | 0 | 1 | 0 |
| 2020 | 5 | 0 | 1 | 0 |
| 2021 | 4 | 0 | 0 | 1 |
| 2022 | 1 | 0 | 1 | 0 |
| 2023 | 1 | 0 | 2 | 0 |
| 2024 | 5 | 0 | 0 | 0 |
| 2025 | 1 | 0 | 0 | 0 |
| 2026 | 2 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 22 | 17 | 0 | 3 | 2 | 0 | 77 |
| Stairs | 39 | 34 | 0 | 2 | 3 | 0 | 82 |
| Kitchen remodel | 7 | 7 | 0 | 0 | 0 | 0 | 147 |
| Bathroom remodel | 9 | 9 | 0 | 0 | 0 | 0 | 65 |

## Most recent permits

The 100 most recent of 179.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202604068981](https://www.permitgraph.org/p/202604068981) | Apr 6, 2026 | Completed: final sign-off Apr 2026 | [284 Noe St](https://www.permitgraph.org/a/3561/013) | revision 202602035073- removal of scope of work to include remove sink and cabinets and remain storage area. |  |
| [202602035073](https://www.permitgraph.org/p/202602035073) | Feb 3, 2026 | Completed: final sign-off Apr 2026 | [284 Noe St](https://www.permitgraph.org/a/3561/013) | unit 284: ground level bookstore ti to replace previous pet store in (e) 2 story mixed use bldg with upper residential unit 280, not included. new back of house area, sinks, appliances and finishes.… | $32,000 |
| [202506068171](https://www.permitgraph.org/p/202506068171) | Jun 6, 2025 | Completed: final sign-off Apr 2026 | [284 Noe St](https://www.permitgraph.org/a/3561/013) | ground level: non-structural interior remodel with new finishes for an existing restroom to make it ada accessible all gender restroom. mep design build. | $40,000 |
| [202409090378](https://www.permitgraph.org/p/202409090378) | Sep 9, 2024 | Completed: final sign-off Mar 2025 | [1109 Grant Av](https://www.permitgraph.org/a/0161/005) | repair bottom of sidewalk as outlined in the sidewalk support retrofit plans. | $40,000 |
| [202404109739](https://www.permitgraph.org/p/202404109739) | Apr 10, 2024 | Completed: final sign-off Jul 2026 | [749 27th Av](https://www.permitgraph.org/a/1617/005) | build rooms in the (e) basement area bathrroms (2) kitchenette enclose the exterior stair area and remodel lupstairs kitchen as per plans by strathdee designs dated 3/11/24 | $175,000 |
| [202402145927](https://www.permitgraph.org/p/202402145927) | Feb 14, 2024 | Completed: final sign-off Jun 2026 | [749 27th Av](https://www.permitgraph.org/a/1617/005) | revision to 202402065370 dated 2/8/24. changes include lowering portion of garage floor to obtain 8' clearance. | $10,000 |
| [202402065370](https://www.permitgraph.org/p/202402065370) | Feb 6, 2024 | Completed: final sign-off Jul 2026 | [749 27th Av](https://www.permitgraph.org/a/1617/005) | revision to pa# 202401264777. the scope of work include the removal and replacement of the existing footings and concrete slab as required. all finished elevation match with existing. no excavation | $70,000 |
| [202401264777](https://www.permitgraph.org/p/202401264777) | Jan 26, 2024 | Completed: final sign-off Mar 2025 | [749 27th Av](https://www.permitgraph.org/a/1617/005) | repair to stud wall and foundation as outlined in golden gate termite report#30225 dated 1/24/2024. limited portions of footings in kind. | $20,000 |
| [202305248492](https://www.permitgraph.org/p/202305248492) | May 24, 2023 | Never finaled: issued May 2023, no final | [146 Peralta Av](https://www.permitgraph.org/a/5514/013) | rev to pa202304145771: install new section of foundation s outlined in plans | $10,000 |
| [202304145771](https://www.permitgraph.org/p/202304145771) | Apr 14, 2023 | Completed: final sign-off Jul 2023 | [146 Peralta Av](https://www.permitgraph.org/a/5514/013) | repair cut base of studs app 12" install a new mudsill on a rised concrete cap remove fungus damaged members as outlined in goldern gate termite report #30193 dated 41023 like for like less than 50% | $15,000 |
| [202304145770](https://www.permitgraph.org/p/202304145770) | Apr 14, 2023 | Never finaled: issued Apr 2023, no final | [24 John St](https://www.permitgraph.org/a/0180/032) | repair damage to lower stairline and lower landing as outlined in golden state termite report 30190 dated 3172023. like for like less than 50% | $9,500 |
| [202211086121](https://www.permitgraph.org/p/202211086121) | Nov 8, 2022 | Never finaled: issued Nov 2022, no final | [65 Manor Dr](https://www.permitgraph.org/a/3278/005) | break stucco and repair/replace damaged wood members from gryrot and termite damage as outlined in our golden state like for like, less than 50% | $12,000 |
| [202202027163](https://www.permitgraph.org/p/202202027163) | Feb 2, 2022 | Completed: final sign-off Apr 2022 | [180 Westgate Dr](https://www.permitgraph.org/a/3271/023) | break out stucco on side of house and repair termite damage as noted on our report #30076 dated 11/9/21. like for like, not visible from street. aprox 150 sq ft like for like | $12,000 |
| [202107013569](https://www.permitgraph.org/p/202107013569) | Jul 1, 2021 | Expired or cancelled: cancelled Jan 2026 | [554 Mangels Av](https://www.permitgraph.org/a/3065/018) | install retainning wall and replace (e) wood deck at rear w/ similar design and mertial as outlined in plans by engineer peter nissen. like for like. | $90,000 |
| [202106021433](https://www.permitgraph.org/p/202106021433) | Jun 2, 2021 | Completed: final sign-off Jun 2021 | [1152 Burrows St](https://www.permitgraph.org/a/5972/019) | repair front stucco as outlined in our golden gate termite report #30004 dated 9/8/2020 like for like. less than 50% | $8,000 |
| [202104148521](https://www.permitgraph.org/p/202104148521) | Apr 14, 2021 | Completed: final sign-off Jun 2021 | [2185 15th Av](https://www.permitgraph.org/a/2202/001Q) | repair the dryrot stucco entry and fire place abbient and rear right corner trim and ply wood like for like less than 50%. per report # 30027. | $18,000 |
| [202104078059](https://www.permitgraph.org/p/202104078059) | Apr 7, 2021 | Completed: final sign-off Jun 2021 | [400 Garfield St](https://www.permitgraph.org/a/6993/020) | termite control. comply w/ report 30026 by golden gate termite | $5,500 |
| [202104078054](https://www.permitgraph.org/p/202104078054) | Apr 7, 2021 | Completed: final sign-off Jun 2021 | [318 Rome St](https://www.permitgraph.org/a/7046A/016) | termite control. comply w/ report 30020 by golden gate termite | $6,700 |
| [202009305539](https://www.permitgraph.org/p/202009305539) | Sep 30, 2020 | Completed: final sign-off Oct 2020 | [613 Broderick St](https://www.permitgraph.org/a/1183/052) | to comply with nov #202052391 dated 9/14/2020, repair wall damaged, like-for-liek, less than 50% repair | $2,500 |
| [202009305542](https://www.permitgraph.org/p/202009305542) | Sep 30, 2020 | Completed: final sign-off Oct 2020 | [430 Arlington St](https://www.permitgraph.org/a/6718/007) | per building code install plywood on basement walls, 1/2" structural grade plywood nailed 6" on sides, 12" on center. ref pa#202008192075 | $3,500 |
| [202009164286](https://www.permitgraph.org/p/202009164286) | Sep 16, 2020 | Completed: final sign-off Oct 2020 | [2434 16th Av](https://www.permitgraph.org/a/2410/022) | repair dryrot damage on existing bay as outlined in report # 20997 dated 8/12/2020. like for like & less than 50%. | $4,800 |
| [202008192075](https://www.permitgraph.org/p/202008192075) | Aug 19, 2020 | Completed: final sign-off Oct 2020 | [430 Arlington St](https://www.permitgraph.org/a/6718/007) | repair interior wood stairs, install a concrete cap on the existing foundation. see 20995 dated 7/9/20 | $22,000 |
| [202003036069](https://www.permitgraph.org/p/202003036069) | Mar 3, 2020 | Never finaled: issued Mar 2020, no final | [314 College Av](https://www.permitgraph.org/a/5833/003) | repair dryrot around rear windows, not visible from street, replace the disturbed windows with similar style, less than 50%, like for like. | $18,000 |
| [202002194892](https://www.permitgraph.org/p/202002194892) | Feb 19, 2020 | Completed: final sign-off Sep 2020 | [445 Diamond St](https://www.permitgraph.org/a/2769/037) | repair of (e) decks, see plans by peter nissen engineer like for like | $45,000 |
| [201909131666](https://www.permitgraph.org/p/201909131666) | Sep 13, 2019 | Completed: final sign-off Jul 2021 | [1742 32nd Av](https://www.permitgraph.org/a/2018/009) | kitchen and bathroom remodel. no change of (e) floor plan | $25,000 |
| [201906173657](https://www.permitgraph.org/p/201906173657) | Jun 17, 2019 | Never finaled: issued Jun 2019, no final | [2925 26th Av](https://www.permitgraph.org/a/7210/002) | as outlined in golden gate termite repport# 20965 dated 6/10/19. repair termite & dryrot damage around rear and side door. replace windows in rear & side of house. windows not visible from street. li… | $8,500 |
| [201904168146](https://www.permitgraph.org/p/201904168146) | Apr 16, 2019 | Completed: final sign-off Aug 2019 | [346 Flood Av](https://www.permitgraph.org/a/3121/017) | as outlined in golden gate termite report # 20957 dated 4/5/19 remove damaged framing behind the 2 showers, reinstall new framing and new showers, replace damage mudsill on the back wall and install… | $35,000 |
| [201903064544](https://www.permitgraph.org/p/201903064544) | Mar 6, 2019 | Completed: final sign-off Jun 2019 | [120 Upland Dr](https://www.permitgraph.org/a/3275/004) | repair damage to downtairs floor joist and in living rm. like for like less than 50%. serves as a supplemental to 201903044349 dated 3/4/19 | $8,000 |
| [201903044349](https://www.permitgraph.org/p/201903044349) | Mar 4, 2019 | Completed: final sign-off Jun 2019 | [120 Upland Dr](https://www.permitgraph.org/a/3275/004) | as outlined in golden gate termite report #20946 dated 2/26/19. increase foundation by installing a concrete cap house sadi and install a draining pipe like for like less than 50% | $38,500 |
| [201812198802](https://www.permitgraph.org/p/201812198802) | Dec 19, 2018 | Never finaled: issued Dec 2018, no final | [51 Rossmoor Dr](https://www.permitgraph.org/a/7231/002B) | repair dryrot and termite damage in rear of dwelling as outlined in golden gate termite report 20934, like for like, less than 50% | $25,000 |
| [201812198801](https://www.permitgraph.org/p/201812198801) | Dec 19, 2018 | Never finaled: issued Dec 2018, no final | [51 Rossmoor Dr](https://www.permitgraph.org/a/7231/002B) | replace 4 windows in tthe back of dwelling. not visible from street. like for like less than 50% | $4,000 |
| [201811297053](https://www.permitgraph.org/p/201811297053) | Nov 29, 2018 | Never finaled: issued Nov 2018, no final | [787 46th Av](https://www.permitgraph.org/a/1598/017) | repair dryrot and termite damage as outlined in golden gate. termite report #20933 dated 9/7/18. like for like. less than 50% | $6,000 |
| [201808076706](https://www.permitgraph.org/p/201808076706) | Aug 7, 2018 | Never finaled: issued Aug 2018, no final | [43 Cayuga Av](https://www.permitgraph.org/a/6786/009B) | repair the front stairs do to dryrot damage as outlined in golden gate termitee report #20928 dated 7/20/18. like for like. less than 50% | $12,500 |
| [201806192349](https://www.permitgraph.org/p/201806192349) | Jun 19, 2018 | Completed: final sign-off Aug 2018 | [82 Woodward St](https://www.permitgraph.org/a/3532/055) | perform work as outlines in report 20917, item 5/6/7/8. like for like, less than 50%. | $22,000 |
| [201806192347](https://www.permitgraph.org/p/201806192347) | Jun 19, 2018 | Completed: final sign-off Aug 2018 | [82 Woodward St](https://www.permitgraph.org/a/3532/055) | perform the repairs as outlines in nov#201866351, items 3/4/5/6/7/10/11/12. note item 8 by owners licensed painting contractor; less than 50%, like for like. | $30,000 |
| [201805239967](https://www.permitgraph.org/p/201805239967) | May 23, 2018 | Completed: final sign-off Jun 2018 | [2700 15th Av](https://www.permitgraph.org/a/2483/001) | repair dryrot and termite damage as outlined in golden gate termite report 201919 dated 5/8/18, like for like less than 50%. stairs/decks memer replace in-kind less than 50% | $28,000 |
| [201805088544](https://www.permitgraph.org/p/201805088544) | May 8, 2018 | Completed: final sign-off Oct 2020 | [1849 Chestnut St](https://www.permitgraph.org/a/0493/025) | soft story retrofit per sfebc per sfebc chapter 4d:2016 cebc appendix a-4 | $30,000 |
| [201803123479](https://www.permitgraph.org/p/201803123479) | Mar 12, 2018 | Completed: final sign-off Apr 2018 | [264 Mallorca Wy](https://www.permitgraph.org/a/0462A/033) | inkind repair of stucco siding due to dry rot damage - max. 100 sf - area immediately garage. less than 50% | $4,500 |
| [201711284985](https://www.permitgraph.org/p/201711284985) | Nov 28, 2017 | Completed: final sign-off Jun 2018 | [743 Avalon Av](https://www.permitgraph.org/a/5959/018) | replace damaged mudsell as outlined in golden gate termite report, #20907, item #2 or 3, dated 11/15/2017. like for like, less than 50% | $6,500 |
| [201711073410](https://www.permitgraph.org/p/201711073410) | Nov 7, 2017 | Completed: final sign-off May 2018 | [1374 17th Av](https://www.permitgraph.org/a/1771/026) | repair the damange behind the front stucco as outlines in golden gate termint report 20898 dated 10/9/2017, like for like, les than 50%. | $28,500 |
| [201708104532](https://www.permitgraph.org/p/201708104532) | Aug 10, 2017 | Completed: final sign-off Aug 2017 | [1500 09th Av](https://www.permitgraph.org/a/1854/031) | remove dry rot portion of the 2nd floor rear porch and replace it with new framing using pressure treated framing. see report. like for like less than 50% | $6,500 |
| [201707192400](https://www.permitgraph.org/p/201707192400) | Jul 19, 2017 | Completed: final sign-off Aug 2017 | [1127 Vallejo St](https://www.permitgraph.org/a/0151/066) | cut away damaged stringers, posts and steps. install new presuure-treated structural members less than 50%, like for like, see report #20888 dated 5/1/17 | $14,500 |
| [201707172083](https://www.permitgraph.org/p/201707172083) | Jul 17, 2017 | Completed: final sign-off Aug 2017 | [541 Lisbon St](https://www.permitgraph.org/a/6275/036) | cut base of studs and install new mudsill on a raised concrete cap, cut away damaged members & install new members like-for-like per termite report #206879, dated 5/18/2017, less than 50% | $7,800 |
| [201706270510](https://www.permitgraph.org/p/201706270510) | Jun 27, 2017 | Never finaled: issued Jun 2017, no final | [48 Harper St](https://www.permitgraph.org/a/6652/007) | replace damaged retaining wall at front yard, in-kind. | $20,000 |
| [201705307919](https://www.permitgraph.org/p/201705307919) | May 30, 2017 | Completed: final sign-off Sep 2018 | [1801 Jackson St](https://www.permitgraph.org/a/0600/001) | compliance with mandatory soft story retrofit program, 2016 cebc appendix a-4. | $30,000 |
| [201705187057](https://www.permitgraph.org/p/201705187057) | May 18, 2017 | Completed: final sign-off Jun 2017 | [2685 Diamond St](https://www.permitgraph.org/a/6729/055) | open up the wall, cut away damaged members, install new members and install new siding. like for like, less than 50%. see report # 20876 dated 5/16/17 | $4,600 |
| [201703232230](https://www.permitgraph.org/p/201703232230) | Mar 23, 2017 | Completed: final sign-off Jun 2017 | [95 Pomona St](https://www.permitgraph.org/a/5357/027) | install (2) new windows on front. see permit 201610251151. | $2,800 |
| [201612054187](https://www.permitgraph.org/p/201612054187) | Dec 5, 2016 | Never finaled: issued Dec 2016, no final | [519 Birch St](https://www.permitgraph.org/a/0794/005A) | pre-construction meeting is requared with city inspetor. repair fungus damaged lower and upper left deck and upper right deck. no structural repairs, less than 50% in rear. no structural changes repl… | $4,500 |
| [201610251151](https://www.permitgraph.org/p/201610251151) | Oct 25, 2016 | Completed: final sign-off Jun 2017 | [95 Pomona St](https://www.permitgraph.org/a/5357/027) | repair fungus damaged wood framing above the rear door. no structural repairs, no structural changes, replacement of hungus damaged members only less than 50%. refer to golden gate termite report #20… | $5,500 |
| [201610251152](https://www.permitgraph.org/p/201610251152) | Oct 25, 2016 | Completed: final sign-off Jan 2017 | [51 Noe St](https://www.permitgraph.org/a/3538/042) | repair fungus damange rear lower,middle & rear lower stairline. no structural repairs, less than 50%. pg#2 of report 20825 or 1/2/3. no structural change, replacement of fungus damage member only. re… | $4,850 |
| [201606210519](https://www.permitgraph.org/p/201606210519) | Jun 21, 2016 | Never finaled: issued Jun 2016, no final | [57 Albion St](https://www.permitgraph.org/a/3555/049) | repair fungus damaged rear stairline. no structural repairs, changes, replacement of fungus damaged members only. refer to golden gate termite report #20797. less than 50%. | $4,800 |
| [201602230326](https://www.permitgraph.org/p/201602230326) | Feb 23, 2016 | Never finaled: issued Feb 2016, no final | [12 Ford St](https://www.permitgraph.org/a/3581/052) | repair fungus damaged studs and mudsill; no structural repair; no structuralchanges replacment of fungus damaged members only. to comply termite report #20773 | $3,000 |
| [201602109317](https://www.permitgraph.org/p/201602109317) | Feb 10, 2016 | Completed: final sign-off Mar 2016 | [451 Kirkham St](https://www.permitgraph.org/a/1854/031) | repair dryrot on rear stairs and replace with new new members. no structural changes. like for like, less than 50%. refer to goldn gate termite report #20771 | $5,600 |
| [201512285967](https://www.permitgraph.org/p/201512285967) | Dec 28, 2015 | Never finaled: issued Dec 2015, no final | [840 Waller St](https://www.permitgraph.org/a/1240/037) | revision to app# 201411131463. replace wood railing with metal railing according to plans by peter nissen. not visible from street. | $60,000 |
| [201501145732](https://www.permitgraph.org/p/201501145732) | Jan 14, 2015 | Completed: final sign-off Feb 2015 | [258 28th Av](https://www.permitgraph.org/a/1387/022I) | replace 9 rear windows and one door. like for like. no structural repair. | $17,500 |
| [201411242423](https://www.permitgraph.org/p/201411242423) | Nov 24, 2014 | Completed: final sign-off Jan 2015 | [741 Teresita Bl](https://www.permitgraph.org/a/3000C/019) | performed the repairs as outlined in the termite report #20698 item#1. repair front stucco like for like. | $7,850 |
| [201411242416](https://www.permitgraph.org/p/201411242416) | Nov 24, 2014 | Completed: final sign-off Apr 2015 | [955 Darien Wy](https://www.permitgraph.org/a/3274/017) | replace cabinets in kitchen and bring 4 electrical circuits, no structural repairs, like for like. | $25,000 |
| [201411242425](https://www.permitgraph.org/p/201411242425) | Nov 24, 2014 | Never finaled: issued Nov 2014, no final | [2243 29th Av](https://www.permitgraph.org/a/2320/002F) | performed the repairs as outlined in the termite reports #20693 item #6 and #20695 item #1. all repair in kind. repair dryrot front stucco like for like. repair dryrot in rear deck less than 50%. upd… | $9,850 |
| [201411131463](https://www.permitgraph.org/p/201411131463) | Nov 13, 2014 | Completed: final sign-off Nov 2016 | [840 Waller St](https://www.permitgraph.org/a/1240/037) | perform the dryrot repairs as outlines in the termite report #cc20692. remove nov# 201402261. | $5,000 |
| [201410108669](https://www.permitgraph.org/p/201410108669) | Oct 10, 2014 | Completed: final sign-off Jan 2015 | [1035 Portola Dr](https://www.permitgraph.org/a/2985/028) | repairs to the front stairs, no structural repairs, less than 50% like for like wood framing/bricks steps | $12,500 |
| [201409025153](https://www.permitgraph.org/p/201409025153) | Sep 2, 2014 | Completed: final sign-off Feb 2015 | [115 Greenwood Av](https://www.permitgraph.org/a/3162/002) | repairs to the front stairs. no change to design. no structural repairs. less than 50%. like for like. | $19,500 |
| [201408194171](https://www.permitgraph.org/p/201408194171) | Aug 19, 2014 | Completed: final sign-off Sep 2014 | [2560 Polk St](https://www.permitgraph.org/a/0524/021) | repair dryrot on the rear stairs, no structural repairs, like-for-like, less than 50%, no full replacement. | $5,900 |
| [201407252232](https://www.permitgraph.org/p/201407252232) | Jul 25, 2014 | Completed: final sign-off Jul 2014 | [1162 Dolores St](https://www.permitgraph.org/a/6535/064) | repairs to rear porch and deck joists. see report #20672 dated 5/12/14. like for like. less than 50% | $4,500 |
| [201405206265](https://www.permitgraph.org/p/201405206265) | May 20, 2014 | Completed: final sign-off Apr 2015 | [955 Darien Wy](https://www.permitgraph.org/a/3274/017) | repair the stucco on the right corner and right bay and left side by stairs. like for like, less than 50%. 300 sf. | $4,800 |
| [201311212549](https://www.permitgraph.org/p/201311212549) | Nov 21, 2013 | Completed: final sign-off Jan 2014 | [436 Oak St](https://www.permitgraph.org/a/0830/009) | repair the dryrot on the rear deck and stairs. like for like. less than 50%. | $14,500 |
| [201311081557](https://www.permitgraph.org/p/201311081557) | Nov 8, 2013 | Completed: final sign-off Jan 2014 | [1559 37th Av](https://www.permitgraph.org/a/1883/015) | repair the (2) rear posts. repair the siding where disturbed. like-for-like, not visible from street. | $2,400 |
| [201311081554](https://www.permitgraph.org/p/201311081554) | Nov 8, 2013 | Completed: final sign-off Apr 2014 | [35 Keystone Wy](https://www.permitgraph.org/a/3281/016) | repair dryrot on front stairs. no structural repairs. like-for-like, less than 50% | $11,900 |
| [201310290576](https://www.permitgraph.org/p/201310290576) | Oct 29, 2013 | Completed: final sign-off Apr 2014 | [3850 Washington St](https://www.permitgraph.org/a/0989/007) | remove brick steps, waterproof, install new steps | $12,000 |
| [201309267881](https://www.permitgraph.org/p/201309267881) | Sep 26, 2013 | Completed: final sign-off Oct 2013 | [4425 18th St](https://www.permitgraph.org/a/2692/039) | revision to app#201308214921. repair deck at rear yard. |  |
| [201309247617](https://www.permitgraph.org/p/201309247617) | Sep 24, 2013 | Completed: final sign-off Oct 2013 | [1454 Jefferson St](https://www.permitgraph.org/a/0436C/035) | replace the tiles on the center deck like per like | $9,800 |
| [201309197280](https://www.permitgraph.org/p/201309197280) | Sep 19, 2013 | Completed: final sign-off Oct 2013 | [125 Murray St](https://www.permitgraph.org/a/5833/010) | remove the existing front steps and install new steps. no structural repairs. less than 50%. like for like. | $9,800 |
| [201308214921](https://www.permitgraph.org/p/201308214921) | Aug 21, 2013 | Never finaled: issued Aug 2013, no final | [4425 18th St](https://www.permitgraph.org/a/2692/039) | repair rear deck as per termite report #20631; like for like not more than 50%; the work will consist of installing new posts and piers; repairing framing and decking and installation of 2 x 2 picket… | $8,700 |
| [201308013370](https://www.permitgraph.org/p/201308013370) | Aug 1, 2013 | Completed: final sign-off Aug 2013 | [526 Connecticut St](https://www.permitgraph.org/a/4099/011) | repair the dryrot on portion of base on left & right wall, install new siding, like for like less than 50%. | $8,950 |
| [201307161999](https://www.permitgraph.org/p/201307161999) | Jul 16, 2013 | Completed: final sign-off Jan 2014 | [2278 30th Av](https://www.permitgraph.org/a/2320/003A) | repair the front stairs (dryrot) like for like. no structural repairs. replace the back window/repair the stucco like for like. no structural repairs. less than 50%. | $14,500 |
| [201306270670](https://www.permitgraph.org/p/201306270670) | Jun 27, 2013 | Completed: final sign-off Oct 2013 | [142 Garfield St](https://www.permitgraph.org/a/6990/027) | repair the dry rot on the front stairs landing less than 50%; like for like, no structural repairs | $14,500 |
| [201305287994](https://www.permitgraph.org/p/201305287994) | May 28, 2013 | Completed: final sign-off Aug 2013 | [736 Judah St](https://www.permitgraph.org/a/1767/023) | repair handrail on rear deck less than 50%. repair dryrot and stucco banister. no structural repairs. repair dryrot in center corner like for like |  |
| [201305247863](https://www.permitgraph.org/p/201305247863) | May 24, 2013 | Completed: final sign-off Jul 2013 | [91 Stoneyford Av](https://www.permitgraph.org/a/5886/029) | repair dryrot on front stucco - approximately 20" x 20'. no structural repairs like for like | $6,900 |
| [201305247891](https://www.permitgraph.org/p/201305247891) | May 24, 2013 | Completed: final sign-off Jul 2013 | [311 11th Av](https://www.permitgraph.org/a/1443/001) | install grab bar in the two guest bathrooms as per code (2 bathrooms)***** | $1,200 |
| [201305086453](https://www.permitgraph.org/p/201305086453) | May 8, 2013 | Completed: final sign-off Jul 2013 | [2739 Turk St](https://www.permitgraph.org/a/1147/017) | repair the front bay, around window 20'x20' of stucco work, no structural repairs, like for like | $4,800 |
| [201301168153](https://www.permitgraph.org/p/201301168153) | Jan 16, 2013 | Completed: final sign-off Jan 2013 | [3909 Mission St](https://www.permitgraph.org/a/5802/042) | to obtain final inspection for work approved under pa#452841 all work is complete. |  |
| [201212115961](https://www.permitgraph.org/p/201212115961) | Dec 11, 2012 | Completed: final sign-off Jul 2013 | [1051 Goettingen St](https://www.permitgraph.org/a/6170/028) | repair the front bay and the stucco around the gutters, no structural repairs, like for like. | $3,900 |
| [201211073771](https://www.permitgraph.org/p/201211073771) | Nov 7, 2012 | Never finaled: issued Nov 2012, no final | [801 Athens St](https://www.permitgraph.org/a/6355/005E) | repair the front stucco. no structural. like for like. | $3,200 |
| [201211073769](https://www.permitgraph.org/p/201211073769) | Nov 7, 2012 | Completed: final sign-off Dec 2012 | [2279 27th Av](https://www.permitgraph.org/a/2322/011A) | stucco repairs of portion of front right & left wall. no structural. like for like. | $2,950 |
| [201210303117](https://www.permitgraph.org/p/201210303117) | Oct 30, 2012 | Completed: final sign-off Feb 2013 | [64 Keystone Wy](https://www.permitgraph.org/a/3282/018) | repair front, rear, right, and left bays. stucco repairs. no structural. like for like, less than 50% | $4,900 |
| [201210242763](https://www.permitgraph.org/p/201210242763) | Oct 24, 2012 | Expired or cancelled: expired Apr 2023 | [7 Hill Point Av](https://www.permitgraph.org/a/1275/022) | installation of rear yard deck and retaining walls. | $40,000 |
| [201210051432](https://www.permitgraph.org/p/201210051432) | Oct 5, 2012 | Completed: final sign-off Dec 2012 | [1350 Santiago St](https://www.permitgraph.org/a/2325/027) | additional work to pa #2012.09.01.9325 - stucco repairs on front wall approx 20' x 30', n structural repairs , like per like. | $5,000 |
| [201209180058](https://www.permitgraph.org/p/201209180058) | Sep 18, 2012 | Completed: final sign-off Jul 2013 | [134 Chenery St](https://www.permitgraph.org/a/6663/003) | repair the dry rot on front stairs, repair less than 50%, no structural repairs, replace like for like. | $11,900 |
| [201209109325](https://www.permitgraph.org/p/201209109325) | Sep 10, 2012 | Completed: final sign-off Dec 2012 | [1350 Santiago St](https://www.permitgraph.org/a/2325/027) | repair base of front wall & restucco, repair base of garage wall & restucco, no structural repairs, like for like. | $3,500 |
| [201208147361](https://www.permitgraph.org/p/201208147361) | Aug 14, 2012 | Completed: final sign-off Sep 2012 | [1410 Polk St](https://www.permitgraph.org/a/0645/011) | to comply w/complaint #201245921: replace kitchen cabinet & linoleum floor, replace porch linoleum floor, install back door closer, replace broken tread (stairs). | $2,900 |
| [201208147358](https://www.permitgraph.org/p/201208147358) | Aug 14, 2012 | Completed: final sign-off Sep 2012 | [43 Keystone Wy](https://www.permitgraph.org/a/3281/015) | replace base of right wall & restucco to match , work is not visible front the street, no structural repairs, replace like for like, termite inspeciton report #20510 | $9,500 |
| [201208076742](https://www.permitgraph.org/p/201208076742) | Aug 7, 2012 | Completed: final sign-off Mar 2013 | [66 Robblee Av](https://www.permitgraph.org/a/5384/004) | construct rear retaining wall faceing silver ave. construct 6'0 high fence on top of rear retaining wall | $15,000 |
| [201207205381](https://www.permitgraph.org/p/201207205381) | Jul 20, 2012 | Completed: final sign-off Jan 2013 | [442 Excelsior Av](https://www.permitgraph.org/a/6018/001) |  | $3,900 |
| [201207023932](https://www.permitgraph.org/p/201207023932) | Jul 2, 2012 | Completed: final sign-off Sep 2012 | [1410 Polk St](https://www.permitgraph.org/a/0645/011) | repair the rear siding around the vent, replace the vent, no structural repair, less than 50% | $950 |
| [201206132556](https://www.permitgraph.org/p/201206132556) | Jun 13, 2012 | Completed: final sign-off Sep 2012 | [42 Keystone Wy](https://www.permitgraph.org/a/3282/022) | repair front stairs. no structural repairs. less than 50%. no structural changes, like for like. no structural changes, like for like | $14,900 |
| [201206072115](https://www.permitgraph.org/p/201206072115) | Jun 7, 2012 | Completed: final sign-off Sep 2012 | [25 Keystone Wy](https://www.permitgraph.org/a/3281/017) | repair front stairs, no structural repairs, less than 50% no structural changes, like for like. | $14,000 |
| [201205170720](https://www.permitgraph.org/p/201205170720) | May 17, 2012 | Completed: final sign-off Jun 2012 | [4276 26th St](https://www.permitgraph.org/a/6555/024) | repair front stair landing "in kind"; remove stair to roof; replace door with window, not visible from street | $3,800 |
| [201205090156](https://www.permitgraph.org/p/201205090156) | May 9, 2012 | Completed: final sign-off Jun 2012 | [184 Upland Dr](https://www.permitgraph.org/a/3275/010) | repair dryrot/termite damage on rear bay of house with similar materials. no structural changes like for like | $3,900 |
| [201203196391](https://www.permitgraph.org/p/201203196391) | Mar 19, 2012 | Completed: final sign-off May 2012 | [60 Keystone Wy](https://www.permitgraph.org/a/3282/018A) | repair front stairs - no structural repairs, replace like to like. less than 50%. | $15,900 |
| [201203015232](https://www.permitgraph.org/p/201203015232) | Mar 1, 2012 | Completed: final sign-off Mar 2012 | [2295 Vallejo St](https://www.permitgraph.org/a/0564/027) | repair dry rot on plywood corner (100 sq. feet or less of repair in kind) | $4,000 |
| [201202134079](https://www.permitgraph.org/p/201202134079) | Feb 13, 2012 | Completed: final sign-off Mar 2012 | [10 Godeus St](https://www.permitgraph.org/a/5642/034) | repair stairs in kind. no structural repair, replace like to like less than 50%. | $5,900 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/dba-golden-gate-termite-diodati-inc-449501.
