Darc Ventures Inc Dba Spl Construction S
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 16 permits filed
148 permits since 2000: 138 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
13 deck permits: 13 completed. Typically 4 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3Details
revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 | $110,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 3756 23rd St | rear deck repair less than 50%Details
rear deck repair less than 50% | $5,000 |
| Apr 23, 2024 | Completed final sign-off May 2024 | 783 35th Av | rear deck repair less than 50%. all work in kind.Details
rear deck repair less than 50%. all work in kind. | $7,000 |
| Sep 20, 2023 | Completed final sign-off Oct 2023 | 2958 Scott St | rear repair (e) deck less than 50%.Details
rear repair (e) deck less than 50%. | $10,000 |
| Jun 29, 2023 | Completed final sign-off Jan 2024 | 76 Conkling St | converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high).Details
converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high). | $125,000 |
| Jan 17, 2023 | Completed final sign-off Feb 2023 | 1364 Vermont St | rear deck repair less than 50%Details
rear deck repair less than 50% | $10,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2024 | 80 Ventura Av | new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor.Details
new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor. | $150,000 |
| Jun 4, 2020 | Completed final sign-off Aug 2020 | 893 Ashbury St | remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building.Details
remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building. | $35,000 |
| Apr 25, 2019 | Completed final sign-off Jul 2020 | 373 Warren Dr | rebuild (e) retaining wall, add deck.Details
rebuild (e) retaining wall, add deck. | $67,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 1370 Webster St | repair rear deck less than 50% front stair framing less than 50% no other work.Details
repair rear deck less than 50% front stair framing less than 50% no other work. | $10,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 2255 Mariposa St | remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation.Details
remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation. | $35,000 |
| Sep 5, 2012 | Completed final sign-off Feb 2014 | 1275 Bay St | add recessed lighting in common areas, install new water heaters for 2 units, same loc. replace appliances in top floor unit. kitchen countertop. replace rotten plywood on rear deck. new shower pan. tiling on top floor. remove steam heat and install elec in middle units. kitchen lighting comply wDetails
add recessed lighting in common areas, install new water heaters for 2 units, same loc. replace appliances in top floor unit. kitchen countertop. replace rotten plywood on rear deck. new shower pan. tiling on top floor. remove steam heat and install elec in middle units. kitchen lighting comply w | $20,000 |