D S Management Inc Dba Metrocon Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Sep 2026
- Last 24 months
- 4 permits filed
105 permits since 2000: 81 completed, 4 in progress, 18 never finaled, 2 expired or cancelled.
Of the 18 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 13 completed. Typically 34 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2019 | Completed final sign-off Jul 2020 | 821 Edinburgh St | construct 2 bedroom, 2 full bath, media rm gr fl. relocate e kitchen, bath, add 1 full bath, one 1/2 bath remodel, 2 bedrom,liv rm 2nd fl. rebuilt e interior staircase from 2nd fl down to gr fl. new deck at rear of build approx 14x6Details
construct 2 bedroom, 2 full bath, media rm gr fl. relocate e kitchen, bath, add 1 full bath, one 1/2 bath remodel, 2 bedrom,liv rm 2nd fl. rebuilt e interior staircase from 2nd fl down to gr fl. new deck at rear of build approx 14x6 | $120,000 |
| Jun 18, 2019 | Completed final sign-off Jun 2023 | 211 Miramar Av | 1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase.Details
1)remodel extg kitchen, relocate extg bathrm, & construct 1 bed room, 1 full bathroom at ground flr. 2) relocate extg kitchen, bathroom, add 1 nw bath room, & convert extg kitchen space to bedroom at 2nd flr. 3)const. 2 bedroom, 2 full bath room at 3rd floor. 4)rebuilt interior staircase. | $180,000 |
| May 14, 2019 | Completed final sign-off Mar 2020 | 94 Ney St | 1)construct one bedroom, one full bath room, & family room at ground floor. 2)relocate extg kitchen bathrm, add one new bathrm, & convert extg kitchen space to bedrm at 2nd fl. 3)construct 1 bedrrm, 1 full bath at attic space. 4)re-built extg interior staircase. 5)construct 2 dormer(size 8'x8')Details
1)construct one bedroom, one full bath room, & family room at ground floor. 2)relocate extg kitchen bathrm, add one new bathrm, & convert extg kitchen space to bedrm at 2nd fl. 3)construct 1 bedrrm, 1 full bath at attic space. 4)re-built extg interior staircase. 5)construct 2 dormer(size 8'x8') | $150,000 |
| Dec 12, 2018 | Completed final sign-off Feb 2021 | 344 Chicago Wy | construct 2 bedroom, 2 full bathrooms, family room & play room @ ground floor; remodel (e) kitchen, bath room & add 1 new bathroom @ 2nd floor; re-built interior staircase from 2nd floor down to ground floorDetails
construct 2 bedroom, 2 full bathrooms, family room & play room @ ground floor; remodel (e) kitchen, bath room & add 1 new bathroom @ 2nd floor; re-built interior staircase from 2nd floor down to ground floor | $115,000 |
| Jun 26, 2018 | Completed final sign-off Feb 2020 | 72 San Benito Wy | basement: new game room and half bath. 1st flr - relocate kitchen, remodel bath, new laundry and wet bar. 2nd flr - remodel 2 baths and reconfigure stairs to attic. attic - remodel family room. all windows are to be of wood construction & w/ true divided lites.Details
basement: new game room and half bath. 1st flr - relocate kitchen, remodel bath, new laundry and wet bar. 2nd flr - remodel 2 baths and reconfigure stairs to attic. attic - remodel family room. all windows are to be of wood construction & w/ true divided lites. | $50,000 |
| Jan 13, 2017 | Completed final sign-off Apr 2018 | 797 Athens St | remodel (e) kitchen , bathroom, add one new bathroom & convert one bedroom to two bedroom at 2nd floor. construct two bedroom, two half bathroom, study room & laundry area at ground floor. construct new deck w/staircase at rear of bldg (size approx 17'x 8').Details
remodel (e) kitchen , bathroom, add one new bathroom & convert one bedroom to two bedroom at 2nd floor. construct two bedroom, two half bathroom, study room & laundry area at ground floor. construct new deck w/staircase at rear of bldg (size approx 17'x 8'). | $72,000 |
| Oct 28, 2016 | Completed final sign-off Feb 2018 | 1239 21st Av | revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck.Details
revision to pa 2016-0330-3486 - relocate partition wall between garage & interior stair at ground floor. construct 6x4 island counter in kitchen at 2nd floor. add one new bathroom at 3rd floor; correct (e) condition for rear deck. | $12,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 532 Cambridge St | relocate kitchen, convert (e)kitchen into (n)bedrm,construct one new bathrm 3x3 skylight & remodel (e)bathrm at 2nd flr: construct 2-bedrm,one bathrm & laundry at ground floor, construct new deck w/staircase @rear of bldg (size approx 19'x5')Details
relocate kitchen, convert (e)kitchen into (n)bedrm,construct one new bathrm 3x3 skylight & remodel (e)bathrm at 2nd flr: construct 2-bedrm,one bathrm & laundry at ground floor, construct new deck w/staircase @rear of bldg (size approx 19'x5') | $65,000 |
| Mar 4, 2016 | Completed final sign-off Oct 2017 | 350 Lansdale Av | remodel (e) kitchen,relocate interior staircase @1st flr,remodel one(e)bathrm & add 2(n)bathrms @2nd flr;relocate (e)bathrm & convert (e)storage rm into(n)bedrm on lower level,construct (n) deck w/staircase @rear bldg,rewire elec&lighting for all floors,remove/replace front stucco.Details
remodel (e) kitchen,relocate interior staircase @1st flr,remodel one(e)bathrm & add 2(n)bathrms @2nd flr;relocate (e)bathrm & convert (e)storage rm into(n)bedrm on lower level,construct (n) deck w/staircase @rear bldg,rewire elec&lighting for all floors,remove/replace front stucco. | $96,000 |
| May 28, 2015 | Completed final sign-off Nov 2016 | 1839 22nd Av | remodel kitchen, two bathroom at 2nd floor. construct two bedroom, storage room & two full bathroom at ground floor. construct new deck w/staircase at rear of bldg (size approx 16' x 9').Details
remodel kitchen, two bathroom at 2nd floor. construct two bedroom, storage room & two full bathroom at ground floor. construct new deck w/staircase at rear of bldg (size approx 16' x 9'). | $58,000 |
| Mar 9, 2015 | Completed final sign-off Nov 2015 | 456 Los Palmos Dr | abatement of nov#201461201. provide new bathroom on 2nd floor. remodel 2 extg baths on 2nd fl. remodel extg half bath on 1st fl. new silder wood clad windows at front and sliding door at rear. legalize stucco finish at front. legalize tile work at extg stairs at rear yard legalize gas fireplace.Details
abatement of nov#201461201. provide new bathroom on 2nd floor. remodel 2 extg baths on 2nd fl. remodel extg half bath on 1st fl. new silder wood clad windows at front and sliding door at rear. legalize stucco finish at front. legalize tile work at extg stairs at rear yard legalize gas fireplace. | $50,000 |
| Sep 16, 2014 | Completed final sign-off Jun 2015 | 47 Kearny St | remove internal staircase from 3rd to 4th fl. fill in concrete floor, move office partiton wall, upgrades as listed in form cDetails
remove internal staircase from 3rd to 4th fl. fill in concrete floor, move office partiton wall, upgrades as listed in form c | $62,000 |
| Jul 25, 2014 | Completed final sign-off Feb 2015 | 721 03rd Av | remodel (e) kitchen, bathroom, replace (e) sheetrock w/new & r-13 insulation & construct new deck w/staircase at rear of bldg at 2nd floor. remodel two (e) bathroom, replace (e) sheetrock w/new & r-13 insulation at 3rd floor. replace stucco in kind at front & wood siding at rear.Details
remodel (e) kitchen, bathroom, replace (e) sheetrock w/new & r-13 insulation & construct new deck w/staircase at rear of bldg at 2nd floor. remodel two (e) bathroom, replace (e) sheetrock w/new & r-13 insulation at 3rd floor. replace stucco in kind at front & wood siding at rear. | $70,000 |