Custom Construction Enterprises
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Sep 2026
- Last 24 months
- 15 permits filed
159 permits since 2000: 138 completed, 8 in progress, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 4 completed. Typically 334 days from filing to permit and 426 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2022 | Completed final sign-off Jul 2025 | 441 Teresita Bl | adding a 1-story addition with a roof deck to rear of (e) house. new space will contain an office & half bath. new interior stairs to connect new space to yard. new exterior stair for acces from new spaces to rear yard. existing bath on 2/f if reconfgured.Details
adding a 1-story addition with a roof deck to rear of (e) house. new space will contain an office & half bath. new interior stairs to connect new space to yard. new exterior stair for acces from new spaces to rear yard. existing bath on 2/f if reconfgured. | $140,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2025 | 1249 Kearny St | full remodel of basement & (e) roof deck. basement to be converted to heated living area. new stair from basement, 1st fl, 2nd fl levels. (e) stair to roof, roof access & roof deck to remain.Details
full remodel of basement & (e) roof deck. basement to be converted to heated living area. new stair from basement, 1st fl, 2nd fl levels. (e) stair to roof, roof access & roof deck to remain. | $400,000 |
| Nov 9, 2010 | Completed final sign-off Aug 2011 | 2042 Leavenworth St | rebuild existing roof deck in-kind. no changes to size or location. roof deck = 353 sq ft.Details
rebuild existing roof deck in-kind. no changes to size or location. roof deck = 353 sq ft. | $6,000 |
| Feb 20, 2009 | Completed final sign-off Apr 2010 | 1779 Sanchez St | 80 sq ft second level addition at rear of house, new master suite and bath at first level, new interior stair, new deck at rear of house & new roof deck over area of addition, additional interior renovations include remodel kitchen & bath and replace windows on front facade.Details
80 sq ft second level addition at rear of house, new master suite and bath at first level, new interior stair, new deck at rear of house & new roof deck over area of addition, additional interior renovations include remodel kitchen & bath and replace windows on front facade. | $200,000 |