# Cupertino Electric Inc.

Contractor license 174637. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/cupertino-electric-inc-174637
- JSON: https://www.permitgraph.org/api/contractor?license=174637
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=174637

197 permits since 2000: 115 completed, 29 never finaled, 53 expired or cancelled. Typically 7 days from filing to permit and 124 days from permit to final inspection. Of the 29 never-finaled permits, 1 is 3 to 5 years old, 15 are 5 to 10 years old, 13 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Mar 2000 to Apr 2024
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 3 | 0 | 0 | 18 |
| 2001 | 9 | 0 | 0 | 11 |
| 2002 | 5 | 0 | 0 | 1 |
| 2003 | 9 | 0 | 1 | 5 |
| 2004 | 14 | 0 | 1 | 2 |
| 2005 | 15 | 0 | 2 | 4 |
| 2006 | 11 | 0 | 0 | 3 |
| 2007 | 12 | 0 | 3 | 2 |
| 2008 | 2 | 0 | 0 | 1 |
| 2009 | 3 | 0 | 1 | 1 |
| 2010 | 2 | 0 | 1 | 0 |
| 2011 | 1 | 0 | 1 | 0 |
| 2012 | 1 | 0 | 0 | 0 |
| 2013 | 1 | 0 | 0 | 1 |
| 2014 | 2 | 0 | 1 | 0 |
| 2015 | 0 | 0 | 1 | 0 |
| 2016 | 0 | 0 | 2 | 2 |
| 2017 | 3 | 0 | 0 | 0 |
| 2018 | 4 | 0 | 11 | 1 |
| 2019 | 4 | 0 | 2 | 1 |
| 2020 | 2 | 0 | 0 | 0 |
| 2021 | 7 | 0 | 1 | 0 |
| 2022 | 3 | 0 | 1 | 0 |
| 2023 | 1 | 0 | 0 | 0 |
| 2024 | 1 | 0 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 0 | 20 |

## Most recent permits

The 100 most recent of 197.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202401314956](https://www.permitgraph.org/p/202401314956) | Apr 23, 2024 | Completed: final sign-off Jul 2026 | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | emergency responder radio coverage system (errcs) at 750 phelps st. system consist of off air donor antenna at chanellized b1-directional amplifier, a battery backup unit and 2 antenna monitoring sys… | $62,206 |
| [202301109980](https://www.permitgraph.org/p/202301109980) | Jan 10, 2023 | Completed: final sign-off Aug 2023 | [2860 16th St](https://www.permitgraph.org/a/3552/013) | revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detai… |  |
| [202208080064](https://www.permitgraph.org/p/202208080064) | Aug 8, 2022 | Completed: final sign-off Jan 2023 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | combine (2) existing permtted data hall numbers 200 & 201 into (1) new server racks for suite 200. | $800,000 |
| [202207259219](https://www.permitgraph.org/p/202207259219) | Jul 25, 2022 | Completed: final sign-off Sep 2022 | [1740 Cesar Chavez St](https://www.permitgraph.org/a/4288/005) | revision to 202104067991 omit suspended folding partition |  |
| [202207057734](https://www.permitgraph.org/p/202207057734) | Jul 5, 2022 | Never finaled: issued Jun 2023, no final | [170 Maiden Ln](https://www.permitgraph.org/a/0309/023) | revision to pa# 2021-1210-4211: emergency responder radio coverage system installation. | $50,000 |
| [202202178216](https://www.permitgraph.org/p/202202178216) | Feb 17, 2022 | Completed: final sign-off Aug 2023 | [2860 16th St](https://www.permitgraph.org/a/3552/013) | installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit fo… | $1,580,530 |
| [202112104211](https://www.permitgraph.org/p/202112104211) | Dec 10, 2021 | Completed: final sign-off Aug 2023 | [170 Maiden Ln](https://www.permitgraph.org/a/0309/023) | install emergency responder radio coverage system. | $50,000 |
| [202108176548](https://www.permitgraph.org/p/202108176548) | Aug 17, 2021 | Completed: final sign-off Apr 2024 | [2300 16th St](https://www.permitgraph.org/a/3930A/002) | pg&e (safeway): site and electrical improvements for the installation of 8 dc fast charging electric vehicle charging ports. 10 existing ports converted to 1 van accessible, 1 standard accessible and… | $338,894 |
| [202107305510](https://www.permitgraph.org/p/202107305510) | Jul 30, 2021 | Never finaled: issued Aug 2021, no final | [30 Otis St](https://www.permitgraph.org/a/3505/016) | rev to pa# 2016-1128-3577; fire smoke damper (fsd) matrix modification to match smoke control report provide water mitigation and drip pans for fire command center (fcc) |  |
| [202104067981](https://www.permitgraph.org/p/202104067981) | Apr 6, 2021 | Completed: final sign-off Dec 2021 | [1185 Market St](https://www.permitgraph.org/a/3702/390) | install 800a switchboard to feed (1) all-in-one 50kw ev charger & (4) all-in-one 100kw ev chargers. install associated conduit & conductors. (5) total evcs being installed as part of approved (12) fu… | $350,000 |
| [202104067991](https://www.permitgraph.org/p/202104067991) | Apr 6, 2021 | Completed: final sign-off Sep 2022 | [1740 Cesar Chavez St](https://www.permitgraph.org/a/4288/005) | suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing. | $125,000 |
| [202103055971](https://www.permitgraph.org/p/202103055971) | Mar 5, 2021 | Completed: final sign-off Mar 2021 | [350 Pacific Av](https://www.permitgraph.org/a/0165/006) | abate nov #200227640 nov to verity removal of parking lifts. the purpose of this perit application is to verity the removal of parking lifts is removed from the site. no other works. |  |
| [202102164734](https://www.permitgraph.org/p/202102164734) | Feb 16, 2021 | Completed: final sign-off Jun 2021 | [350 Pacific Av](https://www.permitgraph.org/a/0165/006) | install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit… | $120,000 |
| [202102164688](https://www.permitgraph.org/p/202102164688) | Feb 16, 2021 | Completed: final sign-off Mar 2022 | [735 07th Av](https://www.permitgraph.org/a/1650/036) | revision to app#202011048170 to the ada portion only. install 400 a meter main at extg parking lot. install 4 50kw ev chargers. install utility transformer pad and conduit. install associated conduit… | $117,900 |
| [202011219472](https://www.permitgraph.org/p/202011219472) | Nov 21, 2020 | Completed: final sign-off Oct 2021 | [1998 Broadway](https://www.permitgraph.org/a/0567/016) | installation of electrical vehicle charging equipment and related infrasturcture. | $379,654 |
| [202011048170](https://www.permitgraph.org/p/202011048170) | Nov 4, 2020 | Completed: final sign-off Mar 2022 | [735 07th Av](https://www.permitgraph.org/a/1650/036) | install 400a meter main at existing parking lot. install (4) 50kw ev chargers. install utility transformer pad & conduit. install associated conduit & conductors. install ev ada van stall and ramp. | $117,900 |
| [201909232374](https://www.permitgraph.org/p/201909232374) | Sep 23, 2019 | Never finaled: issued Sep 2019, no final | [3350 Mission St](https://www.permitgraph.org/a/6635/055) | revised drawing to original approved drawing set pa #201901100096, to comply with pg&e request to modify enclosure, ada signage, modify door location. |  |
| [201905291855](https://www.permitgraph.org/p/201905291855) | May 29, 2019 | Expired or cancelled: expired Aug 2022 | [760 Market St](https://www.permitgraph.org/a/0328/001) | commission & start up of generator unit installed on rooftop & purchased in 2013. generator is not visible from street. unit is on roof. | $49,000 |
| [201905291852](https://www.permitgraph.org/p/201905291852) | May 29, 2019 | Completed: final sign-off Oct 2019 | [100 Van Ness Av](https://www.permitgraph.org/a/0814/020) | remove reinstall (e) lights, fire alarm (drawings submitted under separate contractor), teledata raceways. arch pa 201804207003. provide exit light for tenant space. | $90,000 |
| [201904299158](https://www.permitgraph.org/p/201904299158) | Apr 29, 2019 | Completed: final sign-off Feb 2020 | [1101 Green St](https://www.permitgraph.org/a/0125/026) | install 16 electric vehicle charging stations. electrical only | $160,000 |
| [201904117709](https://www.permitgraph.org/p/201904117709) | Apr 11, 2019 | Never finaled: issued Jun 2019, no final | [4210 Ocean Av](https://www.permitgraph.org/a/7255/005) | install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete pad | $100,000 |
| [201904097505](https://www.permitgraph.org/p/201904097505) | Apr 9, 2019 | Completed: final sign-off Jun 2020 | [2350 Noriega St](https://www.permitgraph.org/a/2019/016) | install one utility transformer, 1 switchboard assembly, 4 150 kw btc power units, 4 150 kw btc dispensers. | $100,000 |
| [201901100096](https://www.permitgraph.org/p/201901100096) | Jan 10, 2019 | Completed: final sign-off Sep 2020 | [3350 Mission St](https://www.permitgraph.org/a/6635/055) | install (1) utility transformer, (1) switchboard assembly, (1) 200 kw btc power unit, (3) 50 kw btc dispensers. | $100,000 |
| [201812128064](https://www.permitgraph.org/p/201812128064) | Dec 12, 2018 | Completed: final sign-off Aug 2019 | [2001 37th Av](https://www.permitgraph.org/a/2094/006) | install electric vehicle charging stations (16) and ada striping. 14 standard stalls 2 ada stalls | $180,000 |
| [201811145815](https://www.permitgraph.org/p/201811145815) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 37th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040411 | $50,000 |
| [201811145797](https://www.permitgraph.org/p/201811145797) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | level 9. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040404. maher n/a. | $50,000 |
| [201811145816](https://www.permitgraph.org/p/201811145816) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 40th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201803012534 | $50,000 |
| [201811145794](https://www.permitgraph.org/p/201811145794) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 29th flr. replace (e) light fixtures w/(n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040397 | $50,000 |
| [201811145813](https://www.permitgraph.org/p/201811145813) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 33rd flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040410. maher n/a. | $50,000 |
| [201811145808](https://www.permitgraph.org/p/201811145808) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 15th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040398 | $50,000 |
| [201811145799](https://www.permitgraph.org/p/201811145799) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 10th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040407 | $50,000 |
| [201811145802](https://www.permitgraph.org/p/201811145802) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 11th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040408 | $50,000 |
| [201811145809](https://www.permitgraph.org/p/201811145809) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 16th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040409 | $50,000 |
| [201811145807](https://www.permitgraph.org/p/201811145807) | Nov 14, 2018 | Never finaled: issued May 2019, no final | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 14th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040395 | $50,000 |
| [201808207740](https://www.permitgraph.org/p/201808207740) | Aug 20, 2018 | Completed: final sign-off Apr 2021 | [207 King St](https://www.permitgraph.org/a/8706/268) | a.k.a. 150 berry street. ref bpa # 2018-0605-0979. furnish and install new lighting systems and controls per 2016 cec t24. furnish and install new receptacles and tele/data outlets to accomodate new… | $1,000,000 |
| [201807255473](https://www.permitgraph.org/p/201807255473) | Jul 25, 2018 | Completed: final sign-off Dec 2018 | [450 South St](https://www.permitgraph.org/a/8721/030) | install 10 electrical vehicle charges. | $250,000 |
| [201806293371](https://www.permitgraph.org/p/201806293371) | Jun 29, 2018 | Completed: final sign-off Dec 2018 | [233 Franklin St](https://www.permitgraph.org/a/0816/070) | install 30 electric vehihicle chargers for pg&e | $380,000 |
| [201804307702](https://www.permitgraph.org/p/201804307702) | Apr 30, 2018 | Never finaled: issued Aug 2018, no final | [3649 Market St](https://www.permitgraph.org/a/2754/046) | excavate and install new electrical vehicle charging stations | $130,000 |
| [201804136275](https://www.permitgraph.org/p/201804136275) | Apr 13, 2018 | Expired or cancelled: cancelled Jan 2026 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | t.i. project. furnish and install 435 receptacles, 32 rpp switchboards, and basket tray to extg space. n/a for maher | $1,635,000 |
| [201711305113](https://www.permitgraph.org/p/201711305113) | Nov 30, 2017 | Completed: final sign-off Jun 2018 | [999 Brannan St](https://www.permitgraph.org/a/3782/003) | install emergency responder radio converage system. ref arch pa #201606291143. maher na | $39,000 |
| [201709229291](https://www.permitgraph.org/p/201709229291) | Sep 22, 2017 | Completed: final sign-off Dec 2017 | [2500 Mason St](https://www.permitgraph.org/a/0020/001) | revision to 201704063389. add elec engineered drawing details fsk-01,fsk-02,fsk-03 per fire inspector. maher not req | $80,000 |
| [201704063389](https://www.permitgraph.org/p/201704063389) | Apr 6, 2017 | Completed: final sign-off Dec 2017 | [2500 Mason St](https://www.permitgraph.org/a/0020/001) | remove and replace generator. install ats. new generator shall not exceed (e) weight of previous. | $80,000 |
| [201611283577](https://www.permitgraph.org/p/201611283577) | Nov 28, 2016 | Never finaled: issued Jan 2019, no final | [30 Otis St](https://www.permitgraph.org/a/3505/016) | to erect 27 stories, 2 basement, type i-a, 404 residnetial units, retail, ballet school & commercial. (r-2,m,b,a-1,a-3,s-2). | $99,200,000 |
| [201605096892](https://www.permitgraph.org/p/201605096892) | May 9, 2016 | Expired or cancelled: cancelled Jan 2026 | [2500 Mason St](https://www.permitgraph.org/a/0020/001) | replace main service; maher n/a | $400,000 |
| [201605056688](https://www.permitgraph.org/p/201605056688) | May 5, 2016 | Never finaled: issued May 2016, no final | [2500 Mason St](https://www.permitgraph.org/a/0020/001) | construct interior partitions with doors, divide electic room into 2 rooms. provide vestibule at existing transformer maher not req | $12,000 |
| [201604064063](https://www.permitgraph.org/p/201604064063) | Apr 6, 2016 | Expired or cancelled: expired Nov 2020 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher na | $85,000 |
| [201503130827](https://www.permitgraph.org/p/201503130827) | Mar 13, 2015 | Never finaled: issued Oct 2015, no final | [601 23rd St](https://www.permitgraph.org/a/4232/010) | install 480 v feeders in trench between existing auxilary generators and new section of switchgear. install three backup disesel generators and associated electrical interconnecting equipment. verifi… | $1,600,000 |
| [201410280102](https://www.permitgraph.org/p/201410280102) | Oct 28, 2014 | Completed: final sign-off Oct 2015 | [2055 Folsom St](https://www.permitgraph.org/a/3572/024) | replace extg power plant with a new model. replace extg battery string with a new model avr 125-33, 6.6gal, 73.92 lb, 29.55 pure acid. n/a for maher. | $125,000 |
| [201406279715](https://www.permitgraph.org/p/201406279715) | Jun 27, 2014 | Never finaled: issued Jun 2014, no final | [1740 Cesar Chavez St](https://www.permitgraph.org/a/4288/005) | life fixture replacement, maher n/a | $200,000 |
| [201406279806](https://www.permitgraph.org/p/201406279806) | Jun 27, 2014 | Completed: final sign-off Aug 2014 | [390 Fremont St](https://www.permitgraph.org/a/3748/010) | add receptacles, add lighting, replace panels. maher n/a | $60,000 |
| [201306149558](https://www.permitgraph.org/p/201306149558) | Jun 14, 2013 | Expired or cancelled: cancelled Jan 2014 | [1175 Columbus Av](https://www.permitgraph.org/a/0044/001) | electrical vehicle charging stations for electric cars | $80,000 |
| [201304245317](https://www.permitgraph.org/p/201304245317) | Apr 24, 2013 | Completed: final sign-off Jan 2014 | [650 California St](https://www.permitgraph.org/a/0241/025) | general lighting & lighitng control modification. electrical connections to new mechanical, car stackers, car chargers & trash compactors . electrical connection to new hot water heaters, gen convian… | $745,000 |
| [201204309417](https://www.permitgraph.org/p/201204309417) | Apr 30, 2012 | Completed: final sign-off May 2012 | [1345 Turk St](https://www.permitgraph.org/a/0756/017) | as built revisions for pa# 2011-0304-1400 due to field changes-changes include 1 additional heat detector, 2 additional relays & 1 additional door holder |  |
| [201112160825](https://www.permitgraph.org/p/201112160825) | Dec 16, 2011 | Never finaled: issued Dec 2011, no final | [400 Howard St](https://www.permitgraph.org/a/3720/006) | modifications to extg fire alarms due to tenant improvements. 4 speaker strobes,4 relays, 4 duct detectors. | $4,000 |
| [201108122415](https://www.permitgraph.org/p/201108122415) | Aug 12, 2011 | Completed: final sign-off Jan 2014 | [200 Paul Av](https://www.permitgraph.org/a/5431A/001F) | new battery room within existing mechanical room, new electrical room, modification to metal canopy d.a. upgrades. note: separate battery system, operation permit required from sffd | $2,500,000 |
| [201010132849](https://www.permitgraph.org/p/201010132849) | Oct 13, 2010 | Completed: final sign-off Jan 2011 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/012) | install call system for area of refuge in the 2 stairwells. call boxes on floors 2nd, 3rd, 4th & 5th floors. mission bay block 26, bldg #2 | $38,641 |
| [201008319959](https://www.permitgraph.org/p/201008319959) | Aug 31, 2010 | Completed: final sign-off Oct 2010 | [455 Mission Bay Blvd South](https://www.permitgraph.org/a/8721/012) | provide " area of refuge" and call system for the (2)stairwells on floors 2-5, mb block 26 building 3 | $12,000 |
| [201007307785](https://www.permitgraph.org/p/201007307785) | Jul 30, 2010 | Never finaled: issued Oct 2010, no final | [560 Davis St](https://www.permitgraph.org/a/0171/068) | addition of 10 speaker/strobes for partial floor remodels in the "norcal insurance" on floors 1 and 2 | $4,000 |
| [200912042671](https://www.permitgraph.org/p/200912042671) | Dec 4, 2009 | Never finaled: issued Dec 2009, no final | [365 Main St](https://www.permitgraph.org/a/3745/008) | provide new fire alarm devices and relocate the existing devices for the colo (1) project @ 365 main street, 1st and 2nd fl | $500,000 |
| [200911181517](https://www.permitgraph.org/p/200911181517) | Nov 18, 2009 | Completed: final sign-off Dec 2009 | [315 Montgomery St](https://www.permitgraph.org/a/0259/029) | fire alarm: scope mezzanine: 9 speakers, 17 strobes & 1 strobe power supply | $10,000 |
| [200908044106](https://www.permitgraph.org/p/200908044106) | Aug 4, 2009 | Expired or cancelled: expired Oct 2010 | [555 Mission St](https://www.permitgraph.org/a/3721/120) | installation of powered door operators at accessible stalls in restrooms. to comply with code ab-056 upgrade, floors 2-18,25,27 and 32-33 | $100,000 |
| [200907223226](https://www.permitgraph.org/p/200907223226) | Jul 22, 2009 | Completed: final sign-off Nov 2009 | [101 02nd St](https://www.permitgraph.org/a/3721/089) | at 18th fl: provide 8 new/relocated horn/strobes devices due to new ceiling and wall layout. provide 8 existing smoke detectors due to new rcp layout, reprogram and test | $3,000 |
| [200907172924](https://www.permitgraph.org/p/200907172924) | Jul 17, 2009 | Completed: final sign-off Aug 2009 | [117 Diamond St](https://www.permitgraph.org/a/2694/028) | relocate (2) strobes because of bathroom addition. no drawing are needed per lt. don fields. reference to pa# 2009-0430-7400 | $500 |
| [200807156719](https://www.permitgraph.org/p/200807156719) | Jul 15, 2008 | Completed: final sign-off Oct 2008 | [180 Montgomery St](https://www.permitgraph.org/a/0289/009) | 17th fl, addition of 30 sprinklers, 29 strobes, 2 smoke detectors, 1 power supply & 1 control module for ti. | $23,000 |
| [200805091738](https://www.permitgraph.org/p/200805091738) | May 9, 2008 | Expired or cancelled: expired Jan 2010 | [905 California St](https://www.permitgraph.org/a/0255/001) | fire alarm replacement of existing fa control panel, replacment of speaker/strobes on all floors. replace fire dept phone jacks (telephone) provide new intelligent control points (icp) all ada rooms | $200,000 |
| [200801303560](https://www.permitgraph.org/p/200801303560) | Jan 30, 2008 | Completed: final sign-off Apr 2008 | [180 Montgomery St](https://www.permitgraph.org/a/0289/009) | revision to pa# 2007/11/27/8958 for ti as-built for fire alarm in suite 820. add 3 pleenum smoke detectors, 2 duct smoke detectors and 1 control module/relay for added smoke dampers | $3,500 |
| [200712069772](https://www.permitgraph.org/p/200712069772) | Dec 6, 2007 | Never finaled: issued Dec 2007, no final | [845 Market St](https://www.permitgraph.org/a/3705/049) | relocate (3) fire/smoke dampers from (n) storage rooms to hallways on floors 2, 3 & 4. | $6,000 |
| [200712049578](https://www.permitgraph.org/p/200712049578) | Dec 4, 2007 | Expired or cancelled: expired Jul 2009 | [845 Market St](https://www.permitgraph.org/a/3705/049) | add fire alarm devices per drawings in (2) corridors on the 7th floor | $2,000 |
| [200711278958](https://www.permitgraph.org/p/200711278958) | Nov 27, 2007 | Completed: final sign-off Apr 2008 | [180 Montgomery St](https://www.permitgraph.org/a/0289/009) | fire alarm system on 8th floor. 6 speakers, 7 strobes and 1 smoke detector. | $8,500 |
| [200710296651](https://www.permitgraph.org/p/200710296651) | Oct 29, 2007 | Completed: final sign-off Jan 2008 | [388 Market St](https://www.permitgraph.org/a/0265/003) | 9th floor - lifety safety work, strobes, smoke detector, speakers in suite #960. | $5,200 |
| [200709273847](https://www.permitgraph.org/p/200709273847) | Sep 27, 2007 | Completed: final sign-off Dec 2007 | [388 Market St](https://www.permitgraph.org/a/0265/003) | 9/f- life safety, 6 speaker/strobes, 1 smoke detector. | $5,000 |
| [200708220512](https://www.permitgraph.org/p/200708220512) | Aug 22, 2007 | Never finaled: issued Aug 2007, no final | [274 King St](https://www.permitgraph.org/a/8702/001) | ground floor-fire alarm system. install conduit and wiring for four wall striobes due to new ceiling being installed. all work on ground floor. | $6,000 |
| [200707066069](https://www.permitgraph.org/p/200707066069) | Jul 6, 2007 | Completed: final sign-off Jan 2008 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | modify existing fire alarm system for new layout of tenant space on 27th floor | $60,000 |
| [200707066068](https://www.permitgraph.org/p/200707066068) | Jul 6, 2007 | Completed: final sign-off Jan 2008 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | modify existing fire alarm system for new layout of tenant space on 26th floor | $60,000 |
| [200706214639](https://www.permitgraph.org/p/200706214639) | Jun 21, 2007 | Completed: final sign-off Oct 2007 | [388 Market St](https://www.permitgraph.org/a/0265/003) | life safety speaker strobres (3) speakers (2), strobe (1) fire alarm only. | $8,000 |
| [200705221906](https://www.permitgraph.org/p/200705221906) | May 22, 2007 | Expired or cancelled: expired Apr 2009 | [388 Market St](https://www.permitgraph.org/a/0265/003) | life safety-speaker/strobes. | $8,500 |
| [200705020293](https://www.permitgraph.org/p/200705020293) | May 2, 2007 | Completed: final sign-off Aug 2007 | [180 Montgomery St](https://www.permitgraph.org/a/0289/009) | add fire alarm safety system @ 18th floor, relocate 3 speakers, relocate 3 strobes, add 3 speak/strobes, add 2 smoke detectors. | $10,000 |
| [200704249511](https://www.permitgraph.org/p/200704249511) | Apr 24, 2007 | Completed: final sign-off Nov 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | fire alarm ssytem for new tenant improvement on 10th floor | $76,000 |
| [200703297631](https://www.permitgraph.org/p/200703297631) | Mar 29, 2007 | Never finaled: issued Mar 2007, no final | [625 Townsend St](https://www.permitgraph.org/a/3799/006) | revision to appl#200512059471 purpose is to document as built condition following emergency generator circuit breaker and ats addition. electrical work associated was performed on e200702085020 | $5,000 |
| [200703196628](https://www.permitgraph.org/p/200703196628) | Mar 19, 2007 | Completed: final sign-off Sep 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | install (3) smoke detector, (3) strobes and (3) speakers for 17th fl tenant build-out at 475 sansome st. | $54,000 |
| [200703136054](https://www.permitgraph.org/p/200703136054) | Mar 13, 2007 | Completed: final sign-off Mar 2007 | [274 King St](https://www.permitgraph.org/a/8702/001) | install conduit wiring for three shtrobes, 1 pull statio as required by seimens | $6,500 |
| [200702274955](https://www.permitgraph.org/p/200702274955) | Feb 27, 2007 | Completed: final sign-off Aug 2007 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite #1430- life safety, speaker, strobes. | $6,000 |
| [200702274956](https://www.permitgraph.org/p/200702274956) | Feb 27, 2007 | Completed: final sign-off Aug 2007 | [388 Market St](https://www.permitgraph.org/a/0265/003) | suite #1450 -life safety, speaker strobes and 1 smoke detector. | $6,000 |
| [200612089471](https://www.permitgraph.org/p/200612089471) | Dec 8, 2006 | Completed: final sign-off Oct 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | upgrade to extg fire alarm system 12th floor | $51,000 |
| [200612089472](https://www.permitgraph.org/p/200612089472) | Dec 8, 2006 | Completed: final sign-off Oct 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | upgrade to extg fire alarm system 16th floor | $47,000 |
| [200612089469](https://www.permitgraph.org/p/200612089469) | Dec 8, 2006 | Completed: final sign-off Oct 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | 14th floor - upgrade to existing fire alarm system. | $47,000 |
| [200612089462](https://www.permitgraph.org/p/200612089462) | Dec 8, 2006 | Completed: final sign-off Sep 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | upgrade to existing fire alarm system. 11th floor. | $43,000 |
| [200612089465](https://www.permitgraph.org/p/200612089465) | Dec 8, 2006 | Completed: final sign-off Nov 2007 | [475 Sansome St](https://www.permitgraph.org/a/0228/039) | 15th floor - upgrade to existing fire alarm system. | $53,000 |
| [200610104525](https://www.permitgraph.org/p/200610104525) | Oct 10, 2006 | Completed: final sign-off Nov 2006 | [405 Howard St](https://www.permitgraph.org/a/3737/001) | 2nd floor - adding onto fire sprinkler system - updating life safety system -(flow & tamper). | $3,500 |
| [200609273507](https://www.permitgraph.org/p/200609273507) | Sep 27, 2006 | Completed: final sign-off Oct 2006 | [475 Sansome St](https://www.permitgraph.org/a/0228/038) | modifications & additions to the existing honeywell fire alarm system. ref: to app. no. 200608048597 | $75,000 |
| [200609122071](https://www.permitgraph.org/p/200609122071) | Sep 12, 2006 | Expired or cancelled: expired Dec 2007 | [170 Ofarrell St](https://www.permitgraph.org/a/0314/004) | upgrade to exiting fire alarm system one to remode the 3rd floor.fire alarm plan only @ 3rd fl. | $30,000 |
| [200608038412](https://www.permitgraph.org/p/200608038412) | Aug 3, 2006 | Completed: final sign-off Nov 2006 | [201 King St](https://www.permitgraph.org/a/8706/004) | 1st floor-installation of new fire alarm devices to tie into building system. 1 pull station, 2 smoke detectors, 1 strobe, 6 horn/strobes, 1 dual sync module. | $5,200 |
| [200608038422](https://www.permitgraph.org/p/200608038422) | Aug 3, 2006 | Expired or cancelled: expired Mar 2009 | [170 Ofarrell St](https://www.permitgraph.org/a/0314/004) | installation of new fire alarm devices to tie into building system. new fire alarm devices at this new retail space on the first and second floors. 33 smoke detectors, 6 duct detectors, 24 speaker st… | $30,000 |
| [200607106096](https://www.permitgraph.org/p/200607106096) | Jul 10, 2006 | Completed: final sign-off Apr 2007 | [155 05th St](https://www.permitgraph.org/a/3724/071) | revision to 200506024064. addition 0f rolldown fire doors, rated door and wall for hotel project. also unforseen subsurface conditions created foundation changes. | $150,000 |
| [200606143987](https://www.permitgraph.org/p/200606143987) | Jun 14, 2006 | Expired or cancelled: expired Oct 2007 | [388 Market St](https://www.permitgraph.org/a/0265/003) | installation of: relocate (2) strobes & (1) speaker. replacing existing to new system-7 strobes & 8 speakers-2nd floor. | $8,000 |
| [200605020404](https://www.permitgraph.org/p/200605020404) | May 2, 2006 | Completed: final sign-off Apr 2007 | [155 05th St](https://www.permitgraph.org/a/3724/071) | modification to existing fire alarm system. add/replace (e) 2 smoke detectors & 2 horn/strobe units, 7 control devices, 2 duct detectors. | $10,000 |
| [200601111898](https://www.permitgraph.org/p/200601111898) | Jan 11, 2006 | Completed: final sign-off Jan 2006 | [101 California St](https://www.permitgraph.org/a/0263/011) | relocate wall strobes (7) 12th flr. | $3,000 |
| [200512281089](https://www.permitgraph.org/p/200512281089) | Dec 28, 2005 | Completed: final sign-off Jan 2006 | [388 Market St](https://www.permitgraph.org/a/0265/003) | life safety, strobes, speakers, 8th floor. suite 850 b | $3,500 |
| [200512220902](https://www.permitgraph.org/p/200512220902) | Dec 22, 2005 | Completed: final sign-off Apr 2006 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | oti-3, 13th floor, el. | $26,000 |
| [200512210803](https://www.permitgraph.org/p/200512210803) | Dec 21, 2005 | Completed: final sign-off Apr 2006 | [45 Fremont St](https://www.permitgraph.org/a/3710/019) | oti-2, 13th floor, ls. | $7,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.