706 permits since 2000: 398 completed, 17 in progress, 154 never finaled, 137 expired or cancelled. Typically 0 days from filing to permit and 163 days from permit to final inspection. Of the 154 never-finaled permits, 11 are 3 to 5 years old, 20 are 5 to 10 years old, 123 are over 10 years old. 1 was filed but never issued.

- Based in: San Juan Capistrano
- On San Francisco permits: Mar 2000 to Mar 2026
- Last 24 months: 21 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 10 | 0 | 0 | 10 |
| 2001 | 17 | 0 | 3 | 10 |
| 2002 | 20 | 0 | 3 | 13 |
| 2003 | 20 | 0 | 10 | 23 |
| 2004 | 14 | 0 | 5 | 10 |
| 2005 | 10 | 0 | 14 | 9 |
| 2006 | 15 | 0 | 5 | 21 |
| 2007 | 11 | 0 | 17 | 16 |
| 2008 | 13 | 0 | 18 | 10 |
| 2009 | 8 | 0 | 10 | 2 |
| 2010 | 5 | 0 | 7 | 3 |
| 2011 | 15 | 0 | 3 | 3 |
| 2012 | 11 | 0 | 4 | 1 |
| 2013 | 25 | 0 | 2 | 0 |
| 2014 | 17 | 0 | 7 | 4 |
| 2015 | 27 | 0 | 12 | 0 |
| 2016 | 17 | 0 | 3 | 0 |
| 2017 | 31 | 0 | 3 | 0 |
| 2018 | 15 | 0 | 4 | 2 |
| 2019 | 36 | 0 | 8 | 0 |
| 2020 | 17 | 0 | 1 | 0 |
| 2021 | 10 | 0 | 4 | 0 |
| 2022 | 8 | 0 | 7 | 0 |
| 2023 | 10 | 4 | 4 | 0 |
| 2024 | 4 | 5 | 0 | 0 |
| 2025 | 11 | 7 | 0 | 0 |
| 2026 | 1 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 6 | 4 | 0 | 1 | 1 | 0 | 17 |
| Kitchen remodel | 2 | 2 | 0 | 0 | 0 | 3 | 42 |
| Bathroom remodel | 2 | 2 | 0 | 0 | 0 | 8 | 517 |

## Most recent permits

The 100 most recent of 706.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202603207986](https://www.permitgraph.org/p/202603207986) | Mar 20, 2026 | In progress: issued Apr 2026 | [300 California Av](https://www.permitgraph.org/a/8931/001) | revision to approved plans permit#202507181153 to replace one existing waterflow bell and four existing waterflow gongs with the new 120 vac waterflow bells | $29,982 |
| [202602105592](https://www.permitgraph.org/p/202602105592) | Feb 10, 2026 | Completed: final sign-off Mar 2026 | [151 03rd St](https://www.permitgraph.org/a/3722/367) | 6th fl: extend (e) nfpa 13 system to protect 2 new rooms (508 sqft). 2 rooms will require 3 sprinkler heads in total, which will be connected to (e) branchlines. new heads will utilize frictionless f… | $21,100 |
| [202510318664](https://www.permitgraph.org/p/202510318664) | Oct 31, 2025 | Completed: final sign-off Oct 2026 | [1 Market St](https://www.permitgraph.org/a/3713/006) | revision to pa # 2025-0109-8015 : address ahj comments, add 3 abb relays to connect fire alarm system to scada for monitoring | $10,300 |
| [202509155296](https://www.permitgraph.org/p/202509155296) | Oct 2, 2025 | In progress: filed Oct 2025, not yet issued | [600 Portway Pg](https://www.permitgraph.org/a/8928/001) | puc proj-25-0618: bldg #513 - chemical storage canopy - wet fire sprinkler system, new underground 5'-0" stub out. install backflow preventor and fire department connection. | $252,873 |
| [202507281697](https://www.permitgraph.org/p/202507281697) | Jul 28, 2025 | In progress: issued Jul 2025 | [1140 Folsom St](https://www.permitgraph.org/a/3730/292) | 1/f: restaurant ti fire sprinkler modificaiton. ref pa# 202401234451 | $24,377 |
| [202507241520](https://www.permitgraph.org/p/202507241520) | Jul 24, 2025 | Completed: final sign-off Dec 2025 | [1140 Folsom St](https://www.permitgraph.org/a/3730/292) | adding 2 strobes to (e) nac to cover ti on 1/f east & also add 1 monitor module to monitor the ansul in that area. | $15,780 |
| [202507181153](https://www.permitgraph.org/p/202507181153) | Jul 18, 2025 | In progress: issued Jul 2025 | [300 California Av](https://www.permitgraph.org/a/8931/001) | b2: emergency fa panel replacement requires adding monitor modules to monitor waterflow switches, also adding 1 smoke detector, 1 pull station and 1 cellular communicator to the panel. | $34,800 |
| [202507181098](https://www.permitgraph.org/p/202507181098) | Jul 18, 2025 | In progress: issued Jul 2025 | [600 California Av](https://www.permitgraph.org/a/8934/001) | emergency fire alarm panel replacement which requires to add monitor p modules to monitor existing waterflow, piv, also includes 1x smoke detector, 1x pull station and one cellular communicator to th… | $34,900 |
| [202506279626](https://www.permitgraph.org/p/202506279626) | Jun 27, 2025 | In progress: issued Jul 2025 | [245 Valencia St](https://www.permitgraph.org/a/3532/091) | coso to replace the existing fire alarm control panel with a new nfs-320 nofifier panel, and replace all existing intiating devices with compatible devices, also adding new devices to cover 1st notii… | $128,631 |
| [202505166644](https://www.permitgraph.org/p/202505166644) | May 16, 2025 | Completed: final sign-off Jun 2025 | [1201 Harrison St](https://www.permitgraph.org/a/3757/001) | demo the dedicated fire alarm system to h2 system and gas monitoring (due to removal of h2 system). ref demo permit 202406275366 and f/a 201906072840. | $35,000 |
| [202505146410](https://www.permitgraph.org/p/202505146410) | May 14, 2025 | Completed: final sign-off Jun 2025 | [6 Mint Pz](https://www.permitgraph.org/a/3704/145) | suite 501; remove existing closet sprinkler from small bedroom closet. eliminate window sprinklers not required for this occupancy. bldg is fully sprinklered and closest bldg to the window is >30 feet | $18,000 |
| [202504224934](https://www.permitgraph.org/p/202504224934) | Apr 22, 2025 | Completed: final sign-off Sep 2025 | [1011 Turk St](https://www.permitgraph.org/a/0759/001) | 1st fl: revision to pa 202504093997 extending existing fire alarm system by adding a new relay module to badge reader control panel to unlock the doors located entry door room #101a, vent #room 103,… |  |
| [202504093997](https://www.permitgraph.org/p/202504093997) | Apr 9, 2025 | Completed: final sign-off Sep 2025 | [1011 Turk St](https://www.permitgraph.org/a/0759/001) | adding a fire alarm relay module to control an egress door at room#113 on the 1st floor | $11,670 |
| [202502110090](https://www.permitgraph.org/p/202502110090) | Feb 11, 2025 | Completed: final sign-off Mar 2025 | [4150 17th St](https://www.permitgraph.org/a/2623/186) | unit #19: relocate 1 pendent sprinkler to accomodate changes to existing t.v. room. add 1 pendent sprinkler to accommodate new storage area adjacent to t.v. room under stairs. ref pa#202412176948 | $12,250 |
| [202502079853](https://www.permitgraph.org/p/202502079853) | Feb 7, 2025 | Completed: final sign-off Mar 2025 | [2035 Castro St](https://www.permitgraph.org/a/6603/057) | emergency repair of underground leak of fire main. initial pipe replacedd revealed more pipe to be corroded, pipe repaired until pressure test passed | $50,000 |
| [202502059749](https://www.permitgraph.org/p/202502059749) | Feb 5, 2025 | Completed: final sign-off Apr 2025 | [906 Broadway](https://www.permitgraph.org/a/0149/009) | replacing the existing sprinkler monitoring system with a new fire alarm control panel, pull station, smoke detector and modules which now compatible with new system | $17,846 |
| [202501289192](https://www.permitgraph.org/p/202501289192) | Jan 28, 2025 | Completed: final sign-off Jul 2025 | [551 03rd St](https://www.permitgraph.org/a/3775/025) | demo the dedicated fire alarm to h2 system & gas monitoring (due to removal of h2 system) reference 201902122678 requested by the property owner throught pa 202407015640 | $35,000 |
| [202501289190](https://www.permitgraph.org/p/202501289190) | Jan 28, 2025 | Completed: final sign-off Aug 2025 | [3550 Mission St](https://www.permitgraph.org/a/6660/058) | demo the dedicated fire alarm to h2 system of gas monitoring (due to removal of h2 system) revision to 201906042429. ref pa 202406265328. | $35,000 |
| [202412106510](https://www.permitgraph.org/p/202412106510) | Jan 15, 2025 | In progress: issued Jan 2025 | [737 Folsom St](https://www.permitgraph.org/a/3751/170) | request for as-built review plans for 202311070339 |  |
| [202501098015](https://www.permitgraph.org/p/202501098015) | Jan 9, 2025 | In progress: issued Jan 2025 | [1 Market St](https://www.permitgraph.org/a/3713/006) | rooms#: 362; replacing the existing clean agent monitoring system with a new monitoring system at room#: 362. fire alarm. | $38,360 |
| [202412126678](https://www.permitgraph.org/p/202412126678) | Dec 12, 2024 | Completed: final sign-off Mar 2025 | [750 08th Ti St](https://www.permitgraph.org/a/1939/081) | replacing the existing king fisher conventional fire alarm control panel with a new fire lite panel and adding a new smoke detecotr and new cellular communicator | $23,542 |
| [202407116306](https://www.permitgraph.org/p/202407116306) | Jul 15, 2024 | In progress: issued Aug 2024 | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | building 615: fire sprinkler system - 518 standard spray upright and pendents enclosed in a basement and 3 levels. | $2,073,783 |
| [202406245084](https://www.permitgraph.org/p/202406245084) | Jun 24, 2024 | Completed: final sign-off Jul 2024 | [151 03rd St](https://www.permitgraph.org/a/3722/367) | ductwork in area of work not protected. add sprinklers as required by code under ductwork. | $16,000 |
| [202405152155](https://www.permitgraph.org/p/202405152155) | May 15, 2024 | Completed: final sign-off Jun 2025 | [3150 California St](https://www.permitgraph.org/a/1022/013) | rev 202312202817- adding 90 degree elbows to be added at front entrance for (n) school building. |  |
| [202405031357](https://www.permitgraph.org/p/202405031357) | May 3, 2024 | In progress: filed May 2024, not yet issued | [333 Market St](https://www.permitgraph.org/a/3710/020) | 1/f: add and install (1) new pendent fire sprinkler to accomodate the construction of a new platform in the starbucks workroom on the first floor. | $2,000 |
| [202403016883](https://www.permitgraph.org/p/202403016883) | Mar 1, 2024 | In progress: issued Mar 2024 | [4150 17th St](https://www.permitgraph.org/a/2623/170) | #3: relocate fire sprinkler pipe to accomodate new wall changes. | $13,000 |
| [202402266507](https://www.permitgraph.org/p/202402266507) | Feb 26, 2024 | Completed: final sign-off Sep 2024 | [177 Stillman St](https://www.permitgraph.org/a/3762/037) | ref pa# 202302172168 connect (n) 6 "fpw line to existing water meter. (n) 6" riser fire riser stubbed up from floor below. |  |
| [202402145928](https://www.permitgraph.org/p/202402145928) | Feb 14, 2024 | In progress: issued Jun 2024 | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | the procurement and installation of the w2 fire pump station at a new bio digester waste treatment facility.working building 610, building 600, building 661, pipe chase h, and building 921 (the w2 fi… | $599,700 |
| [202401194273](https://www.permitgraph.org/p/202401194273) | Jan 19, 2024 | In progress: issued Jan 2024 | [36 05th St](https://www.permitgraph.org/a/3704/002) | revision to pa# 202305198153 (as builts) & 202209092163 (original), relocating the existing speaker strobe found behind ansul hood system to new location shown on plans. |  |
| [202312202817](https://www.permitgraph.org/p/202312202817) | Dec 20, 2023 | Completed: final sign-off Apr 2025 | [3150 California St](https://www.permitgraph.org/a/1022/013) | revision to pa# 202303153714, 45 flange elbow entering building | $64,000 |
| [202312202844](https://www.permitgraph.org/p/202312202844) | Dec 20, 2023 | Completed: final sign-off Nov 2025 | [1633 Valencia St](https://www.permitgraph.org/a/6574/068) | fire water service underground for new construction per pa#202212158402 s | $28,800 |
| [202312051935](https://www.permitgraph.org/p/202312051935) | Dec 5, 2023 | Completed: final sign-off Jun 2024 | [2323 Cesar Chavez St](https://www.permitgraph.org/a/4342/001) | scope is to add a new udact to the existing fire alarm system | $5,367 |
| [202311140737](https://www.permitgraph.org/p/202311140737) | Nov 14, 2023 | Completed: final sign-off Jun 2024 | [4150 17th St](https://www.permitgraph.org/a/2623/168) | the scope of this prject is to replace the (e) fire alarm control panel with a new fire lit ms-5ud-3 panel. | $24,436 |
| [202311070339](https://www.permitgraph.org/p/202311070339) | Nov 7, 2023 | In progress: issued Dec 2023 | [737 Folsom St](https://www.permitgraph.org/a/3751/170) | revision to previous permit 202306301298. owner reqeuest to previous approved tone-based system is changed to be a voice exacuation on a voluntary/non-required base system | $220,000 |
| [202311030116](https://www.permitgraph.org/p/202311030116) | Nov 3, 2023 | Completed: final sign-off Jan 2024 | [501 23rd St](https://www.permitgraph.org/a/4232/010) | revision to the previously approval permit 202209212882. to change address on plans to 501 23rd st. sf ca. also adding more abort switches and replace exterior stobe with horn/strobes | $100,000 |
| [202310048044](https://www.permitgraph.org/p/202310048044) | Oct 4, 2023 | In progress: issued Mar 2024 | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | bldg # pc-h: fire suppression system (we). combined standpipe and sprinkler system. proving protection with uprights and pendants. | $80,000 |
| [202310047980](https://www.permitgraph.org/p/202310047980) | Oct 4, 2023 | In progress: issued Mar 2024 | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | bldg 600: fire suppression system (wet/preaction), combine standpipe/sprinkler system, providing protection w/uprights/pendants | $4,000,000 |
| [202310048023](https://www.permitgraph.org/p/202310048023) | Oct 4, 2023 | In progress: issued Mar 2024 | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | bldg 661: fire supression system. combine standpipe and sprinkler system. provide protection with uprights/pandents. | $125,000 |
| [202309287569](https://www.permitgraph.org/p/202309287569) | Sep 28, 2023 | Completed: final sign-off Oct 2024 | [177 Stillman St](https://www.permitgraph.org/a/3762/037) | install new fire protection systems to protect the space beginning at flange, new in-rack system for non expanded grp plastics, ref pa# 202302172168. | $140,000 |
| [202308013449](https://www.permitgraph.org/p/202308013449) | Aug 1, 2023 | Completed: final sign-off Sep 2023 | [943 Stockton St](https://www.permitgraph.org/a/0211/001) | add 3 pendent sprinklers under new soffit in sfpd down rm | $14,000 |
| [202307283219](https://www.permitgraph.org/p/202307283219) | Jul 28, 2023 | Completed: final sign-off Aug 2023 | [1 Warriors Wy](https://www.permitgraph.org/a/8722/021) | ground floor - add 8 pendent sprinklers below existing t-bar ceiling which will have tiles added | $12,000 |
| [202307172336](https://www.permitgraph.org/p/202307172336) | Jul 17, 2023 | Never finaled: issued Jul 2023, no final | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | bldg 600: tie-in to (e) systems outside of building 600. solids pretreatment facility up to 2nd including the underground expansion joints to be capped off for future connections by others. | $10,000 |
| [202306301298](https://www.permitgraph.org/p/202306301298) | Jun 30, 2023 | Never finaled: issued Aug 2023, no final | [737 Folsom St](https://www.permitgraph.org/a/3751/170) | full fire alarm system retrofit of the (e) f/a system service residential uniters per sf 2016 oridinance 165-16, sf ordinance 077-21, 2019 sffc 1103.7.61.1 and 2022 nfpa72 ss18.4.5. | $1,148,000 |
| [202305318918](https://www.permitgraph.org/p/202305318918) | May 31, 2023 | Completed: final sign-off Aug 2025 | [1151 Fairfax Av](https://www.permitgraph.org/a/4624/033) | hunters view phase 3- block 17, lot 4: underground fire water service, ref pa# 201909121448 | $30,000 |
| [202305198153](https://www.permitgraph.org/p/202305198153) | May 19, 2023 | Never finaled: issued May 2023, no final | [36 05th St](https://www.permitgraph.org/a/3704/002) | revision to pa#202209092163, remove strobe coverage from original permit. |  |
| [202305127673](https://www.permitgraph.org/p/202305127673) | May 12, 2023 | Never finaled: issued May 2023, no final | [849 13th Ti St](https://www.permitgraph.org/a/8946/002) | treasure island, building 62, 849 13th street: as-built: repl conventional fire alarm control panel in-kind. ref 202209092165. | $20,000 |
| [202303153714](https://www.permitgraph.org/p/202303153714) | Mar 15, 2023 | Completed: final sign-off Apr 2025 | [3150 California St](https://www.permitgraph.org/a/1022/013) | 6'0 stub out for 6" fire service underground | $64,000 |
| [202209212882](https://www.permitgraph.org/p/202209212882) | Sep 21, 2022 | Never finaled: issued Sep 2022, no final | [501 23rd St](https://www.permitgraph.org/a/4232/010) | install new novel 1230 clen agent detection system to protect the spare parts enclosure building | $100,000 |
| [202209212884](https://www.permitgraph.org/p/202209212884) | Sep 21, 2022 | Completed: final sign-off Jan 2024 | [501 23rd St](https://www.permitgraph.org/a/4232/010) | install new novel 1230 clean agent system to protect the spare parts enclosure building | $136,800 |
| [202209152525](https://www.permitgraph.org/p/202209152525) | Sep 15, 2022 | Completed: final sign-off Feb 2023 | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | provide new fire water connection to designated outlet of the ambient collection system unit (by others) and add (1) fire sprinkler under said unit to maintain proper floor coverage. all other system… | $10,000 |
| [202209152518](https://www.permitgraph.org/p/202209152518) | Sep 15, 2022 | Completed: final sign-off Sep 2022 | [1765 California St](https://www.permitgraph.org/a/0647/013) | replace dry pendent sprinkler with standard drop wet pendent sprinkler at ceilings. all other system components are not in scope and are to remain as existing. ref permit 202106212853. | $3,000 |
| [202209092163](https://www.permitgraph.org/p/202209092163) | Sep 9, 2022 | Never finaled: issued Sep 2022, no final | [36 05th St](https://www.permitgraph.org/a/3704/002) | adding montioring for (e) ansul system add also adding a/v coverage in mol cafe. | $20,000 |
| [202209092165](https://www.permitgraph.org/p/202209092165) | Sep 9, 2022 | Never finaled: issued Sep 2022, no final | [849 13th Ti St](https://www.permitgraph.org/a/1939/006) | treasure island, building 62, 849 13th street: upgrading the (e) fire alarm system. replacing the (e) pressure valve switches with new waterflow switches and replacing the (e) waterflow bell with new… | $20,000 |
| [202209011709](https://www.permitgraph.org/p/202209011709) | Sep 1, 2022 | Completed: final sign-off Dec 2022 | [221 04th St](https://www.permitgraph.org/a/3734/091) | relocate 6 pendent fire sprinklers and add 6 pendent sprinklers for ti. all other system components not in scope, to remain as (e). ref t.i. bpa#202208150511. | $12,000 |
| [202208050018](https://www.permitgraph.org/p/202208050018) | Aug 5, 2022 | Completed: final sign-off Aug 2022 | [260 10th St](https://www.permitgraph.org/a/3517/037) | relocate (3) pendent fire sprinkler heads to clear structural obstruction, relocate (1) pendent sprinkler head to accommodate new drop down protector. all other to remain as is. | $2,500 |
| [202208050016](https://www.permitgraph.org/p/202208050016) | Aug 5, 2022 | Never finaled: issued Aug 2022, no final | [1302 22nd St](https://www.permitgraph.org/a/4102/072) | relocate (1) pendent fire sprinklers, add 3 (n) pendent sprinklers, relocate 2 upright sprinklers, and add 1 (n) upright sprinkler to clear structural obstructions for t.i. | $12,000 |
| [202206216702](https://www.permitgraph.org/p/202206216702) | Jun 21, 2022 | Never finaled: issued Jun 2022, no final | [833 Jones St](https://www.permitgraph.org/a/0281/001B) | upgrade fire alarm system to new addressable in order to connect to new elevator equipment. adding wireless lf horn in sleeping area. replace smoke detectors in corridors & heat detectors, adding a n… | $62,200 |
| [202204122007](https://www.permitgraph.org/p/202204122007) | Apr 12, 2022 | Completed: final sign-off Jun 2022 | [1998 Broadway](https://www.permitgraph.org/a/0567/016) | as built of fire sprinkler permit 2021-0819-6753 |  |
| [202203311291](https://www.permitgraph.org/p/202203311291) | Mar 31, 2022 | Completed: final sign-off Apr 2022 | [1011 Turk St](https://www.permitgraph.org/a/0759/001) | fire as-built drawing. to submit in order to sign out the issued permit. ref pa# 202102184964. |  |
| [202203160116](https://www.permitgraph.org/p/202203160116) | Mar 16, 2022 | Never finaled: issued May 2023, no final | [1800 Jerrold Av](https://www.permitgraph.org/a/5262/009) | provide wet sprinkler system and class 1 standpipe sytem combined standard spray uprights and pendents in enclosed digesters and roof 882 heads. | $2,800,000 |
| [202202047335](https://www.permitgraph.org/p/202202047335) | Feb 4, 2022 | Completed: final sign-off Dec 2023 | [531 Bryant St](https://www.permitgraph.org/a/3776/094) | installation of underground fire service. | $10,000 |
| [202201246519](https://www.permitgraph.org/p/202201246519) | Jan 24, 2022 | Never finaled: issued Jan 2022, no final | [2829 California St](https://www.permitgraph.org/a/1028/046) | replace + relocate (e) fire sprinkler 4" backflow device. | $10,000 |
| [202109138271](https://www.permitgraph.org/p/202109138271) | Sep 13, 2021 | Completed: final sign-off Nov 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | relocate 7 fire sprinkler heads ref pa 202108055845 architectural drawings. | $10,000 |
| [202109138251](https://www.permitgraph.org/p/202109138251) | Sep 13, 2021 | Never finaled: issued Sep 2021, no final | [1515 03rd St](https://www.permitgraph.org/a/8721/029) | adjust (e) fire sprinklers where door actuators present an obstruction on levels 3,4,5,6. relocate 10 total sprinklers. | $13,000 |
| [202109108115](https://www.permitgraph.org/p/202109108115) | Sep 10, 2021 | Completed: final sign-off Oct 2022 | [405 Folsom St](https://www.permitgraph.org/a/3748/001) | demo (e) deluge systems protecting t8 1/11 design and install new system protecting (n) transfomer 1 and (e) transformer 11 | $130,000 |
| [202109108132](https://www.permitgraph.org/p/202109108132) | Sep 10, 2021 | Completed: final sign-off Oct 2021 | [1250 Columbus Av](https://www.permitgraph.org/a/0028/015) | replace and relocate (e) automatic fire sprinkler service back flow device | $17,000 |
| [202108206813](https://www.permitgraph.org/p/202108206813) | Aug 20, 2021 | Never finaled: issued Aug 2021, no final | [66 08th St](https://www.permitgraph.org/a/3701/053) | add sf-6 monitering point to (e) fire alarm syst on 3rd flr. add associated a/v devices powering up using a remote power supply which is monitored & controlled thru monitor and control modudles. | $84,500 |
| [202108196753](https://www.permitgraph.org/p/202108196753) | Aug 19, 2021 | Completed: final sign-off Jun 2022 | [1998 Broadway](https://www.permitgraph.org/a/0567/016) | provide automatic fire sprinkler protection for garage levels 2 & 3. correct fire sprinkler spaceing issues on garage level 1 | $130,000 |
| [202108196777](https://www.permitgraph.org/p/202108196777) | Aug 19, 2021 | Never finaled: issued Aug 2021, no final | [499 Illinois St](https://www.permitgraph.org/a/3940/004) | add 1 dry barrel pendent sprinkler in newly constructed walk-in cooler. relocated (1) pendent sprinkler and add 1 upright due to obstructions new cooler box creates. ref 2018 1114 5889 | $6,000 |
| [202107124145](https://www.permitgraph.org/p/202107124145) | Jul 12, 2021 | Completed: final sign-off Sep 2021 | [405 Folsom St](https://www.permitgraph.org/a/3748/001) | adding f500 tank and tamper switch monitoring point into the existing fire alarm system. | $20,000 |
| [202106253256](https://www.permitgraph.org/p/202106253256) | Jun 25, 2021 | Completed: final sign-off Nov 2022 | [72 Ellis St](https://www.permitgraph.org/a/0327/011) | to review a revised fire protection piping plan with rgard to pa 201903225967 which change pipe routing because of the constructibility issue. |  |
| [202106222980](https://www.permitgraph.org/p/202106222980) | Jun 22, 2021 | Completed: final sign-off Oct 2022 | [405 Folsom St](https://www.permitgraph.org/a/3748/001) | demo existing fire alarm devices within bank 1-11 space and re-install full heat detector add hvac duct smoke detection monitoring & hvac shutdown and audio/visual coverage once transformer is instal… | $161,080 |
| [202104208990](https://www.permitgraph.org/p/202104208990) | Apr 20, 2021 | Completed: final sign-off Jun 2021 | [2180 Harrison St](https://www.permitgraph.org/a/3592/030) | as built of fire sprinkler permit 2020-0805-1139 | $48,900 |
| [202103307549](https://www.permitgraph.org/p/202103307549) | Mar 30, 2021 | Never finaled: issued Apr 2021, no final | [535 Pacific Av](https://www.permitgraph.org/a/0176/024) | cosco fire to provide design, permit, parts & labor, for the addition of (1) relay module to interface to existing bms system to achieve shutdown of existing ahu units upon activation of existing fir… | $13,500 |
| [202103237086](https://www.permitgraph.org/p/202103237086) | Mar 23, 2021 | Completed: final sign-off Sep 2021 | [400 Paul Av](https://www.permitgraph.org/a/5341A/014) | fire underground. installed 8" fire water loop within the 400 paul site in order to provide water for fire sprinkler located within each build + to serve the private fire hydrants spaced throughout t… | $10,000 |
| [202102184964](https://www.permitgraph.org/p/202102184964) | Feb 18, 2021 | Completed: final sign-off Mar 2022 | [1011 Turk St](https://www.permitgraph.org/a/0759/001) | design, permit, parts & labor, test for elevator modernization cosco fire protection shall provide consultation design installation and equipment per the contractual agreements of the project name &… | $29,500 |
| [202012281805](https://www.permitgraph.org/p/202012281805) | Dec 28, 2020 | Completed: final sign-off Jun 2021 | [950 Mason St](https://www.permitgraph.org/a/0244/001) | repair broken 6" ug fire main. restore system to service after flush & hydrostatic test. | $15,900 |
| [202011058319](https://www.permitgraph.org/p/202011058319) | Nov 5, 2020 | Completed: final sign-off May 2023 | [400 Paul Av](https://www.permitgraph.org/a/5431A/051) | two ductile iron stub-outs for fire supply & fdc, connection at 5 ft to building face | $10,000 |
| [202010227166](https://www.permitgraph.org/p/202010227166) | Oct 22, 2020 | Completed: final sign-off Feb 2021 | [2164 Hyde St](https://www.permitgraph.org/a/0094C/011) | remove (1) fire sprinkler head, relocate (1) fire sprinkler head. | $3,000 |
| [202009295367](https://www.permitgraph.org/p/202009295367) | Sep 29, 2020 | Completed: final sign-off Nov 2020 | [5075 03rd St](https://www.permitgraph.org/a/5339/006A) | emergency replacement of fire alarm system due to failed system. | $52,500 |
| [202009224733](https://www.permitgraph.org/p/202009224733) | Sep 22, 2020 | Completed: final sign-off Feb 2021 | [1570 Bay St](https://www.permitgraph.org/a/0459/032) | provide new voluntary fa detection system for mpac/switchgear and battery bldgs. | $88,500 |
| [202008252626](https://www.permitgraph.org/p/202008252626) | Aug 25, 2020 | Completed: final sign-off May 2023 | [400 Paul Av](https://www.permitgraph.org/a/5431A/051) | fire sprinklers. install in accordance w/ nfpa 13: 69 sprinkler heads in the basement, 88 heads on level 1 and 231 heads on level 2. refer to pa 201603293329 | $90,000 |
| [202008252593](https://www.permitgraph.org/p/202008252593) | Aug 25, 2020 | Completed: final sign-off Jun 2023 | [933 Stockton St](https://www.permitgraph.org/a/0211/001) | revision to pa #201712136329: due to arch. plan pcc50 changed glass canopy on the surface level. fire sprinkler layout needs to be revised on both surface level and plaza level. |  |
| [202008192108](https://www.permitgraph.org/p/202008192108) | Aug 19, 2020 | Completed: final sign-off Jan 2023 | [410 China Basin St](https://www.permitgraph.org/a/8719/003) | underground piping plan to p.o.c at street curb and provide underground piping to wharf hydrant for future construction under site permit#201901281440 (s) | $10,000 |
| [202008051139](https://www.permitgraph.org/p/202008051139) | Aug 5, 2020 | Never finaled: issued Aug 2020, no final | [2180 Harrison St](https://www.permitgraph.org/a/3592/030) | add (1) new fire sprinkler, relocate (23) existing sprinklers. plug (7) sprinklers to accomodate renovations. | $48,900 |
| [202008051127](https://www.permitgraph.org/p/202008051127) | Aug 5, 2020 | Completed: final sign-off Apr 2021 | [2180 Harrison St](https://www.permitgraph.org/a/3592/030) | provide a code compliant ti ball room buildout to an extg fire alarm system. |  |
| [202007210590](https://www.permitgraph.org/p/202007210590) | Jul 21, 2020 | Completed: final sign-off Sep 2021 | [400 Paul Av](https://www.permitgraph.org/a/5431A/051) | the underground installation of the fire sprinkler system for new bldg | $60,000 |
| [202006269205](https://www.permitgraph.org/p/202006269205) | Jun 26, 2020 | Completed: final sign-off Aug 2020 | [1800 Oakdale Av](https://www.permitgraph.org/a/5313/002) | relocate (1) and add (2) fire sprinkler heads to accomodate new wall in office area. | $6,000 |
| [202006128584](https://www.permitgraph.org/p/202006128584) | Jun 12, 2020 | Completed: final sign-off May 2024 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | level 1 t.i.: add 35 new sprinkler heads. ref 201606079321. | $30,000 |
| [202004307277](https://www.permitgraph.org/p/202004307277) | Apr 30, 2020 | Completed: final sign-off Aug 2020 | [151 Union St](https://www.permitgraph.org/a/0112/001) | remove (e) pendant head sprinklers within the elevator shaft and elevator machine room as part of elevator modernization program | $2,000 |
| [202001232576](https://www.permitgraph.org/p/202001232576) | Jan 23, 2020 | Completed: final sign-off Aug 2020 | [1150 Sansome St](https://www.permitgraph.org/a/0112/009) | remove e pendent head sprinklers within elevator shaft and elevator machine room as part of elevator modernization program | $10,800 |
| [202001232574](https://www.permitgraph.org/p/202001232574) | Jan 23, 2020 | Completed: final sign-off Apr 2020 | [5 Embarcadero Center](https://www.permitgraph.org/a/0234/017) | extend 6 pendent sprinklers to new ceiling elevation of 10'0. remove e dry pend and install ndw dry pend in replacement cold box | $12,550 |
| [202001091558](https://www.permitgraph.org/p/202001091558) | Jan 9, 2020 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | added 98 new sprnikler heads for l10 ti n/a maher | $30,000 |
| [202001091561](https://www.permitgraph.org/p/202001091561) | Jan 9, 2020 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | ref pa# 201910073722; added 73 new sprnikler heads for l11 ti n/a maher | $30,000 |
| [201912200098](https://www.permitgraph.org/p/201912200098) | Dec 20, 2019 | Completed: final sign-off Feb 2020 | [1650 Broadway](https://www.permitgraph.org/a/0570/077) | relocate & lower (1) residential fire sprinker in penthouse pantry closet to the new ceiling height | $8,420 |
| [201912179777](https://www.permitgraph.org/p/201912179777) | Dec 17, 2019 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | level 9 - add 109 new fire sprinkler heads for level 9 ti | $30,000 |
| [201912129378](https://www.permitgraph.org/p/201912129378) | Dec 12, 2019 | Completed: final sign-off Dec 2020 | [1515 03rd St](https://www.permitgraph.org/a/8721/029) | add 159 ti fire sprinkler heads | $40,000 |
| [201912109162](https://www.permitgraph.org/p/201912109162) | Dec 10, 2019 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | add 116 ti heads fire sprinklers ref 201910073711 | $30,000 |
| [201911268273](https://www.permitgraph.org/p/201911268273) | Nov 26, 2019 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | 1st fl. add 55 new sprinkler heads for level 1 t.i. | $30,000 |
| [201911217890](https://www.permitgraph.org/p/201911217890) | Nov 21, 2019 | Completed: final sign-off Jan 2021 | [1455 03rd St](https://www.permitgraph.org/a/8721/033) | fire sprinkler for 6th fl: add 107 new sprinklers for ti. maher na | $30,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.