# Cork Corporation

Contractor license 782491. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/cork-corporation-782491
- JSON: https://www.permitgraph.org/api/contractor?license=782491
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=782491

19 permits since 2000: 18 completed, 1 never finaled. Typically 7 days from filing to permit and 314 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 3 to 5 years old.

- Based in: San Francisco
- On San Francisco permits: Oct 2003 to Feb 2023
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 1 | 0 | 0 | 0 |
| 2009 | 1 | 0 | 0 | 0 |
| 2010 | 2 | 0 | 0 | 0 |
| 2013 | 2 | 0 | 0 | 0 |
| 2014 | 4 | 0 | 0 | 0 |
| 2015 | 4 | 0 | 0 | 0 |
| 2016 | 3 | 0 | 0 | 0 |
| 2022 | 1 | 0 | 0 | 0 |
| 2023 | 0 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 7 | 7 | 0 | 0 | 0 | 90 | 130 |
| Deck | 1 | 1 | 0 | 0 | 0 | 90 | 84 |
| Kitchen remodel | 5 | 5 | 0 | 0 | 0 | 23 | 289 |
| Bathroom remodel | 6 | 6 | 0 | 0 | 0 | 56 | 216 |
| Roof deck | 1 | 1 | 0 | 0 | 0 | 106 | 295 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202302131847](https://www.permitgraph.org/p/202302131847) | Feb 13, 2023 | Never finaled: issued Feb 2023, no final | [516 Connecticut St](https://www.permitgraph.org/a/4099/006) | revision to 202203149884. reduce structural scope |  |
| [202203149884](https://www.permitgraph.org/p/202203149884) | Mar 14, 2022 | Completed: final sign-off Apr 2024 | [516 Connecticut St](https://www.permitgraph.org/a/4099/006) | l1: (n) internal staircase change, add non-conditioned space. l2: remodel bedroom & bathroom, add non-conditioned space.l3:remodel (e) kitchen & bathroom, bedroom, add rear-facing sliding doors to ya… | $300,000 |
| [201611072188](https://www.permitgraph.org/p/201611072188) | Nov 7, 2016 | Completed: final sign-off Mar 2017 | [3730 Quintara St](https://www.permitgraph.org/a/2166/027) | repair dry rot in sections of front stairs. | $11,500 |
| [201601288189](https://www.permitgraph.org/p/201601288189) | Jan 28, 2016 | Completed: final sign-off Jul 2016 | [2555 28th Av](https://www.permitgraph.org/a/2429/012) | 1st floor: remodel bathroom, to add a family room, wet bar, bedroom & walk-in closet. relocate interior stairs 1st flr to 2nd flr. 2nd floor: add a bathroom & enlarge the ktichen area, add a deck to… | $125,000 |
| [201601197377](https://www.permitgraph.org/p/201601197377) | Jan 19, 2016 | Completed: final sign-off Jul 2016 | [2555 28th Av](https://www.permitgraph.org/a/2429/012) | remove all lath & plaster in the interior and will replace with sheetrock. | $3,000 |
| [201508245138](https://www.permitgraph.org/p/201508245138) | Aug 24, 2015 | Completed: final sign-off Sep 2015 | [45 Rico Wy](https://www.permitgraph.org/a/0439A/046) | dry rot repair on back of the building 3 or 4 areas approx. 10' x 10', repair in-kind only | $5,000 |
| [201503130808](https://www.permitgraph.org/p/201503130808) | Mar 13, 2015 | Completed: final sign-off Nov 2020 | [974 Geneva Av](https://www.permitgraph.org/a/6411/034) | demolish 2-story type-5 building. | $10,000 |
| [201503130811](https://www.permitgraph.org/p/201503130811) | Mar 13, 2015 | Completed: final sign-off Nov 2020 | [974 Geneva Av](https://www.permitgraph.org/a/6411/034) | to erect 4 stories, 1 basement, type iii-a, 3 units apartment with retail, mixed use building. | $1,500,000 |
| [201501135618](https://www.permitgraph.org/p/201501135618) | Jan 13, 2015 | Completed: final sign-off Apr 2015 | [2519 27th Av](https://www.permitgraph.org/a/2428/003) | first floor to legalize (add) a family room, a bedroom and a full bathroom, walk in closet. add a new interior stairway per plan. 2nd floor add scope of work to appl. 201412093404 to add 1 bedroom an… | $75,000 |
| [201412093404](https://www.permitgraph.org/p/201412093404) | Dec 9, 2014 | Completed: final sign-off Apr 2015 | [2519 27th Av](https://www.permitgraph.org/a/2428/003) | remodel kitchen, bathroom, remove lath & plaster in dining room and living room and replace with type x sheetrock and install new furnace. no walls to be moved, existing foot print to remain. | $45,000 |
| [201411101169](https://www.permitgraph.org/p/201411101169) | Nov 10, 2014 | Completed: final sign-off Sep 2015 | [26 Rico Wy](https://www.permitgraph.org/a/0418A/016) | int renovation & infill (e) open area under room built on columns & infill (e) 3-story lightwell. convert storage space into conditioned space :bedrm,bath,media,sitting,play @ 1st flr. renovation: ki… | $183,160 |
| [201402219087](https://www.permitgraph.org/p/201402219087) | Feb 21, 2014 | Completed: final sign-off May 2015 | [31 Rico Wy](https://www.permitgraph.org/a/0439A/050) | install cribbing and stell beams to provide temporary support during foundation replacement. ref app#201302119885. n/a for the maher ordinance #155-13 | $8,000 |
| [201401307433](https://www.permitgraph.org/p/201401307433) | Jan 30, 2014 | Completed: final sign-off May 2015 | [35 Rico Wy](https://www.permitgraph.org/a/0439A/049) | perimeation grouting of foundation wall next to 31 rico way (pa #2013.0211.9885).; compliance with ord. 155-13 not required | $5,500 |
| [201310159287](https://www.permitgraph.org/p/201310159287) | Oct 15, 2013 | Completed: final sign-off Nov 2014 | [1467 31st Av](https://www.permitgraph.org/a/1822/011A) | interior remodel. 1st fl, convert part of garage to 376 sf of habitable space including new family , bed, baths, infill e lightwell on 1st fl. 2nd fl remodel kitchen and bath, stair and add new bath… | $30,000 |
| [201302119885](https://www.permitgraph.org/p/201302119885) | Feb 11, 2013 | Completed: final sign-off May 2015 | [31 Rico Wy](https://www.permitgraph.org/a/0439A/050) | horizontal addition & remodel of (e) residence. removal of (e) residential unit through merger. | $395,000 |
| [201009140792](https://www.permitgraph.org/p/201009140792) | Sep 14, 2010 | Completed: final sign-off May 2011 | [1200 19th St](https://www.permitgraph.org/a/4038/009) | revision to appl #200310097072 - revise stair configuration, relocate fireplaces, interior work only, no structural work. | $1,000 |
| [201006043878](https://www.permitgraph.org/p/201006043878) | Jun 4, 2010 | Completed: final sign-off May 2011 | [6118 California St](https://www.permitgraph.org/a/1383/057) | repair windows on front at middle unit#6120 california st only). repair leaking stucco and repaint. if necessary. | $30,000 |
| [200910199273](https://www.permitgraph.org/p/200910199273) | Oct 19, 2009 | Completed: final sign-off May 2011 | [1200 19th St](https://www.permitgraph.org/a/4038/009) | temporary shoring for erecting new building. ref. pa#2003.10.09.7072 | $30,000 |
| [200310097072](https://www.permitgraph.org/p/200310097072) | Oct 9, 2003 | Completed: final sign-off May 2011 | [1200 19th St](https://www.permitgraph.org/a/4038/009) | erect four story two unit residential bldg | $220,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.