# Constructive Solutions Inc.

Contractor license 990564. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/constructive-solutions-inc-990564
- JSON: https://www.permitgraph.org/api/contractor?license=990564
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=990564

67 permits since 2000: 53 completed, 7 in progress, 4 never finaled, 3 expired or cancelled. Typically 6 days from filing to permit and 152 days from permit to final inspection. Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.

- Based in: San Francisco
- On San Francisco permits: May 2014 to Nov 2026
- Last 24 months: 11 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 7 | 0 | 0 | 0 |
| 2015 | 5 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 3 | 0 | 0 | 1 |
| 2018 | 3 | 0 | 0 | 1 |
| 2019 | 12 | 0 | 0 | 1 |
| 2020 | 6 | 0 | 1 | 0 |
| 2021 | 7 | 0 | 0 | 0 |
| 2022 | 4 | 0 | 3 | 0 |
| 2023 | 1 | 0 | 0 | 0 |
| 2025 | 3 | 3 | 0 | 0 |
| 2026 | 1 | 4 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 1 | 84 |
| Deck | 1 | 1 | 0 | 0 | 0 | 20 | 113 |
| Stairs | 2 | 2 | 0 | 0 | 0 | 28 | 288 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 51 | 482 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611040332](https://www.permitgraph.org/p/202611040332) | Nov 4, 2026 | In progress: issued Nov 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 8th floor: lighting replacement, new break area counter with sink and faucet, wall infill (interior wall), 2 door replacement. | $45,000 |
| [202610229762](https://www.permitgraph.org/p/202610229762) | Oct 22, 2026 | In progress: issued Oct 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | suite 810: light replacement, open office,corridor, and elevator reception. ada upgrade to restroom and breakroom. no plumbing work. | $80,000 |
| [202605191492](https://www.permitgraph.org/p/202605191492) | May 19, 2026 | In progress: issued May 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | ref 202604159509- 15/fl- ti to serve as a business suite for (n) business tenants to include (n) interior fit out including offices, conference rooms, restrooms, and pantry with seating. | $1,645,900 |
| [202605060805](https://www.permitgraph.org/p/202605060805) | May 6, 2026 | Completed: final sign-off Aug 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 13/f: phone booths installation. | $15,000 |
| [202604159509](https://www.permitgraph.org/p/202604159509) | Apr 15, 2026 | In progress: issued Apr 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 15/f- soft demolition - existing exterior furring wall to be removed from interior side to expose existing brick finishing. ab-017 applies | $4,000 |
| [202512232502](https://www.permitgraph.org/p/202512232502) | Dec 23, 2025 | In progress: issued Jan 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall | $80,000 |
| [202510227917](https://www.permitgraph.org/p/202510227917) | Oct 22, 2025 | Completed: final sign-off May 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 7th/fl- barrier removal: upper an base cabinet with sink, dishwasher (50sf) | $75,000 |
| [202506249359](https://www.permitgraph.org/p/202506249359) | Jun 24, 2025 | Completed: final sign-off May 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 6th fl suite 600: lighting replacement, open office and new executive office improvement, corridor and elevator reception and restroom remodeling. | $125,000 |
| [202506128542](https://www.permitgraph.org/p/202506128542) | Jun 12, 2025 | Completed: final sign-off Dec 2025 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 9th fl. lighting replacement open office and new executive office improvement corridor and elevator rception for 351 california st. suite 900 and hallway | $85,000 |
| [202506068132](https://www.permitgraph.org/p/202506068132) | Jun 6, 2025 | In progress: issued Jun 2025 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 12th fl. suite 1210: lighting replacement. break room and new executive office improvement | $65,000 |
| [202503263062](https://www.permitgraph.org/p/202503263062) | Mar 26, 2025 | In progress: issued Apr 2025 | [351 California St](https://www.permitgraph.org/a/0261/010A) | interior soft demo for 351 california st, 1st fl non load bearing or lateral structural wall, remove lighting, electrical conduit, plumbing fixture, ceilijng, mechanical register and mechanical duct | $20,000 |
| [202305318879](https://www.permitgraph.org/p/202305318879) | May 31, 2023 | Completed: final sign-off Aug 2023 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | installation of factory prefabricated rooftop unit curbs on (e) concrete curbs and (02) factory prefabricated exhaust fan curbs | $15,000 |
| [202212289240](https://www.permitgraph.org/p/202212289240) | Dec 28, 2022 | Never finaled: issued Mar 2023, no final | [351 California St](https://www.permitgraph.org/a/0261/010A) | t.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert (e) basement to gym | $165,000 |
| [202212087888](https://www.permitgraph.org/p/202212087888) | Dec 8, 2022 | Never finaled: issued Jan 2023, no final | [260 Townsend St](https://www.permitgraph.org/a/3787/024) | bldg entry lobby work includes inter demo lobby of decorative precast panels & nw seating area, new guard desk. structural waterproofing, t-24, etc engineering to be design-build.all mep, sprinkler,… | $295,000 |
| [202207299588](https://www.permitgraph.org/p/202207299588) | Jul 29, 2022 | Completed: final sign-off Oct 2022 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 12/f: lighting and exit sign replcement at common hallway. common elevator hallway at the 12th floor. maher n/a. | $5,000 |
| [202202117860](https://www.permitgraph.org/p/202202117860) | Feb 11, 2022 | Completed: final sign-off Jun 2022 | [128 Spear St](https://www.permitgraph.org/a/3717/002) | title 24 compliance. lighting fixtures replacement.sep electrical permit if required. | $2,000 |
| [202202117857](https://www.permitgraph.org/p/202202117857) | Feb 11, 2022 | Completed: final sign-off May 2022 | [128 Spear St](https://www.permitgraph.org/a/3717/002) | demolition of abandoned interior stair - 134 sf | $6,000 |
| [202201286946](https://www.permitgraph.org/p/202201286946) | Jan 28, 2022 | Never finaled: issued May 2022, no final | [351 California St](https://www.permitgraph.org/a/0261/010A) | new storefront system and entry door at 2nd bay from east side of building. new exterior steps at entrance. new accessible entry at east wall of exterior vestibule. | $165,000 |
| [202201135960](https://www.permitgraph.org/p/202201135960) | Jan 13, 2022 | Completed: final sign-off Feb 2022 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | revisoin to pa 2021-0608-1938 to add shotcrete to north wall and memorialize correct and verified roof height dimensions. no added height to roof from approved scope under 2021-0608-1938 |  |
| [202110221036](https://www.permitgraph.org/p/202110221036) | Oct 22, 2021 | Completed: final sign-off Jan 2022 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | revision to pa 202106081938 to lower parapet height due to parapet wall thinness discovered in the field. |  |
| [202110180680](https://www.permitgraph.org/p/202110180680) | Oct 18, 2021 | Completed: final sign-off May 2022 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a. | $170,466 |
| [202110059879](https://www.permitgraph.org/p/202110059879) | Oct 5, 2021 | Completed: final sign-off Jan 2023 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | restroom ventilation/exhaust system. additon of two (n) electrical room ventilation systems,(n) light fixtures, power outlets & plumbing equipment. add emergency fixtures & lights. deferred mep to 20… |  |
| [202109299478](https://www.permitgraph.org/p/202109299478) | Sep 29, 2021 | Completed: final sign-off Apr 2022 | [351 California St](https://www.permitgraph.org/a/0261/010A) | interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restrooms | $118,963 |
| [202109098065](https://www.permitgraph.org/p/202109098065) | Sep 9, 2021 | Completed: final sign-off Feb 2022 | [143 02nd St](https://www.permitgraph.org/a/3721/050) | 5/f -new t bar ceiling @ elevator lobby after (e) wall demolition (e) evac to be remained | $20,000 |
| [202108236930](https://www.permitgraph.org/p/202108236930) | Aug 23, 2021 | Completed: final sign-off Oct 2021 | [200 California St](https://www.permitgraph.org/a/0237/006) | new power and communication outlet @ office. enclosed open office into provide office on 4th floor. | $14,500 |
| [202106081938](https://www.permitgraph.org/p/202106081938) | Jun 8, 2021 | Completed: final sign-off Jan 2023 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | remodel of (e) 174,160 sf building to create (n) tenant suites, suite a suite b & suite c, building uprades incl. replacement of roof, storefront system, seismic and structural upgrades, mep deferred | $2,162,160 |
| [202010206951](https://www.permitgraph.org/p/202010206951) | Oct 20, 2020 | Completed: final sign-off Dec 2021 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 4/f: spec tenant improvement with restroom improvement for accessibility. | $99,643 |
| [202009275196](https://www.permitgraph.org/p/202009275196) | Sep 27, 2020 | Completed: final sign-off Dec 2021 | [2765 16th St](https://www.permitgraph.org/a/3572/020A) | demolition of non-structural interior partitions walls & (e) 2nd fl per ab-017. maher n/a | $20,000 |
| [202009013152](https://www.permitgraph.org/p/202009013152) | Sep 1, 2020 | Never finaled: issued Oct 2020, no final | [555 De Haro St](https://www.permitgraph.org/a/4007/002) | mechanical duct installation throughout the suite. |  |
| [202008313025](https://www.permitgraph.org/p/202008313025) | Aug 31, 2020 | Completed: final sign-off Apr 2021 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 14/f: spec tenant improvement with restroom improvement for accessibility | $99,643 |
| [202007210565](https://www.permitgraph.org/p/202007210565) | Jul 21, 2020 | Completed: final sign-off Jul 2022 | [351 California St](https://www.permitgraph.org/a/0261/010A) | g/f: elevatory lobby: finish & lighting upgrades. scope includes new floor finish at exterior entry and upgraded elevator cab finishes. title 24 calculations included in permit set. | $200,000 |
| [202007019423](https://www.permitgraph.org/p/202007019423) | Jul 1, 2020 | Completed: final sign-off Dec 2020 | [555 De Haro St](https://www.permitgraph.org/a/4007/002) | 2nd fl - change of use (pdr to lab) ti remodel of (e) 12,378 sf of interior space for lab, demonstration space, offices, conference rooms, shower and (e) toilet | $1,200,000 |
| [202006299351](https://www.permitgraph.org/p/202006299351) | Jun 29, 2020 | Completed: final sign-off Oct 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | spec t.i. with restroom improvement for accessibility | $174,466 |
| [201912230434](https://www.permitgraph.org/p/201912230434) | Dec 23, 2019 | Completed: final sign-off Aug 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 2nd floor: tenant imrpovement with restroom improvement for accessibility | $100,449 |
| [201912230433](https://www.permitgraph.org/p/201912230433) | Dec 23, 2019 | Completed: final sign-off Aug 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 3rd floor: tenant imrpovement with restroom improvement for accessibility | $99,643 |
| [201912179803](https://www.permitgraph.org/p/201912179803) | Dec 17, 2019 | Completed: final sign-off May 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | ref pa# 201912048637; mechanical drawing |  |
| [201912048634](https://www.permitgraph.org/p/201912048634) | Dec 4, 2019 | Completed: final sign-off Aug 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 2nd floor: interior soft demo | $4,671 |
| [201912048637](https://www.permitgraph.org/p/201912048637) | Dec 4, 2019 | Completed: final sign-off May 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 13th floor: specific tenant improvement w/ restroom improvement for accessibility//vif no locked elevator lobby in non sprinkled high rise building- this building is only partially sprinkled it is an… | $106,983 |
| [201912048636](https://www.permitgraph.org/p/201912048636) | Dec 4, 2019 | Completed: final sign-off Aug 2020 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 3rd floor: interior soft demo | $4,671 |
| [201911086838](https://www.permitgraph.org/p/201911086838) | Nov 8, 2019 | Completed: final sign-off Dec 2019 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 13th floor: soft demo for interior (no exterior work). fire alarm and sprinkler under sep permit. | $4,671 |
| [201910154438](https://www.permitgraph.org/p/201910154438) | Oct 15, 2019 | Completed: final sign-off Jan 2020 | [143 02nd St](https://www.permitgraph.org/a/3721/050) | basement structural repair. maher n/a. | $14,965 |
| [201910013165](https://www.permitgraph.org/p/201910013165) | Oct 1, 2019 | Completed: final sign-off Sep 2020 | [85 02nd St](https://www.permitgraph.org/a/3708/019) | 4th fl: new gypsum board soffit and herculite doors. | $14,639 |
| [201907055225](https://www.permitgraph.org/p/201907055225) | Jul 5, 2019 | Expired or cancelled: cancelled Oct 2019 | [143 02nd St](https://www.permitgraph.org/a/3721/050) | 2nd flr. accessible barrier removal for a restroom. maher n/a. | $24,965 |
| [201905241652](https://www.permitgraph.org/p/201905241652) | May 24, 2019 | Completed: final sign-off Sep 2019 | [144 02nd St](https://www.permitgraph.org/a/3722/004) | basement: pony up existing wall at existing offices. demo existing 3 offices and provide 2 new offices. maher n/a. | $45,000 |
| [201904168108](https://www.permitgraph.org/p/201904168108) | Apr 16, 2019 | Completed: final sign-off Aug 2019 | [1 Shrader St](https://www.permitgraph.org/a/1191/036) | suite #640- interior office reconfiguration | $54,240 |
| [201904047117](https://www.permitgraph.org/p/201904047117) | Apr 4, 2019 | Completed: final sign-off Jul 2019 | [445 Bush St](https://www.permitgraph.org/a/0287/025) | 6th fl - break room and office reconfiguration. | $94,632 |
| [201808137208](https://www.permitgraph.org/p/201808137208) | Aug 13, 2018 | Completed: final sign-off Jan 2019 | [747 Front St](https://www.permitgraph.org/a/0166/001) | 4th flr. new windows, doors and gyp board soffits at reception. maher n/a | $12,000 |
| [201803305109](https://www.permitgraph.org/p/201803305109) | Mar 30, 2018 | Expired or cancelled: cancelled Jan 2026 | [351 California St](https://www.permitgraph.org/a/0261/010A) | accessibility barrier hardship request. | $5,000 |
| [201803305114](https://www.permitgraph.org/p/201803305114) | Mar 30, 2018 | Completed: final sign-off Sep 2018 | [445 Bush St](https://www.permitgraph.org/a/0287/025) | 9/f: ti: break room and office reconfiguration. | $18,500 |
| [201803123466](https://www.permitgraph.org/p/201803123466) | Mar 12, 2018 | Completed: final sign-off Apr 2018 | [200 California St](https://www.permitgraph.org/a/0237/006) | 4th floor:remove extg doors and window wall.new under ceiling wall with new location of extg electrical outlets. new doors and windows. new low height ada push button at extg restroom door.n/a for ma… | $12,500 |
| [201705166744](https://www.permitgraph.org/p/201705166744) | May 16, 2017 | Completed: final sign-off Jul 2017 | [717 Market St](https://www.permitgraph.org/a/3706/064) | 8th flr: removal of (e) private offices at open offices. new t-bar ceiling at break room & elevator hallway. ada upgrade at (e) mens & womens rrestrooms | $36,532 |
| [201704254885](https://www.permitgraph.org/p/201704254885) | Apr 25, 2017 | Expired or cancelled: cancelled Jan 2026 | [717 Market St](https://www.permitgraph.org/a/3706/064) | 1st and 2nd floors - reconfigureation of (e) private offices & break room light replacement. new phone room | $135,000 |
| [201704063339](https://www.permitgraph.org/p/201704063339) | Apr 6, 2017 | Completed: final sign-off Jan 2018 | [580 Market St](https://www.permitgraph.org/a/0291/005B) | replacement of extg switch gear board with new. new concrete pad for new switch gear board. new wall and door for utility room. utility relocation/modification for new switch gear. | $75,000 |
| [201703091085](https://www.permitgraph.org/p/201703091085) | Mar 9, 2017 | Completed: final sign-off May 2017 | [144 02nd St](https://www.permitgraph.org/a/3722/004) | mezzanine: lighting replacement 1 (e) conference room. interior window installation. interior door relocation. restroom upgrade to meet current accessibility requirements maher na | $45,000 |
| [201609097345](https://www.permitgraph.org/p/201609097345) | Sep 9, 2016 | Completed: final sign-off Dec 2016 | [332 Pine St](https://www.permitgraph.org/a/0260/006) | arch/elec ti on the 3rd floor at 332 pine st to include new offices, restrooms and cabinetry | $150,000 |
| [201512084504](https://www.permitgraph.org/p/201512084504) | Dec 8, 2015 | Completed: final sign-off Feb 2016 | [351 California St](https://www.permitgraph.org/a/0261/010A) | 12th floor suite 1200 - demo non-structural partition walls & ceiling grid. build new office, 4 display storage. new break room for staff use & new light. n/a maher ordinance | $130,000 |
| [201510139551](https://www.permitgraph.org/p/201510139551) | Oct 13, 2015 | Completed: final sign-off Mar 2016 | [447 Battery St](https://www.permitgraph.org/a/0206/002) | new t-bar ceiling, lighting, cabinet, paint, elec, outlet. interior remodel only | $100,000 |
| [201509156942](https://www.permitgraph.org/p/201509156942) | Sep 15, 2015 | Completed: final sign-off Dec 2015 | [351 California St](https://www.permitgraph.org/a/0261/010A) | on mezz floor (2nd floor) build fire conference rooms, breakroom, new elevator, hvac and finishes maher not req. | $275,000 |
| [201509156945](https://www.permitgraph.org/p/201509156945) | Sep 15, 2015 | Completed: final sign-off Feb 2016 | [580 Market St](https://www.permitgraph.org/a/0291/005B) | demo interior walls, restroom, breakroom, t-bar ceiling and finishes. build 4 new offices, ada restrooms, breakroom and finishes | $150,000 |
| [201502037377](https://www.permitgraph.org/p/201502037377) | Feb 3, 2015 | Completed: final sign-off Jan 2016 | [166 Geary St](https://www.permitgraph.org/a/0309/010) | exploratory soft demiolition in advance of ti selective removal of dry wall and fixtures for evaluation of structure & building systems. no work to rated construction or life safety systems. all work… | $5,000 |
| [201410279986](https://www.permitgraph.org/p/201410279986) | Oct 27, 2014 | Completed: final sign-off Nov 2015 | [351 California St](https://www.permitgraph.org/a/0261/010A) | defferred approval for micropiles supporting damper shear walls |  |
| [201406309999](https://www.permitgraph.org/p/201406309999) | Jun 30, 2014 | Completed: final sign-off Sep 2014 | [332 Pine St](https://www.permitgraph.org/a/0260/006) | tenant improvement to 6th floor office space to include 1. demo of existing non-bearing walls, suspended ceiling, and existing restrooms. 2. install non-bearing walls, lighting plan, ada restrooms, a… | $150,000 |
| [201406118096](https://www.permitgraph.org/p/201406118096) | Jun 11, 2014 | Completed: final sign-off Nov 2015 | [351 California St](https://www.permitgraph.org/a/0261/010A) | exploratory demolition at mezzanine level, removal of flooring, casework & fixtures, no structural owrk. all other work under separate permit. | $5,000 |
| [201406097893](https://www.permitgraph.org/p/201406097893) | Jun 9, 2014 | Completed: final sign-off Nov 2015 | [351 California St](https://www.permitgraph.org/a/0261/010A) | voluntary seismic improvements to (e) 16 story bldg. no exterior work. no work in (e) lobby; upgrade (e) mezzanine bathrooms. (n) lula elevator, (n) monumental stair. maher-compliance with ordinance… | $1,150,000 |
| [201405307080](https://www.permitgraph.org/p/201405307080) | May 30, 2014 | Completed: final sign-off Oct 2014 | [1500 Masonic Av](https://www.permitgraph.org/a/2616/037) | deck modifications and window replacement. | $5,000 |
| [201405307089](https://www.permitgraph.org/p/201405307089) | May 30, 2014 | Completed: final sign-off Aug 2015 | [1500 Masonic Av](https://www.permitgraph.org/a/2616/037) | to comply with physical inspection report #cc-7557 | $50,000 |
| [201405125495](https://www.permitgraph.org/p/201405125495) | May 12, 2014 | Completed: final sign-off Jun 2015 | [747 Front St](https://www.permitgraph.org/a/0166/001) | interior improvement of entrance lobby work includes relocation of one interior non-load bearing partitoin, removal of existing dropped ceiling, new lighting & finishes, replacement of storefront. co… | $75,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/contractor/constructive-solutions-inc-990564.
