229 permits since 2000: 177 completed, 46 in progress, 6 never finaled. Typically 5 days from filing to permit and 179 days from permit to final inspection. Of the 6 never-finaled permits, 6 are 3 to 5 years old. 2 were filed but never issued.

- Based in: Newport Beach
- On San Francisco permits: Jun 2022 to Sep 2026
- Last 24 months: 70 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2022 | 17 | 0 | 1 | 0 |
| 2023 | 37 | 3 | 5 | 0 |
| 2024 | 79 | 21 | 0 | 0 |
| 2025 | 39 | 10 | 0 | 0 |
| 2026 | 5 | 12 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 1 | 0 | 0 | 0 | 0 | 75 |
| Stairs | 1 | 1 | 0 | 0 | 0 | 0 | 35 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 0 | 280 |

## Most recent permits

The 100 most recent of 229.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609298771](https://www.permitgraph.org/p/202609298771) | Sep 29, 2026 | In progress: issued Sep 2026 | [729 Jones St](https://www.permitgraph.org/a/0299/002) | revision to 202206035575 elevator checklist has been removed and elevator letter added to the plan. smoke detector in elevator machine room has been removed. six smoke in front of elevator removed. e… |  |
| [202609298765](https://www.permitgraph.org/p/202609298765) | Sep 29, 2026 | In progress: issued Sep 2026 | [2015 Sacramento St](https://www.permitgraph.org/a/0640/016) | revision to pa 202404301094 replace the panel communicator and pull stations and smoke detector from ground level to 2nd level lobby. remove 1 smoke, 1 pull from 2nd floor. remove annunciator from gr… |  |
| [202609158123](https://www.permitgraph.org/p/202609158123) | Sep 15, 2026 | In progress: issued Sep 2026 | [145 Gardenside Dr](https://www.permitgraph.org/a/2854/011) | as built to 202604230016: add 2 heat detector in laundry rooms. add 2 lcd annunciators. |  |
| [202609158133](https://www.permitgraph.org/p/202609158133) | Sep 15, 2026 | In progress: issued Sep 2026 | [2919 Pacific Av](https://www.permitgraph.org/a/0976/047) | revision to bpa: 202506108343 - remove 1 exit sign light, change name of the room from boiler room to laundry room. |  |
| [202608196829](https://www.permitgraph.org/p/202608196829) | Aug 19, 2026 | In progress: issued Aug 2026 | [1438 Green St](https://www.permitgraph.org/a/0547/004) | as built - revision to pa # 202403198139 - upgrade matrix (added door holder function to the sequence of operation matrix). due to unit layout correction, cfp added one low frequency notification dev… |  |
| [202606173471](https://www.permitgraph.org/p/202606173471) | Jun 17, 2026 | In progress: issued Jun 2026 | [1 Polk St](https://www.permitgraph.org/a/0814/027) | to verify sound levels in sleeping areas complying with sffc section 1103.7.6.1 |  |
| [202604280244](https://www.permitgraph.org/p/202604280244) | Apr 28, 2026 | In progress: issued Apr 2026 | [7555 Geary Bl](https://www.permitgraph.org/a/1505/039) | as built to pa 202209152503 and 202501077846 adding 3 control relay for elevator in elevator media room |  |
| [202604239996](https://www.permitgraph.org/p/202604239996) | Apr 23, 2026 | In progress: issued Apr 2026 | [1438 Green St](https://www.permitgraph.org/a/0547/004) | as built to pa# 202403198139: a low frequency removed. the elevator checklist revised. shunt trip has bene removed from elevator/machine room. 4 repeater removed. sequence of operation revised. 1 ann… |  |
| [202604230016](https://www.permitgraph.org/p/202604230016) | Apr 23, 2026 | In progress: issued Apr 2026 | [145 Gardenside Dr](https://www.permitgraph.org/a/2854/011) | as built: 4 pull stations has been removed. 2 pulls has been replaced. annunciator removed. |  |
| [202604018696](https://www.permitgraph.org/p/202604018696) | Apr 1, 2026 | In progress: issued Jul 2026 | [850 Powell St](https://www.permitgraph.org/a/0243/059) | as built to pa 202404119809: relocate fire alarm panel, annunciator, & pull station from garage mezzanine to 1/f mail room. replace heat detector to smoke next to the panel. remove (4) heat detectors… | $100 |
| [202603187808](https://www.permitgraph.org/p/202603187808) | Mar 18, 2026 | Completed: final sign-off Apr 2026 | [7630 Geary Bl](https://www.permitgraph.org/a/1472/024) | as built to pa 202405091752 annunciator has beed removed from the plan. 1 low frequency nofication device shall be provided in the fourth floor bedroom unit 305 |  |
| [202603187826](https://www.permitgraph.org/p/202603187826) | Mar 18, 2026 | Completed: final sign-off Aug 2026 | [1300 Golden Gate Av](https://www.permitgraph.org/a/0755/002) | as built to pa# 202511149630: one relay has been removed from the elevator room alternate recalls. |  |
| [202603187824](https://www.permitgraph.org/p/202603187824) | Mar 18, 2026 | Completed: final sign-off Apr 2026 | [1160 Pine St](https://www.permitgraph.org/a/0252/011) | as built to pa# 202405212542: annunciator has been removed from the plan. an outside bell for the sprinkler system shall be added. a module for the tamper switch shall be provided. |  |
| [202602025053](https://www.permitgraph.org/p/202602025053) | Feb 2, 2026 | Completed: final sign-off Apr 2026 | [639 Geary St](https://www.permitgraph.org/a/0318/021) | addition of 6 sprinkler heads. ref pa#2025-0515-6541 | $6,700 |
| [202602025050](https://www.permitgraph.org/p/202602025050) | Feb 2, 2026 | Completed: final sign-off Apr 2026 | [639 Geary St](https://www.permitgraph.org/a/0318/021) | addition of 3 speakers strobes only. | $2,882 |
| [202601053224](https://www.permitgraph.org/p/202601053224) | Jan 5, 2026 | In progress: issued Jan 2026 | [398 West Portal Av](https://www.permitgraph.org/a/2483/013) | as built to pa #202302222411. the elevator has been modernized and is provided with 3 relays located in the elevator room. elevator recall will be initiated by a smoke detector installed within eleva… | $1,000 |
| [202601053210](https://www.permitgraph.org/p/202601053210) | Jan 5, 2026 | In progress: issued Jan 2026 | [230 Sanchez St](https://www.permitgraph.org/a/3559/002) | as built to pa #202501228787 due to exterior location. the smoke detector in front of unit 230 sanchez st will be replaced with heat detector. | $1,000 |
| [202511149630](https://www.permitgraph.org/p/202511149630) | Nov 14, 2025 | Completed: final sign-off Aug 2026 | [1300 Golden Gate Av](https://www.permitgraph.org/a/0755/002) | as built to permit 202209152507. removed 2 repeaters, 1 smoke on 2/f. added (2) 110cd horn strobes, (1) pull on 1/l. added (1) heat detector in basement boiler room, (1) heat in 1/l laundry room. rep… |  |
| [202511149674](https://www.permitgraph.org/p/202511149674) | Nov 14, 2025 | Completed: final sign-off Dec 2025 | [725 14th St](https://www.permitgraph.org/a/3542/038) | as built to 202404109669. 2 horn strobe have been removed. the facp battery size has been changed from 14ah to 12 ah. |  |
| [202510318643](https://www.permitgraph.org/p/202510318643) | Oct 31, 2025 | Completed: final sign-off Apr 2026 | [2227 Filbert St](https://www.permitgraph.org/a/0534/035) | fire alarm replacement to comply with sffc 1103.7.6.1 and comply with current codes. cfp shall install fire alarm alarm horn to comply with sffd section 1103.7.6.1, csfm code interpretation #12-001,… | $29,500 |
| [202510318648](https://www.permitgraph.org/p/202510318648) | Oct 31, 2025 | Completed: final sign-off Nov 2025 | [1012 Grant Av](https://www.permitgraph.org/a/0177/012) | as built to pa 202510177599: the battery size and model member for the fire alarm control panel (facp) have been revised. |  |
| [202510248102](https://www.permitgraph.org/p/202510248102) | Oct 24, 2025 | In progress: issued Oct 2025 | [4130 Cesar Chavez St](https://www.permitgraph.org/a/6563/043) | as built to pa # 2025-0130-9362. the model number for the annunciator was changed. one annunciator was added next to the panel. module for waterflow switch removed the plan. |  |
| [202510248104](https://www.permitgraph.org/p/202510248104) | Oct 24, 2025 | Completed: final sign-off Oct 2025 | [4140 Cesar Chavez St](https://www.permitgraph.org/a/6563/043) | as built to pa # 2025-0130-9368. the model number for the annunciator was changed. one module for waterflow switch removed from plan. |  |
| [202510248106](https://www.permitgraph.org/p/202510248106) | Oct 24, 2025 | Completed: final sign-off Feb 2026 | [2971 Clay St](https://www.permitgraph.org/a/1004/044) | as built to pa # 2025-0207-9883. remove smoke detector from the bedroom in unit #2973. remove two low frequency horn. |  |
| [202510177597](https://www.permitgraph.org/p/202510177597) | Oct 17, 2025 | Completed: final sign-off Oct 2025 | [2707 Sacramento St](https://www.permitgraph.org/a/0633/001L) | as built to pa #202106071832. removed 2 low frequency sounders from unit 4 and 6. |  |
| [202510177599](https://www.permitgraph.org/p/202510177599) | Oct 17, 2025 | Completed: final sign-off Nov 2025 | [1012 Grant Av](https://www.permitgraph.org/a/0177/012) | as built to pa #202404190374. add 2 heat detectors in the laundry rooms on 2nd and 3rd levels. add 2 smokes in 3rd level stairway. add 2 smoke detectors in common areas on the 2nd & 3rd levels. remov… |  |
| [202509165377](https://www.permitgraph.org/p/202509165377) | Sep 16, 2025 | In progress: issued Sep 2025 | [1112 Larkin St](https://www.permitgraph.org/a/0279/011A) | as built fire alarm, 202402206136. to demonstrate the basement floor plan layout. include addition of 1 heat , detector in the boiler room and 1 manual pull station at basement floor exit. add 1 mini… |  |
| [202509165372](https://www.permitgraph.org/p/202509165372) | Sep 16, 2025 | Completed: final sign-off Sep 2025 | [2101 Pacific Av](https://www.permitgraph.org/a/0590/001) | as built fire alarm to 202508203510. correct the unit design of unit 206 to match on site details, removed horn in the bedroom area since its an open bedroom. |  |
| [202509094880](https://www.permitgraph.org/p/202509094880) | Sep 9, 2025 | In progress: filed Sep 2025, not yet issued | [1059 Union St](https://www.permitgraph.org/a/0121/032) | fire alarm replacement to comply w/sffc 1103.7.6.1 and comply with current code cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1 csfm code interpreation #12=001 and update the… | $50,800 |
| [202509094878](https://www.permitgraph.org/p/202509094878) | Sep 9, 2025 | Completed: final sign-off Nov 2025 | [427 Stockton St](https://www.permitgraph.org/a/0285/003) | as built to pa 202206035574 change alternate recall from 2nd to 3rd level. add 1 emr fire control relay first floor elevator machine room |  |
| [202508203505](https://www.permitgraph.org/p/202508203505) | Aug 20, 2025 | Completed: final sign-off May 2026 | [901 Kearny St](https://www.permitgraph.org/a/0177/002) | as built to pa #202406245063.annunciator update. 2nd annunciator installed. 4th level plan layout to match building layout of unit 305 installed of a bathroom. 5 horns strobes removes removed. |  |
| [202508203510](https://www.permitgraph.org/p/202508203510) | Aug 20, 2025 | Completed: final sign-off Sep 2025 | [2101 Pacific Av](https://www.permitgraph.org/a/0590/001) | as built to pa #202405162261.annunciator model update to match as built and 2nd annunciator installed. horn strobes model update. per inspector's request intall new smoke detector above facu on 1st l… |  |
| [202508132905](https://www.permitgraph.org/p/202508132905) | Aug 13, 2025 | Completed: final sign-off Aug 2025 | [2210 Jackson St](https://www.permitgraph.org/a/0589/003) | as builts to pa #2024-0502-1216. update plan layout to show two existings studio units and a boiler room on the 1st level with their corresponding fire alarm devices. annunicator model updated to mat… |  |
| [202508052363](https://www.permitgraph.org/p/202508052363) | Aug 5, 2025 | Completed: final sign-off Nov 2025 | [427 Stockton St](https://www.permitgraph.org/a/0285/003) | as built to pa#202206035574: add 2 annunciators (total of 3) to the plan to cover the 36 led indicators. |  |
| [202507150798](https://www.permitgraph.org/p/202507150798) | Jul 15, 2025 | Completed: final sign-off Jul 2025 | [1400 Jones St](https://www.permitgraph.org/a/0189/033) | as built to pa # 2023-0616-0255. revise and fix floorplans and riser diagram based on comments from inspector during final inspection. add new addendum f-elevator checklist with no firefighter's hat… |  |
| [202507150803](https://www.permitgraph.org/p/202507150803) | Jul 15, 2025 | Completed: final sign-off Nov 2025 | [427 Stockton St](https://www.permitgraph.org/a/0285/003) | as built to permit 2022-0603-5574. removed 6 repeaters from each level in the plan, riser and calculations. 6 specified the water flow and tamper switch in the riser, plan and equipment list. revised… |  |
| [202506209086](https://www.permitgraph.org/p/202506209086) | Jun 20, 2025 | Completed: final sign-off Jul 2025 | [3500 Market St](https://www.permitgraph.org/a/2746/035) | as built pa 202503041531. elevator cab is provided with fire fighter's light symble. updated elevator checklist. f.a control relay added in emr. annunciator panel model updated. smoke to be replaced… |  |
| [202506118485](https://www.permitgraph.org/p/202506118485) | Jun 11, 2025 | Completed: final sign-off Jun 2025 | [21 Clarence Pl](https://www.permitgraph.org/a/3788/012) | to verify (e) sound levels in sleeping areas, complying with sffc section 1103.7.6.1 |  |
| [202506108387](https://www.permitgraph.org/p/202506108387) | Jun 10, 2025 | Completed: final sign-off Sep 2025 | [946 Stockton St](https://www.permitgraph.org/a/0210A/025) | fire alarm db testing results to show all units living room and sleeping area & sounding device meet .75 dba mark during the test. complying w/ sffc 1103.7.6.1 |  |
| [202506108338](https://www.permitgraph.org/p/202506108338) | Jun 10, 2025 | Completed: final sign-off Aug 2025 | [1299 Lombard St](https://www.permitgraph.org/a/0501/073) | as built to pa#: 202505196749. install new annunicator panel (scu) next to facu (fa-02).update equipment legend, floor plans, calculation. |  |
| [202506108343](https://www.permitgraph.org/p/202506108343) | Jun 10, 2025 | Completed: final sign-off Oct 2026 | [2919 Pacific Av](https://www.permitgraph.org/a/0976/047) | install new illuminated led exit signs with battery backup in common areas to comply with nfda101 and nec 700.12 and local code requirements. | $10,900 |
| [202506068112](https://www.permitgraph.org/p/202506068112) | Jun 6, 2025 | Completed: final sign-off Jul 2025 | [1151 04th St](https://www.permitgraph.org/a/8711/025) | to install 2 new horn strobes within modified commercial retail space. ref pa #202501108125 | $9,000 |
| [202505196779](https://www.permitgraph.org/p/202505196779) | May 19, 2025 | In progress: issued Jun 2025 | [1380 Greenwich St](https://www.permitgraph.org/a/0501/038) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3 fo ab #2.01 amd the 2022 cfc. cbc amd nfpaf2-2022. cfp shall install fire alarm horn to amply w/sffd 1103.7.6.1. existing fi… | $99,000 |
| [202505196749](https://www.permitgraph.org/p/202505196749) | May 19, 2025 | Completed: final sign-off Aug 2025 | [1299 Lombard St](https://www.permitgraph.org/a/0501/073) | as built to pa# 202405071519 & 202501077842. annunctator model updated to a602-9102 to match as built installation. equipment legend updated |  |
| [202505086088](https://www.permitgraph.org/p/202505086088) | May 8, 2025 | In progress: issued May 2025 | [1155 04th St](https://www.permitgraph.org/a/8711/025) | 1/f: adjust (e) fire sprinklers system to accomodate the new full height wall. ref pa# 202501108125. | $15,000 |
| [202504255282](https://www.permitgraph.org/p/202504255282) | Apr 25, 2025 | In progress: issued Apr 2025 | [35 Russia Av](https://www.permitgraph.org/a/6084/018) | as-built to pa 202306281002 - new fire alarm devices for units r, s, t and u on the 1/f to provide proper area coverage. as built plan to demonstrating the correct basement floor plan layout. |  |
| [202504255275](https://www.permitgraph.org/p/202504255275) | Apr 25, 2025 | Completed: final sign-off May 2025 | [2133 Stockton St](https://www.permitgraph.org/a/0040/001) | as built pa 202407015624 & 202411124821 adjust model number and manufacter of annunciators on building a,b and c,d; remove of tamper valves, waterflow switch and pull station on bldg a,b,c and d refl… |  |
| [202504255279](https://www.permitgraph.org/p/202504255279) | Apr 25, 2025 | In progress: filed Apr 2025, not yet issued | [1120 Jackson St](https://www.permitgraph.org/a/0182/008) | as-built to pa 202403268603. the pull station in basement was removed due to its location in front of a locked barrier exit door, and a heat detector was added in the boiler rm. changes are reflected… |  |
| [202504164546](https://www.permitgraph.org/p/202504164546) | Apr 16, 2025 | In progress: issued Apr 2025 | [2770 Lombard St](https://www.permitgraph.org/a/0933/010) | as built to pa #202411054410. change facu panel from 4007es to 4100es. add a device address to all idnac repeaters and update equipment list, calculations. |  |
| [202504164549](https://www.permitgraph.org/p/202504164549) | Apr 16, 2025 | Completed: final sign-off Oct 2025 | [1112 Larkin St](https://www.permitgraph.org/a/0279/011A) | as built to pa #202402206136. as built plans to demonstrate correction floor plan layout and removed to low frequency. |  |
| [202504094008](https://www.permitgraph.org/p/202504094008) | Apr 9, 2025 | Completed: final sign-off Oct 2026 | [2111 Hyde St](https://www.permitgraph.org/a/0095/005) | upgrade fire alarm to system to comply with 2022 sffc section 1103.7.6.1, ab #3.08, ab#2.01 and the 2022 cfc, cbc and nfpa 2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6… | $87,000 |
| [202503263076](https://www.permitgraph.org/p/202503263076) | Mar 26, 2025 | Completed: final sign-off May 2025 | [500 Leavenworth St](https://www.permitgraph.org/a/0318/014) | as built to pa 202411054424. the tamper switch in the basement has been removed. |  |
| [202503212788](https://www.permitgraph.org/p/202503212788) | Mar 21, 2025 | Completed: final sign-off Jun 2025 | [2971 Clay St](https://www.permitgraph.org/a/1004/044) | as built to pa # 202502079883: relocate smoke detector from the kitchen to attic in #2975. adding waterflow dwitch to the equipment list. |  |
| [202503212768](https://www.permitgraph.org/p/202503212768) | Mar 21, 2025 | Completed: final sign-off Apr 2025 | [1221 Jones St](https://www.permitgraph.org/a/0220/036) | to verify sound pressure levels in living areas and dwelling units | $20 |
| [202503192606](https://www.permitgraph.org/p/202503192606) | Mar 19, 2025 | Completed: final sign-off Feb 2026 | [203 Oak St](https://www.permitgraph.org/a/0838/001) | install new fire alarm system to comply with 2022 sffc 1103.7.6.1 automatic and mannual fire system with pull station located throughout exits. all initiating and notification devices located in acco… | $15,000 |
| [202503041531](https://www.permitgraph.org/p/202503041531) | Mar 4, 2025 | Completed: final sign-off Aug 2025 | [3500 Market St](https://www.permitgraph.org/a/2746/035) | add (1)new idnac repeater next to facu on the 1st level.update fire riser diagram,calculations, equipment legend.ref# pa#202306160259 and 202410082535 |  |
| [202503041499](https://www.permitgraph.org/p/202503041499) | Mar 4, 2025 | Completed: final sign-off May 2025 | [2133 Stockton St](https://www.permitgraph.org/a/0040/001) | as built to permits 202407015624 and 202411124821. remove of (1) idnac repeater from original design at building "a&b" next to facp. fix equipment legend, calculations, fire riser diagram. |  |
| [202502261109](https://www.permitgraph.org/p/202502261109) | Feb 26, 2025 | Completed: final sign-off Mar 2025 | [691 Broadway](https://www.permitgraph.org/a/0161/029) | as built to 202404190412 and 202412066315. removal of 1 smoke detector on 3rd level. area already covered by smoke detectors next to it. fix equipment legend,calculations, fire riser diagram. add smo… |  |
| [202502100036](https://www.permitgraph.org/p/202502100036) | Feb 10, 2025 | In progress: issued Feb 2025 | [2130 Stockton St](https://www.permitgraph.org/a/0039/020) | rev 202407015621 and ref 202411134889. add (1) new idnac repeater next to facu on ground floor. remove (3) waterfloow switches and (3) tamper valves. remove (4) heat detectors on ground floor and 1st… |  |
| [202502079883](https://www.permitgraph.org/p/202502079883) | Feb 7, 2025 | Completed: final sign-off Apr 2025 | [2971 Clay St](https://www.permitgraph.org/a/1004/044) | as built to: pa#2021-1006-9920. indicate existing smoke detectors on the first and second levels will provide proper area of coverage. |  |
| [202501309368](https://www.permitgraph.org/p/202501309368) | Jan 30, 2025 | Completed: final sign-off Dec 2025 | [4140 Cesar Chavez St](https://www.permitgraph.org/a/6563/043) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. exi… | $39,900 |
| [202501309359](https://www.permitgraph.org/p/202501309359) | Jan 30, 2025 | Completed: final sign-off Apr 2026 | [890 Bush St](https://www.permitgraph.org/a/0274/012) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 av#3.08, ab#2.01 and the 2022 cfc, cbc and nfpa 2-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1… | $28,700 |
| [202501309362](https://www.permitgraph.org/p/202501309362) | Jan 30, 2025 | Completed: final sign-off Dec 2025 | [4130 Cesar Chavez St](https://www.permitgraph.org/a/6563/043) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1 ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1. exi… | $39,900 |
| [202501228787](https://www.permitgraph.org/p/202501228787) | Jan 22, 2025 | In progress: issued Jan 2025 | [230 Sanchez St](https://www.permitgraph.org/a/3559/002) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1, ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. the replacement f/a system shall be automatic and manual system with one pul… | $22,250 |
| [202501077846](https://www.permitgraph.org/p/202501077846) | Jan 7, 2025 | Completed: final sign-off Mar 2025 | [7555 Geary Bl](https://www.permitgraph.org/a/1505/039) | as bulit to 202209152503- the (e) elevator checklist has been updated. three relays located in elevator machine room has been removed from the plan |  |
| [202501077842](https://www.permitgraph.org/p/202501077842) | Jan 7, 2025 | Completed: final sign-off Aug 2025 | [1299 Lombard St](https://www.permitgraph.org/a/0501/073) | as built to 202405071519 add one (n) nac repeater next to the facu . add stx (n) addressable monitor module to (e) waterflow switches on all levels. fix equipment legend, s.o.o.m matrix, floor plans… |  |
| [202412176974](https://www.permitgraph.org/p/202412176974) | Dec 17, 2024 | In progress: issued Dec 2024 | [15 Teresita Bl](https://www.permitgraph.org/a/2901A/050) | as built to pa#2024-0125-4681 and pa#2024-0320-8242. add existing sprinkler 120 v bell next to the entrance at the first level floor plan layout. add new idnac repeater next to the facu. fix equipmen… |  |
| [202412176968](https://www.permitgraph.org/p/202412176968) | Dec 17, 2024 | Completed: final sign-off Jul 2025 | [2652 Polk St](https://www.permitgraph.org/a/0501/073) | as built to pa#2024-0508-1636. fix the location of the machine room in the front level floor plan layout. remove heater detector and shunt trip relay in the machine room. fix equipment legend, fire r… |  |
| [202412066315](https://www.permitgraph.org/p/202412066315) | Dec 6, 2024 | Completed: final sign-off Mar 2025 | [691 Broadway](https://www.permitgraph.org/a/0161/029) | as built to pa 202404190412 & 202403288793 add for new manual pull stations on 2nd and 3rd level next to fire escape exits. remove 2 horn strobes on 2nd and 3rd levels. fix equipment legeng, calculat… |  |
| [202412066316](https://www.permitgraph.org/p/202412066316) | Dec 6, 2024 | In progress: issued Nov 2025 | [1201 Golden Gate Av](https://www.permitgraph.org/a/0773/030) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1, ab#3.08, ab# 2.01 and 2022 cfc, cbc and nfpa 72-2022. the replacement of fa system shall be automatic and manual system with one… | $179,000 |
| [202411225579](https://www.permitgraph.org/p/202411225579) | Nov 22, 2024 | In progress: issued Nov 2024 | [1055 Washington St](https://www.permitgraph.org/a/0212/030) | as built to pa 202406265271 former laundry room converted to utility room @ 1st level. heat detector and horn strobe removed. annunciator remoded @ 1st level. fix equipment legend s.o.o.m matrix, cal… |  |
| [202411225583](https://www.permitgraph.org/p/202411225583) | Nov 22, 2024 | Completed: final sign-off Aug 2025 | [2380 California St](https://www.permitgraph.org/a/0636/018) | as built pa 202409251599 add 1 new ipnac reporter @ 1st level, add 1 new horn strobe in laundry room at 1st level. fix equipment legend, fire riser diagram, calculations |  |
| [202411134887](https://www.permitgraph.org/p/202411134887) | Nov 13, 2024 | Completed: final sign-off Aug 2025 | [1275 Greenwich St](https://www.permitgraph.org/a/0095/025) | as built to pa#: 202110069907. add 120v sprinkler bell to floor plans and equipment legend. |  |
| [202411134889](https://www.permitgraph.org/p/202411134889) | Nov 13, 2024 | Completed: final sign-off Mar 2025 | [2130 Stockton St](https://www.permitgraph.org/a/0039/020) | as built to pa#: 202407015621. add all the corresponding idnec addresses to notificatoin devices per autocall system. |  |
| [202411124821](https://www.permitgraph.org/p/202411124821) | Nov 12, 2024 | Completed: final sign-off May 2025 | [2133 Stockton St](https://www.permitgraph.org/a/0040/001) | as built fire alarm ref 2024076015624 |  |
| [202411054434](https://www.permitgraph.org/p/202411054434) | Nov 5, 2024 | In progress: issued Nov 2024 | [1731 15th St](https://www.permitgraph.org/a/3555/056) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1. ab#3.08, ab#2.01 and 2022 cfc, cbc and nfpa72-2022. the replacement fire alarm shall be automatic and manual system with one pul… | $47,500 |
| [202411054410](https://www.permitgraph.org/p/202411054410) | Nov 5, 2024 | In progress: issued Dec 2024 | [2770 Lombard St](https://www.permitgraph.org/a/0933/010) | upgrade fire alarm system to comply with 2022 sffc section 1103.7.6.1, ab# 3.08, ab# 2.01 & 2022 cfc, cbc & nfpa 72-2022. replacement of fire alarm system shall be automatic & manual system with one… | $140,000 |
| [202411054424](https://www.permitgraph.org/p/202411054424) | Nov 5, 2024 | Completed: final sign-off May 2025 | [500 Leavenworth St](https://www.permitgraph.org/a/0318/014) | as built for pa #2022-0721-9032 adding three low frequency horns to units 207,407 & 607. |  |
| [202410173204](https://www.permitgraph.org/p/202410173204) | Oct 17, 2024 | Completed: final sign-off Jan 2025 | [3100 Taraval St](https://www.permitgraph.org/a/2370/049) | revision to pa 202105250932 add 2 addressable signal input module to existing waterflow switch & tamper valve |  |
| [202410173159](https://www.permitgraph.org/p/202410173159) | Oct 17, 2024 | Completed: final sign-off Jan 2025 | [158 Shrader St](https://www.permitgraph.org/a/1193/019) | upgrade fire system to comply with 2022 sffc section 1103.7.6.1, ab #3.08, 2.01 and 2022 cfc, cbc, nfpa 72-2022 | $16,300 |
| [202410082535](https://www.permitgraph.org/p/202410082535) | Oct 8, 2024 | Completed: final sign-off Aug 2025 | [3500 Market St](https://www.permitgraph.org/a/2746/035) | revision to 202306160259: change electrical rm to trush rm, add 3 lf horns to e) unit on 5th/f. add 11 lf horns to e) bedrooms previously dining rms. update fire riser, diagram, calculations equipmen… |  |
| [202403288800](https://www.permitgraph.org/p/202403288800) | Oct 3, 2024 | Completed: final sign-off Apr 2025 | [1221 Jones St](https://www.permitgraph.org/a/0220/036) | update (e) fire alarm system to comply with sleeping area notification requirements by adding horns to the living rooms. | $159,000 |
| [202409251599](https://www.permitgraph.org/p/202409251599) | Sep 25, 2024 | Completed: final sign-off Aug 2025 | [2380 California St](https://www.permitgraph.org/a/0636/018) | upgrade fire alarm system to comply with the 2022 sffc 1103.7.6.1 ab fire alarm system shall be automatic and manual system with pull stations located at all required exits since the building has a p… | $72,000 |
| [202408289610](https://www.permitgraph.org/p/202408289610) | Sep 10, 2024 | In progress: issued May 2025 | [1 Daniel Burnham Ct](https://www.permitgraph.org/a/0690/017) | fire alarm replacement to comply with sffc 1103.7.6.1. add low frequency horns in the sleeping areas. | $175,000 |
| [202409060259](https://www.permitgraph.org/p/202409060259) | Sep 6, 2024 | In progress: issued Sep 2024 | [840 Post St](https://www.permitgraph.org/a/0300/021) | as built plans: change the location of bps/revision to pa#202312212984. added lcd-160 annuciator. add sequence of operation for in unit smoke as supervisery. deleted shunt trip because no shunt for e… |  |
| [202409050134](https://www.permitgraph.org/p/202409050134) | Sep 5, 2024 | Completed: final sign-off Feb 2025 | [1535 Eddy St](https://www.permitgraph.org/a/0750/019) | as built to pa#202209061917/r1. add garage level 1, 1st floor, and 2nd floor devices to the plan. |  |
| [202408289642](https://www.permitgraph.org/p/202408289642) | Aug 28, 2024 | Completed: final sign-off Jun 2025 | [2635 Mcallister St](https://www.permitgraph.org/a/1169/037) | as built to pa# 202406063853. remove pull station in first level maintenance closet. |  |
| [202408229263](https://www.permitgraph.org/p/202408229263) | Aug 22, 2024 | Completed: final sign-off Aug 2025 | [1275 Greenwich St](https://www.permitgraph.org/a/0095/025) | as built to 202110069907: remove (2) horn strobes on basement floor. |  |
| [202408068057](https://www.permitgraph.org/p/202408068057) | Aug 6, 2024 | Completed: final sign-off Jan 2025 | [3100 Taraval St](https://www.permitgraph.org/a/2370/049) | revision to pa# 202105250932: corresponding notification devices. add 2 pull stations and add 6 lf sounders on 2nd and 3rd levels. revise adn fix calculations, riser, comply with 2022 section 1103.7.… |  |
| [202407247163](https://www.permitgraph.org/p/202407247163) | Jul 24, 2024 | In progress: filed Jul 2024, not yet issued | [950 Stockton St](https://www.permitgraph.org/a/0210A/003) | fire alarm db testing to show units in living & sleeping areas sounding devices meet 75 dba mark during testing. complying with sffc 1103.7.6.1. all residential floors have an identical layout |  |
| [202407156483](https://www.permitgraph.org/p/202407156483) | Jul 15, 2024 | Completed: final sign-off Feb 2026 | [1141 Stockton St](https://www.permitgraph.org/a/0179/041) | upgrade fire alarm system to cmply with 2022 sffc 1103.7.6.1,ab#3.08 & 2.01, 2022cfc,dbc & nfpa72-2022.f/a system shall be automatic and manual system with pull statiohns located at all required exit… | $19,000 |
| [202407156475](https://www.permitgraph.org/p/202407156475) | Jul 15, 2024 | Completed: final sign-off Apr 2026 | [625 Taylor St](https://www.permitgraph.org/a/0298/003) | revision to 202310198975. change the model number of (e) devices, add (e) smoke detectors from 1st to 5th level. |  |
| [202407116301](https://www.permitgraph.org/p/202407116301) | Jul 11, 2024 | In progress: filed Jul 2024, not yet issued | [1245 04th St](https://www.permitgraph.org/a/8711/028) | modify existing fire alarm system as requested for new construction (t.i) in dahlia school. ref permit 202306129890 | $4,000 |
| [202407055855](https://www.permitgraph.org/p/202407055855) | Jul 9, 2024 | Completed: final sign-off Apr 2025 | [400 Haight St](https://www.permitgraph.org/a/0849/008) | upgrade fire alarm system to comply w/ 2022 sffc 1103.7.6.1,ab#3.08 & 2.01, 2022 cfc,cbc & 72-2022. replacement f/a will be automatic manual sys w/ pull stations located all req exits.facp shall be m… | $17,200 |
| [202407015621](https://www.permitgraph.org/p/202407015621) | Jul 3, 2024 | Completed: final sign-off Mar 2025 | [2130 Stockton St](https://www.permitgraph.org/a/0039/020) | voluntary upgrade to existing fire alarm panel and to comply with sleeping area notification requirements by adding horns living area and bedrooms. | $97,000 |
| [202407015603](https://www.permitgraph.org/p/202407015603) | Jul 1, 2024 | Completed: final sign-off Jul 2024 | [1285 Sutter St](https://www.permitgraph.org/a/0691/021) | text to verify existing sound levels in sleeping area comply with sffc 1103.7.6.1 |  |
| [202407015624](https://www.permitgraph.org/p/202407015624) | Jul 1, 2024 | Completed: final sign-off May 2025 | [2133 Stockton St](https://www.permitgraph.org/a/0040/001) | voluntary upgrade to existing fire alarm panel and to comply with sleeping area notification requirements by adding horns living area and bedrooms. new cellular commmunitor and new initiating devices… | $250,000 |
| [202406275423](https://www.permitgraph.org/p/202406275423) | Jun 27, 2024 | Completed: final sign-off Feb 2025 | [292 14th St](https://www.permitgraph.org/a/3531/022) | as built to pa# 202112033693. adding devices, smoke detector, and pull station at the roof access. |  |
| [202406265300](https://www.permitgraph.org/p/202406265300) | Jun 26, 2024 | Completed: final sign-off Aug 2024 | [1901 Webster St](https://www.permitgraph.org/a/0653/006) | as built to pa 202110069909 1 horn strobe has been added in the office in the basement |  |
| [202406265271](https://www.permitgraph.org/p/202406265271) | Jun 26, 2024 | Completed: final sign-off Jan 2025 | [1055 Washington St](https://www.permitgraph.org/a/0212/030) | upgrade fire alarm system to comply with 2022 sffc 1103.7.6.1 ab 3.08, ab#201, 2022 cfc and nfpa 72-2022. cfp shall install fire alarm horn to comply with sffd section 1103.7.6.1, upgrade e fire alar… | $39,000 |

---