# Clark Construction Group Ca Lp

Contractor license 839892. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/clark-construction-group-ca-lp-839892
- JSON: https://www.permitgraph.org/api/contractor?license=839892
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=839892

62 permits since 2000: 38 completed, 13 in progress, 11 never finaled. Typically 82 days from filing to permit and 479 days from permit to final inspection. Of the 11 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 4 were filed but never issued.

- Based in: Bethesda
- On San Francisco permits: Jun 2014 to Mar 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 1 | 0 | 0 | 0 |
| 2015 | 6 | 0 | 0 | 0 |
| 2016 | 7 | 0 | 1 | 0 |
| 2017 | 6 | 0 | 2 | 0 |
| 2018 | 7 | 0 | 3 | 0 |
| 2019 | 3 | 0 | 0 | 0 |
| 2020 | 3 | 0 | 0 | 0 |
| 2021 | 5 | 0 | 1 | 0 |
| 2022 | 0 | 3 | 1 | 0 |
| 2023 | 0 | 6 | 3 | 0 |
| 2024 | 0 | 1 | 0 | 0 |
| 2025 | 0 | 2 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Kitchen remodel | 1 | 0 | 0 | 1 | 0 | 273 |  |
| Bathroom remodel | 1 | 0 | 0 | 1 | 0 | 273 |  |
| Stairs | 6 | 5 | 0 | 1 | 0 | 123 | 534 |
| Deck | 1 | 0 | 0 | 1 | 0 |  |  |
| Pergola or trellis | 1 | 0 | 1 | 0 | 0 |  |  |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202512041033](https://www.permitgraph.org/p/202512041033) | Mar 5, 2026 | In progress: filed Mar 2026, not yet issued | [2000 Marin St](https://www.permitgraph.org/a/4346/003) | proj-26-2627 mou: erect new 1 story type iib & iiib fuel station. | $850,000 |
| [202412317576](https://www.permitgraph.org/p/202412317576) | Apr 7, 2025 | In progress: issued Mar 2026 | [1828 Egbert Av](https://www.permitgraph.org/a/5434B/005) | project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential… | $7,000,000 |
| [202502251016](https://www.permitgraph.org/p/202502251016) | Feb 25, 2025 | In progress: filed Feb 2025, not yet issued | [401 Hunters Point Bl](https://www.permitgraph.org/a/4605/013) | proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc. | $200,000 |
| [202410032285](https://www.permitgraph.org/p/202410032285) | Nov 5, 2024 | In progress: filed Nov 2024, not yet issued | [750 Phelps St](https://www.permitgraph.org/a/5262/009) | proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3) | $75,000,000 |
| [202312152632](https://www.permitgraph.org/p/202312152632) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and o… | $23,800,000 |
| [202312152620](https://www.permitgraph.org/p/202312152620) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shop… | $48,200,000 |
| [202312152635](https://www.permitgraph.org/p/202312152635) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, b… | $20,900,000 |
| [202312152623](https://www.permitgraph.org/p/202312152623) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campu… | $38,100,000 |
| [202312152622](https://www.permitgraph.org/p/202312152622) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 200… | $700,000 |
| [202312152634](https://www.permitgraph.org/p/202312152634) | Dec 15, 2023 | In progress: filed Dec 2023, not yet issued | [0 Situs To Be Assigned](https://www.permitgraph.org/a/4346/001) | proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 o… | $18,300,000 |
| [202310259489](https://www.permitgraph.org/p/202310259489) | Oct 25, 2023 | Never finaled: filed Oct 2023, never issued | [401 Hunters Point Bl](https://www.permitgraph.org/a/4605/013) | proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs… | $29,000,000 |
| [202310259422](https://www.permitgraph.org/p/202310259422) | Oct 25, 2023 | Never finaled: filed Oct 2023, never issued | [401 Hunters Point Bl](https://www.permitgraph.org/a/4605/013) | proj-25-0614:erect a one story public restroom. type vb. | $500,000 |
| [202310259421](https://www.permitgraph.org/p/202310259421) | Oct 25, 2023 | Never finaled: filed Oct 2023, never issued | [401 Hunters Point Bl](https://www.permitgraph.org/a/4605/013) | proj-25-0614:erect a one story storage and recreation building (boat house)- type vb. | $2,000,000 |
| [202212299456](https://www.permitgraph.org/p/202212299456) | Dec 29, 2022 | In progress: issued Mar 2026 | [1 Sgt John V Young St](https://www.permitgraph.org/a/3179/011) | to erect a 2-story, type 2a, office building. | $15,000,000 |
| [202212299451](https://www.permitgraph.org/p/202212299451) | Dec 29, 2022 | In progress: issued Jun 2026 | [1 Sgt John V Young St](https://www.permitgraph.org/a/3179/011) | existing two story building to be rehabilitated and renovated. work includes upgrades to building structure and replacement of plumbing, electrical and mechanical systems, and interior finishes and f… | $14,000,000 |
| [202205134182](https://www.permitgraph.org/p/202205134182) | May 13, 2022 | Never finaled: issued Aug 2022, no final | [1180 Evans Av](https://www.permitgraph.org/a/4570/024) | side grading associated with pa# 202108065970. | $280,000 |
| [202203089442](https://www.permitgraph.org/p/202203089442) | Mar 8, 2022 | In progress: issued Feb 2025 | [1200 15th St](https://www.permitgraph.org/a/3925/002) | renovate, rehab & seisimically retrofit (e) 2-story, 29500 sf building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ ad… | $28,900,000 |
| [202108065970](https://www.permitgraph.org/p/202108065970) | Aug 6, 2021 | Never finaled: filed Aug 2021, never issued | [1180 Evans Av](https://www.permitgraph.org/a/4570/024) | erect a new 3 stories with no basement electrical switchgear/storage. type 2-a | $16,000,000 |
| [202106152476](https://www.permitgraph.org/p/202106152476) | Jun 15, 2021 | Completed: final sign-off Dec 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | spread footing for sculpture to be located at entry plaza - reference to pa #201712217090 | $75,000 |
| [202105200755](https://www.permitgraph.org/p/202105200755) | May 20, 2021 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and g… | $30,000 |
| [202104148492](https://www.permitgraph.org/p/202104148492) | Apr 14, 2021 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | scope is lab fixed louvers (lvr01). reference to pa #201712217090-s7 for cold formed metal framing criteria & reference to pa #201712217090-s3 volume 4 for architectural location | $50,000 |
| [202103166689](https://www.permitgraph.org/p/202103166689) | Mar 16, 2021 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | reference to pa #201712217090 s2&s3 - scope is lab casework, fume hood, and lab equipment seismic restraint designed by vta engineers, teodor francu, and force support services respectively | $900,000 |
| [202103166691](https://www.permitgraph.org/p/202103166691) | Mar 16, 2021 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | reference to pa #201712217090/s2&s3 - scope is metal fabrications including ladder and vehicular barrier systems anchorage designed by sgh | $52,000 |
| [202011179066](https://www.permitgraph.org/p/202011179066) | Nov 17, 2020 | Completed: final sign-off Mar 2021 | [1419 Bryant St](https://www.permitgraph.org/a/3904/002) | this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127) |  |
| [202008252576](https://www.permitgraph.org/p/202008252576) | Aug 25, 2020 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2. | $180,000 |
| [202001162129](https://www.permitgraph.org/p/202001162129) | Jan 16, 2020 | Completed: final sign-off Dec 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure. | $85,000 |
| [201911056536](https://www.permitgraph.org/p/201911056536) | Nov 5, 2019 | Completed: final sign-off Apr 2020 | [1399 Mcallister St](https://www.permitgraph.org/a/0778/013) | replace rear stairs in kind | $12,000 |
| [201910255602](https://www.permitgraph.org/p/201910255602) | Oct 25, 2019 | Completed: final sign-off Nov 2021 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs. | $1,500,000 |
| [201905019467](https://www.permitgraph.org/p/201905019467) | May 1, 2019 | Completed: final sign-off Aug 2020 | [1570 Burke Av](https://www.permitgraph.org/a/5203/066) | emergency generator installation into newly remodeled warehouse under pa# 2016/12/19/5336. ** maher: n/a ** | $100,000 |
| [201812188668](https://www.permitgraph.org/p/201812188668) | Dec 18, 2018 | Completed: final sign-off Feb 2019 | [100 Van Ness Av](https://www.permitgraph.org/a/0814/020) | provide electrical, hook-up power to 2 new overhead rolling doors, relocate 3 (e) light fixtures | $5,000 |
| [M1014887](https://www.permitgraph.org/p/M1014887) | Dec 10, 2018 | Never finaled: issued Dec 2018, no final | [333 Golden Gate Av](https://www.permitgraph.org/a/0347/017) | street space |  |
| [201810254106](https://www.permitgraph.org/p/201810254106) | Oct 25, 2018 | Completed: final sign-off May 2021 | [250 Howard St](https://www.permitgraph.org/a/3718/037) | revision to 201804274732 s3 for 4 new elevator stops at level 12, (4) new elevator stop at level 25, new elevator lobbies at levels 12 & 25, relocation of restroooms at levels 12 & 25 and additional… | $250,000 |
| [201809170529](https://www.permitgraph.org/p/201809170529) | Sep 17, 2018 | Completed: final sign-off Apr 2019 | [250 Howard St](https://www.permitgraph.org/a/3718/040) | revision to 201604274732 for use of 2 hours rated wrap in selected areas on level 1,44, 45 where gypsum board soffit enclosures cannot be constructed to fully enclose fuel oil lines | $10,000 |
| [201807315999](https://www.permitgraph.org/p/201807315999) | Jul 31, 2018 | Never finaled: issued Aug 2018, no final | [250 Howard St](https://www.permitgraph.org/a/3718/037) | emergency evacuation signs for 45 story bldg per sffd ab2.11. **maher n/a** | $25,000 |
| [201807195002](https://www.permitgraph.org/p/201807195002) | Jul 19, 2018 | Never finaled: issued Apr 2019, no final | [452 Larkin St](https://www.permitgraph.org/a/0346/010) | remodeling of all units only kitchens (14) and bathrooms (14). no structural. | $280,000 |
| [201806262965](https://www.permitgraph.org/p/201806262965) | Jun 26, 2018 | Completed: final sign-off Aug 2020 | [1570 Burke Av](https://www.permitgraph.org/a/5203/066) | electrical tap into the line side of existing main switch board for the new elec fire pump. ref pa# 2016/12/19/5336. ** maher: n/a ** | $25,000 |
| [201804257383](https://www.permitgraph.org/p/201804257383) | Apr 25, 2018 | Completed: final sign-off Oct 2019 | [250 Howard St](https://www.permitgraph.org/a/3718/037) | revision to pa 2015-04-27-4732 s3 of new 45 stories high rise office building per drawings. |  |
| [201802272391](https://www.permitgraph.org/p/201802272391) | Feb 27, 2018 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/037) | revision to 201504274732 s3 for updates to mech fire smoke damper schedule & fan damper matrix. updated mech plan maher na |  |
| [201801098177](https://www.permitgraph.org/p/201801098177) | Jan 9, 2018 | Completed: final sign-off Aug 2019 | [175 Beale St](https://www.permitgraph.org/a/3718/025) | new park on beale and mission st | $250,000 |
| [201712217090](https://www.permitgraph.org/p/201712217090) | Dec 21, 2017 | Completed: final sign-off Jan 2022 | [1995 Evans Av](https://www.permitgraph.org/a/5231/004) | to erect 3 stories, no basement, type ii-a full sprinkler, office, lab, assembly, parking garabe, storage building. (b,a-3,f-1,s-1,s-2) | $76,500,000 |
| [201712186775](https://www.permitgraph.org/p/201712186775) | Dec 18, 2017 | Completed: final sign-off Aug 2019 | [110 Main St](https://www.permitgraph.org/a/3718/027) | new park on corner of howard & main | $600,000 |
| [M851607](https://www.permitgraph.org/p/M851607) | Nov 3, 2017 | Never finaled: issued Nov 2017, no final | [250 Howard St](https://www.permitgraph.org/a/3718/037) | street space |  |
| [201710100828](https://www.permitgraph.org/p/201710100828) | Oct 10, 2017 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/037) | revision to app#201504274732 s3 for mase flashing ( interior water proofing) details for fsae lobbies . |  |
| [201708084134](https://www.permitgraph.org/p/201708084134) | Aug 8, 2017 | Completed: final sign-off Mar 2018 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | revision to permit #201406269545 s3. to facilitate fire alarm system review and show locations of fire rated shafts and shaft bottoms, and reflect options exercised from s5 - elevators and elevator s… |  |
| [201708084141](https://www.permitgraph.org/p/201708084141) | Aug 8, 2017 | Completed: final sign-off Mar 2018 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load… |  |
| [201703131308](https://www.permitgraph.org/p/201703131308) | Mar 13, 2017 | Never finaled: issued Apr 2017, no final | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | nfpa 24 underground fire water - install 113' feet of 6" ductile iron mortar lined pipe. ref app#201609137617. n/a for maher. | $45,000 |
| [201702078853](https://www.permitgraph.org/p/201702078853) | Feb 7, 2017 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/025) | revision to 2015-04-27-4737 s2 (substructure & superstructure) for temp openings at levels b2-12 & level 14 & 27 elevator machine room framing. |  |
| [201610200809](https://www.permitgraph.org/p/201610200809) | Oct 20, 2016 | Completed: final sign-off Aug 2018 | [150 Van Ness Av](https://www.permitgraph.org/a/0814/014) | temporary construction. erection & operation of tower crane. | $50,000 |
| [201610180539](https://www.permitgraph.org/p/201610180539) | Oct 18, 2016 | Completed: final sign-off Aug 2018 | [150 Van Ness Av](https://www.permitgraph.org/a/0814/014) | temporary construction. erection & operation of tower crane | $50,000 |
| [201609137617](https://www.permitgraph.org/p/201609137617) | Sep 13, 2016 | Completed: final sign-off Dec 2017 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | sprinkler plans for wet system and preaction system. install to oh2 density design based on storage and lab uses | $500,000 |
| [201608185443](https://www.permitgraph.org/p/201608185443) | Aug 18, 2016 | Never finaled: issued Aug 2016, no final | [150 Van Ness Av](https://www.permitgraph.org/a/0814/014) | revision to ref pa 201604185012 - soil mix toe of soldier beam change f'c to 150psi to 2500psi maher na |  |
| [201608114757](https://www.permitgraph.org/p/201608114757) | Aug 11, 2016 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/025) | erect and install a luffing jib tower crane to construct 43 story office building. n/a for maher. ref #2015-0427-4732. | $200,000 |
| [201607293773](https://www.permitgraph.org/p/201607293773) | Jul 29, 2016 | Completed: final sign-off Mar 2018 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maher |  |
| [201604185016](https://www.permitgraph.org/p/201604185016) | Apr 18, 2016 | Completed: final sign-off Jul 2017 | [55 Polk St](https://www.permitgraph.org/a/0814/019) | temporary lateral support of excavation for new consturction & long-term vertical support of (e) structure by means of solant drilled beams, wood lagging, tieback. (related to new construction pa# 20… | $190,000 |
| [201604185012](https://www.permitgraph.org/p/201604185012) | Apr 18, 2016 | Completed: final sign-off Jul 2017 | [150 Van Ness Av](https://www.permitgraph.org/a/0814/014) | temporary lateral support of excavation for new consturction by means of soldier beams, wood lagging, tieback & rakers. refer to new construction pa# 2014/06/13/8394. ** maher: n/a ** | $750,000 |
| [201512034127](https://www.permitgraph.org/p/201512034127) | Dec 3, 2015 | Completed: final sign-off Mar 2021 | [1419 Bryant St](https://www.permitgraph.org/a/3904/002) | 2 new stories within (e) envelope. no change in building height. renovate (e) bldg to accomodate change of use from mta facility to animal care & control. (e) brick envelop to remain with new struct… | $26,500,000 |
| [201511122414](https://www.permitgraph.org/p/201511122414) | Nov 12, 2015 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/025) | temporary shoring for subsurface construction ref pa 2015-0427-4732s. maher na | $200,000 |
| [201511041742](https://www.permitgraph.org/p/201511041742) | Nov 4, 2015 | Completed: final sign-off Mar 2018 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | shop drawings submittal of 18" pre-cast piles for deep foundation system of proposed new building under permit application #201406269545 s. |  |
| [201508315621](https://www.permitgraph.org/p/201508315621) | Aug 31, 2015 | Completed: final sign-off Dec 2018 | [250 Howard St](https://www.permitgraph.org/a/3718/025) | installation of test pile drill shaft. reference to new building permit application #201504274732. maher na | $35,000 |
| [201508285592](https://www.permitgraph.org/p/201508285592) | Aug 28, 2015 | Completed: final sign-off Mar 2019 | [195 Beale St](https://www.permitgraph.org/a/3718/012) | temporary relocate 1 story concrete building to off site facility. temporary off-side location sheedy yard on sf prot property and supports at off-site location on separate permit. n/a maher ord. 155… | $35,000 |
| [201504274732](https://www.permitgraph.org/p/201504274732) | Apr 27, 2015 | Completed: final sign-off Oct 2019 | [250 Howard St](https://www.permitgraph.org/a/3718/025) | construct (n) 45-story office building | $239,000,000 |
| [201406269545](https://www.permitgraph.org/p/201406269545) | Jun 26, 2014 | Completed: final sign-off Mar 2018 | [1 Newhall St](https://www.permitgraph.org/a/4570/030) | interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of… | $28,000,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/clark-construction-group-ca-lp-839892.