# Cjb Communications Inc

Contractor license 1026057. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/cjb-communications-inc-1026057
- JSON: https://www.permitgraph.org/api/contractor?license=1026057
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1026057

6 permits since 2000: 2 completed, 3 in progress, 1 never finaled. Typically 340 days from filing to permit and 68 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: Woodland
- On San Francisco permits: Jan 2014 to Aug 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 0 | 0 | 1 | 0 |
| 2016 | 2 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |
| 2026 | 0 | 2 | 0 | 0 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202608116377](https://www.permitgraph.org/p/202608116377) | Aug 11, 2026 | In progress: issued Aug 2026 | [2300 Sutter St](https://www.permitgraph.org/a/1051/036) | revision to 202507301916: (t-mobile) revision to steel beam connection @ rooftop, steel beam end is short, need to add to beam to reach connection point |  |
| [202607165126](https://www.permitgraph.org/p/202607165126) | Jul 16, 2026 | In progress: issued Jul 2026 | [2300 Sutter St](https://www.permitgraph.org/a/1051/036) | revision 202507301916- changes include replace (e) 100amp panel with (n) 200 amp panel. install (n) 200 amp subpanel. structural saddle connection between (n) column and (n) beam. blocking at stud st… |  |
| [202507301916](https://www.permitgraph.org/p/202507301916) | Jul 30, 2025 | In progress: issued May 2026 | [2300 Sutter St](https://www.permitgraph.org/a/1051/036) | remove of existing antenna, install 6 (n) antennas within (3) (n) frp boxes. remove (1) cabinet, install (2) (n) cabinets, (1) (net cabinet gain). install (1) (n) 200 amp breaker inside (e) panel, re… | $87,000 |
| [201611072106](https://www.permitgraph.org/p/201611072106) | Nov 7, 2016 | Completed: final sign-off Mar 2018 | [2690 Geary Bl](https://www.permitgraph.org/a/1071/004) | verizon: modify an (e) roof site: install 700 & aws-1 rrus. add 3 pcs rrus 12&a2 units & associated cabling @ (e) antenna sector. all behind (e) frp screen. previous work done under 2014-0107-5705. m… | $20,000 |
| [201601086706](https://www.permitgraph.org/p/201601086706) | Jan 8, 2016 | Completed: final sign-off Jan 2018 | [601 Van Ness Av](https://www.permitgraph.org/a/0762/026) | replace e (9) antennas with new antennas add 18 rru total units to penthouse wall, add 3 raycaps to penthouse wall and 3 inside shelter . add 1 microwave dish and frp screen box over antennas verizon… | $40,000 |
| [201401075705](https://www.permitgraph.org/p/201401075705) | Jan 7, 2014 | Never finaled: issued Nov 2017, no final | [2690 Geary Bl](https://www.permitgraph.org/a/1071/004) | verizon wireless proposes to replace three existing lte antennas w/ three new dual-bond antennas, add three new rrh units, raycap surge protection devices, hybrid and ret cables. | $18,000 |

---