Back to bathroom remodel contractors
Chin Pang Construction Co ***Check Id***
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Dec 2018
- Last 24 months
- 0 permits filed
135 permits since 2000: 128 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 41 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2014 | Completed final sign-off May 2014 | 260 Tingley St | remodel kitchen, (1) bathroom at second floor.Details
remodel kitchen, (1) bathroom at second floor. | $13,000 |
| May 31, 2013 | Completed final sign-off Jul 2013 | 1350 Felton St | partial remodel for 2 of bathrooms i.e. (e) uper walls and ceilings remained; replace 2 bath tubs, 2 water closets, 2 sinks and 2 lightings. mechanical ventilation is required. lightings to comply with cec 150(k).Details
partial remodel for 2 of bathrooms i.e. (e) uper walls and ceilings remained; replace 2 bath tubs, 2 water closets, 2 sinks and 2 lightings. mechanical ventilation is required. lightings to comply with cec 150(k). | $8,000 |
| Dec 18, 2012 | Completed final sign-off May 2013 | 2075 42nd Av | kitchen remodel & adding (n) bathroom at 2nd floor as per plan. no work at (e) ground fl & no change of exterior house.Details
kitchen remodel & adding (n) bathroom at 2nd floor as per plan. no work at (e) ground fl & no change of exterior house. | $32,000 |
| Oct 22, 2012 | Completed final sign-off Feb 2013 | 1531 33rd Av | remodel ground floor to have 1 family room, 1 full bathroom, wet bar & laundry room. install new gas furnace & water heater in garageDetails
remodel ground floor to have 1 family room, 1 full bathroom, wet bar & laundry room. install new gas furnace & water heater in garage | $42,000 |
| Oct 9, 2012 | Completed final sign-off Jan 2013 | 187 Victoria St | add 1 full bath on ground floorDetails
add 1 full bath on ground floor | $8,000 |
| Jul 16, 2012 | Completed final sign-off Jul 2012 | 1584 48th Av | ground floor unit partial bathroom remodel - extensive shower to 32" x36", change toilet, vanity, wall light.Details
ground floor unit partial bathroom remodel - extensive shower to 32" x36", change toilet, vanity, wall light. | $3,500 |
| Jun 18, 2012 | Completed final sign-off Jul 2012 | 2825 26th St | #g - remodel 1 bathroom, lighting to comply with cec 150 (k).Details
#g - remodel 1 bathroom, lighting to comply with cec 150 (k). | $5,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 1670 46th Av | remodel existing bath at 2nd fl and change existing sliding door to a regular door. change existing (3) windows in kind to double pane. repair all dryrot siding around house.Details
remodel existing bath at 2nd fl and change existing sliding door to a regular door. change existing (3) windows in kind to double pane. repair all dryrot siding around house. | $20,000 |
| Dec 23, 2011 | Completed final sign-off Jan 2012 | 1120 Cole St | kitchen change cabinet with counter top, bathroom remodel, no change structural, no structural work, new lighting to comply with cec150(k)Details
kitchen change cabinet with counter top, bathroom remodel, no change structural, no structural work, new lighting to comply with cec150(k) | $1,500 |
| Jul 1, 2011 | Completed final sign-off Aug 2011 | 514 Vicente St | remodel 1 bathroom, 1 kitchen, change furnace, no change to walls windows or doors, lighting to comply with cec 150(k)Details
remodel 1 bathroom, 1 kitchen, change furnace, no change to walls windows or doors, lighting to comply with cec 150(k) | $18,000 |
| Oct 4, 2010 | Completed final sign-off Oct 2010 | 610 Clement St | remodel bathroom, change skylight cracks glass, change stained ceiling tiles, replace front window wood broken trim, provide high efficency lights or "manuel on" occupancy sensor.Details
remodel bathroom, change skylight cracks glass, change stained ceiling tiles, replace front window wood broken trim, provide high efficency lights or "manuel on" occupancy sensor. | $9,000 |
| Aug 25, 2010 | Completed final sign-off Sep 2010 | 777 35th Av | replace kitchen cabinet, counter top, (wall and ceiling remain) replace bathroom fixtures, tile. (wall and ceiling remain).Details
replace kitchen cabinet, counter top, (wall and ceiling remain) replace bathroom fixtures, tile. (wall and ceiling remain). | $500 |
| Jun 1, 2010 | Completed final sign-off Jun 2010 | 3 Willard North St | unit #3: change bath tub to shower, change toilet, sink floor tile, no lights (new)Details
unit #3: change bath tub to shower, change toilet, sink floor tile, no lights (new) | $3,900 |
| Mar 29, 2010 | Completed final sign-off May 2010 | 1244 Jones St | bathroom remodel in unit 1244. no change to exhaust system. high efficacy lighting or occupancy sensor control.Details
bathroom remodel in unit 1244. no change to exhaust system. high efficacy lighting or occupancy sensor control. | $7,300 |
| Dec 30, 2009 | Completed final sign-off Jan 2010 | 1202 38th Av | change kitchen cabinets, countertop (wall & ceiling to remain). change bathroom tiles & fixtures, add the ceiling fan. wall & ceiling remain, upgrade those power. no new walls or structural work. all work done on 1202 38th ave.Details
change kitchen cabinets, countertop (wall & ceiling to remain). change bathroom tiles & fixtures, add the ceiling fan. wall & ceiling remain, upgrade those power. no new walls or structural work. all work done on 1202 38th ave. | $12,000 |
| Dec 14, 2009 | Completed final sign-off Feb 2010 | 2050 Leavenworth St | remodel & divide one bath into two bath. no any structure work or change. work on 2050 leavenworth.Details
remodel & divide one bath into two bath. no any structure work or change. work on 2050 leavenworth. | $12,000 |
| Mar 25, 2009 | Completed final sign-off Apr 2009 | 2116 Cabrillo St | remodel (e) full bath with (n) fixtures and finshes. rwemodel (e) sunroom with new windows annd finishes. convert (e) storage room into new half bathroom. all work on 2nd floorDetails
remodel (e) full bath with (n) fixtures and finshes. rwemodel (e) sunroom with new windows annd finishes. convert (e) storage room into new half bathroom. all work on 2nd floor | $17,000 |
| Sep 12, 2008 | Expired or cancelled withdrawn Jan 2009 | 2333 24th Av | remodel 2 kitchen, 2 bathrooms, 1 half bathroom for 2333 and 2335 24th av.no change of structure. upper units only.Details
remodel 2 kitchen, 2 bathrooms, 1 half bathroom for 2333 and 2335 24th av.no change of structure. upper units only. | $27,000 |
| Sep 10, 2008 | Completed final sign-off Jan 2009 | 301 18th Av | revision to appl #200806063831 to shift half bathroom in community room approx 6 ft. to south from original permit.Details
revision to appl #200806063831 to shift half bathroom in community room approx 6 ft. to south from original permit. | |
| Jul 17, 2008 | Completed final sign-off Dec 2008 | 2333 24th Av | legalize ground floor with 2 bedrooms, full bathroom, storage with laundry. water heater & gas furnaces in garage. comply with compliant # 200857390Details
legalize ground floor with 2 bedrooms, full bathroom, storage with laundry. water heater & gas furnaces in garage. comply with compliant # 200857390 | $2,000 |
| Jun 10, 2008 | Completed final sign-off Dec 2008 | 2145 Turk Bl | remodel bathroom. no change any structural on second floor. no lighting change.Details
remodel bathroom. no change any structural on second floor. no lighting change. | $6,400 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 301 18th Av | interior remodel - add a half bath.legalize (e) community room and convert (e) door to sliding door at (e) lightwell at ground floor.new furnace roomDetails
interior remodel - add a half bath.legalize (e) community room and convert (e) door to sliding door at (e) lightwell at ground floor.new furnace room | $20,000 |
| Oct 30, 2007 | Completed final sign-off Apr 2008 | 15 Wawona St | ground floor - add one bedroom, one family room & one full bathroom. add at ground floor.Details
ground floor - add one bedroom, one family room & one full bathroom. add at ground floor. | $35,000 |
| Sep 25, 2007 | Never finaled issued Sep 2007, no final | 3319 Divisadero St | convert protion of (e) garage into family room and bathroom. remove (2) existing posts @ garage and replace with beam.Details
convert protion of (e) garage into family room and bathroom. remove (2) existing posts @ garage and replace with beam. | $45,000 |
| Aug 1, 2007 | Completed final sign-off Oct 2007 | 185 Amber Dr | remodel kitchen and guest bathroomDetails
remodel kitchen and guest bathroom | $16,000 |
| May 1, 2007 | Completed final sign-off Nov 2007 | 2002 Pierce St | comply with nov# 200798932-half bathroom to be added at ground floor.Details
comply with nov# 200798932-half bathroom to be added at ground floor. | $6,000 |
| May 1, 2007 | Completed final sign-off Jul 2007 | 1895 47th Av | full bathroom to be added at ground floor. replace seven (e) windows with new in kind.Details
full bathroom to be added at ground floor. replace seven (e) windows with new in kind. | $20,000 |
| May 25, 2006 | Completed final sign-off Oct 2006 | 2226 36th Av | one bedrm, one bath rm, storage rm & family rm to be added at g/f.Details
one bedrm, one bath rm, storage rm & family rm to be added at g/f. | $40,000 |
| May 5, 2006 | Completed final sign-off Jan 2008 | 2466 43rd Av | create family room at street level space of bldg. expand partially to rear yard deck on 2/f above addition. full bath @ g/f. building envelope to be increased.Details
create family room at street level space of bldg. expand partially to rear yard deck on 2/f above addition. full bath @ g/f. building envelope to be increased. | $35,000 |
| Jun 8, 2005 | Completed final sign-off Aug 2005 | 301 18th Av | additional permit remodel apt# 3, # 5, #8. bathrooms remodel, change kitchen cabinets.Details
additional permit remodel apt# 3, # 5, #8. bathrooms remodel, change kitchen cabinets. | $25,000 |
| Apr 11, 2005 | Completed final sign-off Sep 2005 | 301 18th Av | upgrade the violation date 08/31/04. remodel 5 kitchens. 5 bathrooms of the unit#1,#2,#4,#6,#7. partDetails
upgrade the violation date 08/31/04. remodel 5 kitchens. 5 bathrooms of the unit#1,#2,#4,#6,#7. part | $70,000 |
| Sep 3, 2004 | Completed final sign-off Dec 2004 | 25 Casa Wy | remodeling the other bathroom on 2nd flr, replace 2 walls & ceiling plaster to sheetrock at 4th flr.Details
remodeling the other bathroom on 2nd flr, replace 2 walls & ceiling plaster to sheetrock at 4th flr. | $15,000 |
| Aug 11, 2004 | Completed final sign-off Dec 2004 | 25 Casa Wy | remodel bathroom,remove/replace fixtures,new sheetrock,no window changeDetails
remodel bathroom,remove/replace fixtures,new sheetrock,no window change | $12,000 |
| May 26, 2004 | Completed final sign-off Oct 2004 | 71 Gaviota Wy | kitchen, bathroom remodel,dry rot repair at fornt wall, no structure chane. (no structural work )Details
kitchen, bathroom remodel,dry rot repair at fornt wall, no structure chane. (no structural work ) | $28,000 |
| Dec 24, 2003 | Completed final sign-off Apr 2004 | 2049 Leavenworth St | bathroom remodel replace rooms plaster to sheetrockDetails
bathroom remodel replace rooms plaster to sheetrock | $8,500 |
| May 19, 2003 | Completed final sign-off Sep 2003 | 2635 37th Av | construct rooms (1 bedrm,1 study rm,1 utility rm & 1 full bath at grnd flr)Details
construct rooms (1 bedrm,1 study rm,1 utility rm & 1 full bath at grnd flr) | $30,000 |
| May 3, 2002 | Completed final sign-off Nov 2002 | 2427 15th Av | construct rooms and 1/2 bath at gr floor (2 bedrooms, 1 family room, 1- 1/2 bath)Details
construct rooms and 1/2 bath at gr floor (2 bedrooms, 1 family room, 1- 1/2 bath) | $28,000 |
| Feb 21, 2002 | Completed final sign-off Jun 2002 | 2630 16th Av | legalize existing rooms, 1 bedrm, 1 study rm, 1 full bath & working areaDetails
legalize existing rooms, 1 bedrm, 1 study rm, 1 full bath & working area | $25,000 |
| Jun 13, 2001 | Completed final sign-off Sep 2001 | 1526 40th Av | construct 1 guest room bath at ground floorDetails
construct 1 guest room bath at ground floor | $9,000 |
| Nov 30, 2000 | Completed final sign-off May 2001 | 1243 Leavenworth St | remodel kitchen,bathrooms,dry rot repair of clear the termite report. termite report#004355t by diveDetails
remodel kitchen,bathrooms,dry rot repair of clear the termite report. termite report#004355t by dive | $40,000 |
| Oct 10, 2000 | Completed final sign-off Apr 2001 | 365 Fair Oaks St | change kitchen cabinets, bathroom retile, install sheetrockDetails
change kitchen cabinets, bathroom retile, install sheetrock | $5,000 |
| Jun 6, 2000 | Completed final sign-off Aug 2000 | 745 Broderick St | remodel 2 bathrooms, reflooring and change counter topsDetails
remodel 2 bathrooms, reflooring and change counter tops | $11,000 |
| Apr 13, 2000 | Completed final sign-off Jun 2000 | 1350 Lake St | remodel kitchen & bathroom, change 2 water heater,2 elec meter, upgrade to 100 amp, dryrot repairDetails
remodel kitchen & bathroom, change 2 water heater,2 elec meter, upgrade to 100 amp, dryrot repair | $12,000 |