# Charles Pankow Builders Ltd

Contractor license 688972. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972
- JSON: https://www.permitgraph.org/api/contractor?license=688972
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=688972

252 permits since 2000: 216 completed, 2 in progress, 25 never finaled, 9 expired or cancelled. Typically 52 days from filing to permit and 403 days from permit to final inspection. Of the 25 never-finaled permits, 9 are 5 to 10 years old, 16 are over 10 years old.

- Based in: Pasadena
- On San Francisco permits: Jul 2000 to Nov 2026
- Last 24 months: 2 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2000 | 1 | 0 | 0 | 1 |
| 2002 | 1 | 0 | 0 | 0 |
| 2005 | 0 | 0 | 0 | 2 |
| 2010 | 1 | 0 | 0 | 0 |
| 2011 | 3 | 0 | 3 | 0 |
| 2012 | 23 | 0 | 3 | 0 |
| 2013 | 11 | 0 | 4 | 1 |
| 2014 | 21 | 0 | 3 | 0 |
| 2015 | 25 | 0 | 3 | 0 |
| 2016 | 19 | 0 | 1 | 2 |
| 2017 | 33 | 0 | 1 | 0 |
| 2018 | 27 | 0 | 1 | 1 |
| 2019 | 11 | 0 | 3 | 2 |
| 2020 | 24 | 0 | 1 | 0 |
| 2021 | 10 | 0 | 2 | 0 |
| 2022 | 3 | 0 | 0 | 0 |
| 2023 | 1 | 0 | 0 | 0 |
| 2024 | 2 | 0 | 0 | 0 |
| 2025 | 0 | 1 | 0 | 0 |
| 2026 | 0 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 4 | 4 | 0 | 0 | 0 | 55 | 240 |
| Stairs | 15 | 13 | 0 | 2 | 0 | 59 | 142 |
| Kitchen remodel | 4 | 2 | 0 | 2 | 0 | 16 | 558 |
| Deck | 2 | 1 | 0 | 1 | 0 | 13 | 581 |
| Bathroom remodel | 1 | 1 | 0 | 0 | 0 | 230 | 635 |
| Pergola or trellis | 1 | 1 | 0 | 0 | 0 | 84 | 286 |

## Most recent permits

The 100 most recent of 252.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202611170860](https://www.permitgraph.org/p/202611170860) | Nov 17, 2026 | In progress: filed Nov 2026, not yet issued | [2868 Mission St](https://www.permitgraph.org/a/6516/007) | voluntary seismic improvement project including a soft-story and reroofing retrofit. addressing out of plane anchorage and strengthening diaphragms at select locations. the soft story retrofit requir… | $15,370,370 |
| [202508112713](https://www.permitgraph.org/p/202508112713) | Sep 5, 2025 | In progress: issued Oct 2025 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/012) | replace broken door and sidelight screens on level 3 and 4 | $58,376 |
| [202407156444](https://www.permitgraph.org/p/202407156444) | Jul 15, 2024 | Completed: final sign-off Mar 2025 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/012) | revision to 202305268668. added phasing drawings to address fire marchall's comments regarding egress & operation of the smoke control doors being replaced during construction |  |
| [202402015046](https://www.permitgraph.org/p/202402015046) | Feb 1, 2024 | Completed: final sign-off Mar 2024 | [169 Steuart St](https://www.permitgraph.org/a/3715/007) | revision to pa# 202109017557, mechanical title 24. |  |
| [202305268668](https://www.permitgraph.org/p/202305268668) | May 26, 2023 | Completed: final sign-off Mar 2025 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/012) | revision to pa# 202206085877 to reduce scope of work: remove vestibule prev approved. change to some doors. |  |
| [202212057678](https://www.permitgraph.org/p/202212057678) | Dec 5, 2022 | Completed: final sign-off Nov 2023 | [2350 San Jose Av](https://www.permitgraph.org/a/6973/039) | prop h: new non-profit child development center / child care facility t.i.. new play areas, 3 classrooms, additional administrative spaces. warm space is a warm shell per mohcd guidelines. parking, e… | $2,540,000 |
| [202206085877](https://www.permitgraph.org/p/202206085877) | Jun 8, 2022 | Completed: final sign-off Mar 2025 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/012) | demolition of (e) doors on levels 1,3, & 10 and to be replaced with new doors and a new vestibule at one location on level 1 and replacement of the walk-off mat with stone. | $2,800,000 |
| [202202248652](https://www.permitgraph.org/p/202202248652) | Feb 24, 2022 | Completed: final sign-off Aug 2026 | [1801 25th St](https://www.permitgraph.org/a/4285B/001) | tenant improvements, and new play areas.t.i. improvement commericial prjt including 4 classrooms & additional admin spaces.age-approp play areas for childring are provided in the outdoor space.childc… | $2,700,000 |
| [202112083952](https://www.permitgraph.org/p/202112083952) | Dec 8, 2021 | Completed: final sign-off Mar 2024 | [169 Steuart St](https://www.permitgraph.org/a/3715/007) | rev to pa202109011557: relocationg of new walls, power, light fixtures, mech registers on 1/f west and 1/f. added outlets, data ports and 1 light fixtures, power distribution and data routing updated… | $8,000 |
| [202109017557](https://www.permitgraph.org/p/202109017557) | Sep 1, 2021 | Completed: final sign-off Mar 2024 | [169 Steuart St](https://www.permitgraph.org/a/3715/007) | interior renovation of portions of the (e) 1st fl, 2nd fl, 3rd fl and 4th floor of the embarcadero ymca including removal and additions of interior partitions, floor finish, doors, light fixtures, co… | $1,297,738 |
| [202106303527](https://www.permitgraph.org/p/202106303527) | Jun 30, 2021 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | revision to 202006158759. door 226 lacks req latch-side clearane on the side of the door. revision add an electric strike and relocate the card reader clean of the door clearane obstruction. revised… |  |
| [202106162610](https://www.permitgraph.org/p/202106162610) | Jun 16, 2021 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | revision to core/shell permit 202006158760. provide cand readers and signage to lock the level 4 elevator lobby doors while providing access to egress stairs. fire life safetey under separate permit | $500 |
| [202104017748](https://www.permitgraph.org/p/202104017748) | Apr 1, 2021 | Never finaled: issued May 2021, no final | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | emergency evacuation signs | $6,000 |
| [202103257314](https://www.permitgraph.org/p/202103257314) | Mar 25, 2021 | Completed: final sign-off May 2021 | [909 Montgomery St](https://www.permitgraph.org/a/0163/005) | 4th fl: electrical & mechanical design. title 24. ref pa# 202010196842. | $35,000 |
| [202102184898](https://www.permitgraph.org/p/202102184898) | Feb 18, 2021 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | revision to pa# 201810294388. addition of a smoke detector access panel at the elevator hoistway. |  |
| [202102184918](https://www.permitgraph.org/p/202102184918) | Feb 18, 2021 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | install vinyl entrance sign "333 valencia wic clinic" 3.08 sf | $500 |
| [202102104382](https://www.permitgraph.org/p/202102104382) | Feb 10, 2021 | Completed: final sign-off May 2021 | [909 Montgomery St](https://www.permitgraph.org/a/0163/005) | suite #400: revision to app#202010196842. modifications to extg a0.0 cover sheet regarding sprinkler system and construction type. all revisions clouded as bulletin 01, delta 2.2 |  |
| [202101273442](https://www.permitgraph.org/p/202101273442) | Jan 27, 2021 | Completed: final sign-off Aug 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | 2nd fl ti fire alarm: scope of work is to provide a tenant improvement to the existing fire alarm system for the existing building. the system include: 1) module and detectors for fan control supervi… | $100,000 |
| [202101273443](https://www.permitgraph.org/p/202101273443) | Jan 27, 2021 | Never finaled: issued Mar 2021, no final | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | level 3: t.i. to the existing f/a ystem for existing bldg. system will include: 1. modules and detectors for fan control and supervision. 2. modules & detectors for fire smoke dampers control & super… | $100,000 |
| [202101273441](https://www.permitgraph.org/p/202101273441) | Jan 27, 2021 | Completed: final sign-off Aug 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | the scope of the work is to provide a tenant improvement to the existing f/a system for 333 valencia. this system will include: 1. modules and detectors for fan control and supervision, and fire smok… | $100,000 |
| [202012221544](https://www.permitgraph.org/p/202012221544) | Dec 22, 2020 | Never finaled: issued Feb 2021, no final | [909 Montgomery St](https://www.permitgraph.org/a/0163/005) | we are submitting electrical design drawings for approval. current project has a bldg permit# 202009234856 | $300,000 |
| [202012211506](https://www.permitgraph.org/p/202012211506) | Dec 21, 2020 | Completed: final sign-off Feb 2022 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | due to an in-field determination from sffd, this is to document the addition of mushroom-type egress buttons on secured access doors on levels 4 & 5 of 49 south van ness to aid in emergency egress. | $5,000 |
| [202011309864](https://www.permitgraph.org/p/202011309864) | Nov 30, 2020 | Completed: final sign-off Apr 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | add 26 upright sprinklers and 55 new pendent ceiling sprinklers for new tenant imprvement on the 2nd fl. architectural permit is 2020 0615 8759. | $25,000 |
| [202011309866](https://www.permitgraph.org/p/202011309866) | Nov 30, 2020 | Completed: final sign-off Apr 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | add 14 upright sprinklers and 26 new pendent ceiling sprinklers for new tenant imrprovement on the 4th fl. architectural permits is pa# 2020 0615 8760 | $25,000 |
| [202011309856](https://www.permitgraph.org/p/202011309856) | Nov 30, 2020 | Completed: final sign-off Apr 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | add 25 upright sprinklers and 47 new pendent ceiling sprinklers for new tenant improvement on the 3rd fl. arch pa# is 2020 0615 8758. | $25,000 |
| [202011027966](https://www.permitgraph.org/p/202011027966) | Nov 2, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | revision to pa# 202002103977. revisions due to arch changes under pa# 202007079711. work include: 1) revision to hvac & plumbing layout on 1st-4th fl to accommodate shaft relocation due to addition o… | $10,000 |
| [202010196842](https://www.permitgraph.org/p/202010196842) | Oct 19, 2020 | Completed: final sign-off May 2021 | [909 Montgomery St](https://www.permitgraph.org/a/0163/005) | suite #400: modification to an existing ti. new non-bearing partitions, modify existing ceiling, lighting and electrical for new parition layout. relocate existing mech for new parition layout. | $300,000 |
| [202010086190](https://www.permitgraph.org/p/202010086190) | Oct 8, 2020 | Completed: final sign-off Mar 2021 | [131 Steuart St](https://www.permitgraph.org/a/3715/025) | revision to pa 202008041076. minor changes based on in-field discoveries. changes include - slight modification to beam strength details, changes to column strengthening knee braces. |  |
| [202009295459](https://www.permitgraph.org/p/202009295459) | Sep 29, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | 3rd floor: priority processing. mep for previously submitted plans under pa# 202006158758. | $100,000 |
| [202009295460](https://www.permitgraph.org/p/202009295460) | Sep 29, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | 4th floor: priority processing. mep for previously submitted plans under pa# 202006158760. | $100,000 |
| [202009295458](https://www.permitgraph.org/p/202009295458) | Sep 29, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | 2nd floor: priority processing. mep for previously submitted plans under pa# 202006158759. | $100,000 |
| [202009234856](https://www.permitgraph.org/p/202009234856) | Sep 23, 2020 | Completed: final sign-off Apr 2021 | [909 Montgomery St](https://www.permitgraph.org/a/0163/005) | removal of existing internal communicating stair & associated structural between 3rd and 4th floor. also infill of slab at the 4th floor. | $225,000 |
| [202008041076](https://www.permitgraph.org/p/202008041076) | Aug 4, 2020 | Completed: final sign-off Mar 2021 | [131 Steuart St](https://www.permitgraph.org/a/3715/025) | voluntary seismic strengthening of existing steel lateral system & limited to corrections to steel braced frame detailing at the ground level of the bldg for improved ductility & seismic performance.… | $95,000 |
| [202007079711](https://www.permitgraph.org/p/202007079711) | Jul 7, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | revision to permit app #2018-1029-4388. addition of a 2nd elevator located directly south of the previously permitted elevator. the elevator control room on level 1 has been moved. each gendered rest… | $200,000 |
| [202007069626](https://www.permitgraph.org/p/202007069626) | Jul 6, 2020 | Completed: final sign-off Apr 2025 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | sffd only review; revision to approved pa# 201705055487-s2 & approved revision pa# 202001232617. minor revision to the smoke control matrix to conform to approved smoke control report dated 12/6/19.… |  |
| [202007069627](https://www.permitgraph.org/p/202007069627) | Jul 6, 2020 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | pid plan check review only for this alteration regarding pa# 201606200387-s28 (mep - child day care center) ** maher: n/a ** |  |
| [202006208953](https://www.permitgraph.org/p/202006208953) | Jun 20, 2020 | Completed: final sign-off Mar 2022 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | alteration to the issued pa# pa# 201606200387-s14 (fire alarm). ** maher: n/a ** | $45,000 |
| [202006208954](https://www.permitgraph.org/p/202006208954) | Jun 20, 2020 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to the issued pa# 201606200387-s27 (mep-office interiors), updated basis of design for server room & storage room housing av equipment mechanical scope. ** maher: n/a ** | $250,000 |
| [202006158759](https://www.permitgraph.org/p/202006158759) | Jun 15, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | 2nd fl ti - tenant improvement project for the entire 2nd level of the building. use is business/office and the tenant is the city of san francisco department of health. the tenant areas contain meet… | $2,600,000 |
| [202006158758](https://www.permitgraph.org/p/202006158758) | Jun 15, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | tenant improvement project for the entire 3rd level of the building. the use is business / office and the tenant is the city of san francisco department of health. the tenant areas contain meeting ro… | $2,600,000 |
| [202006158760](https://www.permitgraph.org/p/202006158760) | Jun 15, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | tenant improvement for the 4th fl. the use is business / office and the tenant is the city of sf department of health. the tenant areas contain meeting rooms, private offices, open office and break a… | $2,600,000 |
| [202005157559](https://www.permitgraph.org/p/202005157559) | May 15, 2020 | Completed: final sign-off Apr 2022 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to issued addendum 8 (fire sprinklers) for pa#201606200387. pre-action is special fire sprinkler system in the mdf room (w/servers, it equipment). pipes in the room are dry, only fill w/wate… |  |
| [202002103977](https://www.permitgraph.org/p/202002103977) | Feb 10, 2020 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | ductwork rooftop unit, ac equipment, air devices and accessorries per bldg permit 201810294388(architectural). project scope on plans | $190,000 |
| [202001232617](https://www.permitgraph.org/p/202001232617) | Jan 23, 2020 | Completed: final sign-off Aug 2021 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | revision to approved pa #201705055847 s-2 (arch/mech): updates to smoke control report due to removal of smoke partition & fs on 12th fl. changing "smoke barrier" to "smoke partition". updates to roo… |  |
| [202001222535](https://www.permitgraph.org/p/202001222535) | Jan 22, 2020 | Completed: final sign-off May 2022 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | photovoltaic system for the office bldg.**maher n/a** |  |
| [201912189894](https://www.permitgraph.org/p/201912189894) | Dec 18, 2019 | Completed: final sign-off Apr 2023 | [131 Steuart St](https://www.permitgraph.org/a/3715/025) | mep: mech-install n bsmt ventilation system. a small portion of e bsmt will be renovate mep systems. project proposes no new rooms or space & all work is completed in spaces freq. by mainte. personel… | $482,174 |
| [201912038531](https://www.permitgraph.org/p/201912038531) | Dec 3, 2019 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to the issued addendum 4 (architectural) for pa #2016-0620-0387 s4; pavilion updates. |  |
| [201911137159](https://www.permitgraph.org/p/201911137159) | Nov 13, 2019 | Completed: final sign-off Apr 2022 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to the issued fire sprinkler addendum s8 reference pa# 2016-0620-0387 s8 for the office tower |  |
| [201910316096](https://www.permitgraph.org/p/201910316096) | Oct 31, 2019 | Completed: final sign-off Aug 2021 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | rev to pa# 201705055847; clarification re elevator landing floor numering per sfab-090, removal of reference to occupancy group "f-1" from code summary sheet, addition of smoke conrol panel drawing n… |  |
| [201910184888](https://www.permitgraph.org/p/201910184888) | Oct 18, 2019 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | mechanical drawing modifications to the issued pa# 2016/06/20/0387-s6 (mech). ** maher: n/a ** |  |
| [201909101126](https://www.permitgraph.org/p/201909101126) | Sep 10, 2019 | Completed: final sign-off Feb 2020 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 10th fl, ste 1000 - tenant improvement for office space - 3000 sf new non rated partitions, acoustical ceiling, mechanical & electrical | $300,000 |
| [201908290217](https://www.permitgraph.org/p/201908290217) | Aug 29, 2019 | Never finaled: issued Nov 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | alteration of hoistway of (2) passenger elevators, elevator #1 (e) basement winding drm equip. to be removed and replaced w/basement geared traction equipment, elevator #2 (e) bsement geared traction… | $140,000 |
| [201908209367](https://www.permitgraph.org/p/201908209367) | Aug 20, 2019 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | rev to pa# 201606200387, s6; firefighter smoke control panel |  |
| [201907095382](https://www.permitgraph.org/p/201907095382) | Jul 9, 2019 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to pa 2016-0620-0387 s4 (arch) clarifying location of elevator hoistway fire alarm device access doors. |  |
| [201907024997](https://www.permitgraph.org/p/201907024997) | Jul 2, 2019 | Never finaled: issued Aug 2019, no final | [944 Market St](https://www.permitgraph.org/a/0341/006) | demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit. | $120,509 |
| [M1102407](https://www.permitgraph.org/p/M1102407) | Jun 28, 2019 | Never finaled: issued Jun 2019, no final | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | street space |  |
| [201903215927](https://www.permitgraph.org/p/201903215927) | Mar 21, 2019 | Completed: final sign-off Apr 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | revision to app#20160512726753 s3 per dbi inspector in field request added detail of penetration through rated horizontal asembly no other sheets are added to the permitted drawing set, add a71 |  |
| [201902082527](https://www.permitgraph.org/p/201902082527) | Feb 8, 2019 | Completed: final sign-off Feb 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | revision to app#201605127267(s6) clarifications to sheet fai-02 sequence of operations for conformance to the approved smoke control report. |  |
| [201901241148](https://www.permitgraph.org/p/201901241148) | Jan 24, 2019 | Expired or cancelled: withdrawn Dec 2019 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | revision to tower crane#2 tie-in for office bldg. (pa# 201804126232). maher n/a. |  |
| [201901039601](https://www.permitgraph.org/p/201901039601) | Jan 3, 2019 | Completed: final sign-off Feb 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | evacuation signage for building. (55 evac maps) | $20,000 |
| [201901039607](https://www.permitgraph.org/p/201901039607) | Jan 3, 2019 | Expired or cancelled: cancelled Oct 2022 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | storm water reuse/retention. pid plan review. per #pw20160719130 issued 7/19/16. per #pp20181012693 issued 10/12/18. maher n/a. |  |
| [201812107846](https://www.permitgraph.org/p/201812107846) | Dec 10, 2018 | Completed: final sign-off Aug 2021 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | temp tower crane installation for construction use. ref 201705055847s. | $100,000 |
| [201811286924](https://www.permitgraph.org/p/201811286924) | Nov 28, 2018 | Completed: final sign-off Apr 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | rev to pa# 20160512726753; food service equipment drawings for 1st fl. pantry/eating area | $2,000 |
| [201810294388](https://www.permitgraph.org/p/201810294388) | Oct 29, 2018 | Completed: final sign-off Nov 2021 | [333 Valencia St](https://www.permitgraph.org/a/3547/017) | renovation of (e) 4-story bldg- exterior & interior core elements: adding (2) new egress stairs, elevator, (n) restrooms @ each flr lvl, (n) bicycle storage rm, (n) exterior windows on east wall. str… | $6,950,000 |
| [201810264261](https://www.permitgraph.org/p/201810264261) | Oct 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | revision to bpa 201708255962. for fire review only. |  |
| [201810233953](https://www.permitgraph.org/p/201810233953) | Oct 23, 2018 | Never finaled: issued Oct 2018, no final | [701 03rd St](https://www.permitgraph.org/a/3794/006) | fire only permit, record keeping permit for assembly space occupant stamp |  |
| [201810163277](https://www.permitgraph.org/p/201810163277) | Oct 16, 2018 | Completed: final sign-off May 2019 | [135 Main St](https://www.permitgraph.org/a/3717/012) | 18th flr. light demo of (e) partitions, (n) walls constructed, (n) finishes and appliances added | $190,000 |
| [201810123078](https://www.permitgraph.org/p/201810123078) | Oct 12, 2018 | Completed: final sign-off Apr 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | revision to app#201605127267. these revision were made at request of dbi inspector onsite. arch revisions include enclosures around elec equipment at basement level, clarifications regarding mech sha… |  |
| [201809241199](https://www.permitgraph.org/p/201809241199) | Sep 24, 2018 | Completed: final sign-off Apr 2019 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | revision to pa 2016-0512-7267, update hvac equipment schedule and riser diagram. add updated smoke control matrix and smoke control panel. correct cad error showing mechanical piping and ductwork out… |  |
| [201809200876](https://www.permitgraph.org/p/201809200876) | Sep 20, 2018 | Completed: final sign-off Sep 2020 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 15th floor: revision to app#201710040398 to remove any corridor work from scope |  |
| [201809200873](https://www.permitgraph.org/p/201809200873) | Sep 20, 2018 | Completed: final sign-off Sep 2020 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 11th floor: revision to app#201710040408/to remove corridor from scope of work. |  |
| [201808298683](https://www.permitgraph.org/p/201808298683) | Aug 29, 2018 | Completed: final sign-off May 2019 | [135 Main St](https://www.permitgraph.org/a/3717/012) | demo/removing of all interior non-bearing walls and partial removal of drop ceiling. no electrical or plumbing work under this permit. | $5,000 |
| [201808217937](https://www.permitgraph.org/p/201808217937) | Aug 21, 2018 | Completed: final sign-off Dec 2018 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | revision to 2011-1209-0400s6 for fire alarm & 2-way ecs in medical office building. maher n/a. |  |
| [201808096958](https://www.permitgraph.org/p/201808096958) | Aug 9, 2018 | Completed: final sign-off Mar 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | fire sprinkler revision per site permit #2011/1209/0400 s and addendum revison #2018/0510/8813. |  |
| [201808026239](https://www.permitgraph.org/p/201808026239) | Aug 2, 2018 | Completed: final sign-off Oct 2020 | [333 12th St](https://www.permitgraph.org/a/3521/022) | operate tower crane | $100,000 |
| [201806262993](https://www.permitgraph.org/p/201806262993) | Jun 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 10h flr ti - partital floor suite, medical bld maher na suite 1005 | $295,000 |
| [201806262990](https://www.permitgraph.org/p/201806262990) | Jun 26, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | 9h flr ti - partital floor suite, medical bld maher na sprinklers and f/a under sep permit | $100,000 |
| [201805310655](https://www.permitgraph.org/p/201805310655) | May 31, 2018 | Completed: final sign-off May 2021 | [32 Ord St](https://www.permitgraph.org/a/2626/005) | administrative permit to correct unit count from one to two. revision to bpa 2014.1017.9274 and bos motion m16-087 and cpc motion 19609. | $915,600 |
| [201805118905](https://www.permitgraph.org/p/201805118905) | May 11, 2018 | Completed: final sign-off Aug 2018 | [450 Toland St](https://www.permitgraph.org/a/5230/018) | rev to pa# 201606281072: revised parking area per dpw accessibility, parking stall designations and tally affecting accesible parking requirements. the content of this revision does not add to the sc… |  |
| [201805108813](https://www.permitgraph.org/p/201805108813) | May 10, 2018 | Completed: final sign-off Apr 2019 | [1100 Van Ness Av](https://www.permitgraph.org/a/0694/010) | revision to 201112090400 s3 work includes removal of warm core toilets, addition of fsae vestibule (lobby) revise fsae narrative. all floors. maher not req |  |
| [201804126232](https://www.permitgraph.org/p/201804126232) | Apr 12, 2018 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | tower crane# 2. tie-in for office bldg. ref pa# 2016/06/20/0387-s. ** maher: n/a ** tower crane #2 foundation permit under pa#201801269651 | $85,000 |
| [201804095818](https://www.permitgraph.org/p/201804095818) | Apr 9, 2018 | Expired or cancelled: cancelled Jan 2026 | [701 03rd St](https://www.permitgraph.org/a/3794/006) | addition of roll up door to extg space. n/a for maher | $20,000 |
| [201804055645](https://www.permitgraph.org/p/201804055645) | Apr 5, 2018 | Completed: final sign-off Oct 2018 | [214 Van Ness Av](https://www.permitgraph.org/a/0811/012) | to demolish 2 story office building. ** maher: exempted - approval from dph on the plans ** | $103,000 |
| [201804055644](https://www.permitgraph.org/p/201804055644) | Apr 5, 2018 | Completed: final sign-off Oct 2018 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | to demolish 3 stories, 27 units, apartments building. ** maher: exempted - approval from dph on the plans ** | $147,000 |
| [201804055642](https://www.permitgraph.org/p/201804055642) | Apr 5, 2018 | Completed: final sign-off Sep 2020 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | temporary excavation shoring with cut up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks unde… | $511,000 |
| [201804055643](https://www.permitgraph.org/p/201804055643) | Apr 5, 2018 | Completed: final sign-off Aug 2021 | [200 Van Ness Av](https://www.permitgraph.org/a/0811/010) | excavation. temporary excavation shoring with cub up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & t… | $438,000 |
| [201804055641](https://www.permitgraph.org/p/201804055641) | Apr 5, 2018 | Completed: final sign-off Sep 2020 | [150 Hayes St](https://www.permitgraph.org/a/0811/022) | shoring, underpinning & tiebacks on subject property adjacent to 200-214 van ness avenue. new construction ref pa# 2017/05/05/5847-s. ** maher: exempted - approval from dph on the plan ** | $310,000 |
| [201803022749](https://www.permitgraph.org/p/201803022749) | Mar 2, 2018 | Completed: final sign-off May 2019 | [1 South Van Ness Av](https://www.permitgraph.org/a/3506/001) | removal of existing formwork affixed to the southern facade of the city owned property located at 1 south van ness ave. maher na | $62,000 |
| [201803012534](https://www.permitgraph.org/p/201803012534) | Mar 1, 2018 | Completed: final sign-off Jun 2018 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 40th floor: capital improvements include demolishing e restrooms and building back new fully accessible compliant building restrooms new common corridor, finishes, ceiling. n/a for maher | $175,000 |
| [201801269661](https://www.permitgraph.org/p/201801269661) | Jan 26, 2018 | Completed: final sign-off Apr 2021 | [49 South Van Ness Av](https://www.permitgraph.org/a/3506/008) | tower crane for new construction ref pa #2016/0620/0387s. this permit is for phase 1 office tower crane erection**maher exempt** | $260,000 |
| [201712156599](https://www.permitgraph.org/p/201712156599) | Dec 15, 2017 | Never finaled: issued Dec 2017, no final | [401 Van Ness Av](https://www.permitgraph.org/a/0786A/001) | renew for final. all work complete 201506179181 |  |
| [201712126185](https://www.permitgraph.org/p/201712126185) | Dec 12, 2017 | Completed: final sign-off Jun 2018 | [169 Steuart St](https://www.permitgraph.org/a/3715/007) | partial ti of 3rd fl fitness area, upgrade of accessible restrooms, new ceiling, light fixtures, new flooring and paint maher not req, fire under separate permits. | $900,000 |
| [201710191634](https://www.permitgraph.org/p/201710191634) | Oct 19, 2017 | Completed: final sign-off Jun 2018 | [169 Steuart St](https://www.permitgraph.org/a/3715/007) | 3/f: demo walls, remove column cladding. relocate drinking fountains | $90,000 |
| [201710100707](https://www.permitgraph.org/p/201710100707) | Oct 10, 2017 | Completed: final sign-off Feb 2018 | [401 Van Ness Av](https://www.permitgraph.org/a/0786A/001) | to obtain final inspection for work approved under pa# 201304114274 (windows, skylights, terra cotta), 201404213720 (tower crane), 201405286917 (crane erection). all work is complete. |  |
| [201710100705](https://www.permitgraph.org/p/201710100705) | Oct 10, 2017 | Completed: final sign-off Feb 2018 | [401 Van Ness Av](https://www.permitgraph.org/a/0786A/001) | to obtain final inspection for work approved under pa# 201310078659 (shoring). all work is complete. |  |
| [201710040404](https://www.permitgraph.org/p/201710040404) | Oct 4, 2017 | Completed: final sign-off Jun 2019 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 9/f: common corridor / elevator lobby upgrade: lobby finishes, cieling and lighting. sep permits for meps, life saftey & fire srpinkler work/build if needed. building is fully sprinklered. maher ord… |  |
| [201710040409](https://www.permitgraph.org/p/201710040409) | Oct 4, 2017 | Completed: final sign-off Aug 2019 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 16/f: common corridor / elevator lobby upgrade: finishes, ceilings & lighting. mep's, lifesafety & sprinler work will be diesn build/submitted seperately if needed, building is fully sprinklered. mah… |  |
| [201710040407](https://www.permitgraph.org/p/201710040407) | Oct 4, 2017 | Completed: final sign-off Aug 2019 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 10/f: restroom/common corridor upgrade: demo and building back fully compliant r/r and new common corridor. sep permits for meps, life saftey & fire srpinkler work/build if needed. building is fully… | $275,000 |
| [201710040410](https://www.permitgraph.org/p/201710040410) | Oct 4, 2017 | Completed: final sign-off Aug 2019 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 33/f: demo and building back of fully accessbible restrooms and new commong corrdior. sep permits for meps, life saftey & fire srpinkler work/build if needed. building is fully sprinklered. maher n/a | $275,000 |
| [201710040398](https://www.permitgraph.org/p/201710040398) | Oct 4, 2017 | Completed: final sign-off Sep 2020 | [44 Montgomery St](https://www.permitgraph.org/a/0291/012) | 15th fl restrm/corridor upgrade. demo and build back full compliant restrrooms, new common corridor, mep, ls, sprinkler design build and sub sep. bldg fully sprinklered. maher ord 155-13 na |  |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/charles-pankow-builders-ltd-688972.