# Cej Construction Llc

Contractor license 1031309. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/cej-construction-llc-1031309
- JSON: https://www.permitgraph.org/api/contractor?license=1031309
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=1031309

116 permits since 2000: 92 completed, 14 in progress, 6 never finaled, 4 expired or cancelled. Typically 10 days from filing to permit and 352 days from permit to final inspection. Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.

- Based in: South San Francisco
- On San Francisco permits: Jul 2014 to Sep 2026
- Last 24 months: 20 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2014 | 0 | 0 | 1 | 0 |
| 2015 | 0 | 0 | 1 | 0 |
| 2017 | 5 | 0 | 0 | 0 |
| 2018 | 13 | 0 | 1 | 0 |
| 2019 | 27 | 1 | 0 | 0 |
| 2020 | 4 | 0 | 0 | 0 |
| 2021 | 10 | 0 | 1 | 0 |
| 2022 | 8 | 0 | 1 | 3 |
| 2023 | 11 | 0 | 1 | 1 |
| 2024 | 5 | 3 | 0 | 0 |
| 2025 | 7 | 5 | 0 | 0 |
| 2026 | 2 | 5 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Roof deck | 6 | 6 | 0 | 0 | 0 | 71 | 405 |
| Kitchen remodel | 35 | 29 | 2 | 2 | 2 | 22 | 352 |
| Deck | 13 | 11 | 0 | 1 | 1 | 37 | 571 |
| Stairs | 17 | 15 | 1 | 0 | 1 | 57 | 601 |
| Bathroom remodel | 47 | 42 | 2 | 1 | 2 | 22 | 384 |

## Most recent permits

The 100 most recent of 116.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202609288713](https://www.permitgraph.org/p/202609288713) | Sep 28, 2026 | In progress: issued Sep 2026 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | to obtain final inspection for work approved under pa# 202410032261 , 202505297482. all work is complete. |  |
| [202609117985](https://www.permitgraph.org/p/202609117985) | Sep 11, 2026 | In progress: issued Sep 2026 | [2095 15th Av](https://www.permitgraph.org/a/2135/001R) | replace kitchen cabinets & replace with new vinyl window.(fiberglass) | $14,000 |
| [202608126473](https://www.permitgraph.org/p/202608126473) | Aug 12, 2026 | In progress: issued Aug 2026 | [138 Parker Av](https://www.permitgraph.org/a/1065/040) | to obtain final inspection for work approved under pa#202505216958 all work is complete |  |
| [202605292153](https://www.permitgraph.org/p/202605292153) | May 29, 2026 | In progress: issued Jun 2026 | [134 02nd Av](https://www.permitgraph.org/a/1361/034) | recommencement and completion of work approved under pa# 202502240900. | $10,000 |
| [202605040573](https://www.permitgraph.org/p/202605040573) | May 4, 2026 | Completed: final sign-off Nov 2026 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter. |  |
| [202605010541](https://www.permitgraph.org/p/202605010541) | May 1, 2026 | Completed: final sign-off Jul 2026 | [1479 40th Av](https://www.permitgraph.org/a/1813/017) | repair bathroom in kind | $5,000 |
| [202604169567](https://www.permitgraph.org/p/202604169567) | Apr 16, 2026 | In progress: issued May 2026 | [134 02nd Av](https://www.permitgraph.org/a/1361/034) | close the windows in nombers 206, 307, 306, 402, 404. revision to pa #202102174839 (s1) (r8) |  |
| [202510237991](https://www.permitgraph.org/p/202510237991) | Oct 23, 2025 | Completed: final sign-off Dec 2025 | [140 Saint Charles Av](https://www.permitgraph.org/a/7129/006) | change existing window in front of house, change from fixed window into openable window, no size change, same location, same material, facing the street | $2,000 |
| [202510177585](https://www.permitgraph.org/p/202510177585) | Oct 17, 2025 | Completed: final sign-off Dec 2025 | [859 26th Av](https://www.permitgraph.org/a/1669/015) | replace kitchen cabinet and countertop; add electrical oulets, replace garbage disposal, dish washer, floor. | $15,000 |
| [202509225809](https://www.permitgraph.org/p/202509225809) | Sep 22, 2025 | Completed: final sign-off Nov 2026 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drain… |  |
| [202509094859](https://www.permitgraph.org/p/202509094859) | Sep 9, 2025 | In progress: issued Sep 2025 | [134 02nd Av](https://www.permitgraph.org/a/1361/034) | structural revision to pa 202102174839 - provide new interior concrete footing; provide new simpson high strength wood shearwall on 2nd fl 2 grid line 3a | $30,000 |
| [202507241488](https://www.permitgraph.org/p/202507241488) | Jul 24, 2025 | In progress: issued Jul 2025 | [37 Miraloma Dr](https://www.permitgraph.org/a/2980/014) | to obtain final inspection for work approved under pa# 202108257117. all work is complete. |  |
| [202507171021](https://www.permitgraph.org/p/202507171021) | Jul 17, 2025 | Completed: final sign-off Feb 2026 | [450 Frederick St](https://www.permitgraph.org/a/1262/052) | unit b: remodel 2 bathrooms on 2nd & 3d floor; including 2 shower pans. install new fan, tiles, faucets, sinks, toilet. one dedicated curcuit for each bathroom. all in-kind. | $5,000 |
| [202507100562](https://www.permitgraph.org/p/202507100562) | Jul 10, 2025 | Completed: final sign-off Sep 2025 | [559 36th Av](https://www.permitgraph.org/a/1508/007E) | revision to pa # 2019-0215-3147. revise structural glue cam beam with psl. remove glu-lam special inspection |  |
| [202505297482](https://www.permitgraph.org/p/202505297482) | May 29, 2025 | In progress: issued May 2025 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | revision to permit 20241003226 to include the removal of the existing foundation with a new, pier supporated foundation to accommodate a slighe increase in the grade at the rear yard, remove and repl… | $15,000 |
| [202505216958](https://www.permitgraph.org/p/202505216958) | May 21, 2025 | In progress: issued May 2025 | [138 Parker Av](https://www.permitgraph.org/a/1065/040) | revision to pa# 202412237292 at 3rd fl. change sliding dr to folfing dr & reduce opening width. new interior wall to enclose walk in closet. re-arrange fixtures in bathroom. remove 1 skylight from sc… |  |
| [202503202698](https://www.permitgraph.org/p/202503202698) | Mar 20, 2025 | Completed: final sign-off Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | to obtain final inspection for work approved under pa# 202209192722 and 202301311121. all work is complete |  |
| [202503041565](https://www.permitgraph.org/p/202503041565) | Mar 4, 2025 | Completed: final sign-off Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | to obtain final inspection for work approved under pa # 2022-0706-7862 & 2022-0706-7871 all work is complete |  |
| [202502240900](https://www.permitgraph.org/p/202502240900) | Feb 24, 2025 | In progress: issued Feb 2025 | [134 02nd Av](https://www.permitgraph.org/a/1361/034) | temporay shoring (work no affect public row) for a sfr being remodeled per p/a 2021-0217-4839. work no affect public right of way | $30,000 |
| [202412237292](https://www.permitgraph.org/p/202412237292) | Dec 23, 2024 | Completed: final sign-off Nov 2026 | [138 Parker Av](https://www.permitgraph.org/a/1065/040) | 3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet al… | $70,000 |
| [202410102727](https://www.permitgraph.org/p/202410102727) | Oct 10, 2024 | Completed: final sign-off Feb 2026 | [1467 29th Av](https://www.permitgraph.org/a/1824/014) | convert g/l garage storage to n) living space included a den, playroom, 2 bedrooms w/ closets, 2 full baths & laundry. n)g/l space is proposed within e) bldg envelope (860 sf). upper lvl kitchen remo… | $150,000 |
| [202410032261](https://www.permitgraph.org/p/202410032261) | Oct 3, 2024 | In progress: issued Oct 2024 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | remove/replace rear-yard concrete retaining wall with new pier- supported concrete planter and pier-supported concrete grade beam supporting a wood privacy fence. no interior work | $30,000 |
| [202405293153](https://www.permitgraph.org/p/202405293153) | Jul 3, 2024 | In progress: issued Dec 2025 | [725 Sanchez St](https://www.permitgraph.org/a/3605/053) | to erect a 3-story over 1 basement, type v-b, single family residence. within delores heights special use district restrictions | $750,000 |
| [202405293151](https://www.permitgraph.org/p/202405293151) | Jul 3, 2024 | In progress: issued Dec 2025 | [725 Sanchez St](https://www.permitgraph.org/a/3605/053) | to demolish a 2-story, type v-b, single family building. | $25,000 |
| [202406255158](https://www.permitgraph.org/p/202406255158) | Jun 25, 2024 | Completed: final sign-off Jun 2025 | [182 Liberty St](https://www.permitgraph.org/a/3607/055) | add 2 skylights on sloped roof, not visible from the front. interior permit 202312061994 | $10,000 |
| [202406144532](https://www.permitgraph.org/p/202406144532) | Jun 14, 2024 | Completed: final sign-off Oct 2024 | [2388 Greenwich St](https://www.permitgraph.org/a/0511/024C) | to comply w/ physical inspection report #cc-8509 |  |
| [202404039278](https://www.permitgraph.org/p/202404039278) | Apr 3, 2024 | Completed: final sign-off Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | revision to permit# 20231311121: enlarge deck at rear. | $10,000 |
| [202312182715](https://www.permitgraph.org/p/202312182715) | Dec 18, 2023 | Completed: final sign-off Jul 2024 | [135 Skyview Wy](https://www.permitgraph.org/a/2796/020) | 1)legalize counter and sink on ground floor. family room. 2)construct 2 burner cooktop and hood. no oven on ground floor family room. | $1,000 |
| [202312122365](https://www.permitgraph.org/p/202312122365) | Dec 12, 2023 | Completed: final sign-off Mar 2024 | [1236 19th Av](https://www.permitgraph.org/a/1732/037) | to comply with nov: 202311202: fire damage repair: replace sheetrock on walls and ceiling on kitchen and bath approx 25%. replace flooring and paint. | $35,000 |
| [202312061994](https://www.permitgraph.org/p/202312061994) | Dec 6, 2023 | Completed: final sign-off Jun 2025 | [182 Liberty St](https://www.permitgraph.org/a/3607/055) | interior remodel, remodel kitchen, baths, switch lving area to top floor, add 1 full bath. no changes to front or visible areas from street,no envelope expansion | $100,000 |
| [202311301705](https://www.permitgraph.org/p/202311301705) | Nov 30, 2023 | Completed: final sign-off Dec 2023 | [2726 Greenwich St](https://www.permitgraph.org/a/0939/008) | revision to pa#202102255351 r1. documenting changed window & doors during construction per inspector request. front door & opening decor. garage door & opening decor, front 3rd flr window & rear 2nd… |  |
| [202311100622](https://www.permitgraph.org/p/202311100622) | Nov 10, 2023 | Completed: final sign-off Mar 2024 | [1236 19th Av](https://www.permitgraph.org/a/1732/037) | to partially comply with nov 202311202: removal of all fire damaged debris and selective demolition of interior finishes to determine exhaust of fire damage. | $3,000 |
| [202308224909](https://www.permitgraph.org/p/202308224909) | Aug 22, 2023 | Completed: final sign-off Aug 2023 | [440 28th St](https://www.permitgraph.org/a/6603/017) | revision to approved pa# 201810314602, 202105170462, 202203150057. change master bath and walking closet location at 3rd floor. |  |
| [202308073913](https://www.permitgraph.org/p/202308073913) | Aug 7, 2023 | Completed: final sign-off Aug 2025 | [619 Bosworth St](https://www.permitgraph.org/a/6756/030) | revision to 201912300893. revision to exterior staircase per inspector request. change 2/f kitchen layout. |  |
| [202307212692](https://www.permitgraph.org/p/202307212692) | Jul 21, 2023 | Completed: final sign-off Oct 2023 | [559 37th Av](https://www.permitgraph.org/a/1507/012) | commencement of work not started under previously approved permit application 2019-0719-6412 | $3,000 |
| [202307212714](https://www.permitgraph.org/p/202307212714) | Jul 21, 2023 | Completed: final sign-off Nov 2023 | [559 37th Av](https://www.permitgraph.org/a/1507/012) | to comply with physical inspection report #cc-8155 | $3,000 |
| [202305238389](https://www.permitgraph.org/p/202305238389) | May 23, 2023 | Never finaled: issued May 2023, no final | [630 11th Av](https://www.permitgraph.org/a/1634/026) | replaee stucco less than 50%. remove small cornice below 3rd fl window and replace trims | $1,000 |
| [202303143672](https://www.permitgraph.org/p/202303143672) | Mar 14, 2023 | Completed: final sign-off Nov 2023 | [634 Baker St](https://www.permitgraph.org/a/1178/018) | unit 3 on 4/f: remodel kitchen and bathroom. add 1 full bath. | $35,000 |
| [202302081649](https://www.permitgraph.org/p/202302081649) | Feb 8, 2023 | Completed: final sign-off Sep 2025 | [559 36th Av](https://www.permitgraph.org/a/1508/007E) | rev to pa# 2019-0215-3147; underpin (e) footing at garage and replace slab at (e) building area (structural). | $8,000 |
| [202301311121](https://www.permitgraph.org/p/202301311121) | Jan 31, 2023 | Expired or cancelled: expired Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | add 6 new skylights and remodel 2 bathrooms and bedrooms at top floor at top unit. replace drywall in kind, new insulation and all new electrical. all new skylights to have u factor:0.30 max | $2,000 |
| [202210144405](https://www.permitgraph.org/p/202210144405) | Oct 14, 2022 | Never finaled: issued Oct 2022, no final | [634 Baker St](https://www.permitgraph.org/a/1178/018) | unit #3: replace counters in kitchen in-kind. | $500 |
| [202209283360](https://www.permitgraph.org/p/202209283360) | Sep 28, 2022 | Completed: final sign-off Dec 2022 | [1535 35th Av](https://www.permitgraph.org/a/1881/008) | 2nd floor: remodel kitchen and bathroom. | $30,000 |
| [202209222966](https://www.permitgraph.org/p/202209222966) | Sep 22, 2022 | Completed: final sign-off Sep 2023 | [1843 41st Av](https://www.permitgraph.org/a/2078/004) | revision to pa# 202203018982. 1st flr: bedrm reconfigure per layout. 2nd flr: kitchen & bathrm remodel per layout. 3rd flr: new skylight, new deck at rear. | $3,000 |
| [202209192722](https://www.permitgraph.org/p/202209192722) | Sep 19, 2022 | Expired or cancelled: expired Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | relace 4 2nd floor windows in kind with aluminum clad wood | $600 |
| [202208251320](https://www.permitgraph.org/p/202208251320) | Aug 25, 2022 | Completed: final sign-off Nov 2023 | [152 04th Av](https://www.permitgraph.org/a/1363/031) | new roof deck rear (facing back), revision to bpa: 202109289335 | $2,000 |
| [202207067862](https://www.permitgraph.org/p/202207067862) | Jul 6, 2022 | Expired or cancelled: expired Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | remodel kitchen in kind (90 sqft) | $10,000 |
| [202207067871](https://www.permitgraph.org/p/202207067871) | Jul 6, 2022 | Expired or cancelled: expired Jul 2025 | [115 03rd Av](https://www.permitgraph.org/a/1363/004) | 1st fl bathroom remodel. 2nd fl: total remodel (except foyer).remove rear stairs on 3rd fl. add new deck. replace rear siding gr fl kitchen sep permit | $70,000 |
| [202203250898](https://www.permitgraph.org/p/202203250898) | Mar 25, 2022 | Completed: final sign-off May 2023 | [2434 Pacheco St](https://www.permitgraph.org/a/2106/019) | revision to pa# 202202228444. 2/f: reconfigure layout. add skylight. | $15,000 |
| [202203018982](https://www.permitgraph.org/p/202203018982) | Mar 1, 2022 | Completed: final sign-off Sep 2023 | [1843 41st Av](https://www.permitgraph.org/a/2078/004) | 1/f: bathroom remodel, add media room, and 2 bedrooms. 2/f: replace front windows with alum clad-wood. kitchen and bath remodel. | $50,000 |
| [202202228444](https://www.permitgraph.org/p/202202228444) | Feb 22, 2022 | Completed: final sign-off May 2023 | [2434 Pacheco St](https://www.permitgraph.org/a/2106/019) | 1/f: add 1 den (not for sleeping), famly room and 1 full bathroom. 2/f: remodel ktichen. add new deck. | $65,000 |
| [202201065494](https://www.permitgraph.org/p/202201065494) | Jan 6, 2022 | Completed: final sign-off Mar 2023 | [1675 38th Av](https://www.permitgraph.org/a/1905/019) | rev to previous permit application 202103267356 revise structural framing of roof, eliminate steel beam. | $3,000 |
| [202201065498](https://www.permitgraph.org/p/202201065498) | Jan 6, 2022 | Completed: final sign-off Mar 2023 | [1675 38th Av](https://www.permitgraph.org/a/1905/019) | revision to bpa# 202103267356. add swimming pool at rear. |  |
| [202110271316](https://www.permitgraph.org/p/202110271316) | Oct 27, 2021 | Completed: final sign-off Dec 2023 | [630 11th Av](https://www.permitgraph.org/a/1634/026) | rev to pa202103257292: reconfigure deck at rear. revise structural at interior stairs. | $2,000 |
| [202109289300](https://www.permitgraph.org/p/202109289300) | Sep 28, 2021 | Completed: final sign-off Oct 2021 | [822 South Van Ness Av](https://www.permitgraph.org/a/3595/004) | to comply w/complaint #201635681, item #10 repair floor covering | $5,000 |
| [202109289335](https://www.permitgraph.org/p/202109289335) | Sep 28, 2021 | Completed: final sign-off Nov 2023 | [152 04th Av](https://www.permitgraph.org/a/1363/031) | 1st flr: add 2 bedrooms, 2 full bath, fam rm and laundry. infill at rear. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: add 3 bedrooms, 2 full baths and cantilever at rear. reconfigure interior sta… | $120,000 |
| [202108277322](https://www.permitgraph.org/p/202108277322) | Aug 27, 2021 | Completed: final sign-off Aug 2022 | [87 Springfield Dr](https://www.permitgraph.org/a/7254/016) | 2/f: remodel existing bathroom, add 1 full bath. | $25,000 |
| [202107154457](https://www.permitgraph.org/p/202107154457) | Jul 15, 2021 | Completed: final sign-off Dec 2021 | [1754 34th Av](https://www.permitgraph.org/a/2016/038) | kitchen (110 sq ft) and bathroom (80 sq ft) remodel | $25,000 |
| [202106102099](https://www.permitgraph.org/p/202106102099) | Jun 10, 2021 | Completed: final sign-off Apr 2024 | [2726 Greenwich St](https://www.permitgraph.org/a/0939/008) | revision of pa # 2020 1202 0093. extend replacement to perimeter foundation | $20,000 |
| [202106081895](https://www.permitgraph.org/p/202106081895) | Jun 8, 2021 | Completed: final sign-off Mar 2023 | [1675 38th Av](https://www.permitgraph.org/a/1905/019) | replace (3) front wndows in kind w/aluminum-clad wood. | $2,000 |
| [202103267356](https://www.permitgraph.org/p/202103267356) | Mar 26, 2021 | Completed: final sign-off Mar 2023 | [1675 38th Av](https://www.permitgraph.org/a/1905/019) | 1st fl: add 2 bedrooms, 1 full bath & media room. 2nd fl: remodel kitchen & bathroom. add 1 full bath. add deck at rear. infill at rear. | $85,000 |
| [202103257292](https://www.permitgraph.org/p/202103257292) | Mar 25, 2021 | Completed: final sign-off Dec 2023 | [630 11th Av](https://www.permitgraph.org/a/1634/026) | 1st fl: add 1 bedroom, 1 full bath, family & mudroom. 2nd fl: remodel bedrooms & bathroom. add 1 full bath. relocate interior stairs. add deck at rear. replace all front windows in-kind. | $85,000 |
| [202102255351](https://www.permitgraph.org/p/202102255351) | Feb 25, 2021 | Completed: final sign-off Apr 2024 | [2726 Greenwich St](https://www.permitgraph.org/a/0939/008) | interior renovation floor 1-4 with new windows in existing openings at rear & front elevation. new roof deck with hatch access, 240 sqft. | $440,000 |
| [202102174839](https://www.permitgraph.org/p/202102174839) | Feb 17, 2021 | Never finaled: issued Aug 2023, no final | [134 02nd Av](https://www.permitgraph.org/a/1361/034) | vertical expansion at rear portion of bldg, excavation at rear of garage storage for bedroom and living space, refinish front facade. sprinkler 13 throughout | $400,000 |
| [202010217076](https://www.permitgraph.org/p/202010217076) | Oct 21, 2020 | Completed: final sign-off Nov 2021 | [2388 Greenwich St](https://www.permitgraph.org/a/0511/024C) | revision to pa 202002063772. dryrot repair. replace windows in-ikind w/ aluminum-clad wood windows. | $2,000 |
| [202009053611](https://www.permitgraph.org/p/202009053611) | Sep 5, 2020 | Completed: final sign-off Dec 2021 | [2388 Greenwich St](https://www.permitgraph.org/a/0511/024C) | revision to pa #202002063772: add 235 sq ft roof deck w/ access stair and sliding roof hatch. lighting and power as required | $40,000 |
| [202002063772](https://www.permitgraph.org/p/202002063772) | Feb 6, 2020 | Completed: final sign-off Nov 2021 | [2388 Greenwich St](https://www.permitgraph.org/a/0511/024C) | 1st fl add 1 bedroom, 1 full bath, family rm, 2nd fl remodel kitchen, bedrooms, bath. add 1 full bath, 3rd fl remodel kitchen, bedrooms, bath, add 1 bedroom, full bath | $5,000 |
| [202002033405](https://www.permitgraph.org/p/202002033405) | Feb 3, 2020 | Completed: final sign-off Oct 2020 | [1493 Masonic Av](https://www.permitgraph.org/a/1270/005) | legalize rooms on 1st floor: 1 bedroom, 1 playroom, and 1 full bath | $30,000 |
| [201912300893](https://www.permitgraph.org/p/201912300893) | Dec 30, 2019 | Completed: final sign-off Aug 2025 | [619 Bosworth St](https://www.permitgraph.org/a/6756/030) | add 2 bedrooms to 1st fl. add 1 bath to 1st fl, rebuild staircase from ground to 2nd fl. add laundry rm with sink to 1st fl. relocate water heater. relocated gas meter. remove central furnace and duc… | $40,000 |
| [201911066629](https://www.permitgraph.org/p/201911066629) | Nov 6, 2019 | Completed: final sign-off Oct 2020 | [1493 Masonic Av](https://www.permitgraph.org/a/1270/005) | remodel kitchen & 2 bathrooms on 3/f & remodel powder room on 2/f. | $35,000 |
| [201910225127](https://www.permitgraph.org/p/201910225127) | Oct 22, 2019 | Completed: final sign-off Jun 2021 | [1097 Green St](https://www.permitgraph.org/a/0126/042) | unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower… | $40,000 |
| [201910215077](https://www.permitgraph.org/p/201910215077) | Oct 21, 2019 | Completed: final sign-off Nov 2019 | [200 Brannan St](https://www.permitgraph.org/a/3774/386) | #410 -remodel kitchen, 2 bahtrooms, no removal of walls. | $18,000 |
| [201910073665](https://www.permitgraph.org/p/201910073665) | Oct 7, 2019 | Completed: final sign-off Oct 2020 | [2027 17th Av](https://www.permitgraph.org/a/2137/001F) | interior remodel: convert (e) garage to 1 bedroom, 1 entertainment room & 1 bath, add 1 bike parking 1st fl. remove (e) door from (e) stair to (e) kitchen of 2nd fl. mech elec plumbing under separate… | $100,000 |
| [201910043634](https://www.permitgraph.org/p/201910043634) | Oct 4, 2019 | Completed: final sign-off Sep 2020 | [1867 34th Av](https://www.permitgraph.org/a/2071/005) | remodel 10x10 kitchen and one bathroom 5x7. add 23 new lights. | $25,000 |
| [201909303064](https://www.permitgraph.org/p/201909303064) | Sep 30, 2019 | Completed: final sign-off Sep 2020 | [521 Ellsworth St](https://www.permitgraph.org/a/5725/027) | 1sr flr - add master bedroom, 1 full bath and family rm, 2nd flr - remodel kitchen and bath | $55,000 |
| [201909192171](https://www.permitgraph.org/p/201909192171) | Sep 19, 2019 | In progress: issued Aug 2026 | [880 Pacheco St](https://www.permitgraph.org/a/2049A/015) | basemen: add adu per ord# 95-17. add kitchen, living, 1 bedroom and 1 full bath. comply w/ complaint # 201831925.**maher n/a** note: fire sprinkler required as a 4-story structure per sfbc/infill & c… | $76,000 |
| [201909171817](https://www.permitgraph.org/p/201909171817) | Sep 17, 2019 | Completed: final sign-off Sep 2020 | [4038 Cesar Chavez St](https://www.permitgraph.org/a/6564/013) | revision to pa #201901301589. modify windows. replace siding on building. wood in front, hardie siding in back | $20,000 |
| [201909101207](https://www.permitgraph.org/p/201909101207) | Sep 10, 2019 | Completed: final sign-off Jan 2021 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | construction of a roof top deck at 3rd flr roof at rear over 2nd floor at rear 3'-0" from the property line. associated rear facade alteration ref to 2019-0418-8412 and 2019-0521-1258. | $8,000 |
| [201908290202](https://www.permitgraph.org/p/201908290202) | Aug 29, 2019 | Completed: final sign-off Sep 2020 | [4038 Cesar Chavez St](https://www.permitgraph.org/a/6564/013) | consolidate structural dwgs into one permit include 201808177726, 201812128132, 201901301589. include detail #12, sheet s3.3. relocate strong wall on gridline c sheet s2.0. revise shear wall on gridl… |  |
| [201908239725](https://www.permitgraph.org/p/201908239725) | Aug 23, 2019 | Completed: final sign-off Mar 2022 | [766 Moscow St](https://www.permitgraph.org/a/6338/013) | to comply w/ nov 201933241. 1st fl - add w bedrooms, 1 full bath, media & family; 2nd fl - remodel kitchen & bathroom. add 1 bedroom, home office & 2 full bathrooms; add new deck 2 rear. remove stora… | $70,000 |
| [201907186189](https://www.permitgraph.org/p/201907186189) | Jul 18, 2019 | Completed: final sign-off Apr 2022 | [2046 44th Av](https://www.permitgraph.org/a/2163/037) | additional of dwelling unit at 1st flr per ordinance no. 95-17. remodel both floors, rear 2-story horizontal addition for new bedroom & bathroom, 1-level wood deck. | $90,000 |
| [201907186242](https://www.permitgraph.org/p/201907186242) | Jul 18, 2019 | Completed: final sign-off Oct 2020 | [123 Westwood Dr](https://www.permitgraph.org/a/3166/010) | 1st fl - add 2 bedrooms, 1 full bath and laundry; 2nd fl- remodel kitchen and bath; replace front window at attic in-kind | $60,000 |
| [201907176140](https://www.permitgraph.org/p/201907176140) | Jul 17, 2019 | Completed: final sign-off Jan 2021 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | revision to pa #201904188412, modify dormer location at roof, front dormers move south (away from front) modify 3rd fl plan for dormer adjustment. | $5,000 |
| [201905302076](https://www.permitgraph.org/p/201905302076) | May 30, 2019 | Completed: final sign-off Sep 2020 | [1627 37th Av](https://www.permitgraph.org/a/1906/003) | increase the value by $150,000 for pa# 20190529585- no work under this permit. | $150,000 |
| [201905211258](https://www.permitgraph.org/p/201905211258) | May 21, 2019 | Completed: final sign-off Jan 2021 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | remodel single fam dwelling:infill below (e) habitable space at rear rooms down at 1st flr. bedrooms & bathrooms:(n) windows & doors at rear. replace (e) windows in-kind all windows visible from stre… | $140,000 |
| [201905029585](https://www.permitgraph.org/p/201905029585) | May 2, 2019 | Completed: final sign-off Sep 2020 | [1627 37th Av](https://www.permitgraph.org/a/1906/003) | rev to pa 201902203375; reconfigure layout per plans |  |
| [201904188412](https://www.permitgraph.org/p/201904188412) | Apr 18, 2019 | Completed: final sign-off Jan 2021 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | renovation of (e) single family dwelling adding dormers to extg attic space for addition of (n) bathroom & bedroom, family room at attic. new stair to attic level (3rd floor level). new windows at do… | $60,000 |
| [201903125054](https://www.permitgraph.org/p/201903125054) | Mar 12, 2019 | Completed: final sign-off Aug 2019 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | exploratory demoliton to remove plaster from interior walls througout bldg, 100 sf ft total. | $1,000 |
| [201903074720](https://www.permitgraph.org/p/201903074720) | Mar 7, 2019 | Completed: final sign-off Jan 2021 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | replace extg sub-standard brick foundation with new concrete foundation. same location. retaining wall at rearyard w/patio. structural work only. demo finish for structural work. | $60,000 |
| [201902203375](https://www.permitgraph.org/p/201902203375) | Feb 20, 2019 | Completed: final sign-off Sep 2020 | [1627 37th Av](https://www.permitgraph.org/a/1906/003) | 1st flr - add 2 bedrooms, 2 full bathrooms, media and laundry. 2nd flr - remodel kitchen and bath, ass 1 full bath. reconfigure interior stairs and infill south lightwell | $80,000 |
| [201902153147](https://www.permitgraph.org/p/201902153147) | Feb 15, 2019 | Completed: final sign-off Oct 2025 | [559 36th Av](https://www.permitgraph.org/a/1508/007E) | 3-story horizontal & 1-story vertical addiiton. 1/fl-new 1bd/1ba adu, elevator& new interior stairs. 2&3/fl-full remodel. 4/fl-new floor connect to 3/fl unit. whole building to be fully sprinklered p… | $200,000 |
| [201902132804](https://www.permitgraph.org/p/201902132804) | Feb 13, 2019 | Completed: final sign-off Mar 2019 | [4319 25th St](https://www.permitgraph.org/a/6545/035) | to comply w/ complaint 201922021 at ground flr. remove (e) lathe and plaster from interior partition walls. | $1,850 |
| [201902112612](https://www.permitgraph.org/p/201902112612) | Feb 11, 2019 | Completed: final sign-off May 2019 | [518 46th Av](https://www.permitgraph.org/a/1499/029) | unit 518 & 520: remodel (2) kitchens (115 sq. ft. each) & (2) bathrooms (40 sq. ft. each), no change in fixture location | $45,000 |
| [201902011875](https://www.permitgraph.org/p/201902011875) | Feb 1, 2019 | Completed: final sign-off Jun 2020 | [2074 45th Av](https://www.permitgraph.org/a/2164/017A) | interior renovation to include removal of walls between kitchen and living room. enlarge royer, new bathroom and laundry @ ground floor. | $90,000 |
| [201901301589](https://www.permitgraph.org/p/201901301589) | Jan 30, 2019 | Completed: final sign-off Sep 2020 | [4038 Cesar Chavez St](https://www.permitgraph.org/a/6564/013) | new roof deck at the rear of (e) building | $20,000 |
| [201901291455](https://www.permitgraph.org/p/201901291455) | Jan 29, 2019 | Completed: final sign-off Sep 2019 | [1938 18th Av](https://www.permitgraph.org/a/2117/027) | kitchen remodel. remove and replace existing kitchen cabinets, sink, stove, add island and install recessed lights. n/a for maher | $35,000 |
| [201812319388](https://www.permitgraph.org/p/201812319388) | Dec 31, 2018 | Completed: final sign-off Apr 2019 | [619 Bosworth St](https://www.permitgraph.org/a/6756/030) | remodel 2nd floor bathroom with shower pan. | $6,000 |
| [201812188574](https://www.permitgraph.org/p/201812188574) | Dec 18, 2018 | Completed: final sign-off Apr 2019 | [727 Delano Av](https://www.permitgraph.org/a/6971A/040) | revision to bap# 2017-1020-1835. adding a new laundry area, revise bathroom layout on ground floor. remove window in bathroom. new independent heating unit for accessary unit "727 delano ave" | $3,000 |
| [201812128132](https://www.permitgraph.org/p/201812128132) | Dec 12, 2018 | Completed: final sign-off Sep 2020 | [4038 Cesar Chavez St](https://www.permitgraph.org/a/6564/013) | reinstall original entry stairs to 1st and 2nd floor. | $20,000 |
| [201811206468](https://www.permitgraph.org/p/201811206468) | Nov 20, 2018 | Completed: final sign-off May 2019 | [518 46th Av](https://www.permitgraph.org/a/1499/029) | 1st flr - convert (e) half bath to full. 2nd flr - add laundry and interior stairs to connect floors. 3rd flr - add laundry and stairs to roof. add roof deck. infill south lightwell at 1st and 2nd fl… | $30,000 |
| [201811196216](https://www.permitgraph.org/p/201811196216) | Nov 19, 2018 | Completed: final sign-off Feb 2019 | [729 Rolph St](https://www.permitgraph.org/a/6418/018) | on 2nd fl - to comply with his nov 201835213 dated 4/2/2018, convert closet to a powder room, exhaust fan in 1/2 bath. | $8,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/cej-construction-llc-1031309.