Back to kitchen remodel contractors
Cedar House Construction/Brian White
- Based in
- San Anselmo
- On San Francisco permits
- May 2000 to Apr 2025
- Last 24 months
- 1 permit filed
85 permits since 2000: 75 completed, 1 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 21 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2018 | Completed final sign-off Jun 2019 | 1000 North Point St | remodel of (2) bathrooms, (1) kitchen. new caepets and new hardwood floors throughout. kitchen 20'x7'. all plumbing in same locations. replace in kind. bathroom #1, 15x10. bathroom #2, 10x10. no interiror wall additions, demolition or relocation,Details
remodel of (2) bathrooms, (1) kitchen. new caepets and new hardwood floors throughout. kitchen 20'x7'. all plumbing in same locations. replace in kind. bathroom #1, 15x10. bathroom #2, 10x10. no interiror wall additions, demolition or relocation, | $115,000 |
| Sep 21, 2016 | Expired or cancelled cancelled Oct 2016 | 450 Hayes St | to replace hardwood flooring, to remodel 1 kitchen. 2 bathrooms, paint throughout, no structural work. no interior wall changes. no exterior workDetails
to replace hardwood flooring, to remodel 1 kitchen. 2 bathrooms, paint throughout, no structural work. no interior wall changes. no exterior work | $122,000 |
| Apr 5, 2016 | Completed final sign-off Nov 2016 | 690 Funston Av | remodel kitchen & half bath to include minimal side yard expansion, 11 square feet below (e) legal room. add 16 s.f. light-well in-fill.Details
remodel kitchen & half bath to include minimal side yard expansion, 11 square feet below (e) legal room. add 16 s.f. light-well in-fill. | $68,000 |
| Jan 7, 2015 | Completed final sign-off Feb 2016 | 124 Jordan Av | remodel kitchen, remove rear bay window at kitchen, remodel extg 4 baths at 1st, 2nd, & 3rd floors. remove extg brick fireplace flues, and reconfigure baths and supplement extg structural. voluntary structural strengthening.Details
remodel kitchen, remove rear bay window at kitchen, remodel extg 4 baths at 1st, 2nd, & 3rd floors. remove extg brick fireplace flues, and reconfigure baths and supplement extg structural. voluntary structural strengthening. | $80,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 1980 Vallejo St | unit 1a - interior renovation of e basement living unit including e kitchen and e bath. new entry and interior doors, new plumbing fixtures, new interior partitons walls, new lighting, electrical & plbg work as required.replace e. window. n/a maher ordinanceDetails
unit 1a - interior renovation of e basement living unit including e kitchen and e bath. new entry and interior doors, new plumbing fixtures, new interior partitons walls, new lighting, electrical & plbg work as required.replace e. window. n/a maher ordinance | $68,000 |
| Feb 27, 2013 | Completed final sign-off Sep 2013 | 640 Davis St | to remodel 1 kitchen, 2 bathrooms, to install new lightimng, new hardwood floors . to paint unit throughout unit #40Details
to remodel 1 kitchen, 2 bathrooms, to install new lightimng, new hardwood floors . to paint unit throughout unit #40 | $173,000 |
| Jul 19, 2012 | Completed final sign-off Dec 2012 | 2077 Jackson St | work in unit #1: 1 kitchen remodel, 1 bathroom remodel, new hardwood floors and painting throughout. np structural work to be performed. no interior partition walls to be relocated or configured. lighting to comply with cec 180(k).Details
work in unit #1: 1 kitchen remodel, 1 bathroom remodel, new hardwood floors and painting throughout. np structural work to be performed. no interior partition walls to be relocated or configured. lighting to comply with cec 180(k). | $33,800 |
| Feb 22, 2012 | Completed final sign-off Feb 2012 | 2077 Jackson St | for administrative purpose only: to correct improper block & lot number which was written on pa# 201110146835, the correct block & lot is 0602-030. the scope of work included remodel existing kitchen & bath. all work has been completed.Details
for administrative purpose only: to correct improper block & lot number which was written on pa# 201110146835, the correct block & lot is 0602-030. the scope of work included remodel existing kitchen & bath. all work has been completed. | |
| Oct 14, 2011 | Expired or cancelled cancelled Mar 2012 | 2077 Jackson St | to remodel (1) existing kitchen and (1) existing bathroom. all fixtures to be replaced din kind, same locations as existing. to refinish all floors and paint throughout. no exterior work to be performed. no structural work to be performed.Details
to remodel (1) existing kitchen and (1) existing bathroom. all fixtures to be replaced din kind, same locations as existing. to refinish all floors and paint throughout. no exterior work to be performed. no structural work to be performed. | $28,000 |
| Jul 22, 2011 | Completed final sign-off Jan 2013 | 32 Forest Side Av | to remodel: 1-kitchen, 1-masterbathroom, 1-dining room, 1-family room. to add new recessed lighting thoughout house at 2nd & 3rd floor onlyDetails
to remodel: 1-kitchen, 1-masterbathroom, 1-dining room, 1-family room. to add new recessed lighting thoughout house at 2nd & 3rd floor only | $115,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2011 | 3501 Laguna St | to replace in kind kitchen cabinets and appliances. to replace in kind same locations all plmg fixtures in studio bathroom. no windows, wall,ceiling or wall work on this permit.to replace light fixtures and electrical outlets through out studio. no other work.Details
to replace in kind kitchen cabinets and appliances. to replace in kind same locations all plmg fixtures in studio bathroom. no windows, wall,ceiling or wall work on this permit.to replace light fixtures and electrical outlets through out studio. no other work. | $27,000 |
| Jul 21, 2008 | Completed final sign-off Oct 2008 | 1330 Francisco St | work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind.Details
work @ unit# 1332 only. install 2 new toilets, new pedestall sink & light fixtures in bathrooms. replace kitchen counters only. replace gas valve & install new appliances. install air gap into countertop. remove roof deck. repair roof & put deck back in kind. | $8,500 |
| May 30, 2008 | Completed final sign-off Mar 2009 | 751 12th Av | remodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new planDetails
remodel 2 1/2 existing bathrooms and 1 kitchen. repair in kind minimal rotten rear deck boards, bolt foundatin, strengthen basement walls with new plywood, remove interior kitchen staircase to remove and replace master bath and hall bath. non bearing interior walls and build to new plan | $155,000 |
| Apr 21, 2008 | Completed final sign-off Jan 2009 | 60 Mclaren Av | remodel kitchen and master bathroom, 2-1/2 guest bathrooms to be install, lighting & update electrical, remodel familyy room & dinning rm, to built in book cases & toy storage, no structural work.Details
remodel kitchen and master bathroom, 2-1/2 guest bathrooms to be install, lighting & update electrical, remodel familyy room & dinning rm, to built in book cases & toy storage, no structural work. | $325,000 |
| Mar 3, 2008 | Completed final sign-off May 2008 | 60 Mclaren Av | application to demolish 1 (e) kitchen, 4 (e) bathrooms. remodel plans are not finaled. permits for new kitchen and bathrooms to be pulled seperatly. no structural work to be performed with this permitDetails
application to demolish 1 (e) kitchen, 4 (e) bathrooms. remodel plans are not finaled. permits for new kitchen and bathrooms to be pulled seperatly. no structural work to be performed with this permit | $10,500 |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 601 Van Ness Av | to remodel (1) existing kitchen, (1) (e) bathroom, no interior or exterior wall changesDetails
to remodel (1) existing kitchen, (1) (e) bathroom, no interior or exterior wall changes | $32,500 |
| Sep 12, 2005 | Completed final sign-off Mar 2006 | 350 Brentwood Av | to remodel (1) kitchen, 3 1/2 bathrooms, family room, dining room and all bedrooms.Details
to remodel (1) kitchen, 3 1/2 bathrooms, family room, dining room and all bedrooms. | $296,000 |
| Jun 7, 2005 | Completed final sign-off Oct 2005 | 350 Brentwood Av | to remove all lathe & plaster from all walls in basement to remove only 1 existing kitchen; to removDetails
to remove all lathe & plaster from all walls in basement to remove only 1 existing kitchen; to remov | $36,850 |
| Mar 17, 2005 | Completed final sign-off Aug 2005 | 1177 Filbert St | to remodel (e) kitchen + to move walls ( interior only) in bathroom to new location, remodel (e)Details
to remodel (e) kitchen + to move walls ( interior only) in bathroom to new location, remodel (e) | $56,000 |
| Mar 8, 2005 | Completed final sign-off Aug 2005 | 171 25th Av | to remodel one new kitchen one new powder room and one new bathroom on 2nd/fl. no exterior work toDetails
to remodel one new kitchen one new powder room and one new bathroom on 2nd/fl. no exterior work to | $85,000 |
| Sep 29, 2003 | Completed final sign-off Feb 2004 | 112 Clifford Tr | to remodel 1 kitchen, 1 bathrm, and install new lighting, throughout downstairs only to replace allDetails
to remodel 1 kitchen, 1 bathrm, and install new lighting, throughout downstairs only to replace all | $38,500 |
| Mar 19, 2002 | Completed final sign-off May 2002 | 3785 21st St | refinish hardwood floors paint, new tile, sink tub, cabinets. all plumbing in kitchen & bedroom.Details
refinish hardwood floors paint, new tile, sink tub, cabinets. all plumbing in kitchen & bedroom. | $27,000 |
| May 22, 2000 | Completed final sign-off Aug 2000 | 3362 Sacramento St | kitchen remodeling, upgrade electrical move existing electrical plumbing for wash/dryerDetails
kitchen remodeling, upgrade electrical move existing electrical plumbing for wash/dryer | $14,500 |