Caruso Construction Inc.
- Based in
- Pacifica
- On San Francisco permits
- Oct 2001 to Jun 2026
- Last 24 months
- 7 permits filed
198 permits since 2000: 172 completed, 2 in progress, 10 never finaled, 14 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 8 completed, 2 in progress, 1 expired or cancelled. Typically 4 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 647 11th Av | revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entrywayDetails
revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entryway | |
| Dec 30, 2025 | In progress issued Apr 2026 | 647 11th Av | 2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fronDetails
2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fron | $150,000 |
| Nov 14, 2023 | Expired or cancelled expired Apr 2026 | 274 Casitas Av | replacement of interior stair (connecting 2nd fl to 1st fl) with new interior stair connecting 2nd fl to lower level. enclosing open area under (e) stair. removal of (e) exterior stair and cantilevered decks replacement. guest bath and master bath remodel (no layout changes). replacement ofDetails
replacement of interior stair (connecting 2nd fl to 1st fl) with new interior stair connecting 2nd fl to lower level. enclosing open area under (e) stair. removal of (e) exterior stair and cantilevered decks replacement. guest bath and master bath remodel (no layout changes). replacement of | $80,000 |
| Aug 3, 2016 | Completed final sign-off Jul 2017 | 185 San Leandro Wy | renovate kitchen, powder rm, two baths, demo & relocate one bath, replace & repair & relocate windows, add wood deck less than 30" above grade, replace roof deck wall, add finish at basement.Details
renovate kitchen, powder rm, two baths, demo & relocate one bath, replace & repair & relocate windows, add wood deck less than 30" above grade, replace roof deck wall, add finish at basement. | $80,000 |
| Jan 6, 2014 | Completed final sign-off May 2016 | 27 Buena Vista Tr | 1. sub-basement: add 1 br, 1 ba & 1 clo. 2. basmt: add deck. 3. 1/f: add 1 ba & deck. 4. 2/f: remodel one ba.Details
1. sub-basement: add 1 br, 1 ba & 1 clo. 2. basmt: add deck. 3. 1/f: add 1 ba & deck. 4. 2/f: remodel one ba. | $128,000 |
| Sep 30, 2013 | Completed final sign-off Jul 2015 | 2529 Vallejo St | 2 flush mount skylights in extg openings on 2nd floor deck. revision 201004089921Details
2 flush mount skylights in extg openings on 2nd floor deck. revision 201004089921 | $9,500 |
| Nov 20, 2012 | Completed final sign-off Feb 2013 | 739 Lake St | interior alterations of finishes, cabinetry, plumbing, appliances on upper levels including kitchen, family rm, master bath, master bedroom, laundry, bath & bedrooms. re-flooring top floor & providing wash-up sink. no changes to walls or square footage. repairing (e) decking in kind less than 50%.Details
interior alterations of finishes, cabinetry, plumbing, appliances on upper levels including kitchen, family rm, master bath, master bedroom, laundry, bath & bedrooms. re-flooring top floor & providing wash-up sink. no changes to walls or square footage. repairing (e) decking in kind less than 50%. | $25,000 |
| Oct 16, 2012 | Completed final sign-off Jan 2013 | 3225 Clay St | repair water damage at roof/deck penetrations.Details
repair water damage at roof/deck penetrations. | $8,000 |
| Apr 20, 2012 | Completed final sign-off Dec 2012 | 34 Wawona St | work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the houseDetails
work is the interior remodel of the (e) kitchen & master bedroom/bathroom & the addition of a rear deck. there is no work on the front of the house | $150,000 |
| Jan 14, 2005 | Completed final sign-off Mar 2005 | 215 Cherry St | repair dry rot at front entry stairs & deck, (less than 50 percent being replaced)Details
repair dry rot at front entry stairs & deck, (less than 50 percent being replaced) | $10,000 |
| Jun 10, 2003 | Completed final sign-off Jan 2004 | 820 Florida St | repair remodel to 2 story house over hadsement, repair (e) rear enclosed porch & rear deck, new foupDetails
repair remodel to 2 story house over hadsement, repair (e) rear enclosed porch & rear deck, new foup | $95,000 |