C & L Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Sep 2026
- Last 24 months
- 4 permits filed
95 permits since 2000: 86 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 13 completed. Typically 14 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2020 | Completed final sign-off Mar 2021 | 323 29th Av | revise previously approved application 201512044244 for stair configuration.Details
revise previously approved application 201512044244 for stair configuration. | |
| Oct 18, 2019 | Completed final sign-off Jan 2022 | 1544 Powell St | legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit.Details
legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit. | $15,000 |
| Jan 4, 2019 | Completed final sign-off Apr 2019 | 2339 29th Av | dry rot repair: rebuild existing wood deck & rear staircase in-kind. repair existing rear siding. replace rear door on basement level.Details
dry rot repair: rebuild existing wood deck & rear staircase in-kind. repair existing rear siding. replace rear door on basement level. | $20,000 |
| Jun 4, 2018 | Completed final sign-off Sep 2019 | 220 Taraval St | rebuild existing front stairDetails
rebuild existing front stair | $20,000 |
| Mar 13, 2018 | Completed final sign-off Dec 2018 | 220 Taraval St | new exterior stair canopy above 3rd floorDetails
new exterior stair canopy above 3rd floor | $5,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2019 | 746 Cabrillo St | extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.Details
extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407. | $80,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 1035 Market St | construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr flDetails
construction of tenant offices in e tenant suite on basement and gr level. construction of walls, ceilings, finishes. warming kitchen gr fl, plumbing, mech related to hvac. lighting, electrical, data outlets. reconfigure stair connecting basement and gr fl | $500,000 |
| May 6, 2013 | Completed final sign-off Jun 2013 | 1035 Market St | modification of (e) fire sprinkler system for partial basement & ground floor areas. no underground work. ti w/ 24 sprinklers for coverage of communicating stair.Details
modification of (e) fire sprinkler system for partial basement & ground floor areas. no underground work. ti w/ 24 sprinklers for coverage of communicating stair. | $3,000 |
| Mar 5, 2013 | Completed final sign-off Jan 2014 | 1035 Market St | removal of portion of grnd flr for stair frm ground to basement, installation of new elevator in (e) shaft, new compliant egress route to stevenson st, new air intake for smoke control system, new storefront, doors & walls for grnd flr/basement steDetails
removal of portion of grnd flr for stair frm ground to basement, installation of new elevator in (e) shaft, new compliant egress route to stevenson st, new air intake for smoke control system, new storefront, doors & walls for grnd flr/basement ste | $95,000 |
| Oct 25, 2010 | Completed final sign-off Dec 2010 | 1035 Market St | install 24 each fire sprinkers around new stairs opening on 3rd and 2nd floors. remove 10 each extg heads. relocate 17 each heads.Details
install 24 each fire sprinkers around new stairs opening on 3rd and 2nd floors. remove 10 each extg heads. relocate 17 each heads. | $7,500 |
| Sep 7, 2010 | Completed final sign-off Dec 2010 | 1035 Market St | remove portion of floor at floors 3 and 4 as req for new opening and stair. install steel stairs, handrails, guardrails between floors 2 and 3, 3 and 4Details
remove portion of floor at floors 3 and 4 as req for new opening and stair. install steel stairs, handrails, guardrails between floors 2 and 3, 3 and 4 | $57,200 |
| Jul 1, 2010 | Completed final sign-off Sep 2011 | 3491 Pacific Av | interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room.Details
interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room. | $350,000 |
| Jan 22, 2010 | Completed final sign-off Sep 2010 | 1035 Market St | construction of rated demising wall, construction of utility entrance with stairs on stevenson street & access entry on market street.Details
construction of rated demising wall, construction of utility entrance with stairs on stevenson street & access entry on market street. | $34,200 |