Back to bathroom remodel contractors
C & L Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Sep 2026
- Last 24 months
- 4 permits filed
95 permits since 2000: 86 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 23 completed, 2 in progress. Typically 10 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 748 Cabrillo St | revision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor.Details
revision various drawing pages to pa#202604240029 to change outside bathroom shower to tub, add 1 sink in primary bathroom, add 1 mop sink in utility room. change hydronic radiant floor heating system to heat pump. additionally, remove w/d/laundry sink from 2nd floor. | |
| Apr 24, 2026 | In progress issued May 2026 | 748 Cabrillo St | 3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit.Details
3/f - unit 748: interior remodel in duplex building. relocate existing living room and bedroom. add 1 bathroom. 3/f window replacement and skylights under separate permit. | $180,000 |
| Oct 21, 2022 | Completed final sign-off Mar 2025 | 217 16th Av | interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plansDetails
interior remodel to (e) 2 unit dwelling per plans. unit 217: remove 2nd floor powder and laundry. unit 219: remove 2 bath tubs, no change to exterior. no added conditioned space. remodel in both units includes kitchens and baths and minor wall reconfigurations per plans | $80,000 |
| Sep 5, 2020 | Completed final sign-off Feb 2022 | 1610 41st Av | new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor.Details
new rear deck on 2nd floor. add new master bathroom, one powder room, relocate (e) kitchen on 2nd floor. add (n) mechanical room & laundry on 1st floor. | $70,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2022 | 1544 Powell St | legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit.Details
legalize (e) unit in basement per ordinance # 43-14. (1 bedroom & 1 bathroom unit). add adu @ basement under separate permit. remove internal stairs in unit. | $15,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2022 | 1544 Powell St | add adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window.Details
add adu @ basement per ordinance# 162-16. (1 bedroom & 1 bathroom unit). legalize (e) unit under separate permit. replace (e) entry door with glass window. | $15,000 |
| Apr 2, 2019 | Completed final sign-off Aug 2019 | 746 Cabrillo St | revise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room.Details
revise pa 201801188877. add 1 bathroom, change t24 to radiant heat, infill under rear popout for utility room. | $10,000 |
| Feb 21, 2019 | Completed final sign-off Jan 2020 | 60 Yerba Buena Av | interior kitchen & master bathroom remodel. no change to exterior.Details
interior kitchen & master bathroom remodel. no change to exterior. | $50,000 |
| Mar 27, 2018 | Completed final sign-off Aug 2018 | 85 El Verano Wy | remodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room.Details
remodel ground flr: convert laundry rm to bathroom, garage & utility room. no change to ecterior or structural. remove office behind garage. extend garage space w/sink, counter & outlets. move existing laundry to utility room. | $8,000 |
| Mar 20, 2018 | Completed final sign-off Mar 2024 | 1534 17th Av | vertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms.Details
vertical & horizontal addition. add 3rd fl, extend 1st & 2nd fl @ rear. excavate ground fl for ceiling height. remodel front facade & entry. add (2) bathrooms & (3) bedrooms. | $400,000 |
| Feb 6, 2018 | Completed final sign-off Jan 2019 | 1666 45th Av | revision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kindDetails
revision to pa 2018/-0112-/8508 - remodel sfd, fill in below existing rear 2nd story pop out. add rear deck in buildable area. add 2 bedrooms, bathroom, add bar on 1st floor. new bathroom on 2nd floor. replace windows in kind | $100,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2019 | 746 Cabrillo St | extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407.Details
extend unit 746 to gr fl. reconstruct rear stairs. remodel kitchen, add 1 bath. replace side and rear windows with alum frame. no change to front facade. revision to permit 2017-1017-1407. | $80,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 1666 45th Av | remodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior.Details
remodel interior of (e) single family dwelling., 2nd flr- remodel bathroom add beam in ceiling. 1st flr - reinforce garage beam, replace foundation, remove interior finishes for exploratory demo. no change to floor plan or exterior. | $20,000 |
| Jul 27, 2017 | Completed final sign-off Jan 2018 | 220 Taraval St | unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work.Details
unit #4 remodel & alteration at 3rd floor. renovate one kitchen & one bathroom. relocate entry door & window. no structural work. | $20,000 |
| Dec 6, 2016 | Completed final sign-off Jul 2017 | 220 Taraval St | interior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior.Details
interior remodel of unit #3 on the 3rd floor. add one bedroom and one bathroom. no change to exterior. | $10,000 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 2130 32nd Av | remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only.Details
remodel (e) living, dining, kitchen & full bath. convert closet to create new powder room. work on 2nd floor only. | $40,000 |
| May 19, 2015 | Completed final sign-off Aug 2015 | 675 28th St | existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door.Details
existing kitchen & 2 bath rooms, refinish, no structural work, exterior & interior painting work, no alteration of wall, window and door. | $20,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 1275 21st Av | remodel existing one full bathroom on 3rd floor per plan.Details
remodel existing one full bathroom on 3rd floor per plan. | $8,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 3176 Washington St | interior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress.Details
interior remodel - add 2nd floor bathroom & relocate closets, no changes to structural system or egress. | $10,000 |
| Aug 25, 2014 | Completed final sign-off Jan 2015 | 1277 21st Av | remodel existing kitchen & one bathroom on 2nd floor per plan.Details
remodel existing kitchen & one bathroom on 2nd floor per plan. | $20,000 |
| Dec 28, 2011 | Completed final sign-off Feb 2013 | 1170 Sacramento St | unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixturesDetails
unit #11d-interior remodel of residential condo, no work on common walls or exterior envelope. egress route to remain throughout construction. combine master bathrooms, rebuild kitchen & bathroom fixtures | $80,000 |
| Jul 1, 2010 | Completed final sign-off Sep 2011 | 3491 Pacific Av | interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room.Details
interior remodel of (e0 building. replace (e0 4 story elevator. remove accessory stair. relocate (e) furnace and water heater. replace exterior windows on rear and side. add 1 full bath room. | $350,000 |
| May 19, 2009 | Completed final sign-off Aug 2009 | 311 California St | permit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along withDetails
permit revision to pa#200904247031, demolition revealed a 7" heigh difference between the tenant suite and common area restrooms. in order to provide an accessible restroom to each level, we are raising the slab at one bathroom and making the both unisex. all plumbing & electrical devices along with | $10,000 |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 311 California St | barrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories.Details
barrier removal. provide access to ada restroom from ground floor tenant suite. reconfigure bathroom affected by demolition to remain ada compliant. provide new toilet and sink and accessories. | $20,000 |
| Apr 3, 2008 | Completed final sign-off Jun 2008 | 2240 Hyde St | work @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain.Details
work @ unit# 5 only. existing 2 bathrooms fixtures & tiles replaced. no structural (e) light fixtures to remain. | $12,000 |