130 permits since 2000: 101 completed, 2 in progress, 14 never finaled, 13 expired or cancelled. Typically 0 days from filing to permit and 146 days from permit to final inspection. Of the 14 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.

- Based in: San Francisco
- On San Francisco permits: Nov 2003 to Aug 2026
- Last 24 months: 3 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2003 | 1 | 0 | 0 | 1 |
| 2004 | 1 | 0 | 0 | 0 |
| 2005 | 8 | 0 | 2 | 0 |
| 2006 | 9 | 0 | 1 | 6 |
| 2007 | 21 | 0 | 3 | 3 |
| 2008 | 2 | 0 | 1 | 0 |
| 2015 | 6 | 0 | 0 | 0 |
| 2016 | 11 | 0 | 1 | 0 |
| 2017 | 7 | 0 | 1 | 0 |
| 2018 | 9 | 0 | 0 | 0 |
| 2019 | 5 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 0 |
| 2021 | 8 | 0 | 2 | 1 |
| 2022 | 7 | 0 | 0 | 1 |
| 2023 | 2 | 0 | 2 | 0 |
| 2024 | 2 | 1 | 0 | 1 |
| 2026 | 2 | 1 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Stairs | 16 | 15 | 0 | 1 | 0 | 2 | 166 |
| Kitchen remodel | 53 | 46 | 1 | 3 | 3 | 0 | 148 |
| Bathroom remodel | 68 | 57 | 1 | 5 | 5 | 0 | 172 |
| Deck | 11 | 8 | 0 | 2 | 1 | 1 | 208 |

## Most recent permits

The 100 most recent of 130.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202608056131](https://www.permitgraph.org/p/202608056131) | Aug 5, 2026 | In progress: issued Aug 2026 | [738 43rd Av](https://www.permitgraph.org/a/1602/027F) | to obtain final inspection for work performed under pa#202307172308, 202401123939, & pa#202212208800. all work is complete. |  |
| [202601224314](https://www.permitgraph.org/p/202601224314) | Jan 22, 2026 | Completed: final sign-off May 2026 | [2551 29th Av](https://www.permitgraph.org/a/2430/009A) | remodel kitchen in kind. no wall modification, no structural work. | $20,000 |
| [202601224351](https://www.permitgraph.org/p/202601224351) | Jan 22, 2026 | Completed: final sign-off Apr 2026 | [1622 10th Av](https://www.permitgraph.org/a/1934/038) | recommencement and completion of work approved under pa# 202203119800. | $5,000 |
| [202411215471](https://www.permitgraph.org/p/202411215471) | Nov 21, 2024 | Expired or cancelled: expired Apr 2026 | [1622 10th Av](https://www.permitgraph.org/a/1934/038) | commencement of work not started under previously approved permit. application pa #202203119800. | $50,000 |
| [202405091809](https://www.permitgraph.org/p/202405091809) | May 9, 2024 | Completed: final sign-off Jun 2024 | [2522 38th Av](https://www.permitgraph.org/a/2438/034) | remove old stucco in front of the house. replace two windows in front with wood-clad. replace front door. | $25,000 |
| [202401194285](https://www.permitgraph.org/p/202401194285) | Jan 19, 2024 | Completed: final sign-off Jan 2024 | [19 Salmon St](https://www.permitgraph.org/a/0158/036) | to comply w/nov# 202176581, replace kitchen exhaust fan. | $1,000 |
| [202401123939](https://www.permitgraph.org/p/202401123939) | Jan 12, 2024 | In progress: issued Jan 2024 | [738 43rd Av](https://www.permitgraph.org/a/1602/027F) | revision to approved pa# 202307172308: relocated bathroom and kitchenette. |  |
| [202311171058](https://www.permitgraph.org/p/202311171058) | Nov 17, 2023 | Completed: final sign-off Nov 2024 | [156 Elmira St](https://www.permitgraph.org/a/5377/016) | ground floor: to add (2) bedroom and a full bath, media room. storage, and laundry room. | $80,000 |
| [202310209138](https://www.permitgraph.org/p/202310209138) | Oct 20, 2023 | Never finaled: issued Oct 2023, no final | [440 10th Av](https://www.permitgraph.org/a/1535/035) | kitchen remodeling | $8,000 |
| [202307172308](https://www.permitgraph.org/p/202307172308) | Jul 17, 2023 | Never finaled: issued Aug 2023, no final | [738 43rd Av](https://www.permitgraph.org/a/1602/027F) | 1/f: construct (2) bedrooms, laundry, bathroom, kitchenette (2 burner, no oven). | $54,000 |
| [202303073143](https://www.permitgraph.org/p/202303073143) | Mar 7, 2023 | Completed: final sign-off Jul 2023 | [2024 Moraga St](https://www.permitgraph.org/a/1917/013) | to comply with #202303161. add new siding over the extg siding right side. | $23,000 |
| [202205063726](https://www.permitgraph.org/p/202205063726) | May 6, 2022 | Completed: final sign-off Jul 2022 | [155 Masonic Av](https://www.permitgraph.org/a/1108/003C) | bathroom remodel: no new wall and no existing wall relocation. plumbing fixture count remain the same as existing. new lighting shall comply with cec 150.0(k)5. | $18,000 |
| [202204111930](https://www.permitgraph.org/p/202204111930) | Apr 11, 2022 | Completed: final sign-off Aug 2022 | [1267 Pacific Av](https://www.permitgraph.org/a/0183/032) | apt 3: remodel (e) 1 kitchen & 1 bathroom. new fixtures. work in-kind, no layout changes or wall modifications. no structural work. no framing modifications. | $30,000 |
| [202203119800](https://www.permitgraph.org/p/202203119800) | Mar 11, 2022 | Expired or cancelled: expired Nov 2024 | [1622 10th Av](https://www.permitgraph.org/a/1934/038) | comply with nov 202185673 and 202287504. 1)install family room, bedroom, and bathroom at 1st floor. 2) remodeling extg kitchen, change extg windows at lightwell to casement windows at 2nd floor only.… | $50,000 |
| [202202077492](https://www.permitgraph.org/p/202202077492) | Feb 7, 2022 | Completed: final sign-off Jul 2022 | [184 07th Av](https://www.permitgraph.org/a/1366/027) | remodel kitchen and 1 1/2 bathroom. rewire electrical painting. replace 4 windows at kitchen. non street facing. | $48,000 |
| [202202077457](https://www.permitgraph.org/p/202202077457) | Feb 7, 2022 | Completed: final sign-off Mar 2022 | [65 Blake St](https://www.permitgraph.org/a/1067/013) | to comply with nov 202185726. repair/replace the damaged post and post footing. no exterior work, interior only. | $8,000 |
| [202202077488](https://www.permitgraph.org/p/202202077488) | Feb 7, 2022 | Completed: final sign-off Jul 2022 | [157 07th Av](https://www.permitgraph.org/a/1367/014) | remodel kitchen and 1 1/2 bathroom. painting. | $35,000 |
| [202201317034](https://www.permitgraph.org/p/202201317034) | Jan 31, 2022 | Completed: final sign-off Feb 2022 | [1622 10th Av](https://www.permitgraph.org/a/1934/038) | revision to bpa#202201035260: clear violation #202185673 to replace two windows in kind at rear, non street facking. | $2,000 |
| [202201035260](https://www.permitgraph.org/p/202201035260) | Jan 3, 2022 | Completed: final sign-off Feb 2022 | [1622 10th Av](https://www.permitgraph.org/a/1934/038) | replace siding wood at back and painting. rear window installation in-kind (4) windows total.not visible from street | $8,000 |
| [202110130376](https://www.permitgraph.org/p/202110130376) | Oct 13, 2021 | Completed: final sign-off Feb 2023 | [431 San Miguel St](https://www.permitgraph.org/a/7038/026) | proposed 2 bedroom, 1 full bathroom, and a hall way at extg 1st floor. | $56,000 |
| [202109168538](https://www.permitgraph.org/p/202109168538) | Sep 16, 2021 | Expired or cancelled: expired Apr 2026 | [50 Hazelwood Av](https://www.permitgraph.org/a/3138/017) | construct 2 bedroom, 2 full bath, & media room at ground floor. remodel (e) kitchen & 2 full bathroom on 2nd floor. | $138,000 |
| [202108065951](https://www.permitgraph.org/p/202108065951) | Aug 6, 2021 | Never finaled: issued Apr 2022, no final | [436 Ofarrell St](https://www.permitgraph.org/a/0317/005) | revision to p.a. 2008-0805-8406. smoke containment work to an existing 6-stop. no structural work. voluntary accessibility improvement to unit 502. | $42,800 |
| [202108035665](https://www.permitgraph.org/p/202108035665) | Aug 3, 2021 | Completed: final sign-off Feb 2022 | [2432 42nd Av](https://www.permitgraph.org/a/2384/024) | the proposed horizontal addition and adu is under pa #2016 0127 8150. this permit is for title-24 energy design req by inspector only. |  |
| [202107204774](https://www.permitgraph.org/p/202107204774) | Jul 20, 2021 | Completed: final sign-off Mar 2022 | [3919 Pacheco St](https://www.permitgraph.org/a/2163/052) | remodel kitchen and bath, remove walls on 2nd floor. infill below bedroom, add a full bath on 1st floor. replace deck at rear. replace water heater, furnace. upgrade electrical and plumbing system. a… | $100,000 |
| [202107154401](https://www.permitgraph.org/p/202107154401) | Jul 15, 2021 | Completed: final sign-off Oct 2021 | [122 Ordway St](https://www.permitgraph.org/a/6158/024) | remodel kitchen and bathroom. rewiring electrical, painting. refinish hardwood flooling. replace four window at back of house. | $53,000 |
| [202105261094](https://www.permitgraph.org/p/202105261094) | May 26, 2021 | Completed: final sign-off Apr 2022 | [431 San Miguel St](https://www.permitgraph.org/a/7038/026) | to comply with nov 202177076. 2nd fl only. add a new bath rm. relocated (e) kitchen to dining room. change (e) kitchen to home office. renew all electrical. remove (e) stairs. repair front dry rot ab… | $45,000 |
| [202105200738](https://www.permitgraph.org/p/202105200738) | May 20, 2021 | Completed: final sign-off Jan 2022 | [3719 Alemany Bl](https://www.permitgraph.org/a/7133/009) | 1st floor; convert storage into living space. add 2 bedrooms, 1 full bath & media. 2nd fl: remodel kitchen & bath. add office & 1 full bath. add new deck at rear. | $80,000 |
| [202103227035](https://www.permitgraph.org/p/202103227035) | Mar 22, 2021 | Completed: final sign-off Aug 2021 | [2921 Judah St](https://www.permitgraph.org/a/1819/043) | add a family room & a full bath on 1st fl. add vinyl window & door at rear. relocate/replace water heater, furnace & entry door. upgrade electrical & plumbing system. | $50,000 |
| [202103156523](https://www.permitgraph.org/p/202103156523) | Mar 15, 2021 | Never finaled: issued Mar 2021, no final | [239 Phelan Av](https://www.permitgraph.org/a/3160/001) | remodel 2/f bathroom. tub to showerpan. | $16,000 |
| [202103156521](https://www.permitgraph.org/p/202103156521) | Mar 15, 2021 | Completed: final sign-off Jul 2021 | [1377 17th Av](https://www.permitgraph.org/a/1772/005E) | remodel kitchen. | $12,000 |
| [202009255009](https://www.permitgraph.org/p/202009255009) | Sep 25, 2020 | Never finaled: issued Jun 2021, no final | [2638 39th Av](https://www.permitgraph.org/a/2458/013) | add2 bedrooms, 2 bath, 1 media room on ground floor. relocate kitchen, add 1 bath on 2nd floor. add new deck at rear of house less than 10' high. | $68,888 |
| [201911126944](https://www.permitgraph.org/p/201911126944) | Nov 12, 2019 | Completed: final sign-off Apr 2021 | [2136 Alemany Bl](https://www.permitgraph.org/a/6970/002B) | to legalize the dwelling unit w/ 2 bedrooms, 1 bath and 1 kitchen at 1st flr to comply w/ ord# 43-14. | $45,000 |
| [201909272978](https://www.permitgraph.org/p/201909272978) | Sep 27, 2019 | Completed: final sign-off Jun 2020 | [83 Ledyard St](https://www.permitgraph.org/a/5395/034) | rev pa# 201807194977; comply with complaint #201951711, 1st fl reconfigure layout per plan, 2nd fl. remodel kitchen & bath room, convert half bath to full bath | $36,500 |
| [201905080171](https://www.permitgraph.org/p/201905080171) | May 8, 2019 | Completed: final sign-off Jun 2020 | [83 Ledyard St](https://www.permitgraph.org/a/5395/034) | replace the front window and replace stucco in-kind. winodws in exisitng openings, 2 casement, 1 picture, no lower transom. marvin ultimate alum. clad wood | $1,500 |
| [201902284121](https://www.permitgraph.org/p/201902284121) | Feb 28, 2019 | Completed: final sign-off Mar 2019 | [438 Ofarrell St](https://www.permitgraph.org/a/0317/006) | to comply with complaint 201921721, items 2/3/4: repair garage room. | $5,000 |
| [201901089811](https://www.permitgraph.org/p/201901089811) | Jan 8, 2019 | Completed: final sign-off Jun 2019 | [4800 Geary Bl](https://www.permitgraph.org/a/1444/018A) | repair back stairs, less 50%. repair in kind. naher n/a | $4,000 |
| [201812218999](https://www.permitgraph.org/p/201812218999) | Dec 21, 2018 | Completed: final sign-off Nov 2020 | [1318 18th Av](https://www.permitgraph.org/a/1772/007) | remodeling (e) 2nd fl kitchen, bath room, provide additional 2- baths, convert (e) dining rm to bed rm. front building | $55,000 |
| [201812148353](https://www.permitgraph.org/p/201812148353) | Dec 14, 2018 | Completed: final sign-off Sep 2019 | [651 Geneva Av](https://www.permitgraph.org/a/6965B/034) | add 2 bedrooms, media room, and 2 bathrooms on ground floor. relocate kitchen on 2nd floor. | $40,000 |
| [201809139990](https://www.permitgraph.org/p/201809139990) | Sep 13, 2018 | Completed: final sign-off Jan 2026 | [1763 37th Av](https://www.permitgraph.org/a/2012/016) | proposed alteration and horizontal addition at rear bldg. 2nd flr add a master bedroom & bathroom @ rear. 1st flr add a new unit with 1 bedroom, 1 bathroom and kitchen/living room. | $180,000 |
| [201808217857](https://www.permitgraph.org/p/201808217857) | Aug 21, 2018 | Completed: final sign-off Mar 2019 | [43 Athens St](https://www.permitgraph.org/a/5946/036) | remodel (e) kitchen bathrm, add 1 new bathrm & convert (e) living rm to bedrm; 2nd fl - upgrade (e) family rm, construct 1 bedrm & full bathrm @ ground floor; construct new deck with staircase at rea… | $72,000 |
| [201807194977](https://www.permitgraph.org/p/201807194977) | Jul 19, 2018 | Completed: final sign-off Jun 2020 | [83 Ledyard St](https://www.permitgraph.org/a/5395/034) | construct new media room, two bedrooms, two bathrooms, storage & laundry room at 1st (ground) floor per plans. | $45,000 |
| [201805159191](https://www.permitgraph.org/p/201805159191) | May 15, 2018 | Completed: final sign-off May 2018 | [59 Stoneyford Av](https://www.permitgraph.org/a/5886/037) | replace siding of house, northside, about 600 sq ft on the third floor. not visible from street | $6,000 |
| [201805048199](https://www.permitgraph.org/p/201805048199) | May 4, 2018 | Completed: final sign-off Aug 2018 | [620 Mendell St](https://www.permitgraph.org/a/5254/002) | non-structural interior remodel to include 1st fl - add a wall to creat a hall to yard; 2nd fl - add 1 full bath, convert (e), living room to office & bedroom | $25,000 |
| [201804136340](https://www.permitgraph.org/p/201804136340) | Apr 13, 2018 | Completed: final sign-off Aug 2019 | [2500 28th Av](https://www.permitgraph.org/a/2428/020) | construct two bedrooms, two full baths ground floor; per plans. | $15,000 |
| [201802211870](https://www.permitgraph.org/p/201802211870) | Feb 21, 2018 | Completed: final sign-off Nov 2020 | [1318 18th Av](https://www.permitgraph.org/a/1772/007) | unit legalization per ordinance 43-14 at 1st flr front building, building a. | $53,000 |
| [201709137929](https://www.permitgraph.org/p/201709137929) | Sep 13, 2017 | Completed: final sign-off Jun 2018 | [1833 Kirkham St](https://www.permitgraph.org/a/1868/041) | 2/f: remove dryrot balcony, remodel (e) kitchen & bathroom, add 1 new bathroom, enclosed (e) light court, add skylight. 1/f: new bedroom, bathroom & family room, relocate interior stairs, replace int… | $160,000 |
| [201708013590](https://www.permitgraph.org/p/201708013590) | Aug 1, 2017 | Completed: final sign-off Aug 2022 | [1939 Ocean Av](https://www.permitgraph.org/a/6915/025) | tenant improvement for extg limited restaurant for health dept. change of ownership, update accessibility, restroom and counter. refurbish/remove/relocate and or replace kitchen equipments. | $12,000 |
| [201707172077](https://www.permitgraph.org/p/201707172077) | Jul 17, 2017 | Completed: final sign-off Aug 2017 | [571 26th Av](https://www.permitgraph.org/a/1518/013) | remodel kitchen, change cabinets, counter top, no change on walls. | $6,800 |
| [201707172032](https://www.permitgraph.org/p/201707172032) | Jul 17, 2017 | Completed: final sign-off Sep 2018 | [2146 31st Av](https://www.permitgraph.org/a/2187/017) | unit legalization per ordinance# 43-14 @ 1st floor. 2 bedrooms & 1 full bathroom. | $45,000 |
| [201705307843](https://www.permitgraph.org/p/201705307843) | May 30, 2017 | Completed: final sign-off Jan 2018 | [806 44th Av](https://www.permitgraph.org/a/1686/040) | install2 bedrooms, 1 bath, hall & laundry at 1st fl | $48,000 |
| [201705025400](https://www.permitgraph.org/p/201705025400) | May 2, 2017 | Completed: final sign-off Oct 2017 | [2530 16th Av](https://www.permitgraph.org/a/2416/012) | rearrange/remodel bedrooms, bath, kitchen and stairs, add bath on 2nd floor. add bedrooms, family, storage, full bath 1st fl. replace relocate windows doors. relocate water heater, furnace. upgrade e… | $90,000 |
| [201704244720](https://www.permitgraph.org/p/201704244720) | Apr 24, 2017 | Never finaled: issued Apr 2017, no final | [58 Blake St](https://www.permitgraph.org/a/1068/008) | replace wood on decks (parts), not to exceed 50%. | $2,800 |
| [201703242346](https://www.permitgraph.org/p/201703242346) | Mar 24, 2017 | Completed: final sign-off Aug 2018 | [2339 California St](https://www.permitgraph.org/a/0653/038) | to comply with nov 201763041 remodel of kitchen in unit 12 | $15,000 |
| [201608225653](https://www.permitgraph.org/p/201608225653) | Aug 22, 2016 | Completed: final sign-off May 2017 | [837 32nd Av](https://www.permitgraph.org/a/1675/001G) | legalize (e) bedroom, (e) bath and add half bath on 1st floor. add (n) master bath, relocate ktichen on 2nd floor. replace 17 windows in-kind (wood at front) with u=0.32 and replace stucco in lower f… | $67,000 |
| [201608054291](https://www.permitgraph.org/p/201608054291) | Aug 5, 2016 | Completed: final sign-off Aug 2017 | [1133 Bacon St](https://www.permitgraph.org/a/6038/038) | install 2 bedrooms and 1 bathroom at 1st floor. | $45,000 |
| [201608024021](https://www.permitgraph.org/p/201608024021) | Aug 2, 2016 | Completed: final sign-off Aug 2016 | [706 46th Av](https://www.permitgraph.org/a/1599/038) | comply with notice of violation complaint # 201622774. replace (4) windows in the rear bedroom. patch hole in the wall, repair sink in the kitchen, repair bath toilet. install electrical outlet in th… | $1,000 |
| [201607152483](https://www.permitgraph.org/p/201607152483) | Jul 15, 2016 | Completed: final sign-off Dec 2016 | [30 Encanto Av](https://www.permitgraph.org/a/1115/020) | remodel 2/f 1 kitchen and 2 full bathrooms. replace exh fans inkind. replace fireplace at 2/f with gas, direct vent. instlal per mfg install reqs. replace dry rot siding wood at s/s wall about 300sf.… | $53,000 |
| [201606039093](https://www.permitgraph.org/p/201606039093) | Jun 3, 2016 | Completed: final sign-off Aug 2016 | [2433 Larkin St](https://www.permitgraph.org/a/0524/005) | #5- remodel kitchen, everything remaining in same location. | $9,800 |
| [201605258299](https://www.permitgraph.org/p/201605258299) | May 25, 2016 | Completed: final sign-off Oct 2016 | [15 Grand View Tr](https://www.permitgraph.org/a/2715/016) | existing 2nd exits wood balcony at 2/f and 3/f to be repaired. existing stairs to be rebuilt at 1st fl, rear of building | $20,000 |
| [201605127250](https://www.permitgraph.org/p/201605127250) | May 12, 2016 | Completed: final sign-off Aug 2017 | [507 Divisadero St](https://www.permitgraph.org/a/1204/008) | remodeling extg unit "a" at 2nd floor. remodeling kitchen, add 1 bath room, change extg bedroom to 2 bedroom. new furnace. | $35,000 |
| [201603313667](https://www.permitgraph.org/p/201603313667) | Mar 31, 2016 | Completed: final sign-off Aug 2018 | [106 06th St](https://www.permitgraph.org/a/3726/002) | comply with nov 201547101 item no 15 and 16. handrails at basement | $200 |
| [201603162210](https://www.permitgraph.org/p/201603162210) | Mar 16, 2016 | Completed: final sign-off Aug 2016 | [718 39th Av](https://www.permitgraph.org/a/1606/042) | remodel kitchen, baths and bedroom on 2nd floor create hallway to study | $20,000 |
| [201602250495](https://www.permitgraph.org/p/201602250495) | Feb 25, 2016 | Never finaled: issued May 2016, no final | [2238 39th Av](https://www.permitgraph.org/a/2311/015A) | 1st floor - add 2 bedrooms, 1 bath and family room. 2nd floor - remodel bathroom. no work visible from the street. | $55,000 |
| [201601278150](https://www.permitgraph.org/p/201601278150) | Jan 27, 2016 | Completed: final sign-off Feb 2022 | [2432 42nd Av](https://www.permitgraph.org/a/2384/024) | rear (2) stories horizontal rear addtion. add adu at the ground floor. | $200,000 |
| [201601046312](https://www.permitgraph.org/p/201601046312) | Jan 4, 2016 | Completed: final sign-off Apr 2016 | [766 39th Av](https://www.permitgraph.org/a/1606/031) | remodel 2nd floor full bathroom. no walls moved, removed, added or infilled. all extg layouts to remain unchanged. | $14,000 |
| [201511031637](https://www.permitgraph.org/p/201511031637) | Nov 3, 2015 | Completed: final sign-off Apr 2016 | [2300 16th Av](https://www.permitgraph.org/a/2344B/021) | revision to bpa 201505156485; to add stair/landing to provide 44" max height for bedroom egress window. | $500 |
| [201510301227](https://www.permitgraph.org/p/201510301227) | Oct 30, 2015 | Completed: final sign-off Aug 2016 | [15 Emerson St](https://www.permitgraph.org/a/1070/001E) | remodel of (e) basement for addition of new living space, including new master bedroom, new master bathrm,&new powder rm,connected to (e)1st flr living space by (e)visually open connecting stair,relo… | $80,000 |
| [201508073663](https://www.permitgraph.org/p/201508073663) | Aug 7, 2015 | Completed: final sign-off Oct 2016 | [460 Monticello St](https://www.permitgraph.org/a/6926/015) | 1st flr alteration to add 3 bedrooms, family room, 2 full baths & laundry room. remodel kitchen & bathroom, add a new bathroom on 2nd flr. install 11 windows, retrofit 2 windows. | $120,000 |
| [201507080885](https://www.permitgraph.org/p/201507080885) | Jul 8, 2015 | Completed: final sign-off Aug 2015 | [2254 38th Av](https://www.permitgraph.org/a/2312/019) | 2nd floor: remodel bathroom. re-tile and change toilet. no walls to be moved. no structural work. | $3,000 |
| [201506118714](https://www.permitgraph.org/p/201506118714) | Jun 11, 2015 | Completed: final sign-off Aug 2015 | [186 Peabody St](https://www.permitgraph.org/a/6305/017) | install new deck with stair at rear | $6,000 |
| [201505156485](https://www.permitgraph.org/p/201505156485) | May 15, 2015 | Completed: final sign-off Apr 2016 | [2300 16th Av](https://www.permitgraph.org/a/2344B/021) | add 2 bedrooms, 1 full bathroom, 1 wet bar and a family with foundation repair. | $90,000 |
| [200808058406](https://www.permitgraph.org/p/200808058406) | Aug 5, 2008 | Never finaled: issued Feb 2016, no final | [436 Ofarrell St](https://www.permitgraph.org/a/0317/005) | converting of nine offices to nine residential units | $15,000 |
| [200801243171](https://www.permitgraph.org/p/200801243171) | Jan 24, 2008 | Completed: final sign-off Jul 2008 | [287 Teddy Av](https://www.permitgraph.org/a/6234/028) | remodel kitchen and bath, no wall changes | $14,000 |
| [200801112364](https://www.permitgraph.org/p/200801112364) | Jan 11, 2008 | Completed: final sign-off May 2008 | [2807 Bryant St](https://www.permitgraph.org/a/4335/004A) | remodeled (e) kitchen in both units. kitchen location remains same. also, remodeled bathrooms in both units. | $7,000 |
| [200712211142](https://www.permitgraph.org/p/200712211142) | Dec 21, 2007 | Completed: final sign-off Jan 2008 | [3217 Santiago St](https://www.permitgraph.org/a/2372/047) | reroofing. | $3,500 |
| [200712211134](https://www.permitgraph.org/p/200712211134) | Dec 21, 2007 | Never finaled: issued Dec 2007, no final | [65 Medau Pl](https://www.permitgraph.org/a/0088/010) | replace sheetrock to basement walls & ceiling with 5/5" type "x" gyp bd. repair handrail adj. unit# 556a & # 556b. repair stairs adj unit# 556a & # 556b. | $3,000 |
| [200711168300](https://www.permitgraph.org/p/200711168300) | Nov 16, 2007 | Completed: final sign-off Aug 2008 | [567 Silver Av](https://www.permitgraph.org/a/5895/005A) | interior remodel to provide at ground floor new bedroom,bathroom,laundry,and play room, 2nd floor-remodel kitchen,relocate bathroomrepair termite damge on 2 floors | $45,000 |
| [200711148180](https://www.permitgraph.org/p/200711148180) | Nov 14, 2007 | Completed: final sign-off Apr 2008 | [735 Naples St](https://www.permitgraph.org/a/6340/040) | ref. 2004/0722/9572. to comply with n.o.v. #200725410 to infill lightwell and new stairs to second floor. removed stairwell and closed access to upstairs in front of building. | $10,000 |
| [200710236156](https://www.permitgraph.org/p/200710236156) | Oct 23, 2007 | Completed: final sign-off Jan 2008 | [656 Girard St](https://www.permitgraph.org/a/6120/008) | alteration to existing 2nd floor to respond compliant #200726566. 1. to add one new half bath room on (e) walk-in-closet area. 2. convert (e) dining room to new computer room use. 3. remodel (e) bath… | $18,000 |
| [200710034443](https://www.permitgraph.org/p/200710034443) | Oct 3, 2007 | Completed: final sign-off Jun 2008 | [1451 29th Av](https://www.permitgraph.org/a/1824/010) | interior remodel of kitchen & bathrooms. upstairs will have 3 baths, 2 bedrooms with office. downstairs will have 2 new bedroom, 2 bath. add new beams @ 2/f kitchen, infilling lightwell 2 total. remo… | $99,000 |
| [200709112318](https://www.permitgraph.org/p/200709112318) | Sep 11, 2007 | Completed: final sign-off Dec 2007 | [728 Pacific Av](https://www.permitgraph.org/a/0161/051) | work @ unit# 201. soft demo. of 2nd flr. restaurant, including dining, kitchen & service area. remove (e) non-strl. walls, suspended ceiling, furred walls & columns, equip, fixtures, light & plumb fi… | $25,000 |
| [200707136699](https://www.permitgraph.org/p/200707136699) | Jul 13, 2007 | Completed: final sign-off Sep 2007 | [1477 09th Av](https://www.permitgraph.org/a/1844/016) | comply w/ nov 200710232 dated 7/03/07, g/f, remodel illegal kitchen & wall heater, remodel bath to 1/2 bath, 2nd fl remodel bathrms. repari rear stairs per his complain #200709932 | $20,000 |
| [200707096228](https://www.permitgraph.org/p/200707096228) | Jul 9, 2007 | Completed: final sign-off Dec 2024 | [314 04th Av](https://www.permitgraph.org/a/1435/034) | interior remodel with new rear exterior deck. new bathrooms & kitchen remodels @ both units. front stair repair & windows to be replaced in kind. | $120,000 |
| [200706295634](https://www.permitgraph.org/p/200706295634) | Jun 29, 2007 | Completed: final sign-off Jan 2009 | [771 Jackson St](https://www.permitgraph.org/a/0193/025) | partial replacement of foundation @ southwest corner of basement and removal of soil and cut opening into existing basement demising wall (architectural plans on sep. permit.) | $75,000 |
| [200706255078](https://www.permitgraph.org/p/200706255078) | Jun 25, 2007 | Completed: final sign-off Aug 2007 | [2111 46th Av](https://www.permitgraph.org/a/2171/003) | renewal of pa#2005/12/01/9338, 2006/12/19/0074 for bathroom installed on first floor |  |
| [200706012772](https://www.permitgraph.org/p/200706012772) | Jun 1, 2007 | Completed: final sign-off Sep 2007 | [2585 25th Av](https://www.permitgraph.org/a/2426/004H) | interior remodel. new bathroom & bedroom downstairs. bath & kitchen remodel upstairs. | $40,000 |
| [200705302492](https://www.permitgraph.org/p/200705302492) | May 30, 2007 | Expired or cancelled: expired Jan 2008 | [170 Hale St](https://www.permitgraph.org/a/5879/019) | revision to app#200705242170. rebuild one play room, 2 bedroom, one full bath room, one storage/laundry room on extg ground floor per plan |  |
| [200705010168](https://www.permitgraph.org/p/200705010168) | May 1, 2007 | Completed: final sign-off May 2007 | [527 Columbus Av](https://www.permitgraph.org/a/0117/005) | replace (e) brick footing with new concrete 3' high wall & 5"-0" fence. | $5,000 |
| [200705010163](https://www.permitgraph.org/p/200705010163) | May 1, 2007 | Completed: final sign-off Nov 2007 | [20 Tucker Av](https://www.permitgraph.org/a/6200/008) | renew pa#8907407 for final inspection. |  |
| [200705010165](https://www.permitgraph.org/p/200705010165) | May 1, 2007 | Completed: final sign-off Dec 2007 | [3217 Santiago St](https://www.permitgraph.org/a/2372/047) | renew pa#200601041444,#200608220224 for final inspection. |  |
| [200704189105](https://www.permitgraph.org/p/200704189105) | Apr 18, 2007 | Expired or cancelled: expired Oct 2016 | [739 32nd Av](https://www.permitgraph.org/a/1612/006A) | remodling (two bathrooms. paint per complaint#200798927. | $13,000 |
| [200704189107](https://www.permitgraph.org/p/200704189107) | Apr 18, 2007 | Completed: final sign-off Jun 2007 | [734 Broadway](https://www.permitgraph.org/a/0147/008B) | work on unit#736 broadway st only.replace 400 sqf tile. at entry floor. | $5,000 |
| [200703287448](https://www.permitgraph.org/p/200703287448) | Mar 28, 2007 | Completed: final sign-off May 2007 | [2121 Laguna St](https://www.permitgraph.org/a/0627/031) | electrical installation of 4 can lights in ceiling,all lights in bath shall be flourescent or controlled, 1 over shower, 1 vanity by o.s light and replace fans in 2 bathrooms. tiling of floor and are… | $14,628 |
| [200703206689](https://www.permitgraph.org/p/200703206689) | Mar 20, 2007 | Completed: final sign-off Jun 2007 | [1686 26th Av](https://www.permitgraph.org/a/1918/026) | to add 2 bed room, one play room, one full bath room, one storage/laundry room on extg ground floor. construct new rear stairs (7'-0" ht) and repair extg one story rear deck (7'-0"ht) in kind per pla… | $26,000 |
| [200703075670](https://www.permitgraph.org/p/200703075670) | Mar 7, 2007 | Completed: final sign-off May 2007 | [1750 Broadway](https://www.permitgraph.org/a/0569/007) | unit#1 only.remove (1) bathroom and remove (1) kitchen. (no structural) + new lighting. lighting to comply w/ t-24 enery codes. to comply w/his nov#200337840 date 02/19/03. | $8,000 |
| [200703025337](https://www.permitgraph.org/p/200703025337) | Mar 2, 2007 | Never finaled: issued Mar 2007, no final | [1020 Geary St](https://www.permitgraph.org/a/0694/005) | accessable restroom modify existing restroom to provide barrer removal on the restroom | $6,000 |
| [200701242513](https://www.permitgraph.org/p/200701242513) | Jan 24, 2007 | Never finaled: issued Jan 2007, no final | [2282 29th Av](https://www.permitgraph.org/a/2321/013H) | repair stucco 150 sf in kind. balcony ceiling only and side walls | $3,000 |
| [200701242512](https://www.permitgraph.org/p/200701242512) | Jan 24, 2007 | Expired or cancelled: expired Sep 2008 | [57 Stratford Dr](https://www.permitgraph.org/a/7240/024) | replace outside stucco, 150 sf in kind at side | $3,000 |
| [200701192112](https://www.permitgraph.org/p/200701192112) | Jan 19, 2007 | Completed: final sign-off Jul 2007 | [2100 Alemany Bl](https://www.permitgraph.org/a/6970/001A) | remodel 2 bathrooms and replace outside back yard, concrete and outside paint (100 sq.ft.) to comply with nov #200787257 | $9,000 |
| [200701192114](https://www.permitgraph.org/p/200701192114) | Jan 19, 2007 | Completed: final sign-off May 2007 | [45 Ross Al](https://www.permitgraph.org/a/0193/021A) | replace 2 bathrooms, tile, paint. at walls - 2nd floor & 3rd floor | $6,000 |

---