# C I K Power Distributors, Llc

Contractor license 969729. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/c-i-k-power-distributors-llc-969729
- JSON: https://www.permitgraph.org/api/contractor?license=969729
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=969729

10 permits since 2000: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 276 days from filing to permit and 225 days from permit to final inspection. Of the 1 never-finaled permit, 1 is 5 to 10 years old.

- Based in: Orange
- On San Francisco permits: May 2015 to Sep 2020
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2015 | 1 | 0 | 0 | 0 |
| 2016 | 1 | 0 | 0 | 0 |
| 2017 | 1 | 0 | 0 | 0 |
| 2018 | 2 | 0 | 0 | 1 |
| 2019 | 2 | 0 | 0 | 0 |
| 2020 | 0 | 0 | 1 | 1 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202009043503](https://www.permitgraph.org/p/202009043503) | Sep 4, 2020 | Never finaled: issued Nov 2020, no final | [1155 Harrison St](https://www.permitgraph.org/a/3758/047) | at&t modification: remove (6) (e) antennas; install (8) (n) antennas; remove (6) (e) rrus; install (12) (n) rrus; remove (3) (e) cabinets; install (3) (n) cabinets; remove (36) (e) batteries; install… | $65,000 |
| [202001313291](https://www.permitgraph.org/p/202001313291) | Jan 31, 2020 | Expired or cancelled: cancelled Mar 2022 | [576 Sacramento St](https://www.permitgraph.org/a/0228/012) | existing verizon wireless cell site modification. install new 5 g antennas to be wrapped i rf transparent film. install new basebord in equip rm maher not req | $30,000 |
| [201909161713](https://www.permitgraph.org/p/201909161713) | Sep 16, 2019 | Completed: final sign-off Aug 2020 | [942 Market St](https://www.permitgraph.org/a/0341/018) | remove (6) antennas, replace w/6 new models. install (4) new remote radio units & (2) ovps near antennas. remove 14 runs coaxial cables; install (2) hybrid cables. add (2) ovps in equipment room & (2… | $110,250 |
| [201909161715](https://www.permitgraph.org/p/201909161715) | Sep 16, 2019 | Completed: final sign-off Apr 2020 | [1500 Market St](https://www.permitgraph.org/a/0836/001) | remove antennas, mounting pipes, and all ancillary equipment associated with extg wts facility. | $75,000 |
| [201812188653](https://www.permitgraph.org/p/201812188653) | Dec 18, 2018 | Expired or cancelled: cancelled Jun 2022 | [22 Battery St](https://www.permitgraph.org/a/0266/006) | att modification: install 3 new antennas, and other sm equip. no changes to batteries | $19,000 |
| [201805169306](https://www.permitgraph.org/p/201805169306) | May 16, 2018 | Completed: final sign-off Dec 2019 | [650 07th St](https://www.permitgraph.org/a/3783/007) | att modification r and r 4 e antennas with 4 new antennas, install 4 n rrus, r and r antenna mount for sector b pos 2 install striping per emf | $33,000 |
| [201803305149](https://www.permitgraph.org/p/201803305149) | Mar 30, 2018 | Completed: final sign-off Aug 2022 | [22 Battery St](https://www.permitgraph.org/a/0266/006) | at&t wirelessl swap 2 antennas, install 3 new rrus-4478, swap 1 rus-11 &a2 for 1 rrus - total 3. swap 1 gps antenna with lte gps. install 1 - 5216 in rack., remove 4 batteries | $15,000 |
| [201710040432](https://www.permitgraph.org/p/201710040432) | Oct 4, 2017 | Completed: final sign-off Oct 2021 | [2191 Market St](https://www.permitgraph.org/a/3558/152) | verizon wireless: rooftop: remove & replace (6) antennas. add (3) (n) antennas, add 20 rru's & supporting equipment on rooftop. install (n) 48 dc power plan in (e) equipment room. frp will be surroun… | $25,000 |
| [201608266083](https://www.permitgraph.org/p/201608266083) | Aug 26, 2016 | Completed: final sign-off Feb 2018 | [832 Folsom St](https://www.permitgraph.org/a/3733/017) | verizon wireless proposes to upgrade an (e) wts. remove(11) (e) panel antennas & install (10) (n) panel antennas; remove (4)(e)radio units & install (10) (n) rrus32 radio units; install (2)(n) diplex… | $15,000 |
| [201505216897](https://www.permitgraph.org/p/201505216897) | May 21, 2015 | Completed: final sign-off Jul 2019 | [576 Sacramento St](https://www.permitgraph.org/a/0228/012) | remove & replace (6) antennas w/ (6) (n) antennas. install (6) surge protectors. install (6) rrh units, (3) cables & (3) displexers. remove (3) rrh units. work on roof and ground floor. | $10,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/c-i-k-power-distributors-llc-969729.
