Back to bathroom remodel contractors
Bryce C B Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2007 to Jun 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 60 completed, 2 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 19 completed. Typically 72 days from filing to permit and 291 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2023 | Completed final sign-off Jul 2026 | 2948 Bush St | remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand..Details
remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand.. | $777,663 |
| Mar 1, 2022 | Completed final sign-off Aug 2024 | 465 38th Av | existing rear staircase to be re-configured. new bathroom at garage floor. new garage area.Details
existing rear staircase to be re-configured. new bathroom at garage floor. new garage area. | $70,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 1931 23rd St | alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. onDetails
alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. on | $900,000 |
| Jul 9, 2021 | Completed final sign-off Feb 2022 | 2070 Beach St | remodel kitchen and (2) bathrooms, new appliances, new fixturesDetails
remodel kitchen and (2) bathrooms, new appliances, new fixtures | $200,000 |
| Oct 21, 2020 | Completed final sign-off Nov 2022 | 182 Andover St | replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard.Details
replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard. | $56,500 |
| Dec 10, 2019 | Completed final sign-off Sep 2020 | 322 Chattanooga St | minor interior remodel @ exiting 1st floor bedroom. replace (e) entry door w/ new solid door. add new laundry room within 2nd flr. interior remodel @ (e) 3rd flr bedroom, bathroom, and powder room. replace (e) door &sidelight @ 3rd flr bedroom w/ new fixed windowDetails
minor interior remodel @ exiting 1st floor bedroom. replace (e) entry door w/ new solid door. add new laundry room within 2nd flr. interior remodel @ (e) 3rd flr bedroom, bathroom, and powder room. replace (e) door &sidelight @ 3rd flr bedroom w/ new fixed window | $71,261 |
| Jan 29, 2019 | Completed final sign-off May 2019 | 1830 Taylor St | kitchen counters, bathroom tile & vanity counter, tub replace with shower.Details
kitchen counters, bathroom tile & vanity counter, tub replace with shower. | $10,000 |
| Dec 14, 2018 | Completed final sign-off Jun 2020 | 1000 03rd St | unit#1002. bathroom remodel. install cabinet, light carpentry, light electrical, changing light fixtures.Details
unit#1002. bathroom remodel. install cabinet, light carpentry, light electrical, changing light fixtures. | $15,000 |
| Mar 30, 2018 | Completed final sign-off Jul 2020 | 362 Jersey St | horizontal addition & interior renovation. portion of 1st floor to be converted into habitable conditioned space with 1 new bedroom, 2 new baths & wet bar. reconfiguration of 2nd floor & new windows, doors, cabinets, plumbing through out.Details
horizontal addition & interior renovation. portion of 1st floor to be converted into habitable conditioned space with 1 new bedroom, 2 new baths & wet bar. reconfiguration of 2nd floor & new windows, doors, cabinets, plumbing through out. | $115,000 |
| Nov 21, 2014 | Completed final sign-off Aug 2019 | 1451 Shotwell St | bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms.Details
bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms. | $400,000 |
| Oct 17, 2014 | Completed final sign-off Feb 2022 | 1 Southern Heights Av | renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse.Details
renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse. | $296,099 |
| Feb 5, 2014 | Completed final sign-off Apr 2016 | 687 28th St | (n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter.Details
(n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter. | $339,470 |
| Feb 4, 2013 | Completed final sign-off Sep 2013 | 351 Prentiss St | remodel of a single family residence. conversion of (e) unconditioned space to (n) habitable sapce - remodeling of 1/f bathroom. conversion of rear addition into master bedroom at 1/f. remodel of 2/f kitchen & bathroom. addition of bedroom & study at 2/f. (n) foundation & dry-rot repair,Details
remodel of a single family residence. conversion of (e) unconditioned space to (n) habitable sapce - remodeling of 1/f bathroom. conversion of rear addition into master bedroom at 1/f. remodel of 2/f kitchen & bathroom. addition of bedroom & study at 2/f. (n) foundation & dry-rot repair, | $118,000 |
| Aug 18, 2010 | Completed final sign-off Mar 2011 | 69 Amber Dr | remodel two (e) bathrooms @ 2nd floor. add (n) skylight & replace (e) skylight. replace two (e) sliding glass doors at rear facade in-kind. replace (e) window unit in bedroom w/window/door in kind.Details
remodel two (e) bathrooms @ 2nd floor. add (n) skylight & replace (e) skylight. replace two (e) sliding glass doors at rear facade in-kind. replace (e) window unit in bedroom w/window/door in kind. | $20,000 |
| Feb 25, 2010 | Completed final sign-off Apr 2010 | 2047 Green St | remodel of existng bathroom - new electrical, new plumbing/shower pan, new tile ( existing footprint). high efficacy lighting or occupancy sensor control. no change to exhaust system.Details
remodel of existng bathroom - new electrical, new plumbing/shower pan, new tile ( existing footprint). high efficacy lighting or occupancy sensor control. no change to exhaust system. | $15,000 |
| Dec 3, 2009 | Completed final sign-off Oct 2010 | 1795 Sanchez St | interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen.Details
interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen. | $60,000 |
| Mar 26, 2009 | Completed final sign-off Feb 2010 | 1 Burnett North Av | unit #3 - remodel e master bathroom. replace tub, sink, vanity. replace e lighting fixtures, switches. add new tile. replace e window in kind with dbl glazed aluminum to match (e).Details
unit #3 - remodel e master bathroom. replace tub, sink, vanity. replace e lighting fixtures, switches. add new tile. replace e window in kind with dbl glazed aluminum to match (e). | $20,000 |
| Sep 26, 2007 | Completed final sign-off Feb 2009 | 2199 Mission St | replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit.Details
replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit. | $50,000 |
| Feb 5, 2007 | Completed final sign-off Sep 2007 | 1849 Golden Gate Av | remodel unit #2- 1 kitchen, 1 bathroom, 2 bedrooms, install new exterior doors in rear, remodel unit #4 - 1 kitchenDetails
remodel unit #2- 1 kitchen, 1 bathroom, 2 bedrooms, install new exterior doors in rear, remodel unit #4 - 1 kitchen | $125,000 |