# Brady Construction Inc

Contractor license 941565. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/brady-construction-inc-941565
- JSON: https://www.permitgraph.org/api/contractor?license=941565
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=941565

120 permits since 2000: 94 completed, 5 in progress, 16 never finaled, 5 expired or cancelled. Typically 8 days from filing to permit and 182 days from permit to final inspection. Of the 16 never-finaled permits, 5 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.

- Based in: San Bruno
- On San Francisco permits: Oct 2006 to Oct 2026
- Last 24 months: 9 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2006 | 0 | 0 | 1 | 0 |
| 2011 | 9 | 0 | 1 | 0 |
| 2012 | 7 | 0 | 0 | 1 |
| 2013 | 8 | 0 | 3 | 2 |
| 2014 | 7 | 0 | 0 | 0 |
| 2015 | 8 | 0 | 1 | 0 |
| 2016 | 6 | 0 | 2 | 0 |
| 2017 | 13 | 0 | 2 | 0 |
| 2018 | 4 | 0 | 0 | 1 |
| 2019 | 11 | 0 | 1 | 0 |
| 2020 | 2 | 0 | 0 | 0 |
| 2021 | 5 | 0 | 1 | 0 |
| 2022 | 4 | 0 | 3 | 0 |
| 2023 | 5 | 0 | 1 | 1 |
| 2024 | 1 | 0 | 0 | 0 |
| 2025 | 1 | 2 | 0 | 0 |
| 2026 | 3 | 3 | 0 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Bathroom remodel | 31 | 27 | 0 | 3 | 1 | 15 | 285 |
| Kitchen remodel | 27 | 23 | 0 | 3 | 1 | 27 | 256 |
| Roof deck | 2 | 1 | 0 | 1 | 0 | 358 | 400 |
| Stairs | 15 | 14 | 0 | 1 | 0 | 47 | 530 |
| Pergola or trellis | 1 | 1 | 0 | 0 | 0 | 507 | 706 |
| Deck | 11 | 10 | 0 | 1 | 0 | 127 | 249 |

## Most recent permits

The 100 most recent of 120.

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202610279955](https://www.permitgraph.org/p/202610279955) | Oct 27, 2026 | In progress: issued Oct 2026 | [2778 Green St](https://www.permitgraph.org/a/0950/016) | provide temporary shoring system to facilitate excavation & construction of the proposed remodel & addition per approved pa# 201309257720 s3 | $10,000 |
| [202610209662](https://www.permitgraph.org/p/202610209662) | Oct 20, 2026 | In progress: issued Oct 2026 | [2778 Green St](https://www.permitgraph.org/a/0950/016) | revision to pa# 2013-0925-7720 & 2023-0525-8606: remove hot tub from scope of work. | $10,000 |
| [202609158152](https://www.permitgraph.org/p/202609158152) | Sep 15, 2026 | Completed: final sign-off Oct 2026 | [824 Corbett Av](https://www.permitgraph.org/a/2779/003) | unit #5, 1st floor - dry rot repair to deck, less than 50% in kind. not visible from the street, rear of building. | $5,500 |
| [202607134932](https://www.permitgraph.org/p/202607134932) | Jul 13, 2026 | Completed: final sign-off Oct 2026 | [770 Natoma St](https://www.permitgraph.org/a/3728/045) | revision to permit 201808308752 (recommencement under 202602276664). change from hardi frame to moment frame. | $10,000 |
| [202604300384](https://www.permitgraph.org/p/202604300384) | Apr 30, 2026 | In progress: issued May 2026 | [274 Duncan St](https://www.permitgraph.org/a/6593/015) | to obtain final inspection for work performed under pa# 201508275398, 201906072813 and 202203099557. all work is complete. |  |
| [202602276664](https://www.permitgraph.org/p/202602276664) | Feb 27, 2026 | Completed: final sign-off Oct 2026 | [770 Natoma St](https://www.permitgraph.org/a/3728/045) | recommencement and completion of work approved under pa#: 201808308752. | $100,000 |
| [202507160971](https://www.permitgraph.org/p/202507160971) | Jul 16, 2025 | Completed: final sign-off Aug 2025 | [579 Corbett Av](https://www.permitgraph.org/a/2717/038) | rot repair existing deck @ #2 per sb-721 | $5,000 |
| [202502130271](https://www.permitgraph.org/p/202502130271) | Feb 13, 2025 | In progress: issued Feb 2025 | [274 Duncan St](https://www.permitgraph.org/a/6593/015) | recommencement and completion of work approved under pa# 202203099557. |  |
| [202502130272](https://www.permitgraph.org/p/202502130272) | Feb 13, 2025 | In progress: filed Feb 2025, not yet issued | [274 Duncan St](https://www.permitgraph.org/a/6593/015) | recommencement and completion of work approved under pa#201906072813 |  |
| [202411074618](https://www.permitgraph.org/p/202411074618) | Nov 7, 2024 | Completed: final sign-off Jun 2026 | [64 Alpine Tr](https://www.permitgraph.org/a/1258/008) | revision to permit 202211086122-s1. remove concrete spiral stairs at rear from scope of work. garage post to remain. |  |
| [202310168713](https://www.permitgraph.org/p/202310168713) | Oct 16, 2023 | Completed: final sign-off Oct 2024 | [616 Arkansas St](https://www.permitgraph.org/a/4098/005) | (21) front windows in kind replacement | $40,000 |
| [202308094062](https://www.permitgraph.org/p/202308094062) | Aug 9, 2023 | Completed: final sign-off Jul 2024 | [1147 Lake St](https://www.permitgraph.org/a/1372/074) | interior remodel; kitchen and bathroom renovation; replacement of non-front facade exterior windows | $95,000 |
| [202305258606](https://www.permitgraph.org/p/202305258606) | May 25, 2023 | Never finaled: issued Jun 2023, no final | [2778 Green St](https://www.permitgraph.org/a/0950/016) | revision to 201309257720 addenda 2. basememt remodel including above ground endless lap pool. above ground hot tub, and partial excavation for elevator & bathroom |  |
| [202305117567](https://www.permitgraph.org/p/202305117567) | May 11, 2023 | Completed: final sign-off Apr 2026 | [447 Clipper St](https://www.permitgraph.org/a/6555/040) | new subterranean garage. no increase to habitable area. | $66,500 |
| [202305097384](https://www.permitgraph.org/p/202305097384) | May 9, 2023 | Completed: final sign-off Nov 2023 | [88 Entrada Ct](https://www.permitgraph.org/a/6917A/026) | non structural remodel of two bathrooms in kind | $15,000 |
| [202303304737](https://www.permitgraph.org/p/202303304737) | Mar 30, 2023 | Completed: final sign-off Feb 2024 | [1470 Portola Dr](https://www.permitgraph.org/a/2989B/012) | replace in kind entry stair and porch finish, to replace the (e) cracked stairs | $15,000 |
| [202303063105](https://www.permitgraph.org/p/202303063105) | Mar 6, 2023 | Expired or cancelled: withdrawn Jun 2023 | [2778 Green St](https://www.permitgraph.org/a/0950/016) | new above ground pool and hot tub in basement | $50,000 |
| [202211086122](https://www.permitgraph.org/p/202211086122) | Nov 8, 2022 | Completed: final sign-off Jun 2026 | [64 Alpine Tr](https://www.permitgraph.org/a/1258/008) | 1st main flr level kitchen, bathrm & dining rm remodel. (n) exterior spiral staircase to connect 64 unit w/ garden level. upper flr level primary bedrm, family rm, bathrm, closets & laundry remodel.… | $800,000 |
| [202209202776](https://www.permitgraph.org/p/202209202776) | Sep 20, 2022 | Completed: final sign-off Nov 2022 | [246 Casitas Av](https://www.permitgraph.org/a/2973A/032A) | 26 windows and 1 door to be replaced in kind. not visible from street | $25,000 |
| [202206025423](https://www.permitgraph.org/p/202206025423) | Jun 2, 2022 | Completed: final sign-off Apr 2023 | [60 Cedro Av](https://www.permitgraph.org/a/6908/033) | remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation. | $125,000 |
| [202204192472](https://www.permitgraph.org/p/202204192472) | Apr 19, 2022 | Never finaled: issued Sep 2023, no final | [2889 Pacific Av](https://www.permitgraph.org/a/0977/015) | addition of (n) living space in attic,(n) roof dormers at front east & south facing.(n) 434sf roof deck 7 pv panels,(n) 852sf addition @ side & rear yard @ garden level.(n)118sf addition @ side @ 1/f… | $60,000 |
| [202204122048](https://www.permitgraph.org/p/202204122048) | Apr 12, 2022 | Never finaled: issued Apr 2022, no final | [2889 Pacific Av](https://www.permitgraph.org/a/0977/015) | revision to pa# 202111102176. field amendments & replacement of remaining portion of brick foundation. | $80,000 |
| [202203099557](https://www.permitgraph.org/p/202203099557) | Mar 9, 2022 | Never finaled: issued Mar 2022, no final | [274 Duncan St](https://www.permitgraph.org/a/6593/015) | provide foundation installation sequence. provide temporart support of front wall to accomodate lowering. | $750,000 |
| [202202258704](https://www.permitgraph.org/p/202202258704) | Feb 25, 2022 | Completed: final sign-off Aug 2022 | [250 Santa Paula Av](https://www.permitgraph.org/a/3076/009) | master bath remodel new tile and fixtures. no change to floor plan or structure | $20,000 |
| [202111102176](https://www.permitgraph.org/p/202111102176) | Nov 10, 2021 | Never finaled: issued Dec 2021, no final | [2889 Pacific Av](https://www.permitgraph.org/a/0977/015) | revision to pa 2021-0603-1583 field amendments & partial foundation replacement. interior remodel at basement, main & upper floors. voluntary seismic upgrade at upper floor. update roof framing detai… | $200,000 |
| [202108045758](https://www.permitgraph.org/p/202108045758) | Aug 4, 2021 | Completed: final sign-off May 2023 | [209 29th St](https://www.permitgraph.org/a/6633/001A) | basement addition and interior remodel. | $285,000 |
| [202107295404](https://www.permitgraph.org/p/202107295404) | Jul 29, 2021 | Completed: final sign-off Jul 2023 | [1470 Portola Dr](https://www.permitgraph.org/a/2989B/012) | existing basement remodel within (e) envelope, adding (2) bathrooms, & bedroom, interior remodel to kitchen and bathrooms replace exterior wood deck and stairs, eplace in kind all windows, except bat… | $200,000 |
| [202106102065](https://www.permitgraph.org/p/202106102065) | Jun 10, 2021 | Completed: final sign-off Jul 2021 | [1273 Arguello Bl](https://www.permitgraph.org/a/1750/042) | remodel (1) bathroom & powder room tile, replace countertop inkitchen, no change to cabinets/sink | $10,000 |
| [202105240901](https://www.permitgraph.org/p/202105240901) | May 24, 2021 | Completed: final sign-off Apr 2022 | [65 San Lorenzo Wy](https://www.permitgraph.org/a/3013A/017) | window replacement and interior kitchen, bathroom, and basement remodel. add new half bath | $50,000 |
| [202103045806](https://www.permitgraph.org/p/202103045806) | Mar 4, 2021 | Completed: final sign-off Nov 2021 | [1805 Buchanan St](https://www.permitgraph.org/a/0676/073) | revision to pa 201602220182 s-2 and pa 201907125765. correct the building sotries from "3 stories over basement" to "4 stories" remove egress windows from 4th story bedrooms as allowed by cbc 1030.1… |  |
| [202010297796](https://www.permitgraph.org/p/202010297796) | Oct 29, 2020 | Completed: final sign-off Jun 2021 | [1424 Ulloa St](https://www.permitgraph.org/a/2410/012) | enclose (e) unconditioned space adj to garage, new bedroom & bathrom partial demo (e) slapb, new french doors at back wall. | $45,000 |
| [202009234829](https://www.permitgraph.org/p/202009234829) | Sep 23, 2020 | Completed: final sign-off Jun 2021 | [61 Carmelita St](https://www.permitgraph.org/a/0863/006) | seismic strengthening for the garage and a new header for the garage opening. | $23,770 |
| [201908199178](https://www.permitgraph.org/p/201908199178) | Aug 19, 2019 | Completed: final sign-off Jan 2020 | [2557 Filbert St](https://www.permitgraph.org/a/0945/016) | new gate at entry | $2,000 |
| [201907125765](https://www.permitgraph.org/p/201907125765) | Jul 12, 2019 | Completed: final sign-off Nov 2021 | [1805 Buchanan St](https://www.permitgraph.org/a/0676/073) | revision to permit #201602220182(s-2), modify stairs at (e) basement. modify parking layout of basement. no structural changes. no exterior changes. |  |
| [201906133352](https://www.permitgraph.org/p/201906133352) | Jun 13, 2019 | Completed: final sign-off Aug 2019 | [350 Divisadero St](https://www.permitgraph.org/a/1217/027) | t.i of ground floor commercial space. store frontage and interior remodel. relocation of ada ramp, new fence at rear yard. | $45,000 |
| [201906072813](https://www.permitgraph.org/p/201906072813) | Jun 7, 2019 | Never finaled: issued Dec 2020, no final | [274 Duncan St](https://www.permitgraph.org/a/6593/015) | revised site permit #201508275398. 3rd & 4th flrs vertical & horizontal addition. lower unit: rebuilt kitchen, and relocated & rebuild (1) bath, and interior remodel. upper unit: rebuilt kitchen, (1)… |  |
| [201904198504](https://www.permitgraph.org/p/201904198504) | Apr 19, 2019 | Completed: final sign-off Oct 2021 | [1707 Jones St](https://www.permitgraph.org/a/0151/010) | interior remodel, new windows at side & rear facades, partial basement excavation. | $225,000 |
| [201904107611](https://www.permitgraph.org/p/201904107611) | Apr 10, 2019 | Completed: final sign-off Sep 2019 | [2557 Filbert St](https://www.permitgraph.org/a/0945/016) | remodel of (e) single family home. 1st fl: (n) laundry, (2)(n) bedrooms with ensuite bathrooms, relocate w/h & furnace. 2nd fl: (n) stairs, rmeodel kitchen & relocate laundry. 3rd fl: (2) (n) ensuite… | $250,000 |
| [201904107619](https://www.permitgraph.org/p/201904107619) | Apr 10, 2019 | Completed: final sign-off Jan 2020 | [2567 Filbert St](https://www.permitgraph.org/a/0945/016) | remodel of (e) single family home. 1st fl: relocate w/d to 3rd fl. (n) family rm. 2nd fl: add powder room to kitchen. 3rd fl: reconfig master bed & bath, reconfigure half to full bath. | $300,000 |
| [201903266234](https://www.permitgraph.org/p/201903266234) | Mar 26, 2019 | Completed: final sign-off Mar 2019 | [56 Entrada Ct](https://www.permitgraph.org/a/6917A/019) | to obtain final inspection for work approved under pa# 2015-0213-8319 & 2017-1016-1319. all work is complete. |  |
| [201903226020](https://www.permitgraph.org/p/201903226020) | Mar 22, 2019 | Completed: final sign-off Jun 2019 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | structural strengthening | $4,000 |
| [201903185558](https://www.permitgraph.org/p/201903185558) | Mar 18, 2019 | Completed: final sign-off Oct 2019 | [1869 California St](https://www.permitgraph.org/a/0648/019) | replacement of extg rear yard deck at grade in kind | $50,000 |
| [201903185561](https://www.permitgraph.org/p/201903185561) | Mar 18, 2019 | Completed: final sign-off Oct 2019 | [1770 Pine St](https://www.permitgraph.org/a/0648/009) | new retaining wall along rear property line. | $250,000 |
| [201902112617](https://www.permitgraph.org/p/201902112617) | Feb 11, 2019 | Completed: final sign-off Jan 2020 | [34 Entrada Ct](https://www.permitgraph.org/a/6917/008) | remodel kitchen and (e) bath, add laundry and (n) bath. minor infill at rear facade. new deck at rear | $50,000 |
| [201809049027](https://www.permitgraph.org/p/201809049027) | Sep 4, 2018 | Completed: final sign-off Feb 2020 | [34 Entrada Ct](https://www.permitgraph.org/a/6917/008) | foundation replacement and remodel one extg bathroom | $30,000 |
| [201808308752](https://www.permitgraph.org/p/201808308752) | Aug 30, 2018 | Expired or cancelled: expired Oct 2026 | [770 Natoma St](https://www.permitgraph.org/a/3728/045) | mandatory soft story program sfebc chapter 4d. engineering criteria iebc a4. **comply w/ maher**. (ss portion cost $55,000). foundation replacement and lower basement level for future adu under #2019… | $100,000 |
| [201804116087](https://www.permitgraph.org/p/201804116087) | Apr 11, 2018 | Completed: final sign-off May 2018 | [312 West Portal Av](https://www.permitgraph.org/a/2483/004) | tenant improvement. build out office (enclosed). install office partitions to create work stations. | $7,000 |
| [201803093309](https://www.permitgraph.org/p/201803093309) | Mar 9, 2018 | Completed: final sign-off Jan 2020 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | lightwell infill at 3rd fl not shared lightwell. revision of master bath previously approved under permit #201704254805, replace windows, balusters & decorative columns at facade. maher not req | $30,000 |
| [201803022661](https://www.permitgraph.org/p/201803022661) | Mar 2, 2018 | Completed: final sign-off Jul 2018 | [4234 22nd St](https://www.permitgraph.org/a/2766/017) | this project involve the conversion of e non habitable space at level 1 to become a new 450 sf 2nd dwelling unit. includes new living room/kitchen, full bath, bedroom. all work within the existing fo… | $50,000 |
| [201711073412](https://www.permitgraph.org/p/201711073412) | Nov 7, 2017 | Completed: final sign-off Dec 2018 | [779 Duncan St](https://www.permitgraph.org/a/6605/041) | revision to pa 2017-0518-6939 reduced structural & architectural scope - remove 1st floor bathroom and other conditioned space from original scope |  |
| [201710030177](https://www.permitgraph.org/p/201710030177) | Oct 3, 2017 | Completed: final sign-off Jul 2018 | [4234 22nd St](https://www.permitgraph.org/a/2766/017) | revision to pa 2016-0714-2300 revision to an existing building permit that s1/r1 expands the scope of the work to include the replacement of the existing foundation and adds new doors/window at the g… | $15,000 |
| [201709289830](https://www.permitgraph.org/p/201709289830) | Sep 28, 2017 | Completed: final sign-off Jan 2020 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | revision to app#201704254805 to add storage room at basement. n/a for maher | $35,000 |
| [201707242770](https://www.permitgraph.org/p/201707242770) | Jul 24, 2017 | Completed: final sign-off Jan 2020 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | revision to pa #201704254805 with no exterior work: upgrade foundation design with piers as recommended by soil report. maher n/a | $75,000 |
| [201707141960](https://www.permitgraph.org/p/201707141960) | Jul 14, 2017 | Completed: final sign-off May 2019 | [775 Corbett Av](https://www.permitgraph.org/a/2763/038) | install exterior stair & remove interior stair from garage to 1st floor. | $10,000 |
| [201706290674](https://www.permitgraph.org/p/201706290674) | Jun 29, 2017 | Completed: final sign-off Oct 2017 | [85 Parker Av](https://www.permitgraph.org/a/1037/015) | the repair at level 1 due to water damage. the scope include the replacement of interior finishes, replacement in kind of an extg window, new elelctrical and plumbing(utility sink to replace extg) | $15,000 |
| [201706199714](https://www.permitgraph.org/p/201706199714) | Jun 19, 2017 | Never finaled: issued Aug 2017, no final | [2776 Green St](https://www.permitgraph.org/a/0950/016) | revise issued permit 201309257720 to show 2 units plus one housekeeping. |  |
| [201705186939](https://www.permitgraph.org/p/201705186939) | May 18, 2017 | Completed: final sign-off Dec 2018 | [779 Duncan St](https://www.permitgraph.org/a/6605/041) | remodel (e) kitchen, 1 bathroom, add 1 powder room & skylight @ 2nd floor. enlarge/excavate entry, bath & storage area to achieve 8'-0" ceiling height, add one bathroom, wine room, add new sliding gl… | $150,000 |
| [201705106243](https://www.permitgraph.org/p/201705106243) | May 10, 2017 | Completed: final sign-off Nov 2018 | [34 Entrada Ct](https://www.permitgraph.org/a/6917/008) | landscape retaining wall at rear and side excavation not to exceed 20 cubic yards. not to exceed 7 feet above grade. | $5,000 |
| [201704254805](https://www.permitgraph.org/p/201704254805) | Apr 25, 2017 | Completed: final sign-off Jan 2020 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | convert extg basement to habitable space. new double height room at basement and ground floor within extg bldg envelope. replace of extg exterior doors at rear facade only. remodel extg kitchen and m… | $225,000 |
| [201704144034](https://www.permitgraph.org/p/201704144034) | Apr 14, 2017 | Completed: final sign-off Nov 2018 | [34 Entrada Ct](https://www.permitgraph.org/a/6917/008) | replace front exterior stairs in kind. | $5,000 |
| [201703080967](https://www.permitgraph.org/p/201703080967) | Mar 8, 2017 | Never finaled: issued May 2017, no final | [2774 Green St](https://www.permitgraph.org/a/0950/016) | convert ground floor apartment to housekeeping maher na | $1,000 |
| [201702270157](https://www.permitgraph.org/p/201702270157) | Feb 27, 2017 | Completed: final sign-off Jan 2020 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | remodel kitchen and master bathroom. no structural plans. all walls to remain in some location. | $60,000 |
| [201702159439](https://www.permitgraph.org/p/201702159439) | Feb 15, 2017 | Completed: final sign-off Jul 2017 | [2930 Lake St](https://www.permitgraph.org/a/1328/008A) | remodel of powder room on ground floor. this powder room was built with permit & subject to verification of dbi inspector. | $6,000 |
| [201701106902](https://www.permitgraph.org/p/201701106902) | Jan 10, 2017 | Completed: final sign-off Jul 2017 | [2930 Lake St](https://www.permitgraph.org/a/1328/008A) | remodel (2) existing bathrooms. no structural changes | $20,000 |
| [201610271252](https://www.permitgraph.org/p/201610271252) | Oct 27, 2016 | Completed: final sign-off Jul 2017 | [2930 Lake St](https://www.permitgraph.org/a/1328/008A) | kitchen and family room remodel. new windows at rear and 2 side windows in wood. ref 201610241016 | $50,000 |
| [201610241016](https://www.permitgraph.org/p/201610241016) | Oct 24, 2016 | Completed: final sign-off Jul 2017 | [2930 Lake St](https://www.permitgraph.org/a/1328/008A) | soft demo ofwall finishes inkitchen area. remodel of kitchen. no structural. no walls removed | $2,000 |
| [201608155005](https://www.permitgraph.org/p/201608155005) | Aug 15, 2016 | Never finaled: issued Aug 2016, no final | [2778 Green St](https://www.permitgraph.org/a/0950/016) | response to boa 15-117 ref pa 201309257720 maher na |  |
| [201607142300](https://www.permitgraph.org/p/201607142300) | Jul 14, 2016 | Completed: final sign-off Jul 2018 | [4234 22nd St](https://www.permitgraph.org/a/2766/017) | horizontal & vertical rear yard addition & interior remodel adding non-habitable on level 1 & habitable on level 2 & 3 including 1 1/2 bath, 1 bedrm & deck & (n) entry steps. | $200,000 |
| [201605268499](https://www.permitgraph.org/p/201605268499) | May 26, 2016 | Completed: final sign-off May 2019 | [775 Corbett Av](https://www.permitgraph.org/a/2763/038) | per ordinance# 30-15. convert basement floor into 2 additional dwelling units for a total of 8 units. units to be within (e) blding envelope. ref pa# 2015/09/17/7300 (soft story). area of work & path… | $68,000 |
| [201603303440](https://www.permitgraph.org/p/201603303440) | Mar 30, 2016 | Never finaled: issued Mar 2016, no final | [2918 Sacramento St](https://www.permitgraph.org/a/1004/012) | remodel of master bathroom, master bedroom and guest bath. install new door to rear deck, replace windows in bedroom. windows not visible from street. | $65,000 |
| [201603091629](https://www.permitgraph.org/p/201603091629) | Mar 9, 2016 | Completed: final sign-off Oct 2017 | [858 Ashbury St](https://www.permitgraph.org/a/1270/031) | excavate (e)basement to maintain 9'0"(n)slab,foundation,(n)bath(n)media room,(n)bed,kitchenette,lighting throughout.on level 2 reno kitchen,bath,bed,(n)window in lr,(n)entry to unit 1,in common area… | $275,000 |
| [201602220182](https://www.permitgraph.org/p/201602220182) | Feb 22, 2016 | Completed: final sign-off Nov 2021 | [1805 Buchanan St](https://www.permitgraph.org/a/0676/073) | to erect 3 stories of 6 dwelling units | $2,020,000 |
| [201512225675](https://www.permitgraph.org/p/201512225675) | Dec 22, 2015 | Completed: final sign-off Feb 2018 | [7 Bennington St](https://www.permitgraph.org/a/5666/029) | 1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stai… | $85,000 |
| [201512165243](https://www.permitgraph.org/p/201512165243) | Dec 16, 2015 | Completed: final sign-off Apr 2016 | [1511 15th St](https://www.permitgraph.org/a/3553/054) | t.i. & mezzanine -change of use from restaurant use (never occupied) to professional service office, open to the public or other businesses. allowable use per sf planning cade sec. 843.64a and 890.10… | $120,000 |
| [201510159866](https://www.permitgraph.org/p/201510159866) | Oct 15, 2015 | Completed: final sign-off Mar 2016 | [567 Texas St](https://www.permitgraph.org/a/4102/055) | install retaining wall along south property line. not visible from street. | $10,000 |
| [201509227682](https://www.permitgraph.org/p/201509227682) | Sep 22, 2015 | Completed: final sign-off May 2017 | [924 Lake St](https://www.permitgraph.org/a/1348/005) | new roof deck over 2nd story. | $3,000 |
| [201508073641](https://www.permitgraph.org/p/201508073641) | Aug 7, 2015 | Completed: final sign-off Dec 2016 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | horizontal/vertical addition. 165 sq. ft horizontal/vertical addition with a 55 sq. ft. footprint at southern side of structure. remodel upper level bathrooms and bedrooms. (n) radiant heat at upper… | $15,000 |
| [201507292787](https://www.permitgraph.org/p/201507292787) | Jul 29, 2015 | Completed: final sign-off Dec 2016 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | revision to 201401136154 and 201506088338. re-arrange interior lower level floor plan and reverse stair direction. | $1,000 |
| [201506088338](https://www.permitgraph.org/p/201506088338) | Jun 8, 2015 | Completed: final sign-off Dec 2016 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | replace foundation stem wall, revision to permit application 201401136154. | $50,000 |
| [201504244563](https://www.permitgraph.org/p/201504244563) | Apr 24, 2015 | Completed: final sign-off Aug 2015 | [366 Dolores St](https://www.permitgraph.org/a/3566/006) | compliance with mandatory seismic retrofit program 2013 sf bc sec 34b and 2012iebc appx. a-4 | $55,000 |
| [201501286921](https://www.permitgraph.org/p/201501286921) | Jan 28, 2015 | Never finaled: issued Apr 2015, no final | [2774 Green St](https://www.permitgraph.org/a/0950/016) | rev. to pa#201303293392, 201311152011, 201401095896, 201401095899. enlarge existing window at rear with new aluminium windows. reconfigure rooms on all floor per plan. n/a ordinance #155-13 | $5,000 |
| [201412113531](https://www.permitgraph.org/p/201412113531) | Dec 11, 2014 | Completed: final sign-off Mar 2015 | [131 Devonshire Wy](https://www.permitgraph.org/a/2676/020) | replace two front windows with new alumnimum awning windows. windows to be awning two front bedrooms. | $3,000 |
| [201406269592](https://www.permitgraph.org/p/201406269592) | Jun 26, 2014 | Completed: final sign-off Aug 2014 | [230 Lakeview Av](https://www.permitgraph.org/a/7049/024) | site retaining wall. replace failing retaining wall with new concrete retaining wall along west pl at rear yard | $10,000 |
| [201406249222](https://www.permitgraph.org/p/201406249222) | Jun 24, 2014 | Completed: final sign-off Nov 2014 | [166 Beaver St](https://www.permitgraph.org/a/2613/012) | add 4 piers to support retaining wall in rear yard. | $15,000 |
| [201404082777](https://www.permitgraph.org/p/201404082777) | Apr 8, 2014 | Completed: final sign-off Aug 2015 | [222 Cumberland St](https://www.permitgraph.org/a/3600/110) | change architect and engineer of record from (e) 200809181926s1/r1. remove proposed arcade as revision to previous permit #200809181926s1/r1. retaining wall for swimming pool | $200,000 |
| [201404032407](https://www.permitgraph.org/p/201404032407) | Apr 3, 2014 | Completed: final sign-off Apr 2014 | [1571 Church St](https://www.permitgraph.org/a/6600/023) | to comply with physical inspection report #cc-75203, revision top ermit #2014.0311.0410 |  |
| [201403110410](https://www.permitgraph.org/p/201403110410) | Mar 11, 2014 | Completed: final sign-off Mar 2014 | [1571 Church St](https://www.permitgraph.org/a/6600/023) | replace siding at rear of building and paint aprox 500ft not visible from the street. | $9,000 |
| [201401136154](https://www.permitgraph.org/p/201401136154) | Jan 13, 2014 | Completed: final sign-off Dec 2016 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | (n) wood deck adjacent to driveway & kitchen, (n) ext stairs, (n) lower habitable space, structural work & seismic upgrades, (n) rear door @ lower level, (n) interior stairs @ lower level & upper lev… | $300,000 |
| [201311152011](https://www.permitgraph.org/p/201311152011) | Nov 15, 2013 | Never finaled: issued Nov 2013, no final | [2778 Green St](https://www.permitgraph.org/a/0950/016) | revision to pa# 201303293392. replace foundation at north end of bldg. add moment frame on 8.8 grid line with piers. | $3,000 |
| [201310300707](https://www.permitgraph.org/p/201310300707) | Oct 30, 2013 | Completed: final sign-off Feb 2014 | [2502 Broadway](https://www.permitgraph.org/a/0561/007) | legalize and remodel existing 1st floor bathroom, bedroom and closet. | $20,000 |
| [201309257720](https://www.permitgraph.org/p/201309257720) | Sep 25, 2013 | Never finaled: issued Aug 2015, no final | [2778 Green St](https://www.permitgraph.org/a/0950/016) | (e)2 dwelling units + 1 housekeeping unit: ref.pa#201608155005 -infill of 3 non-shared lightwells, 1 on west side & 2 on east. horiz. addition at 4/f & remodel. expanded b/f. sprinkler nfpa 13 throug… | $50,000 |
| [201308265265](https://www.permitgraph.org/p/201308265265) | Aug 26, 2013 | Completed: final sign-off Dec 2016 | [1177 Guerrero St](https://www.permitgraph.org/a/3645/016) | demo (e) shed @ rear yard & portions of perimeter fence. (n) conc. walls/fence with trellis, (n) exterior grill, (n) hot tub & (n) sink. | $15,000 |
| [201307303154](https://www.permitgraph.org/p/201307303154) | Jul 30, 2013 | Completed: final sign-off Sep 2013 | [154 Park St](https://www.permitgraph.org/a/5720/048) | replace foundation in utility room & add shear wall in garage, move toilet form utility room to water closet/bathroom, add new furnace in garage, add two new closets on ground floor. | $12,000 |
| [201307031134](https://www.permitgraph.org/p/201307031134) | Jul 3, 2013 | Completed: final sign-off Aug 2013 | [4069 19th St](https://www.permitgraph.org/a/3602/080) | remove extg steps/stairs and concrete footing. replace in kind. | $15,000 |
| [201306179716](https://www.permitgraph.org/p/201306179716) | Jun 17, 2013 | Completed: final sign-off Oct 2013 | [115 Elsie St](https://www.permitgraph.org/a/5619/062) | replace four vinyl windows in kind with four wood windows. | $1,500 |
| [201305298023](https://www.permitgraph.org/p/201305298023) | May 29, 2013 | Completed: final sign-off Oct 2013 | [115 Elsie St](https://www.permitgraph.org/a/5619/062) | structural change only. to roof framing. revised 1 3/4x9 1/4 lvl roof trusses to be 5 1/4x5 1/4 roof trusses in order to lower new roof by 4" as req. by planning. revision to permit app#201205029629 |  |
| [201305106645](https://www.permitgraph.org/p/201305106645) | May 10, 2013 | Completed: final sign-off Oct 2013 | [35 Prosper St](https://www.permitgraph.org/a/3564/034) | ground gloor apartment remodel. kitchen, bath, remodel. new bath. new foundation per plan. structural strengthening per plan. relocate rooms. | $90,000 |
| [201304235235](https://www.permitgraph.org/p/201304235235) | Apr 23, 2013 | Expired or cancelled: cancelled Jan 2026 | [1112 De Haro St](https://www.permitgraph.org/a/4159/021) | replace existing conc/stone perimeter wall w/new 8" conc wall along north approx 30' and east side approx 12'. revision to pa# 201107180425s1 | $15,000 |
| [201304164692](https://www.permitgraph.org/p/201304164692) | Apr 16, 2013 | Expired or cancelled: cancelled Jan 2026 | [1112 De Haro St](https://www.permitgraph.org/a/4159/021) | revision to appl #2011.07.18.0425 - replace exisitng concrete/stone wall with new 8" concrete wall along norht side approx 30' along east side approx 12'. | $15,000 |
| [201303293440](https://www.permitgraph.org/p/201303293440) | Mar 29, 2013 | Completed: final sign-off Mar 2015 | [131 Devonshire Wy](https://www.permitgraph.org/a/2676/020) | horizontal addition, 3 renovated bathroom (full), 1 renovated kitchen, 1 fire place retrofit. | $400,000 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.