Blue Mountain Construction Services Inc
- Based in
- Vacaville
- On San Francisco permits
- Jun 2012 to May 2022
- Last 24 months
- 0 permits filed
107 permits since 2000: 93 completed, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 8 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
24 deck permits: 23 completed, 1 never finaled. Typically 4 days from filing to permit and 536 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 2436 Jackson St | common area - remove/replace lower right side, lower rail, post w/base 2x6 fascia, ledger rak post 3/level rail post, structure, 4/level lower rail, 5/level deck boards sister cantilevered bridge, joist 2x12x16; in-kind rear of building. ref bpa#201701247763Details
common area - remove/replace lower right side, lower rail, post w/base 2x6 fascia, ledger rak post 3/level rail post, structure, 4/level lower rail, 5/level deck boards sister cantilevered bridge, joist 2x12x16; in-kind rear of building. ref bpa#201701247763 | $5,647 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 29 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind. 50% or less repair. | $22,508 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 37 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repairDetails
rear deck. replace and repair. all repairs in-kind. 50% or less repair | $22,508 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 121 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind. 50% or less repair. | $22,508 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 25 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or lessDetails
rear deck. replace and repair. all repairs in-kind. 50% or less | $22,508 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 133 Addison St | rear deck. replace and repair. all repairs in-kind as needed; 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind as needed; 50% or less repair. | $45,016 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 109 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind. 50% or less repair. | $67,524 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 141 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind. 50% or less repair. | $67,524 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 153 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repair.Details
rear deck. replace and repair. all repairs in-kind. 50% or less repair. | $45,016 |
| Aug 21, 2017 | Completed final sign-off Feb 2019 | 57 Addison St | rear deck. replace and repair. all repairs in-kind. 50% or less repairDetails
rear deck. replace and repair. all repairs in-kind. 50% or less repair | $22,508 |
| Aug 16, 2017 | Completed final sign-off Feb 2019 | 284 Moreland St | front deck replacement. wood rails. wood frame, decking, siding. trim w/paint touch up. all repairs in kindDetails
front deck replacement. wood rails. wood frame, decking, siding. trim w/paint touch up. all repairs in kind | $13,774 |
| Aug 16, 2017 | Completed final sign-off Feb 2019 | 153 Addison St | rear deck replacement wood rail wood frame, wood decking siding & trim w/paint touch up. all repairs will be in kindDetails
rear deck replacement wood rail wood frame, wood decking siding & trim w/paint touch up. all repairs will be in kind | $45,018 |
| Aug 16, 2017 | Completed final sign-off Feb 2019 | 2429 Diamond St | front deck replacement. wood rail, wood frame, deck, siding & trim w/paint touch up. all repairs in-kindDetails
front deck replacement. wood rail, wood frame, deck, siding & trim w/paint touch up. all repairs in-kind | $13,774 |
| Aug 16, 2017 | Completed final sign-off Feb 2018 | 33 Addison St | front bridge replacement. wood rails, wood framing, wood decking, wood siding, trim w/paint touch up . all repairs in-kindDetails
front bridge replacement. wood rails, wood framing, wood decking, wood siding, trim w/paint touch up . all repairs in-kind | $386,177 |
| Aug 16, 2017 | Completed final sign-off Feb 2019 | 2425 Diamond St | front deck replacement. wood rail, wood frame, decking, siding & trim w/paint touch up. all repairs in kindDetails
front deck replacement. wood rail, wood frame, decking, siding & trim w/paint touch up. all repairs in kind | $13,774 |
| Jun 7, 2017 | Completed final sign-off Feb 2019 | 286 Bemis St | remove and replace deck railing and boards in-kind. front only. 4 locations, less than 50%Details
remove and replace deck railing and boards in-kind. front only. 4 locations, less than 50% | $12,000 |
| Jun 7, 2017 | Completed final sign-off Feb 2019 | 211 Moreland St | remove & replace deck railing & boars in kind. 4 locations, less than 50%.Details
remove & replace deck railing & boars in kind. 4 locations, less than 50%. | $12,000 |
| Jun 7, 2017 | Completed final sign-off Sep 2017 | 341 Arbor St | remove & replace deck railing & boards in kind. front and rear, 8 locations, less than 50%.Details
remove & replace deck railing & boards in kind. front and rear, 8 locations, less than 50%. | $24,000 |
| Mar 14, 2017 | Completed final sign-off Sep 2017 | 164 Bemis St | remove and replace deck railis in-kind @ 16 locations at front of building.Details
remove and replace deck railis in-kind @ 16 locations at front of building. | $24,000 |
| Mar 14, 2017 | Completed final sign-off Feb 2018 | 250 Arbor St | remove and replace deck rails in kind at 4 locations, at fron of building.Details
remove and replace deck rails in kind at 4 locations, at fron of building. | $6,000 |
| Mar 14, 2017 | Completed final sign-off Sep 2017 | 300 Arbor St | remove amd replace deck rail in-kind @ 8 locations at front of building.Details
remove amd replace deck rail in-kind @ 8 locations at front of building. | $12,000 |
| Mar 14, 2017 | Completed final sign-off Sep 2017 | 130 Bemis St | remove and replace deck rail in-kind @ 8 locations at front of buildingDetails
remove and replace deck rail in-kind @ 8 locations at front of building | $12,000 |
| Jan 24, 2017 | Completed final sign-off Sep 2017 | 2436 Jackson St | back stairs, remove and replace 3 deck planks at 2nd and 3rd landing, 1 rx4 post, 2 planks top landing. tread at 6 locations at front stairs, remode and replace 5 planks and 2 treads. all in kind 25% of stairs common areaDetails
back stairs, remove and replace 3 deck planks at 2nd and 3rd landing, 1 rx4 post, 2 planks top landing. tread at 6 locations at front stairs, remode and replace 5 planks and 2 treads. all in kind 25% of stairs common area | $6,892 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 3311 Fillmore St | remove and replace shingle siding at rear, remove tile on common area deck, install new deck to wall flashing and door pan flashing. remove and reset 4 doors for flashing. install new traffic coating and new gutter and downspout at rear of building. repair in kind.Details
remove and replace shingle siding at rear, remove tile on common area deck, install new deck to wall flashing and door pan flashing. remove and reset 4 doors for flashing. install new traffic coating and new gutter and downspout at rear of building. repair in kind. | $10,642 |