# Best Forever Construction Company

Contractor license 959829. San Francisco building permit record since 2000.

- Page: https://www.permitgraph.org/contractor/best-forever-construction-company-959829
- JSON: https://www.permitgraph.org/api/contractor?license=959829
- State license record: https://www.cslb.ca.gov/onlineservices/checklicenseII/LicenseDetail.aspx?LicNum=959829

16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled. Typically 30 days from filing to permit and 206 days from permit to final inspection. Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.

- Based in: Dublin
- On San Francisco permits: Sep 2016 to Oct 2022
- Last 24 months: 0 permits filed

This is the city's permit record, not a license check. It does not show whether the state license is active, bonded or insured.

## Permits filed each year

| Year | Completed | In progress | Never finaled | Expired or cancelled |
| --- | --- | --- | --- | --- |
| 2016 | 2 | 0 | 0 | 0 |
| 2017 | 2 | 0 | 0 | 0 |
| 2018 | 3 | 0 | 1 | 0 |
| 2019 | 3 | 0 | 1 | 1 |
| 2020 | 2 | 0 | 0 | 0 |
| 2022 | 0 | 0 | 1 | 0 |

## By project type

| Project type | Permits | Completed | In progress | Never finaled | Expired or cancelled | Typical days to permit | Typical days to final |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Deck | 1 | 0 | 0 | 0 | 1 | 0 |  |
| Kitchen remodel | 5 | 3 | 0 | 1 | 1 | 7 | 292 |
| Bathroom remodel | 6 | 5 | 0 | 0 | 1 | 18 | 208 |

## Most recent permits

| Permit | Filed | Outcome | Address | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- |
| [202210255152](https://www.permitgraph.org/p/202210255152) | Oct 25, 2022 | Never finaled: issued Jan 2023, no final | [674 Sacramento St](https://www.permitgraph.org/a/0227/016) | upgrade (e) front door. construct ada toilet room & install automatic push button operator for front door. all work at g/f (674 sacramento st). | $22,000 |
| [202006249074](https://www.permitgraph.org/p/202006249074) | Jun 24, 2020 | Completed: final sign-off Jun 2021 | [265 Lee Av](https://www.permitgraph.org/a/6944/002) | unit 267 2nd flr: add 1 full bathroom, remodel (e) kitchen and bathroom, replace bathtub with shower. replace all windows. unit 265 1st flr: reconfiguration of existing unit from 1 bedroom, 1 full ba… | $110,000 |
| [202001131724](https://www.permitgraph.org/p/202001131724) | Jan 13, 2020 | Completed: final sign-off Jul 2020 | [132 Valmar Tr](https://www.permitgraph.org/a/5960/008) | exterior windows and door replacement front and rear elevation. all the windows including garage door and front entrance door, wood material. windows to be aluinum wood clad, same operation. | $14,000 |
| [201912099019](https://www.permitgraph.org/p/201912099019) | Dec 9, 2019 | Expired or cancelled: expired Jan 2025 | [132 Valmar Tr](https://www.permitgraph.org/a/5960/008) | to comply with complaint #201905058. interior finishing within building envelope. finish lighting, plbg, fixtures, trims, baseboard, switches, flooring, repainting. refinish backyard deck. fix concre… | $40,000 |
| [201909192150](https://www.permitgraph.org/p/201909192150) | Sep 19, 2019 | Completed: final sign-off Jun 2020 | [132 Valmar Tr](https://www.permitgraph.org/a/5960/008) | comply with nov 201966311 - exterior stucco and wood siding repair and repaint. | $3,000 |
| [201906274585](https://www.permitgraph.org/p/201906274585) | Jun 27, 2019 | Completed: final sign-off Jun 2020 | [1042 Divisadero St](https://www.permitgraph.org/a/1154/016) | remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as needed | $38,000 |
| [201906052581](https://www.permitgraph.org/p/201906052581) | Jun 5, 2019 | Completed: final sign-off May 2022 | [2481 Mission St](https://www.permitgraph.org/a/3610/020) | demo (e) millwork, walls and finishes. remove (e) equip & fixtures. new non struct partitions, new low wall, millwork, new equip, finishes | $80,000 |
| [201902082491](https://www.permitgraph.org/p/201902082491) | Feb 8, 2019 | Never finaled: issued Feb 2019, no final | [3251 20th Av](https://www.permitgraph.org/a/7295/038) | space 250j: revision to pa 201810233848. delete title 24 energy. all (e) lighting to remain. all (e) type 1 hood, kitchen grease exhaust fan to remain |  |
| [201811024862](https://www.permitgraph.org/p/201811024862) | Nov 2, 2018 | Completed: final sign-off Jan 2019 | [1730 Pacheco St](https://www.permitgraph.org/a/2113/027) | convert 1 full bathroom and 1/2 bathroom to 2 full bathrooms | $10,000 |
| [201810233848](https://www.permitgraph.org/p/201810233848) | Oct 23, 2018 | Completed: final sign-off Feb 2019 | [3251 20th Av](https://www.permitgraph.org/a/7295/038) | suite 250 j. demo (e) millwork, new low wall and millwork, new equipment and finishes | $70,000 |
| [201808248257](https://www.permitgraph.org/p/201808248257) | Aug 24, 2018 | Completed: final sign-off Sep 2019 | [332 Clement St](https://www.permitgraph.org/a/1429/023) | commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to… | $120,000 |
| [201807245452](https://www.permitgraph.org/p/201807245452) | Jul 24, 2018 | Never finaled: issued Jul 2018, no final | [332 Clement St](https://www.permitgraph.org/a/1429/023) | demo existing millwork. non-structural partitions | $3,000 |
| [201707252825](https://www.permitgraph.org/p/201707252825) | Jul 25, 2017 | Completed: final sign-off Mar 2018 | [265 Hester Av](https://www.permitgraph.org/a/5070/029) | 1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only. | $60,000 |
| [201702240030](https://www.permitgraph.org/p/201702240030) | Feb 24, 2017 | Completed: final sign-off Dec 2017 | [1522 19th Av](https://www.permitgraph.org/a/1864/001M) | remodel (e) kitchen, bathroom & add one new bathroom at 2nd floor. legalize two bedrooms, office, laundry & two full bathroom at ground floor. n/a maher ordinance | $72,000 |
| [201609097337](https://www.permitgraph.org/p/201609097337) | Sep 9, 2016 | Completed: final sign-off Feb 2017 | [1025 Market St](https://www.permitgraph.org/a/3703/088) | exterior lighting installation; 6 exterior lights on market street. 2 exterior lights on stevenson street. maher n/a | $10,000 |
| [201609076998](https://www.permitgraph.org/p/201609076998) | Sep 7, 2016 | Completed: final sign-off Apr 2017 | [1159 Hyde St](https://www.permitgraph.org/a/0249/002) | soft story retrofit, comply with sfbc chapter 34b, calculations based on iebc appendix a-4 | $45,555 |

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 23 November 2026.
This is the text of https://www.permitgraph.org/contractor/best-forever-construction-company-959829.
