Back to bathroom remodel contractors
Benjamin Shaw
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 73 completed, 2 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 31 completed, 1 in progress, 3 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2025 | In progress issued Aug 2025 | 666 Cayuga Av | 1/f - the project will condition an (e) 518 sq.ft storage area to a new bedroom, laundry area, and full bathroom. the (e) interior stairs will be relocated. 2 bathrooms and 3 closets on 2/f will be remodeled. one new door and one new window will replace 2 (e) windows at 1/f, rear of building.Details
1/f - the project will condition an (e) 518 sq.ft storage area to a new bedroom, laundry area, and full bathroom. the (e) interior stairs will be relocated. 2 bathrooms and 3 closets on 2/f will be remodeled. one new door and one new window will replace 2 (e) windows at 1/f, rear of building. | $85,000 |
| May 12, 2022 | Completed final sign-off Apr 2023 | 546 Arlington St | remodel of kitchen & bathroom on main lvl, relocating non-load-bearing bath wall to expand space into existing kitchen. no change in size to existing floor plan.Details
remodel of kitchen & bathroom on main lvl, relocating non-load-bearing bath wall to expand space into existing kitchen. no change in size to existing floor plan. | $65,000 |
| May 7, 2019 | Never finaled issued May 2019, no final | 412 Anderson St | remodel (e) 2nd flr bath and half bath to new master bath & full bathDetails
remodel (e) 2nd flr bath and half bath to new master bath & full bath | $25,000 |
| Feb 20, 2019 | Completed final sign-off Jul 2025 | 662 Cayuga Av | this project will condition (e) 538sf. first flr storage area to a new bedroom and full bathroom. (e) doors and windows will be replace on the rear of the bld. (e) stucco to be replaced on rear wallDetails
this project will condition (e) 538sf. first flr storage area to a new bedroom and full bathroom. (e) doors and windows will be replace on the rear of the bld. (e) stucco to be replaced on rear wall | $35,000 |
| Jan 9, 2019 | Completed final sign-off Jun 2019 | 388 Marietta Dr | kitchen and bath. remodel, adding 1 bedroom from (e) kitchen/sitting room spaceDetails
kitchen and bath. remodel, adding 1 bedroom from (e) kitchen/sitting room space | $75,000 |
| Apr 27, 2018 | Completed final sign-off Mar 2021 | 75 Valley St | partial demo and rebuild rear 12 ft of bldg to add ground fl living space & a 2nd story kitchen & exterior deck. ground unit interior demolish & rebuild unit, add additional bath. second fl unit: demolish and rebuild existing kitchenDetails
partial demo and rebuild rear 12 ft of bldg to add ground fl living space & a 2nd story kitchen & exterior deck. ground unit interior demolish & rebuild unit, add additional bath. second fl unit: demolish and rebuild existing kitchen | $150,000 |
| Dec 11, 2017 | Completed final sign-off Jun 2018 | 253 Eureka St | remodel of existing bathroom to enlarge showerDetails
remodel of existing bathroom to enlarge shower | $12,000 |
| Oct 5, 2017 | Completed final sign-off Oct 2018 | 27 Dorland St | addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion.Details
addition of conditioned space at first floor to include 2 bedrooms, playroom, laundry and a bathroom and (n) interior and exterior stairs. no building expansion. | $120,000 |
| Apr 21, 2017 | Completed final sign-off Sep 2017 | 172 Divisadero St | bath/bedroom remodel - no changes to layout, no new walls, no demo of wallsDetails
bath/bedroom remodel - no changes to layout, no new walls, no demo of walls | $25,000 |
| Jul 26, 2016 | Completed final sign-off Jun 2017 | 1425 20th St | demolition, renovation and (n) construction (at infill) to renovate and create additional living space on the 1st flr. add master bedroom, bedroom and full bath on 1st floor. (n) foundation and structural work will be provided to support the new layout. (n) walls, doors, windows, finishes. plumbingDetails
demolition, renovation and (n) construction (at infill) to renovate and create additional living space on the 1st flr. add master bedroom, bedroom and full bath on 1st floor. (n) foundation and structural work will be provided to support the new layout. (n) walls, doors, windows, finishes. plumbing | $175,000 |
| May 24, 2016 | Completed final sign-off Mar 2018 | 225 Valdez Av | new interior addition at lower level to include family room, bedrooms, laundry and bathroom. revise location of bedroom #2 entry door at entry levelDetails
new interior addition at lower level to include family room, bedrooms, laundry and bathroom. revise location of bedroom #2 entry door at entry level | $170,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 1393 Noe St | 1 bath remodel. no walls moved or built. all work is non-structural.Details
1 bath remodel. no walls moved or built. all work is non-structural. | $15,000 |
| Sep 11, 2015 | Completed final sign-off Oct 2016 | 40 San Felipe Av | upstairs-reconfigure bath into new compartmented bath. main level - remodel kitchen, new entry alcove, new staircase to basement, new powder rm, new master bath and bedroom closet. basement - lower level - move fau/wh. new bath and bedroom, new staircase to garage, new elect/light throughout house.Details
upstairs-reconfigure bath into new compartmented bath. main level - remodel kitchen, new entry alcove, new staircase to basement, new powder rm, new master bath and bedroom closet. basement - lower level - move fau/wh. new bath and bedroom, new staircase to garage, new elect/light throughout house. | $300,000 |
| Feb 9, 2015 | Completed final sign-off Apr 2015 | 1425 20th St | bath remodel. no walls moved - (e) exhaust fan duct to be re-used. new fixtures and tile work. no structural work.Details
bath remodel. no walls moved - (e) exhaust fan duct to be re-used. new fixtures and tile work. no structural work. | $25,000 |
| Oct 8, 2014 | Completed final sign-off Apr 2015 | 127 Topaz Wy | remodel of third floor master bath, relocate third floor master closet. new open railing on existing stair from second to third floor.Details
remodel of third floor master bath, relocate third floor master closet. new open railing on existing stair from second to third floor. | $25,000 |
| Jun 19, 2014 | Completed final sign-off Aug 2014 | 438 Colon Av | (1) master bath remodelDetails
(1) master bath remodel | $12,500 |
| Feb 20, 2014 | Completed final sign-off May 2014 | 27 Dorland St | kitchen and 1 bath remodel. same location. no new walls. new exhaust fan using e ductingDetails
kitchen and 1 bath remodel. same location. no new walls. new exhaust fan using e ducting | $25,000 |
| Feb 4, 2014 | Completed final sign-off May 2014 | 304 Eureka St | one master bath remodel, repl (e) toilet, vanity & shower at same locations, repl (e) exhaust fan, re-use ducting, repl window in shoer (no change in size, no change to ext, not prop line) new tile at floors and walllsDetails
one master bath remodel, repl (e) toilet, vanity & shower at same locations, repl (e) exhaust fan, re-use ducting, repl window in shoer (no change in size, no change to ext, not prop line) new tile at floors and wallls | $10,000 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 2225 15th St | dry rot repair at bath end. bath remodel - new fixtures/same .locations, new tile/new exhaust fan, same ducting as before. no change in door, wall and window.Details
dry rot repair at bath end. bath remodel - new fixtures/same .locations, new tile/new exhaust fan, same ducting as before. no change in door, wall and window. | $10,000 |
| Jun 26, 2013 | Completed final sign-off Sep 2013 | 2821 22nd St | bath remodel, new fixtures (tub, vanity, toilet) all in existing locations. add 1 new exhaust fan, replace 1 existing. new tile at shower & floor, no new walls, new lights shall be high efficacy or motion sensor.Details
bath remodel, new fixtures (tub, vanity, toilet) all in existing locations. add 1 new exhaust fan, replace 1 existing. new tile at shower & floor, no new walls, new lights shall be high efficacy or motion sensor. | $5,000 |
| May 24, 2013 | Completed final sign-off May 2014 | 662 Cayuga Av | bath remodel - relocate sink & toilet. remove (e) skylight. convert (e) shower stall into linen/ coat closet.Details
bath remodel - relocate sink & toilet. remove (e) skylight. convert (e) shower stall into linen/ coat closet. | $10,000 |
| Apr 8, 2013 | Completed final sign-off Jul 2013 | 304 Eureka St | bath remodel. relocate toilet, remove extg ceiling soffit, relocate laundry. install new tub, toilet, pedestal sink.Details
bath remodel. relocate toilet, remove extg ceiling soffit, relocate laundry. install new tub, toilet, pedestal sink. | $7,500 |
| Feb 6, 2013 | Completed final sign-off Aug 2013 | 62 Surrey St | conversion of existing basement to a new bedroom w/full bath, with the addition of an inernal stair to the existing 1st flDetails
conversion of existing basement to a new bedroom w/full bath, with the addition of an inernal stair to the existing 1st fl | $50,000 |
| Feb 5, 2013 | Completed final sign-off Apr 2013 | 3 Peralta Av | bath remodel, new fixtures & tile, same location, new replacement milgard window, no change to size. no walls moved. not visable from street.Details
bath remodel, new fixtures & tile, same location, new replacement milgard window, no change to size. no walls moved. not visable from street. | $5,000 |
| Mar 6, 2012 | Completed final sign-off Oct 2012 | 167 Skyview Wy | interior remodel of 1st floor. move extg bath and install new centrerline beamDetails
interior remodel of 1st floor. move extg bath and install new centrerline beam | $35,000 |
| Dec 16, 2011 | Completed final sign-off Apr 2012 | 3 Peralta Av | one kitchen and one bath remodel - new fixtures and appliances, (e) locations new cabinets. replace (e) plaster at exterior walls, insulate and 5/8" drywall. replace (e) furnace. replace (e) window sashes with marvin tilt-pac dbl. glazed. no walls removed or built.Details
one kitchen and one bath remodel - new fixtures and appliances, (e) locations new cabinets. replace (e) plaster at exterior walls, insulate and 5/8" drywall. replace (e) furnace. replace (e) window sashes with marvin tilt-pac dbl. glazed. no walls removed or built. | $45,000 |
| Nov 30, 2011 | Completed final sign-off Jan 2012 | 62 Surrey St | bathroom remodel: new tub, toilet, sink in (e) locations, new tile, no walls moved or built, new drywall & paint, new lighting fixtures.Details
bathroom remodel: new tub, toilet, sink in (e) locations, new tile, no walls moved or built, new drywall & paint, new lighting fixtures. | $5,000 |
| Sep 23, 2011 | Never finaled issued Sep 2011, no final | 114 28th St | bathroom remodel (no wall moved). replace tub, tile, toilet, misc trimk, floor tile. no structural work, no new lighting.Details
bathroom remodel (no wall moved). replace tub, tile, toilet, misc trimk, floor tile. no structural work, no new lighting. | $7,500 |
| Sep 20, 2006 | Completed final sign-off Dec 2006 | 3458 16th St | replace kitchen cabinets, fixtures appliances. replace bath vanity.no changes to partitions or windows.Details
replace kitchen cabinets, fixtures appliances. replace bath vanity.no changes to partitions or windows. | $7,000 |
| Apr 7, 2006 | Completed final sign-off Jul 2006 | 203 04th Av | refer to permit #200602225197. revision to permit/move bath vanity and build wh closet in kitchen.Details
refer to permit #200602225197. revision to permit/move bath vanity and build wh closet in kitchen. | |
| Jul 21, 2005 | Completed final sign-off Jan 2006 | 3936 20th St | kitchen & bathroom remodel, new windows. opening in wals. modify spiral stair.Details
kitchen & bathroom remodel, new windows. opening in wals. modify spiral stair. | $85,000 |
| Jul 24, 2002 | Completed final sign-off Mar 2003 | 16 St Josephs Av | kitchen & bath remodel, replace interior doors, window-3 front,3back.. new paint & hardwood.Details
kitchen & bath remodel, replace interior doors, window-3 front,3back.. new paint & hardwood. | $30,000 |
| Oct 24, 2001 | Completed final sign-off Dec 2001 | 351 Buena Vista East Av | remove (e) bathtub, replace w/walk-in shower (tiled walls & floor) all other bath fixtures to remainDetails
remove (e) bathtub, replace w/walk-in shower (tiled walls & floor) all other bath fixtures to remain | $2,500 |
| Mar 2, 2001 | Completed final sign-off Jun 2001 | 3655 21st St | add shower to (e) bath at 1st floor, add small closet to front hallDetails
add shower to (e) bath at 1st floor, add small closet to front hall | $7,500 |
| Apr 11, 2000 | Completed final sign-off Jul 2000 | 1782 Sanchez St | remodel (e) bathroom, replace (e) fixtures, new tile, tub, shower (all in existing location)Details
remodel (e) bathroom, replace (e) fixtures, new tile, tub, shower (all in existing location) | $15,000 |