Bc United Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Sep 2026
- Last 24 months
- 33 permits filed
121 permits since 2000: 89 completed, 21 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 in progress. Typically 69 days from filing to permit and 341 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 315 Capp St | rebuilt (e) front deck.Details
rebuilt (e) front deck. | $8,000 |
| Oct 31, 2024 | Completed final sign-off Apr 2026 | 1827 33rd Av | renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to groundDetails
renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to ground | $730,000 |
| Oct 26, 2021 | Completed final sign-off Oct 2022 | 1826 23rd Av | 1/f: add a bedroom, a abthroom, an office, wet bar & an entertainment/louge. 2/f: infill light wells at north & south side of bldg. reconfigure interior layout with two bedrooms, two bathrooms, one powder room, kitchen, dining, breakfast & living room. add deck at rear of bldg, add four skylights.Details
1/f: add a bedroom, a abthroom, an office, wet bar & an entertainment/louge. 2/f: infill light wells at north & south side of bldg. reconfigure interior layout with two bedrooms, two bathrooms, one powder room, kitchen, dining, breakfast & living room. add deck at rear of bldg, add four skylights. | $30,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2022 | 785 Oak St | basement: replace window at (e) bedroom. french door replacement at (e) bedroom. add door at (e) office. eliminate partial deck and stair at rear yard. add 6' privacy wood screen at (e) decking. 1st flr: remove closets t living room. relocate kitchen & dining room. elminate lenient closet @ bathroomDetails
basement: replace window at (e) bedroom. french door replacement at (e) bedroom. add door at (e) office. eliminate partial deck and stair at rear yard. add 6' privacy wood screen at (e) decking. 1st flr: remove closets t living room. relocate kitchen & dining room. elminate lenient closet @ bathroom | $50,000 |