Bbc Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jan 2002 to Sep 2026
- Last 24 months
- 8 permits filed
214 permits since 2000: 190 completed, 2 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
6 roof deck permits: 6 completed. Typically 28 days from filing to permit and 299 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2024 | Completed final sign-off Jul 2026 | 761 Kansas St | (n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeterDetails
(n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeter | $350,000 |
| Jul 25, 2022 | Completed final sign-off Sep 2023 | 761 Kansas St | new ships ladder and roof hatch to access roof & (e) penthouse.stucturual strentehing of roof framing for an anitcipated future roof deck between gridlines a8&f.(future roof deck omitted)partrial demo of (e) penthouse and rerouging of utilities as required to achive 3ft clearance width at ladder.Details
new ships ladder and roof hatch to access roof & (e) penthouse.stucturual strentehing of roof framing for an anitcipated future roof deck between gridlines a8&f.(future roof deck omitted)partrial demo of (e) penthouse and rerouging of utilities as required to achive 3ft clearance width at ladder. | $30,000 |
| Mar 8, 2021 | Completed final sign-off Mar 2025 | 2529 Union St | new ground level horizontal expansion (145 sf added), new 3rd story horizontal expansion of an existing penthouse (315 sf added), addition of a 3rd story roof deck (350 sf), demo of existing rear yard spiral stair and addition of new interior stair connecting 2nd and 3rd stories, demo of existing chDetails
new ground level horizontal expansion (145 sf added), new 3rd story horizontal expansion of an existing penthouse (315 sf added), addition of a 3rd story roof deck (350 sf), demo of existing rear yard spiral stair and addition of new interior stair connecting 2nd and 3rd stories, demo of existing ch | $500,000 |
| Sep 11, 2013 | Completed final sign-off Jan 2014 | 2021 Pacific Av | repair dryrot and waterproof membrane at garage roof deck and at entry stairs. replace wood steps with wood "in kind" to match existing steps. repair is less than 50%Details
repair dryrot and waterproof membrane at garage roof deck and at entry stairs. replace wood steps with wood "in kind" to match existing steps. repair is less than 50% | $15,000 |
| Jun 17, 2008 | Completed final sign-off Feb 2009 | 21 Presidio Tr | remove stucco repair with roof membrane. replace windows in kind, add rail at roof deck, remove skylight & replace windows with patio doors. new roof deck at rear.Details
remove stucco repair with roof membrane. replace windows in kind, add rail at roof deck, remove skylight & replace windows with patio doors. new roof deck at rear. | $50,000 |
| Sep 12, 2003 | Completed final sign-off Oct 2003 | 267 Topaz Wy | replace existing siding up to 4 ft roof deck wall over garage. install new membrane over extng. w/Details
replace existing siding up to 4 ft roof deck wall over garage. install new membrane over extng. w/ | $6,000 |